Professional Documents
Culture Documents
Description of work
Work
Group
Target
Completion
Site
Engineer
1
2
3
4
5
APK Station
Septic Tank Work
White washing of Toilet
Window fixing for Off duty room
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
PF
PF
PF
PF
PF
Mintu pal
Ravi
Dept
Mintu pal
Dept
25.04.13
20.04.13
25.04.13
20.04.13
18.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
Mintu pal
30.04.13
Manikantan
7
8
9
10
11
12
13
14
PF
PF
PF
PF
PF
PF
PF
PF
Dept
Dept
Mintu pal
Dept
Dept
Syed
Dept
Mintu pal
25.04.13
20.04.13
Completed
25.04.13
25.04.13
30.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
Ghosh
20.04.13
Manikantan
PF
PF
PF
PF
PF
Mintu pal
Mintu pal
Ravi
Dept
Dept
20.04.13
20.04.13
20.04.13
30.04.13
15.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
15
16
17
18
19
20
Page 1 of 21
Remarks
Work in progress
Before CRS
Before CRS
Work
Group
Target
Completion
Site
Engineer
1
2
3
4
5
NKK Station
Septic tank connection works
Plumbing works inside public toilet(Fitting & fixing)
Rain water down pipe from building top to be provided
Chamber towards VPT end of building for collecting rain water
Indian closet in off duty room toilet to be replaced
PF
PF
PF
PF
PF
Ghosh
Ghosh
Ghosh
Ghosh
Ghosh
30.04.13
18.04.13
25.04.13
25.04.13
20.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
PF
7
8
9
10
11
12
PF
PF
PF
PF
PF
PF
Ghosh
Ghosh
Ghosh
Ghosh
Ghosh
13
PF
Gopi
14
15
16
17
18
19
20
PF
PF
PF
PF
PF
PF
PF
Syed
Dept
Dept
Murugaya
M.Krisnan
Ravi
Ghosh
20.04.13
30.04.13
30.04.13
25.04.13
25.04.13
20.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
21
Pointing & finishing of precast slab for cable duct inside station building
PF
Murugaya
25.04.13
Manikantan
Sl. No.
Description of work
Page 2 of 21
Manikantan
20.04.13
20.04.14
25.04.13
30.04.13
25.04.13
30.04.13
Remarks
During CRS
New proposal given on
10.04.13
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
Manikantan
During CRS
Item to be confirmed
Work
Group
Target
Completion
Site
Engineer
Building
Building
PF
Building
Building
Building
Building
Building
Building
Building
Building
Building
PF
PF
Mintu pal
Ravi
syed
Mintu pal
Mintu pal
Mintu pal
Dept
RAJA
Mintu pal
Mintu pal
Mintu pal
Syed
Mintu pal
Syed
20.04.13
22.04.13
18.04.13
20.04.13
20.04.13
Work in progress
20.04.13
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Damodharan
Balance slab for cable duct in PF. No.2 to be cast and all slabs to be pointed
PF
Mintupal
22.04.13
Damodharan
WIP
Dressing of platform
Soil filling for ramp at VPT end
PF
PF
Mintupal
Mintupal
20.04.13
20.04.13
Damodharan
Damodharan
WIP
PF
Gopi
20.04.13
Damodharan
PF
Gopi
30.04.13
Damodharan
Sl. No.
Description of work
TIRUCHULI
Septic Tank Work
White washing of Toilet
Facia board fixing
Tap fixing for toilet , inside toilet of station Building
Patch Tiles work for all rooms
Duct slab finishing and pointing inside Station Building
Ticket counter window work at booking office
Door for public toilet
Roof tiles for public toilet
Broken glass refixing for windows
Glass fixing for ventilator
Hand rails for toilet ramp
Tap fixing for water cubicle
Facia board fixing
Page 3 of 21
30.04.13
19.04.13
18.04.13
20.04.13
20.04.13
22.04.13
Remarks
Before CRS
Before CRS
Post - 250/250;
Walling- 200/250
To commence by 15.04.13
Name of the
S/c
As on : 17.04.13
Site
REMARKS
Engg.
Muthupandi
Alwin
Muthupandi
Alwin
Muthupandi
Muthupandi
Muthupandi
Muthupandi
Alwin
Alwin
Alwin
Alwin
Muthupandi
Alwin
Muthupandi
Alwin
SI
Description
No.
VIRUDHUNAGAR YARD
1
Qty
12.04.13
20.04.13
6.75
21.6
1.69
120
5 Nos.
Each
17.04.13
24.04.13
Mintupaul
Alwin
35 Mtr
18.04.13
23.04.13
Gopi
Alwin
20.04.13
Gopi
Alwin
23.04.13
25.04.13
Ravi
Alwin
18.04.13
19.04.13
Raja
Alwin
23.04.13
12.04.13
26.04.13
14.04.13
Mintupaul
Mintupaul
Alwin
Alwin
1 No
Page 4 of 21
Work in progress
Completed
SI
No.
Description
Qty
Name of the
S/c
Site
Engg.
18.04.13
Mintupaul
Alwin
REMARKS
Physically challenged
portion
Name board in the PF
13
no:5
Connection of leach pit
14
in lc gate
2 Nos.
18.04.13
25.04.13
Kuppan
Alwin
2 Nos.
23.04.13
24.04.13
Murugaiya
Alwin
Perali, Villipathiry
2 Nos.
23.04.13
26.04.13
Department
Alwin
Nagampatti,
Thottiyankulam
4 Nos.
18.04.13
22.04.13
Murugaiya
Alwin
4 Nos.
23.04.13
03.05.13
Murugaiya
Alwin
2 Nos.
18.04.13
19.04.13
Gopi
Alwin
Irrunchirai , Narikudi
balance
2 Nos.
100cum 18.04.13
each
22.04.13
Dept
Alwin
Keelapasali,
Chinnakannanur.
23.04.13
Murugaiya
Alwin
Irrunchirai
12
1 No.
13.04.13
Page 5 of 21
Work in progress
17.04.13
Sl. No.
Br. No.
Location
Span
Barrel length
Width
Depth
Total (Cum)
Completion date
199
55613-14
1 x2x 3 RCB
8.000
0.30
4.80
Completed
200
556/14-15
1x1.2x1.2 RCB
201
556/16-17
1x1.2x1.2 RCB
202
557/2-3
1x1.2x1.2 RCB
7.650
1.2
0.40
3.67
Completed
203
557/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
Completed
204
557/6-7
1x6x2.3 RCB
6.850
0.37
15.07
Completed
205
557/9-10
1x1.2x1.2 RCB
7.650
1.2
0.23
2.14
Completed
206
557/10-11
1x1.2x1.2 RCB
7.650
1.2
0.33
3.06
Completed
207
559/3-4
1x6x3.1 RCB
6.850
0.40
16.44
Completed
10
208
559/6-7
1x6x2.4 RCB
6.850
0.50
20.55
Completed
11
209
559/8-9
1x4x2.5 RCB
6.850
0.57
15.53
Completed
12
210
559/9-10
1x1.2x1.2 RCB
7.650
1.2
0.30
2.75
Completed
13
211
559/11-12
1x1.2x1.2 RCB
7.650
1.2
0.40
3.67
Completed
14
212
559/14-15
1x1.2x1.2 RCB
7.650
1.2
0.57
5.20
Completed
15
212A
559/16-17
1x1.2x1.2 RCB
7.650
1.2
0.10
0.92
Completed
16
213
559/16-560/1
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
Completed
17
214
560/4-5
1x1.2x1.2 RCB
10.710
1.2
0.53
6.85
Completed
18
215
560/5-6
1x1.2x1.2 RCB
9.180
1.2
0.40
4.41
Completed
19
216
560/10-11
1x1.2x1.2 RCB
7.650
1.2
0.53
4.90
17.04.13
20
217
561/1-2
1x4.5x3 RCB
6.850
4.5
0.77
23.63
18.04.13
21
218
561/3-4
6x12.2 PSC
22
219
561/5-6
23
220
561/11-12
1x1.2x1.2 RCB
9.180
1.2
0.47
5.14
20.04.13
24
221
562/1-2
1x4x2.4 RCB
6.850
0.47
12.79
21.04.13
25
222
562/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
22.04.13
26
223
562/6-7
1x1.2x1.2 RCB
7.650
1.2
0.27
2.45
22.04.13
27
224
562/8-9
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
23.04.13
Major Bridge
16.04.13
Closed Bridge
Page 6 of 21
Sl. No.
Br. No.
Location
Span
Barrel length
Width
Depth
Total (Cum)
Completion date
28
225
563/7-8
1x6x2.2 RCB
6.850
0.50
20.55
Completed
29
226
563/8-9
1x6x3 RCB
6.850
0.67
27.40
Completed
30
227
563/10-11
1x4x3 RCB
6.850
0.50
13.70
Completed
31
228
564/1-2
2x4x1.7 RCB
7.000
0.50
14.00
Completed
32
229
564/15-565/1
1x1.2x1.2 RCB
7.650
1.2
0.60
5.51
25.04.13
33
230
565/7-8
1x4x1.6 RCB
6.85
0.53
14.61
25.04.13
34
231
565/8-9
1x4.5x1.8 RCB
6.850
4.5
0.60
18.50
25.04.13
35
232
565/9-10
1x1.2x1.2 RCB
7.650
1.2
0.27
2.45
25.04.13
36
233
565/13-14
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
25.04.13
37
234
566/1-2
1x1.2x1.2 RCB
7.650
1.2
0.47
4.28
27.04.13
38
235
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
27.04.13
39
236
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.60
5.51
27.04.13
40
237
567/4-5
1x4.5x1.8 RCB
6.850
4.5
0.47
14.39
27.04.13
41
238
568/1-2
1 x4x 2 RCB
6.850
0.40
10.96
27.04.13
42
239
568/2-3
1x4x2.3 RCB
6.850
0.50
13.70
27.04.13
43
240
568/7-8
4x12.2 PSC
44
241
568/8-9
1x4.5x2.6
6.850
4.57
0.27
8.35
30.04.13
45
242
569/3-4
1x1.2x1.2 RCB
9.180
1.2
0.50
5.51
30.04.13
46
243
569/5-6
1x1.2x1.2 RCB
10.710
1.2
0.20
2.57
30.04.13
47
244
569/6-7
1x1.2x1.2 RCB
10.710
1.2
0.27
3.43
30.04.13
48
245
569/7-8
1x2.5x2.6 RCB
6.850
2.5
0.33
5.71
30.04.13
49
246
569/8-9
1x4.5x4.4 RCB
6.850
4.5
0.40
12.33
02.05.13
50
247
569/14-15
1x1.2x1.2 RCB
9.180
1.2
0.27
2.94
02.05.13
51
248
570/14-15
6.850
0.20
5.48
02.05.13
52
249
572/3-4
1x1.2x1.2 RCB
7.650
1.2
0.17
1.53
02.05.13
53
250
572/13-14
1x 6x 3 RCB
6.850
0.10
4.11
02.05.13
54
251
572/14-15
1x6x5.3 RCB
6.850
0.37
15.07
05.05.13
55
252
573/3-5
9x12.2 PSC
56
252 A
573/5-6
57
253
573/8-9
Major Bridge
Completed
Major Bridge
20.04.13
Closed Bridge
1x1.2x1.2 RCB
10.710
Page 7 of 21
1.2
0.23
3.00
Completed
Sl. No.
Br. No.
Location
Span
Barrel length
Width
Depth
Total (Cum)
Completion date
58
254
573/9-10
1x1.2x1.2 RCB
9.180
1.2
0.10
1.10
Completed
59
255
573/11-12
1x1.2x1.2 RCB
7.650
1.2
0.17
1.53
Completed
60
256
573/14-15
1x1.2x1.2 RCB
7.650
1.2
0.17
1.53
Completed
61
257
574/2-3
1x1.2x1.2 RCB
7.650
1.2
0.38
3.52
03.05.13
62
258
574/4-5
1x1.2x1.2 RCB
7.650
1.2
0.20
1.84
03.05.13
63
259
574/5-6
1x6x2.3 RCB
6.850
0.27
10.96
10.05.13
64
260
574/12-13
1x1.2x1.2 RCB
7.650
1.2
0.27
2.45
03.05.13
65
261
575/5-6
1x4.5x3 RCB
6.850
4.5
0.53
16.44
12.05.13
66
262
575/15-576/1
1x1.2x1.2 RCB
7.650
1.2
0.27
2.45
13.05.13
67
263
575/15-576/1
68
264
576/7-8
1x1.2x1.2 RCB
32.130
1.2
0.20
7.71
13.05.13
69
265
576/10-11
1x2x2.3 RCB
32.325
0.17
10.78
15.05.13
70
266
577/6-7
1x4.5x3.4 RCB
6.850
4.5
0.17
5.14
13.05.13
71
267
577/9-10
1x1.2x1.2 RCB
10.710
1.2
0.33
4.28
13.05.13
72
268
577/12-13
1x1.2x1.2 RCB
9.180
1.2
0.23
2.57
13.05.13
73
269
577/12-13
1x2.5x2.8 RCB
6.850
2.5
0.30
5.14
15.05.13
74
270
577/14-15
2x4x2.1 RCB
6.850
0.17
4.57
15.05.13
75
271
577/16-578/1
1x2x1.2 RCB
6.850
0.50
6.85
Completed
76
272
579/7-8
1x3x1.2 RCB
6.850
0.40
8.22
Completed
77
273
580/3-4
1x4.5x1.4 RCB
6.850
4.5
0.37
11.30
17.05.13
78
274
580/13-14
1x1.2x1.2 RCB
7.650
1.2
0.20
1.84
17.05.13
79
275
581/2-3
1x1.2x1.2 RCB
7.650
1.2
0.43
3.98
17.05.13
80
276
581/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
4.59
17.05.13
81
277
581/7-8
1x1.2x1.2 RCB
7.650
1.2
0.43
3.98
17.05.13
82
278
581/13-14
1x1.2x1.2 RCB
7.650
1.2
0.47
4.28
17.05.13
83
279
581/15-582/1
1x4.5x1.6 RCB
6.850
4.5
0.37
11.30
17.05.13
84
280
582/8-9
1x1.2x1.2 RCB
7.650
1.2
0.43
3.98
17.05.13
85
281
582/10-11
1x1.2x1.2 RCB
7.650
1.2
0.40
3.67
17.05.13
86
282
583/11-12
87
283
583/12-13
Closed Bridge
Retained
1x1.2x1.2 RCB
9.180
Page 8 of 21
1.2
Completed
0.38
4.22
20.04.13
Sl. No.
Br. No.
Location
Span
Barrel length
Width
Depth
Total (Cum)
Completion date
88
284
583/12-13
1x1.2x1.2 RCB
9.180
1.2
0.47
5.14
Completed
89
285
583/14-15
1x1.2x1.2 RCB
10.710
1.2
0.50
6.43
Completed
90
286
584/1-2
1x1.2x1.2 RCB
10.710
1.2
0.37
4.71
Completed
91
287
584/4-5
1x6x2.3 RCB
13.760
0.24
19.81
Completed
92
288
584/7-8
5X12.2 PSC
93
288A
584/8-9
1x1.2x1.2 RCB
13.000
1.2
0.30
4.68
05.05.13
94
289
585/5-6
1x1.2x1.2 RCB
9.180
1.2
0.17
1.84
05.05.13
95
290
585/6-7
1x4.5x3.1 RCB
6.850
4.5
0.43
13.36
07.05.13
96
291
587/1-2
1x1.2x1.2 RCB
7.650
1.2
0.38
3.52
05.05.13
97
292
588/5-6
1x4.5x3.7 RCB
6.850
4.5
0.67
20.55
Completed
98
293
588/7-9
11 x12.2 PSC
Major Bridge
Completed
Major Bridge
Page 9 of 21
Completed
647.33
17.04.13
Sl. No.
Br. No.
Location
Completion date
294
589/11-12
9.00
20.04.13
296
590/14-15
33.00
27.04.13
299
591/10-11
3.00
28.04.13
300
591/12-13
1.38
29.04.13
302
592/15-593/1
4.50
30.04.13
308
595/3-4
3.60
2/05,13
313
595/12-13
11.00
03.05.13
329
608/9-10
5.00
04.05.13
330
609/5-6
4.50
06.05.13
10
331
611/12-13
5.00
07.05.13
11
333
612/9-10
12.30
10.05.13
12
338A
613/14-15
6.10
11.05.13
13
340
613/15-614/1
5.00
12.05.13
14
348
618/12-13
12.00
13.05.13
115.38
Page 10 of 21
17.04.13
Sl. No.
Br. No.
Location
Completion date
202
557/2-3
1.38
23.04.13
203
557/5-6
1.38
24.04.13
205
557/9-10
1.38
25.04.13
206
557/10-11
1.38
26.04.13
210
559/9-10
1.08
27.04.13
230
565/7-8
6.17
30.04.13
249
572/3-4
1.38
05.05.13
270
577/14-15
8.22
15.05.13
22.35
REACH-I
Sl. No.
BR.No
LOCATION
PROPOSED SPAN
BARREL
WRIDTH
DEPTH
199
55613-14
1 x2x 3 RCB
8.000
0.30
200
556/14-15
1x1.2x1.2 RCB
201
556/16-17
1x1.2x1.2 RCB
202
557/2-3
1x1.2x1.2 RCB
7.650
1.2
0.40
203
557/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
204
557/6-7
1x6x2.3 RCB
6.850
0.37
205
557/9-10
1x1.2x1.2 RCB
7.650
1.2
0.23
206
557/10-11
1x1.2x1.2 RCB
7.650
1.2
0.33
207
559/3-4
1x6x3.1 RCB
6.850
0.40
10
208
559/6-7
1x6x2.4 RCB
6.850
0.50
11
209
559/8-9
1x4x2.5 RCB
6.850
0.57
12
210
559/9-10
1x1.2x1.2 RCB
7.650
1.2
0.30
13
211
559/11-12
1x1.2x1.2 RCB
7.650
1.2
0.40
14
212
559/14-15
1x1.2x1.2 RCB
7.650
1.2
0.57
15
212A
559/16-17
1x1.2x1.2 RCB
7.650
1.2
0.10
16
213
559/16-560/1
1x1.2x1.2 RCB
7.650
1.2
0.50
17
214
560/4-5
1x1.2x1.2 RCB
10.710
1.2
0.53
18
215
560/5-6
1x1.2x1.2 RCB
9.180
1.2
0.40
19
216
560/10-11
1x1.2x1.2 RCB
7.650
1.2
0.53
20
217
561/1-2
1x4.5x3 RCB
6.850
4.5
0.50
21
218
561/3-4
6x12.2 PSC
22
219
561/5-6
23
220
561/11-12
Constructed in MNM
Major Bridge
Closed Bridge
1x1.2x1.2 RCB
9.180
1.2
0.47
24
221
562/1-2
1x4x2.4 RCB
6.850
0.47
25
222
562/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
26
223
562/6-7
1x1.2x1.2 RCB
7.650
1.2
0.27
27
224
562/8-9
1x1.2x1.2 RCB
7.650
1.2
0.50
28
225
563/7-8
1x6x2.2 RCB
6.850
0.50
29
226
563/8-9
1x6x3 RCB
6.850
0.67
30
227
563/10-11
1x4x3 RCB
6.850
0.50
31
228
564/1-2
2x4x1.7 RCB
7.000
0.50
32
229
564/15-565/1
1x1.2x1.2 RCB
7.650
1.2
0.60
33
230
565/7-8
1x4x1.6 RCB
6.85
0.53
34
231
565/8-9
1x4.5x1.8 RCB
6.850
4.5
0.60
35
232
565/9-10
1x1.2x1.2 RCB
7.650
1.2
0.27
36
233
565/13-14
1x1.2x1.2 RCB
7.650
1.2
0.50
37
234
566/1-2
1x1.2x1.2 RCB
7.650
1.2
0.47
38
235
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.50
39
236
566/3-4
1x1.2x1.2 RCB
7.650
1.2
0.60
40
237
567/4-5
1x4.5x1.8 RCB
6.850
4.5
0.47
41
238
568/1-2
1 x4x 2 RCB
6.850
0.40
42
239
568/2-3
1x4x2.3 RCB
6.850
0.50
43
240
568/7-8
4x12.2 PSC
44
241
568/8-9
1x4.5x2.6
6.850
4.57
0.27
45
242
569/3-4
1x1.2x1.2 RCB
9.180
1.2
0.50
46
243
569/5-6
1x1.2x1.2 RCB
10.710
1.2
0.20
47
244
569/6-7
1x1.2x1.2 RCB
10.710
1.2
0.27
48
245
569/7-8
1x2.5x2.6 RCB
6.850
2.5
0.33
49
246
569/8-9
1x4.5x4.4 RCB
6.850
4.5
0.40
50
247
569/14-15
1x1.2x1.2 RCB
9.180
1.2
0.27
51
248
570/14-15
6.850
0.20
Major Bridge
52
249
572/3-4
1x1.2x1.2 RCB
7.650
1.2
0.17
53
250
572/13-14
1x 6x 3 RCB
6.850
0.10
54
251
572/14-15
1x6x5.3 RCB
6.850
0.37
55
252
573/3-5
9x12.2 PSC
56
252 A
573/5-6
57
253
573/8-9
1x1.2x1.2 RCB
10.710
1.2
0.23
58
254
573/9-10
1x1.2x1.2 RCB
9.180
1.2
0.10
59
255
573/11-12
1x1.2x1.2 RCB
7.650
1.2
0.17
60
256
573/14-15
1x1.2x1.2 RCB
7.650
1.2
0.17
61
257
574/2-3
1x1.2x1.2 RCB
7.650
1.2
0.38
62
258
574/4-5
1x1.2x1.2 RCB
7.650
1.2
0.20
63
259
574/5-6
1x6x2.3 RCB
6.850
0.27
64
260
574/12-13
1x1.2x1.2 RCB
7.650
1.2
0.27
65
261
575/5-6
1x4.5x3 RCB
6.850
4.5
0.53
66
262
575/15-576/1
1x1.2x1.2 RCB
7.650
1.2
0.27
67
263
575/15-576/1
68
264
576/7-8
1x1.2x1.2 RCB
32.130
1.2
0.20
69
265
576/10-11
1x2x2.3 RCB
32.325
0.17
70
266
577/6-7
1x4.5x3.4 RCB
6.850
4.5
0.17
71
267
577/9-10
1x1.2x1.2 RCB
10.710
1.2
0.33
72
268
577/12-13
1x1.2x1.2 RCB
9.180
1.2
0.23
73
269
577/12-13
1x2.5x2.8 RCB
6.850
2.5
0.30
74
270
577/14-15
2x4x2.1 RCB
6.850
0.17
75
271
577/16-578/1
1x2x1.2 RCB
6.850
0.50
76
272
579/7-8
1x3x1.2 RCB
6.850
0.40
77
273
580/3-4
1x4.5x1.4 RCB
6.850
4.5
0.37
78
274
580/13-14
1x1.2x1.2 RCB
7.650
1.2
0.20
79
275
581/2-3
1x1.2x1.2 RCB
7.650
1.2
0.43
Major Bridge
Closed Bridge
Closed Bridge
80
276
581/5-6
1x1.2x1.2 RCB
7.650
1.2
0.50
81
277
581/7-8
1x1.2x1.2 RCB
7.650
1.2
0.43
82
278
581/13-14
1x1.2x1.2 RCB
7.650
1.2
0.47
83
279
581/15-582/1
1x4.5x1.6 RCB
6.850
4.5
0.37
84
280
582/8-9
1x1.2x1.2 RCB
7.650
1.2
0.43
85
281
582/10-11
1x1.2x1.2 RCB
7.650
1.2
0.40
86
282
583/11-12
87
283
583/12-13
1x1.2x1.2 RCB
9.180
1.2
0.38
88
284
583/12-13
1x1.2x1.2 RCB
9.180
1.2
0.47
89
285
583/14-15
1x1.2x1.2 RCB
10.710
1.2
0.50
90
286
584/1-2
1x1.2x1.2 RCB
10.710
1.2
0.37
91
287
584/4-5
1x6x2.3 RCB
13.760
0.24
92
288
584/7-8
5X12.2 PSC
93
288A
584/8-9
1x1.2x1.2 RCB
13.000
1.2
0.30
94
289
585/5-6
1x1.2x1.2 RCB
9.180
1.2
0.17
95
290
585/6-7
1x4.5x3.1 RCB
6.850
4.5
0.43
96
291
587/1-2
1x1.2x1.2 RCB
7.650
1.2
0.38
97
292
588/5-6
1x4.5x3.7 RCB
6.850
4.5
0.67
98
293
588/7-9
11 x12.2 PSC
Retained
Major Bridge
Major Bridge
Total
CUM
Date-17-04-13
Inside vent way
cleaning
Cleaning
Status
Date of
completion
4.80
Required
Labours
Completed
JCB hours
required
Date of
completion
Completed
3.67
Completed
Completed
4.59
Completed
Completed
15.07
Completed
Completed
2.14
Completed
Completed
3.06
Completed
Completed
16.44
Completed
20.55
Completed
15.53
Completed
2.75
Completed
3.67
Completed
5.20
Completed
0.92
Completed
4.59
Completed
6.85
Completed
4.41
Completed
4.90
21.04.13
15.41
21.04.13
11
Completed
Closed Bridge
5.14
21.04.13
Pitching
work was
executed by
other
agency
12.79
20.04.13
4.59
20.04.13
2.45
19.04.13
4.59
19.04.13
20.55
Completed
27.40
Completed
7.5
13.70
Completed
14.00
Completed
5.51
29.04.13
14.61
29.04.13
10
18.50
30.04.13
13
2.45
30.04.13
4.59
01.05.13
4.28
01.05.13
4.59
02.05.13
5.51
02.05.13
14.39
03.05.13
10
6.5
10.96
03.05.13
5.5
13.70
04.05.13
10
5.5
Pitching
work was
executed by
other
agency
04.05.13
Completed
8.35
05.05.13
5.51
05.05.13
2.57
06.05.13
3.43
06.05.13
5.71
07.05.13
12.33
07.05.13
2.94
08.05.13
5.48
08.05.13
Pitching
work was
executed by
other
agency
1.53
09.05.13
09.05.13
4.11
09.05.13
09.05.13
15.07
10.05.13
11
10.05.13
Completed
Closed Bridge
3.00
Completed
1.10
Completed
1.53
Completed
1.53
Completed
3.52
Completed
1.84
Completed
10.96
Completed
2.45
11.05.13
11.05.13
16.44
11.05.13
12
11.05.13
2.45
12.05.13
12.05.13
7.71
12.05.13
6.5
12.05.13
10.78
12.05.13
12.05.13
5.14
13.05.13
13.05.13
4.28
13.05.13
13.05.13
2.57
13.05.13
13.05.13
5.14
14.05.13
14.05.13
4.57
14.05.13
14.05.13
Closed Bridge
6.85
Completed
8.22
Completed
11.30
15.03.13
15.03.13
1.84
16.05.13
16.05.13
3.98
16.05.13
16.05.13
4.59
16.05.13
16.05.13
3.98
17.05.13
17.05.13
4.28
17.05.13
17.05.13
11.30
18.05.13
18.05.13
3.98
19.05.13
19.05.13
3.67
19.05.13
19.05.13
19.05.13
Completed
4.22
19.05.13
5.14
Completed
6.43
Completed
4.71
Completed
19.81
Completed
Completed
4.68
20.05.13
20.05.13
1.84
20.05.13
20.05.13
Completed
13.36
3.52
20.55
20.05.13
20.05.13
Completed
Completed
634.31
244
416.5
SI. NO
BR. NO
Location
PROPOSED
SPAN
293 A, RUB
589/3-4
294
589/11-12
1X2.0X1.2
296
590/14-15
2X6.0X2.3
297
590/14-15
1X1.2X1.2
298
591/5-6
1X1.2X1.2
299
591/10-11
1X6.0X2.3
300
591/12-13
1X1.2X1.2
301
592/2-3
1X4.0X1.8
302
592/15-593/1
10
303
593/7-8
1X4.5X3.4
11
304
594/2-3
1X1.2X1.2
12
305
15-595/1
1X1.2X1.2
13
306
595/1-2
1X1.2X1.2
14
307
595/2-3
1X1.2X1.2
15
308
595/3-4
1X1.2X1.2
16
309
595/5-6
1X1.2X1.2
17
310
595/8-9
1X1.2X1.2
18
311
595/11-12
1X1.2X1.2
19
312
595/12-13
1X1.2X1.2
20
313
21
314
22
315
596/9-10
23
316
597/1-2
1X1.2X1.2
24
317
597/4-5
1X1.2X1.2
25
318
597/6-7
1X1.2X1.2
26
319
598/6-7
1X1.2X1.2
27
320
598/14-15
1X2.5X2.0
28
321
599/7-8
1X1.2X1.2
29
322
600/13-14
1X1.2X1.2
30
324
600/15-16
1X4.0X3.0
31
325
602/14-15
1X4.0X3.0
32
326
604/5-6
1X4.5X2.5
33
327
605/2-3
1X4.5X1.6
34
328
608/1-2
1X1.2X1.2
35
329
608/9-10
1X2.0X2.0
36
330
609/5-6
1X1.2X1.2
37
331
611/12-13
1X1.2X1.2
38
333
612/9-10
2X6.0X3.5
2X4.0X3.3
BARREL
WRIDTH
DEPTH
CUM
cleaning
Date of
completion
Cleaning
JCB hours
Date of
required completion
0.45
27.00
18.350
12.000
0.300
66.06
26.04.13
7.680
1.200
0.20
1.84
27.04.13
9.180
1.200
0.150
1.65
27.04.13
6.850
6.000
0.200
8.22
28.04.13
7.650
1.200
0.300
2.75
28.04.13
6.850
4.000
0.250
6.85
29.04.13
15.000
2.000
0.300
9.00
30.04.13
6.850
4.500
0.300
9.25
02.05.13
9.180
1.200
0.100
1.10
02.05.13
12.240
1.200
0.200
2.94
03.05.13
9.180
1.200
0.300
3.30
03.05.13
6.850
1.200
0.00
Completed
20.000
1.200
0.300
7.20
04.05.13
12.240
1.200
0.300
4.41
04.05.13
20.000
1.200
0.100
2.40
05.05.13
10.710
1.200
0.300
3.86
05.05.13
9.180
1.200
0.300
3.30
06.05.13
6.850
4.000
0.00
Completed
16.000
2.000
0.350
11.20
07.05.13
16.000
2.000
0.350
11.20
07.05.13
12.240
1.200
0.350
5.14
08.05.13
12.240
1.200
0.500
7.34
08.05.13
12.240
1.200
0.500
7.34
09.05.13
9.180
1.200
0.300
3.30
09.05.13
6.850
2.500
0.250
4.28
10.05.13
7.650
1.200
0.300
2.75
10.05.13
21.420
1.200
0.350
9.00
11.05.13
6.850
4.000
0.800
21.92
12.05.13
6.850
4.000
0.200
5.48
12.05.13
6.850
4.500
0.850
26.20
13.05.13
6.850
4.500
0.850
26.20
13.05.13
7.650
1.200
0.250
2.30
14.05.13
19.000
2.000
0.250
9.50
19.000
1.200
0.250
5.70
19.000
1.200
0.250
5.70
15.05.13
0.00
Completed
Pitching work
was
executed by
other agency
completed
22.04.13
30
6.850
completed
Required
Labours
14.05.13
15.05.13
SI. NO
BR. NO
Location
PROPOSED
SPAN
39
334
612/13-14
1X1.2X1.2
40
335
613/6-7
1X2.0X1.75
41
336
613/7-8
1X1.2X1.2
42
337
613/10-11
1X1.2X1.2
43
338
613/13-14
1X1.2X1.2
44
339
613/14-15
1X6.0X2.7
45
340
46
341
47
342
48
343
617/5-6
1X1.2X1.2
49
344
618/7-8
1X4.0X1.5
50
345
618/8-9
1X4.0X1.5
51
346
618/10-11
1X1.2X1.2
52
347
618/12-13
1X1.2X1.2
53
348
613/15-614/1 1X1.2X1.2
614/8-9
1X2.0X1.5
615/15-616/1 1X4.0X1.3
2X4.0X2.5
BARREL
WRIDTH
DEPTH
CUM
Pitching work
was
executed by
Inside
vent way
other agency
cleaning
Date of
completion
Required
Labours
7.650
1.200
0.300
2.75
16.05.13
18.000
2.000
0.300
10.80
16.05.13
7.650
1.200
0.350
0.30
17.05.13
7.650
1.200
0.300
2.75
17.05.13
7.650
1.200
0.250
2.30
17.05.13
6.850
6.000
0.00
Completed
19.000
1.200
0.450
10.26
18.05.13
19.000
2.000
0.450
17.10
18.05.13
Pitching work
was
executed by
other agency
6.850
4.000
1.000
27.40
19.05.13
6.850
1.200
0.300
2.47
6.850
4.000
1.000
27.40
20.05.13
10.000
4.000
1.000
40.00
21.05.13
10.000
1.200
1.000
12.00
22.05.13
10.000
1.200
0.100
1.20
22.05.13
9.000
4.000
1.000
36.00
518.43
24.05.13
19.05.13