ABSTRACT OF COST Name of work: Construction of control Room at Kanoria Solar Power plant, Barsingha Bawari, Bap

CARPET AREA = 1521.3


S.N. 1 B.S.R.Ite m N Ite m Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of Ordinary Soil Hard Soil Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.(1:4:8) 3.1 .6 3.1 .5 3 6. 10 Qty Uni t Rate Amount

1 (a) 1 (b) 2

166

C u

200. 00

33200

75 mm P.C.C (1:3:6) under the C.C flooring


Random Rubble stone masonry for foundation and plinth in Cement Sand mortar above 30CM&11.5cm thick wall in C.M. 1:6

17 2. 1

c u c u

2900. 00 3100. 00

49300 6510

25. 22 4

C u

2100. 00

52962

Course Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :
56. 51 C u 175181 3100.00

5. 20 5.2 .2

Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) Add extra over item no.5.1 for brickwork in super structure up to third story Reinforced cement concrete work in Beams, suspended floors, roofs, griders having slopes up to 15, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases spiral stair case upto floor 3 level including curing compaction, finishing with rendering in CM 1:3(1 cement:3 coarse sand) and making good and joint excluding the cost of centering, shuttering and reinforcement. with 1:1.5:3I1 cement:1.5corse sand:3 graded stone agg. 20mm nominal size) M25 grade Design Mix Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor three level.

24

C u

2450. 00

58800

4. 50

4.6 .1 4. 13

69. 55

C u

5500. 00

382525

Thermo-mechanically Treated bars (Conforming of relevant IS code) 8 12.30 Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick thick. 20mm

660 7

K g

68. 00

449293

536. 46

S q

72. 00

38625.29

11.40

Providing and fixing 50mm thick cement concrete flooring with Metallic concrete hardener topping, under layer of 38mm thick cement concrete 1:2:4 (1 cement : 2-coarse sand : 4-graded stone aggregate 20mm thick nominal size) and top layer of 12mm thick metallic concrete hardener consisting of mix 1:2 (1 cement : 2 stone aggregate, 6mm nominal size) by volume & mixed with metallic hardening compound of approved quality @ Ordinary cement without any pigment 2Kg./Sqm including cement slurry, rounding off Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing Ordinary completecement without any pigment
Grading of roof with water proofing treatment cement concrete 1:2:4 (1cement:2coarse sand:4graded stone agg. 20mm nominal size) 40mm av.

170. 70

sqm

232. 00

39601.27

10

11.19

8. 5

sqm

927. 00

7881

11

10.17

3. 7

C u

4332. 00

16331

12

3. 80

P/F 50mm thick plain cement concrete roofing parapet coping over roof fixed in cement mortar
16. 99 S q 400. 00

6800

13

9. 13

Supplying and fixing rolling shutters of approved make, made of 80 x 1.25mm. M.S. laths interlocked together through their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete including cost of spring hooks, providing and fixing necessary 25.3cm. long wire springs grade No. 2 and M.S. top cover 1.25mm thick for rolling shutters as per design. (Clear openable area to be measured for payment). Extra for providing mechanical device chain and crank operation operating rolling shutters. Exceeding 16.80for Sqm in the area.

9. 15

12. 06 12. 06

s q S q

2539. 68.00 725. 00

32000

8700

14

8. 10

Providing

& fixing door, window, chowkhats

and other frames, including antitermite treatment, M.S. flat, hold fasts of size 250 x 40 x 3mm fixed with M.S. bolt 5mm dia 50mm long duly embedded in Sal wood Grade - I.
1. 7 c u 75148 42456.00

15

12.39

Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding: New work (two or more coats) over and including scrapping and priming coat with cement primer.
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with wooden members and removal of formwork for upto floor three level for : Suspended floors, roofs landings staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam etc.

487. 69

s q m

82. 00

40000

16

4.10

161. 26 17 8.40

S q

280. 00

45080

Providing and fixing fully panelled/partly panelled/ double leaf shutter frame for doors as per approved design and drawings with approved ordinary C.P./ oxidised steel fittings as per Annexure - 'A' and width of styles & top rails of 100mm and lock rails width of 150mm and bottom rails of 200mm width including teak wood beading of size 19mm x 12mm on both 35 mm thick faces complete :
Shesham wood grade I Providing and laying dry stone kharanja under the C.C floor (metallic hardner) 11. 99 27. 34 S q C u m 4000. 00 1672.00 48000

8.4.1.3 18

45712

19

12.31

Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) Raised and cut pointing. Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :

217. 23

S q

10 9.6

23800

20

12.43

48. 31

s q

68. 00

3300

21

29. 96

Total Rs.

S q

60. 00

1640549.00 123041.00 123041.00

1800

Add 7.5 % of Electricity work Add 7.5 % of Sanitary Work Grand Total 1521.3 sqft Per sq feet
expenses.

1886631.00 Rs 1240.14
excluding any margin,

Carpet area Rate


construction water , liaison and traveling

Remark:- All above calculation for costing based on Local survey at Baap region