LARSEN & TOUBRO LIMITED

MANAMADURAI - TIRUCHULI - VIRUDHUNAGAR RC PROJECT


ACTION PLAN FOR COMPLETING BALANCE WORKS
As on : 17.04.13
Sl. No.

Description of work

Work
Group

Name of the S/c

Target
Completion

Site
Engineer

1
2
3
4
5

APK Station
Septic Tank Work
White washing of Toilet
Window fixing for Off duty room
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms

PF
PF
PF
PF
PF

Mintu pal
Ravi
Dept
Mintu pal
Dept

25.04.13
20.04.13
25.04.13
20.04.13
18.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

Duct slab finishing and pointing inside Station Building

PF

Mintu pal

30.04.13

Manikantan

7
8
9
10
11
12
13
14

Ticket counter window work at booking office


Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for waiting hall ramp & toilet ramp
Tap fixing for water cubicle
Tiles broken by local people to be replaced in water cubicle
Balance slab for cable duct in PF. No.2 to be casted and all slabs to be
pointed
Finishing of flooring in Equipment room
Finishing of steps in battery room
Painting of relay room and equipment room
Dressing of platform
Soil filling for ramp at VPT end

PF
PF
PF
PF
PF
PF
PF
PF

Dept
Dept
Mintu pal
Dept
Dept
Syed
Dept
Mintu pal

25.04.13
20.04.13
Completed
25.04.13
25.04.13
30.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

PF

Ghosh

20.04.13

Manikantan

PF
PF
PF
PF
PF

Mintu pal
Mintu pal
Ravi
Dept
Dept

20.04.13
20.04.13
20.04.13
30.04.13
15.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

15
16
17
18
19
20

Page 1 of 21

Remarks

Work in progress

PVC or rubber sheet to be


ordered
To be enquired
Awaiting approval

Before CRS
Before CRS

Work
Group

Name of the S/c

Target
Completion

Site
Engineer

1
2
3
4
5

NKK Station
Septic tank connection works
Plumbing works inside public toilet(Fitting & fixing)
Rain water down pipe from building top to be provided
Chamber towards VPT end of building for collecting rain water
Indian closet in off duty room toilet to be replaced

PF
PF
PF
PF
PF

Ghosh
Ghosh
Ghosh
Ghosh
Ghosh

30.04.13
18.04.13
25.04.13
25.04.13
20.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

New physically challenged toilet to be constructed

PF

7
8
9
10
11
12

Broken glass for windows to be replaced


Glass fixing for ventilator
Door for ticket store room
Finishing of slab broken for electrical works in booking office room
Plastering for CC Blocks steps infront of new station bulding
Flooring in rear side and VPT side of toilet

PF
PF
PF
PF
PF
PF

Ghosh
Ghosh
Ghosh
Ghosh
Ghosh

13

Pale fencing fixing surrounding toilet in ground floor

PF

Gopi

14
15
16
17
18
19
20

Roof shelter provision between new and old station building


Ticket counter window work at booking office
Tap fixing for water cubicle
Paving for water cubicle
Pointing of precast slab in PF. No.2 cable duct
Painting of relay room and equipment room
Finishing of flooring in rooms broken for S&T and electrical works

PF
PF
PF
PF
PF
PF
PF

Syed
Dept
Dept
Murugaya
M.Krisnan
Ravi
Ghosh

20.04.13
30.04.13
30.04.13
25.04.13
25.04.13
20.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

21

Pointing & finishing of precast slab for cable duct inside station building

PF

Murugaya

25.04.13

Manikantan

Sl. No.

Description of work

Page 2 of 21

Manikantan
20.04.13
20.04.14
25.04.13
30.04.13
25.04.13
30.04.13

Remarks

During CRS
New proposal given on
10.04.13

Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan

To be discussed with clients

During CRS
Item to be confirmed

Work
Group

Name of the S/c

Target
Completion

Site
Engineer

Building
Building
PF
Building
Building
Building
Building
Building
Building
Building
Building
Building
PF
PF

Mintu pal
Ravi
syed
Mintu pal
Mintu pal
Mintu pal
Dept
RAJA
Mintu pal
Mintu pal
Mintu pal
Syed
Mintu pal
Syed

20.04.13
22.04.13
18.04.13
20.04.13
20.04.13

Work in progress

20.04.13

Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan

Balance slab for cable duct in PF. No.2 to be cast and all slabs to be pointed

PF

Mintupal

22.04.13

Damodharan

WIP

Dressing of platform
Soil filling for ramp at VPT end

PF
PF

Mintupal
Mintupal

20.04.13
20.04.13

Damodharan
Damodharan

WIP

Pale fencing casting

PF

Gopi

20.04.13

Damodharan

Pale fencing erection

PF

Gopi

30.04.13

Damodharan

Sl. No.

Description of work
TIRUCHULI
Septic Tank Work
White washing of Toilet
Facia board fixing
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
Duct slab finishing and pointing inside Station Building
Ticket counter window work at booking office
Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for toilet ramp
Tap fixing for water cubicle
Facia board fixing

Page 3 of 21

30.04.13
19.04.13
18.04.13
20.04.13
20.04.13
22.04.13

Remarks

Before CRS

Before CRS

Post - 250/250;
Walling- 200/250
To commence by 15.04.13

LARSEN & TOUBRO LIMITED


TIRUCHULI - VIRUDHUNAGAR RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS

Name of the
S/c

As on : 17.04.13
Site
REMARKS
Engg.

Muthupandi

Alwin

PF no: 5 after wall


clearance by client side

Muthupandi

Alwin

PF no: 5 after wall


clearence by client side

Muthupandi
Muthupandi
Muthupandi
Muthupandi

Alwin
Alwin
Alwin
Alwin

Attending PF wall &


coping so as to be keep
distance of 1.67m to
1.68m from c/l of track
to face of coping and
.76m to .84m from top
of rail level to coping

Muthupandi

Alwin

Balance 40m alignment


detail to be given by
clients

Tiling work for the


proposed toilet @ vpt
and drainage
connection

Muthupandi

Alwin

Tiling work completed,


drainage connection not
in our scope
Since width of platform is
less on Tvnli end , we can
construct only 2nos
immediately balance will
be done after completing
FOB foundation works

SI
Description
No.
VIRUDHUNAGAR YARD
1

Qty

Start Date End Date

Fixing of coping slab for


PF no.: 2,3 & 5
Construction of PF wall
in the portion of exg.
Trolly path
PCC
CC wall
Carballing
Fixing

12.04.13

20.04.13

6.75
21.6
1.69
120

Water cubical &


benches

5 Nos.
Each

17.04.13

24.04.13

Mintupaul

Alwin

Pale fencing left out in


the proposed PF no:5

35 Mtr

18.04.13

23.04.13

Gopi

Alwin

20.04.13

Gopi

Alwin

23.04.13

25.04.13

Ravi

Alwin

18.04.13

19.04.13

Raja

Alwin

23.04.13
12.04.13

26.04.13
14.04.13

Mintupaul
Mintupaul

Alwin
Alwin

Colour washing of pale


fencing
Colour washing of toilet
8
building
Toilet building, pvc
9
door fixing
10 Roof tiles fixing
11 Water tap fixing
7

1 No

Page 4 of 21

Work in progress

Completed

SI
No.

Description

Qty

Name of the
S/c

Site
Engg.

18.04.13

Mintupaul

Alwin

Start Date End Date

REMARKS

Physically challenged
portion
Name board in the PF
13
no:5
Connection of leach pit
14
in lc gate

2 Nos.

18.04.13

25.04.13

Kuppan

Alwin

2 Nos.

23.04.13

24.04.13

Murugaiya

Alwin

Perali, Villipathiry

15 LC gate toilet room

2 Nos.

23.04.13

26.04.13

Department

Alwin

Nagampatti,
Thottiyankulam

4 Nos.

18.04.13

22.04.13

Murugaiya

Alwin

Leach Pit Completed

4 Nos.

23.04.13

03.05.13

Murugaiya

Alwin

2 Nos.

18.04.13

19.04.13

Gopi

Alwin

Irrunchirai , Narikudi
balance

2 Nos.
100cum 18.04.13
each

22.04.13

Dept

Alwin

Keelapasali,
Chinnakannanur.

23.04.13

Murugaiya

Alwin

Irrunchirai

12

Gate lodge building


Sanitary connection
1 and construction of
leach pit
Paving from gate lodge
2
to road
Colour washing of
3
fencing

Level crossing - filling


the surroundings with
Earth b/w pale fencing
and gate lodgee

New toilet room

1 No.

13.04.13

Page 5 of 21

Work in progress

LARSEN & TOUBRO LIMITED


MANAMADURAI - TIRUCHULI RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS - VENT WAY CLEARANCE
Date :

17.04.13

Sl. No.

Br. No.

Location

Span

Barrel length

Width

Depth

Total (Cum)

Completion date

199

55613-14

1 x2x 3 RCB

8.000

0.30

4.80

Completed

200

556/14-15

1x1.2x1.2 RCB

201

556/16-17

1x1.2x1.2 RCB

202

557/2-3

1x1.2x1.2 RCB

7.650

1.2

0.40

3.67

Completed

203

557/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

Completed

204

557/6-7

1x6x2.3 RCB

6.850

0.37

15.07

Completed

205

557/9-10

1x1.2x1.2 RCB

7.650

1.2

0.23

2.14

Completed

206

557/10-11

1x1.2x1.2 RCB

7.650

1.2

0.33

3.06

Completed

207

559/3-4

1x6x3.1 RCB

6.850

0.40

16.44

Completed

10

208

559/6-7

1x6x2.4 RCB

6.850

0.50

20.55

Completed

11

209

559/8-9

1x4x2.5 RCB

6.850

0.57

15.53

Completed

12

210

559/9-10

1x1.2x1.2 RCB

7.650

1.2

0.30

2.75

Completed

13

211

559/11-12

1x1.2x1.2 RCB

7.650

1.2

0.40

3.67

Completed

14

212

559/14-15

1x1.2x1.2 RCB

7.650

1.2

0.57

5.20

Completed

15

212A

559/16-17

1x1.2x1.2 RCB

7.650

1.2

0.10

0.92

Completed

16

213

559/16-560/1

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

Completed

17

214

560/4-5

1x1.2x1.2 RCB

10.710

1.2

0.53

6.85

Completed

18

215

560/5-6

1x1.2x1.2 RCB

9.180

1.2

0.40

4.41

Completed

19

216

560/10-11

1x1.2x1.2 RCB

7.650

1.2

0.53

4.90

17.04.13

20

217

561/1-2

1x4.5x3 RCB

6.850

4.5

0.77

23.63

18.04.13

21

218

561/3-4

6x12.2 PSC

22

219

561/5-6

23

220

561/11-12

1x1.2x1.2 RCB

9.180

1.2

0.47

5.14

20.04.13

24

221

562/1-2

1x4x2.4 RCB

6.850

0.47

12.79

21.04.13

25

222

562/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

22.04.13

26

223

562/6-7

1x1.2x1.2 RCB

7.650

1.2

0.27

2.45

22.04.13

27

224

562/8-9

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

23.04.13

Constructed in MNM-RMM GC Project

Major Bridge

16.04.13

Closed Bridge

Page 6 of 21

Sl. No.

Br. No.

Location

Span

Barrel length

Width

Depth

Total (Cum)

Completion date

28

225

563/7-8

1x6x2.2 RCB

6.850

0.50

20.55

Completed

29

226

563/8-9

1x6x3 RCB

6.850

0.67

27.40

Completed

30

227

563/10-11

1x4x3 RCB

6.850

0.50

13.70

Completed

31

228

564/1-2

2x4x1.7 RCB

7.000

0.50

14.00

Completed

32

229

564/15-565/1

1x1.2x1.2 RCB

7.650

1.2

0.60

5.51

25.04.13

33

230

565/7-8

1x4x1.6 RCB

6.85

0.53

14.61

25.04.13

34

231

565/8-9

1x4.5x1.8 RCB

6.850

4.5

0.60

18.50

25.04.13

35

232

565/9-10

1x1.2x1.2 RCB

7.650

1.2

0.27

2.45

25.04.13

36

233

565/13-14

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

25.04.13

37

234

566/1-2

1x1.2x1.2 RCB

7.650

1.2

0.47

4.28

27.04.13

38

235

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

27.04.13

39

236

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.60

5.51

27.04.13

40

237

567/4-5

1x4.5x1.8 RCB

6.850

4.5

0.47

14.39

27.04.13

41

238

568/1-2

1 x4x 2 RCB

6.850

0.40

10.96

27.04.13

42

239

568/2-3

1x4x2.3 RCB

6.850

0.50

13.70

27.04.13

43

240

568/7-8

4x12.2 PSC

44

241

568/8-9

1x4.5x2.6

6.850

4.57

0.27

8.35

30.04.13

45

242

569/3-4

1x1.2x1.2 RCB

9.180

1.2

0.50

5.51

30.04.13

46

243

569/5-6

1x1.2x1.2 RCB

10.710

1.2

0.20

2.57

30.04.13

47

244

569/6-7

1x1.2x1.2 RCB

10.710

1.2

0.27

3.43

30.04.13

48

245

569/7-8

1x2.5x2.6 RCB

6.850

2.5

0.33

5.71

30.04.13

49

246

569/8-9

1x4.5x4.4 RCB

6.850

4.5

0.40

12.33

02.05.13

50

247

569/14-15

1x1.2x1.2 RCB

9.180

1.2

0.27

2.94

02.05.13

51

248

570/14-15

1 x4x 1.9 RCB

6.850

0.20

5.48

02.05.13

52

249

572/3-4

1x1.2x1.2 RCB

7.650

1.2

0.17

1.53

02.05.13

53

250

572/13-14

1x 6x 3 RCB

6.850

0.10

4.11

02.05.13

54

251

572/14-15

1x6x5.3 RCB

6.850

0.37

15.07

05.05.13

55

252

573/3-5

9x12.2 PSC

56

252 A

573/5-6

57

253

573/8-9

Major Bridge

Completed

Major Bridge

20.04.13

Closed Bridge
1x1.2x1.2 RCB

10.710

Page 7 of 21

1.2

0.23

3.00

Completed

Sl. No.

Br. No.

Location

Span

Barrel length

Width

Depth

Total (Cum)

Completion date

58

254

573/9-10

1x1.2x1.2 RCB

9.180

1.2

0.10

1.10

Completed

59

255

573/11-12

1x1.2x1.2 RCB

7.650

1.2

0.17

1.53

Completed

60

256

573/14-15

1x1.2x1.2 RCB

7.650

1.2

0.17

1.53

Completed

61

257

574/2-3

1x1.2x1.2 RCB

7.650

1.2

0.38

3.52

03.05.13

62

258

574/4-5

1x1.2x1.2 RCB

7.650

1.2

0.20

1.84

03.05.13

63

259

574/5-6

1x6x2.3 RCB

6.850

0.27

10.96

10.05.13

64

260

574/12-13

1x1.2x1.2 RCB

7.650

1.2

0.27

2.45

03.05.13

65

261

575/5-6

1x4.5x3 RCB

6.850

4.5

0.53

16.44

12.05.13

66

262

575/15-576/1

1x1.2x1.2 RCB

7.650

1.2

0.27

2.45

13.05.13

67

263

575/15-576/1

68

264

576/7-8

1x1.2x1.2 RCB

32.130

1.2

0.20

7.71

13.05.13

69

265

576/10-11

1x2x2.3 RCB

32.325

0.17

10.78

15.05.13

70

266

577/6-7

1x4.5x3.4 RCB

6.850

4.5

0.17

5.14

13.05.13

71

267

577/9-10

1x1.2x1.2 RCB

10.710

1.2

0.33

4.28

13.05.13

72

268

577/12-13

1x1.2x1.2 RCB

9.180

1.2

0.23

2.57

13.05.13

73

269

577/12-13

1x2.5x2.8 RCB

6.850

2.5

0.30

5.14

15.05.13

74

270

577/14-15

2x4x2.1 RCB

6.850

0.17

4.57

15.05.13

75

271

577/16-578/1

1x2x1.2 RCB

6.850

0.50

6.85

Completed

76

272

579/7-8

1x3x1.2 RCB

6.850

0.40

8.22

Completed

77

273

580/3-4

1x4.5x1.4 RCB

6.850

4.5

0.37

11.30

17.05.13

78

274

580/13-14

1x1.2x1.2 RCB

7.650

1.2

0.20

1.84

17.05.13

79

275

581/2-3

1x1.2x1.2 RCB

7.650

1.2

0.43

3.98

17.05.13

80

276

581/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

4.59

17.05.13

81

277

581/7-8

1x1.2x1.2 RCB

7.650

1.2

0.43

3.98

17.05.13

82

278

581/13-14

1x1.2x1.2 RCB

7.650

1.2

0.47

4.28

17.05.13

83

279

581/15-582/1

1x4.5x1.6 RCB

6.850

4.5

0.37

11.30

17.05.13

84

280

582/8-9

1x1.2x1.2 RCB

7.650

1.2

0.43

3.98

17.05.13

85

281

582/10-11

1x1.2x1.2 RCB

7.650

1.2

0.40

3.67

17.05.13

86

282

583/11-12

87

283

583/12-13

Closed Bridge

Retained
1x1.2x1.2 RCB

9.180

Page 8 of 21

1.2

Completed
0.38

4.22

20.04.13

Sl. No.

Br. No.

Location

Span

Barrel length

Width

Depth

Total (Cum)

Completion date

88

284

583/12-13

1x1.2x1.2 RCB

9.180

1.2

0.47

5.14

Completed

89

285

583/14-15

1x1.2x1.2 RCB

10.710

1.2

0.50

6.43

Completed

90

286

584/1-2

1x1.2x1.2 RCB

10.710

1.2

0.37

4.71

Completed

91

287

584/4-5

1x6x2.3 RCB

13.760

0.24

19.81

Completed

92

288

584/7-8

5X12.2 PSC

93

288A

584/8-9

1x1.2x1.2 RCB

13.000

1.2

0.30

4.68

05.05.13

94

289

585/5-6

1x1.2x1.2 RCB

9.180

1.2

0.17

1.84

05.05.13

95

290

585/6-7

1x4.5x3.1 RCB

6.850

4.5

0.43

13.36

07.05.13

96

291

587/1-2

1x1.2x1.2 RCB

7.650

1.2

0.38

3.52

05.05.13

97

292

588/5-6

1x4.5x3.7 RCB

6.850

4.5

0.67

20.55

Completed

98

293

588/7-9

11 x12.2 PSC

Major Bridge

Completed

Major Bridge

Total ASSESSMENT QTY

Page 9 of 21

Completed

647.33

LARSEN & TOUBRO LIMITED


TIRUCHULI - VIRUDHUNAGAR RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS - WEARING COAT
Date :

17.04.13

Sl. No.

Br. No.

Location

Wearing Coat (Cum)

Completion date

294

589/11-12

9.00

20.04.13

296

590/14-15

33.00

27.04.13

299

591/10-11

3.00

28.04.13

300

591/12-13

1.38

29.04.13

302

592/15-593/1

4.50

30.04.13

308

595/3-4

3.60

2/05,13

313

595/12-13

11.00

03.05.13

329

608/9-10

5.00

04.05.13

330

609/5-6

4.50

06.05.13

10

331

611/12-13

5.00

07.05.13

11

333

612/9-10

12.30

10.05.13

12

338A

613/14-15

6.10

11.05.13

13

340

613/15-614/1

5.00

12.05.13

14

348

618/12-13

12.00

13.05.13

115.38

Page 10 of 21

LARSEN & TOUBRO LIMITED


TIRUCHULI - VIRUDHUNAGAR RC PROJECT
ACTION PLAN FOR COMPLETING BALANCE WORKS - WEARING COAT
Date :

17.04.13

Sl. No.

Br. No.

Location

Wearing Coat (Cum)

Completion date

202

557/2-3

1.38

23.04.13

203

557/5-6

1.38

24.04.13

205

557/9-10

1.38

25.04.13

206

557/10-11

1.38

26.04.13

210

559/9-10

1.08

27.04.13

230

565/7-8

6.17

30.04.13

249

572/3-4

1.38

05.05.13

270

577/14-15

8.22

15.05.13

22.35

REACH-I

MANAMADURAI-THIRUCHCHULI VENT WAY DETAILS

Sl. No.

BR.No

LOCATION

PROPOSED SPAN

BARREL

WRIDTH

DEPTH

199

55613-14

1 x2x 3 RCB

8.000

0.30

200

556/14-15

1x1.2x1.2 RCB

201

556/16-17

1x1.2x1.2 RCB

202

557/2-3

1x1.2x1.2 RCB

7.650

1.2

0.40

203

557/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

204

557/6-7

1x6x2.3 RCB

6.850

0.37

205

557/9-10

1x1.2x1.2 RCB

7.650

1.2

0.23

206

557/10-11

1x1.2x1.2 RCB

7.650

1.2

0.33

207

559/3-4

1x6x3.1 RCB

6.850

0.40

10

208

559/6-7

1x6x2.4 RCB

6.850

0.50

11

209

559/8-9

1x4x2.5 RCB

6.850

0.57

12

210

559/9-10

1x1.2x1.2 RCB

7.650

1.2

0.30

13

211

559/11-12

1x1.2x1.2 RCB

7.650

1.2

0.40

14

212

559/14-15

1x1.2x1.2 RCB

7.650

1.2

0.57

15

212A

559/16-17

1x1.2x1.2 RCB

7.650

1.2

0.10

16

213

559/16-560/1

1x1.2x1.2 RCB

7.650

1.2

0.50

17

214

560/4-5

1x1.2x1.2 RCB

10.710

1.2

0.53

18

215

560/5-6

1x1.2x1.2 RCB

9.180

1.2

0.40

19

216

560/10-11

1x1.2x1.2 RCB

7.650

1.2

0.53

20

217

561/1-2

1x4.5x3 RCB

6.850

4.5

0.50

21

218

561/3-4

6x12.2 PSC

22

219

561/5-6

23

220

561/11-12

Constructed in MNM

Major Bridge
Closed Bridge

1x1.2x1.2 RCB

9.180

1.2

0.47

24

221

562/1-2

1x4x2.4 RCB

6.850

0.47

25

222

562/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

26

223

562/6-7

1x1.2x1.2 RCB

7.650

1.2

0.27

27

224

562/8-9

1x1.2x1.2 RCB

7.650

1.2

0.50

28

225

563/7-8

1x6x2.2 RCB

6.850

0.50

29

226

563/8-9

1x6x3 RCB

6.850

0.67

30

227

563/10-11

1x4x3 RCB

6.850

0.50

31

228

564/1-2

2x4x1.7 RCB

7.000

0.50

32

229

564/15-565/1

1x1.2x1.2 RCB

7.650

1.2

0.60

33

230

565/7-8

1x4x1.6 RCB

6.85

0.53

34

231

565/8-9

1x4.5x1.8 RCB

6.850

4.5

0.60

35

232

565/9-10

1x1.2x1.2 RCB

7.650

1.2

0.27

36

233

565/13-14

1x1.2x1.2 RCB

7.650

1.2

0.50

37

234

566/1-2

1x1.2x1.2 RCB

7.650

1.2

0.47

38

235

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.50

39

236

566/3-4

1x1.2x1.2 RCB

7.650

1.2

0.60

40

237

567/4-5

1x4.5x1.8 RCB

6.850

4.5

0.47

41

238

568/1-2

1 x4x 2 RCB

6.850

0.40

42

239

568/2-3

1x4x2.3 RCB

6.850

0.50

43

240

568/7-8

4x12.2 PSC

44

241

568/8-9

1x4.5x2.6

6.850

4.57

0.27

45

242

569/3-4

1x1.2x1.2 RCB

9.180

1.2

0.50

46

243

569/5-6

1x1.2x1.2 RCB

10.710

1.2

0.20

47

244

569/6-7

1x1.2x1.2 RCB

10.710

1.2

0.27

48

245

569/7-8

1x2.5x2.6 RCB

6.850

2.5

0.33

49

246

569/8-9

1x4.5x4.4 RCB

6.850

4.5

0.40

50

247

569/14-15

1x1.2x1.2 RCB

9.180

1.2

0.27

51

248

570/14-15

1 x4x 1.9 RCB

6.850

0.20

Major Bridge

52

249

572/3-4

1x1.2x1.2 RCB

7.650

1.2

0.17

53

250

572/13-14

1x 6x 3 RCB

6.850

0.10

54

251

572/14-15

1x6x5.3 RCB

6.850

0.37

55

252

573/3-5

9x12.2 PSC

56

252 A

573/5-6

57

253

573/8-9

1x1.2x1.2 RCB

10.710

1.2

0.23

58

254

573/9-10

1x1.2x1.2 RCB

9.180

1.2

0.10

59

255

573/11-12

1x1.2x1.2 RCB

7.650

1.2

0.17

60

256

573/14-15

1x1.2x1.2 RCB

7.650

1.2

0.17

61

257

574/2-3

1x1.2x1.2 RCB

7.650

1.2

0.38

62

258

574/4-5

1x1.2x1.2 RCB

7.650

1.2

0.20

63

259

574/5-6

1x6x2.3 RCB

6.850

0.27

64

260

574/12-13

1x1.2x1.2 RCB

7.650

1.2

0.27

65

261

575/5-6

1x4.5x3 RCB

6.850

4.5

0.53

66

262

575/15-576/1

1x1.2x1.2 RCB

7.650

1.2

0.27

67

263

575/15-576/1

68

264

576/7-8

1x1.2x1.2 RCB

32.130

1.2

0.20

69

265

576/10-11

1x2x2.3 RCB

32.325

0.17

70

266

577/6-7

1x4.5x3.4 RCB

6.850

4.5

0.17

71

267

577/9-10

1x1.2x1.2 RCB

10.710

1.2

0.33

72

268

577/12-13

1x1.2x1.2 RCB

9.180

1.2

0.23

73

269

577/12-13

1x2.5x2.8 RCB

6.850

2.5

0.30

74

270

577/14-15

2x4x2.1 RCB

6.850

0.17

75

271

577/16-578/1

1x2x1.2 RCB

6.850

0.50

76

272

579/7-8

1x3x1.2 RCB

6.850

0.40

77

273

580/3-4

1x4.5x1.4 RCB

6.850

4.5

0.37

78

274

580/13-14

1x1.2x1.2 RCB

7.650

1.2

0.20

79

275

581/2-3

1x1.2x1.2 RCB

7.650

1.2

0.43

Major Bridge
Closed Bridge

Closed Bridge

80

276

581/5-6

1x1.2x1.2 RCB

7.650

1.2

0.50

81

277

581/7-8

1x1.2x1.2 RCB

7.650

1.2

0.43

82

278

581/13-14

1x1.2x1.2 RCB

7.650

1.2

0.47

83

279

581/15-582/1

1x4.5x1.6 RCB

6.850

4.5

0.37

84

280

582/8-9

1x1.2x1.2 RCB

7.650

1.2

0.43

85

281

582/10-11

1x1.2x1.2 RCB

7.650

1.2

0.40

86

282

583/11-12

87

283

583/12-13

1x1.2x1.2 RCB

9.180

1.2

0.38

88

284

583/12-13

1x1.2x1.2 RCB

9.180

1.2

0.47

89

285

583/14-15

1x1.2x1.2 RCB

10.710

1.2

0.50

90

286

584/1-2

1x1.2x1.2 RCB

10.710

1.2

0.37

91

287

584/4-5

1x6x2.3 RCB

13.760

0.24

92

288

584/7-8

5X12.2 PSC

93

288A

584/8-9

1x1.2x1.2 RCB

13.000

1.2

0.30

94

289

585/5-6

1x1.2x1.2 RCB

9.180

1.2

0.17

95

290

585/6-7

1x4.5x3.1 RCB

6.850

4.5

0.43

96

291

587/1-2

1x1.2x1.2 RCB

7.650

1.2

0.38

97

292

588/5-6

1x4.5x3.7 RCB

6.850

4.5

0.67

98

293

588/7-9

11 x12.2 PSC

Retained

Major Bridge

Major Bridge

Total

LI VENT WAY DETAILS

CUM

Date-17-04-13
Inside vent way

Outside vent way

cleaning

Cleaning

Status

Date of
completion

4.80

Required
Labours

Completed

JCB hours
required

Date of
completion

Completed

Constructed in MNM-RMM GC Project

3.67

Completed

Completed

4.59

Completed

Completed

15.07

Completed

Completed

2.14

Completed

Completed

3.06

Completed

Completed

16.44

Completed

20.55

Completed

15.53

Completed

2.75

Completed

3.67

Completed

5.20

Completed

0.92

Completed

4.59

Completed

6.85

Completed

4.41

Completed

4.90

21.04.13

15.41

21.04.13

11

Completed
Closed Bridge
5.14

21.04.13

Pitching
work was
executed by
other
agency

12.79

20.04.13

4.59

20.04.13

2.45

19.04.13

4.59

19.04.13

20.55

Completed

27.40

Completed

7.5

13.70

Completed

14.00

Completed

5.51

29.04.13

14.61

29.04.13

10

18.50

30.04.13

13

2.45

30.04.13

4.59

01.05.13

4.28

01.05.13

4.59

02.05.13

5.51

02.05.13

14.39

03.05.13

10

6.5

10.96

03.05.13

5.5

13.70

04.05.13

10

5.5

Pitching
work was
executed by
other
agency

04.05.13

Completed
8.35

05.05.13

5.51

05.05.13

2.57

06.05.13

3.43

06.05.13

5.71

07.05.13

12.33

07.05.13

2.94

08.05.13

5.48

08.05.13

Pitching
work was
executed by
other
agency

1.53

09.05.13

09.05.13

4.11

09.05.13

09.05.13

15.07

10.05.13

11

10.05.13

Completed
Closed Bridge
3.00

Completed

1.10

Completed

1.53

Completed

1.53

Completed

3.52

Completed

1.84

Completed

10.96

Completed

2.45

11.05.13

11.05.13

16.44

11.05.13

12

11.05.13

2.45

12.05.13

12.05.13

7.71

12.05.13

6.5

12.05.13

10.78

12.05.13

12.05.13

5.14

13.05.13

13.05.13

4.28

13.05.13

13.05.13

2.57

13.05.13

13.05.13

5.14

14.05.13

14.05.13

4.57

14.05.13

14.05.13

Closed Bridge

6.85

Completed

8.22

Completed

11.30

15.03.13

15.03.13

1.84

16.05.13

16.05.13

3.98

16.05.13

16.05.13

4.59

16.05.13

16.05.13

3.98

17.05.13

17.05.13

4.28

17.05.13

17.05.13

11.30

18.05.13

18.05.13

3.98

19.05.13

19.05.13

3.67

19.05.13

19.05.13

19.05.13

Completed
4.22

19.05.13

5.14

Completed

6.43

Completed

4.71

Completed

19.81

Completed
Completed

4.68

20.05.13

20.05.13

1.84

20.05.13

20.05.13

Completed

13.36
3.52
20.55

20.05.13

20.05.13

Completed
Completed

634.31

244

416.5

REACH - II ( THIRUCHULI - VIRUDHNAGAR )


MINOR BRIDGES DETAILS
AS ON : 17.04.13
Inside vent way

SI. NO

BR. NO

Location

PROPOSED
SPAN

293 A, RUB

589/3-4

294

589/11-12

1X2.0X1.2

296

590/14-15

2X6.0X2.3

297

590/14-15

1X1.2X1.2

298

591/5-6

1X1.2X1.2

299

591/10-11

1X6.0X2.3

300

591/12-13

1X1.2X1.2

301

592/2-3

1X4.0X1.8

302

592/15-593/1

10

303

593/7-8

1X4.5X3.4

11

304

594/2-3

1X1.2X1.2

12

305

15-595/1

1X1.2X1.2

13

306

595/1-2

1X1.2X1.2

14

307

595/2-3

1X1.2X1.2

15

308

595/3-4

1X1.2X1.2

16

309

595/5-6

1X1.2X1.2

17

310

595/8-9

1X1.2X1.2

18

311

595/11-12

1X1.2X1.2

19

312

595/12-13

1X1.2X1.2

20

313

21

314

22

315

596/9-10

23

316

597/1-2

1X1.2X1.2

24

317

597/4-5

1X1.2X1.2

25

318

597/6-7

1X1.2X1.2

26

319

598/6-7

1X1.2X1.2

27

320

598/14-15

1X2.5X2.0

28

321

599/7-8

1X1.2X1.2

29

322

600/13-14

1X1.2X1.2

30

324

600/15-16

1X4.0X3.0

31

325

602/14-15

1X4.0X3.0

32

326

604/5-6

1X4.5X2.5

33

327

605/2-3

1X4.5X1.6

34

328

608/1-2

1X1.2X1.2

35

329

608/9-10

1X2.0X2.0

36

330

609/5-6

1X1.2X1.2

37

331

611/12-13

1X1.2X1.2

38

333

612/9-10

2X6.0X3.5

2X4.0X3.3

BARREL

WRIDTH

DEPTH

CUM

cleaning
Date of
completion

Cleaning
JCB hours
Date of
required completion

0.45

27.00

18.350

12.000

0.300

66.06

26.04.13

7.680

1.200

0.20

1.84

27.04.13

9.180

1.200

0.150

1.65

27.04.13

6.850

6.000

0.200

8.22

28.04.13

7.650

1.200

0.300

2.75

28.04.13

6.850

4.000

0.250

6.85

29.04.13

15.000

2.000

0.300

9.00

30.04.13

6.850

4.500

0.300

9.25

02.05.13

9.180

1.200

0.100

1.10

02.05.13

12.240

1.200

0.200

2.94

03.05.13

9.180

1.200

0.300

3.30

03.05.13

6.850

1.200

0.00

Completed

20.000

1.200

0.300

7.20

04.05.13

12.240

1.200

0.300

4.41

04.05.13

20.000

1.200

0.100

2.40

05.05.13

10.710

1.200

0.300

3.86

05.05.13

9.180

1.200

0.300

3.30

06.05.13

6.850

4.000

0.00

Completed

16.000

2.000

0.350

11.20

07.05.13

16.000

2.000

0.350

11.20

07.05.13

12.240

1.200

0.350

5.14

08.05.13

12.240

1.200

0.500

7.34

08.05.13

12.240

1.200

0.500

7.34

09.05.13

9.180

1.200

0.300

3.30

09.05.13

6.850

2.500

0.250

4.28

10.05.13

7.650

1.200

0.300

2.75

10.05.13

21.420

1.200

0.350

9.00

11.05.13

6.850

4.000

0.800

21.92

12.05.13

6.850

4.000

0.200

5.48

12.05.13

6.850

4.500

0.850

26.20

13.05.13

6.850

4.500

0.850

26.20

13.05.13

7.650

1.200

0.250

2.30

14.05.13

19.000

2.000

0.250

9.50

19.000

1.200

0.250

5.70

19.000

1.200

0.250

5.70

15.05.13

0.00

Completed

Pitching work
was
executed by
other agency

completed

22.04.13

30

6.850

completed

Required
Labours

Outside vent way

14.05.13
15.05.13

SI. NO

BR. NO

Location

PROPOSED
SPAN

39

334

612/13-14

1X1.2X1.2

40

335

613/6-7

1X2.0X1.75

41

336

613/7-8

1X1.2X1.2

42

337

613/10-11

1X1.2X1.2

43

338

613/13-14

1X1.2X1.2

44

339

613/14-15

1X6.0X2.7

45

340

46

341

47

342

48

343

617/5-6

1X1.2X1.2

49

344

618/7-8

1X4.0X1.5

50

345

618/8-9

1X4.0X1.5

51

346

618/10-11

1X1.2X1.2

52

347

618/12-13

1X1.2X1.2

53

348

613/15-614/1 1X1.2X1.2
614/8-9

1X2.0X1.5

615/15-616/1 1X4.0X1.3

2X4.0X2.5

BARREL

WRIDTH

DEPTH

CUM

Pitching work
was
executed by
Inside
vent way
other agency
cleaning
Date of
completion

Required
Labours

Outside vent way


Cleaning
JCB hours
Date of
required completion

7.650

1.200

0.300

2.75

16.05.13

18.000

2.000

0.300

10.80

16.05.13

7.650

1.200

0.350

0.30

17.05.13

7.650

1.200

0.300

2.75

17.05.13

7.650

1.200

0.250

2.30

17.05.13

6.850

6.000

0.00

Completed

19.000

1.200

0.450

10.26

18.05.13

19.000

2.000

0.450

17.10

18.05.13
Pitching work
was
executed by
other agency

6.850

4.000

1.000

27.40

19.05.13

6.850

1.200

0.300

2.47

6.850

4.000

1.000

27.40

20.05.13

10.000

4.000

1.000

40.00

21.05.13

10.000

1.200

1.000

12.00

22.05.13

10.000

1.200

0.100

1.20

22.05.13

9.000

4.000

1.000

36.00
518.43

24.05.13

19.05.13