LIST OF COST CODES FOR VELIGONDA PROJECT LIST OF COST CODES FOR VELIGONDA PROJECT LIST OF COST CODES FOR VELIGONDA PROJECT
Cost Cost
Work Description Work Description Cost Code Work Description
Code Code
349402 Dam Excavation Work including Dam Survey 349402 Dam Excavation Work including Dam Survey 349402 Dam Excavation Work including Dam Survey
349403 Drilling work for Grouting Dam foundation 349403 Drilling work for Grouting Dam foundation 349403 Drilling work for Grouting Dam foundation
349404 Dam Grouting work 349404 Dam Grouting work 349404 Dam Grouting work
349405 Dam Concrete Work 349405 Dam Concrete Work 349405 Dam Concrete Work
349406 Dam Form work 349406 Dam Form work 349406 Dam Form work
349407 Dam Reinforcement 349407 Dam Reinforcement 349407 Dam Reinforcement
349408 Dam BackFilling with excavated muck 349408 Dam BackFilling with excavated muck 349408 Dam BackFilling with excavated muck
349409 Miscellaneous dam work 349409 Miscellaneous dam work 349409 Miscellaneous dam work
349411 Canal Excavation Work including Canal Survey 349411 Canal Excavation Work including Canal Survey 349411 Canal Excavation Work including Canal Survey
349412 Canal Concrete Work 349412 Canal Concrete Work 349412 Canal Concrete Work
349413 Canal Reinforcement 349413 Canal Reinforcement 349413 Canal Reinforcement
349414 Canal Form work 349414 Canal Form work 349414 Canal Form work
349415 Canal Filling work 349415 Canal Filling work 349415 Canal Filling work
349416 Canal Pitching work 349416 Canal Pitching work 349416 Canal Pitching work
349417 Miscellaneous canal work 349417 Miscellaneous canal work 349417 Miscellaneous canal work
349418 Canal Distributory system 349418 Canal Distributory system 349418 Canal Distributory system
349423 Geotechnical Engineering 349423 Geotechnical Engineering 349423 Geotechnical Engineering
349428 Crushing plant including Survey work 349428 Crushing plant including Survey work 349428 Crushing plant including Survey work
349429 Bulk material Handling from Crusher to Batching Plant 349429 Bulk material Handling from Crusher to Batching Plant 349429 Bulk material Handling from Crusher to Batching Plant
349430 Quarrying and Bulk material Transportation to Crusher 349430 Quarrying and Bulk material Transportation to Crusher 349430 Quarrying and Bulk material Transportation to Crusher
Activities related to Fabrication,Erection of Batching plant (120 cum per Activities related to Fabrication,Erection of Batching plant (120 cum per Activities related to Fabrication,Erection of Batching plant (120 cum
349432 hour),Cement silo& Inundation Bins etc
349432 hour),Cement silo& Inundation Bins etc
349432 per hour),Cement silo& Inundation Bins etc
Site,Client office,P&M shed,Store shed,Time office,Safety,Field Site,Client office,P&M shed,Store shed,Time office,Safety,Field Site,Client office,P&M shed,Store shed,Time office,Safety,Field
sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC
1200 lab,Carpentry/Barbender shop,DG shed,Control
1200 lab,Carpentry/Barbender shop,DG shed,Control
1200 lab,Carpentry/Barbender shop,DG shed,Control
room,Dispensary,Washing ramp,Common toilets etc. room,Dispensary,Washing ramp,Common toilets etc. room,Dispensary,Washing ramp,Common toilets etc.
Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for
1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit 1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit 1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit
and Monsoon protection works. and Monsoon protection works. and Monsoon protection works.
Guest house construction,Labour canteen,Market complex,Road for GH Guest house construction,Labour canteen,Market complex,Road for GH Guest house construction,Labour canteen,Market complex,Road for
1202 Camp and Recreation club etc.
1202 Camp and Recreation club etc.
1202 GH Camp and Recreation club etc.
1181 Canal initial survey,Soil investigation etc. 1181 Canal initial survey,Soil investigation etc. 1181 Canal initial survey,Soil investigation etc.
1183 Safety appliances 1183 Safety appliances 1183 Safety appliances
Note: Note: Note:
All concerned engineers are requested to mention Particular cost code of the particular
Allactivity
concerned
on Indent.
engineers are requested to mention Particular cost code of the particular
Allactivity
concerned
on Indent.
engineers are requested to mention Particular cost code of the particular activity on Indent.
Authorised signatories should check the Cost code prior to signing. Authorised signatories should check the Cost code prior to signing. Authorised signatories should check the Cost code prior to signing.
All Entries should be Legible in Indent. All Entries should be Legible in Indent. All Entries should be Legible in Indent.
LIST OF COST CODES FOR VELIGONDA PROJECT LIST OF COST CODES FOR VELIGONDA PROJECT LIST OF COST CODES FOR VELIGONDA PROJECT
Cost Cost
Work Description Work Description Cost Code Work Description
Code Code
349402 Dam Excavation Work including Dam Survey 349402 Dam Excavation Work including Dam Survey 349402 Dam Excavation Work including Dam Survey
349403 Drilling work for Grouting Dam foundation 349403 Drilling work for Grouting Dam foundation 349403 Drilling work for Grouting Dam foundation
349404 Dam Grouting work 349404 Dam Grouting work 349404 Dam Grouting work
349405 Dam Concrete Work 349405 Dam Concrete Work 349405 Dam Concrete Work
349406 Dam Form work 349406 Dam Form work 349406 Dam Form work
349407 Dam Reinforcement 349407 Dam Reinforcement 349407 Dam Reinforcement
349408 Dam BackFilling with excavated muck 349408 Dam BackFilling with excavated muck 349408 Dam BackFilling with excavated muck
349409 Miscellaneous dam work 349409 Miscellaneous dam work 349409 Miscellaneous dam work
349411 Canal Excavation Work including Canal Survey 349411 Canal Excavation Work including Canal Survey 349411 Canal Excavation Work including Canal Survey
349412 Canal Concrete Work 349412 Canal Concrete Work 349412 Canal Concrete Work
349413 Canal Reinforcement 349413 Canal Reinforcement 349413 Canal Reinforcement
349414 Canal Form work 349414 Canal Form work 349414 Canal Form work
349415 Canal Filling work 349415 Canal Filling work 349415 Canal Filling work
349416 Canal Pitching work 349416 Canal Pitching work 349416 Canal Pitching work
349417 Miscellaneous canal work 349417 Miscellaneous canal work 349417 Miscellaneous canal work
349418 Canal Distributory system 349418 Canal Distributory system 349418 Canal Distributory system
349423 Geotechnical Engineering 349423 Geotechnical Engineering 349423 Geotechnical Engineering
349428 Crushing plant including Survey work 349428 Crushing plant including Survey work 349428 Crushing plant including Survey work
349429 Bulk material Handling from Crusher to Batching Plant 349429 Bulk material Handling from Crusher to Batching Plant 349429 Bulk material Handling from Crusher to Batching Plant
349430 Quarrying and Bulk material Transportation to Crusher 349430 Quarrying and Bulk material Transportation to Crusher 349430 Quarrying and Bulk material Transportation to Crusher
Activities related to Fabrication,Erection of Batching plant (120 cum per Activities related to Fabrication,Erection of Batching plant (120 cum per Activities related to Fabrication,Erection of Batching plant (120 cum
349432 hour),Cement silo& Inundation Bins etc
349432 hour),Cement silo& Inundation Bins etc
349432 per hour),Cement silo& Inundation Bins etc
Site,Client office,P&M shed,Store shed,Time office,Safety,Field Site,Client office,P&M shed,Store shed,Time office,Safety,Field Site,Client office,P&M shed,Store shed,Time office,Safety,Field
sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC sheds,Canteen,Security shed,Labour rest shed,Cement godown,QA/QC
1200 lab,Carpentry/Barbender shop,DG shed,Control
1200 lab,Carpentry/Barbender shop,DG shed,Control
1200 lab,Carpentry/Barbender shop,DG shed,Control
room,Dispensary,Washing ramp,Common toilets etc. room,Dispensary,Washing ramp,Common toilets etc. room,Dispensary,Washing ramp,Common toilets etc.
Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for Batching plant,Tower cranes,Storage silo,Miscellaneous fndn for
1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit 1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit 1201 P&M,Water tanks,Construction of Approach road,Fuel dispensing unit
and Monsoon protection works. and Monsoon protection works. and Monsoon protection works.
Guest house construction,Labour canteen,Market complex,Road for GH Guest house construction,Labour canteen,Market complex,Road for GH Guest house construction,Labour canteen,Market complex,Road for
1202 Camp and Recreation club etc.
1202 Camp and Recreation club etc.
1202 GH Camp and Recreation club etc.
1181 Canal initial survey,Soil investigation etc. 1181 Canal initial survey,Soil investigation etc. 1181 Canal initial survey,Soil investigation etc.
1183 Safety appliances 1183 Safety appliances 1183 Safety appliances
Note: Note: Note:
All concerned engineers are requested to mention Particular cost code of the particular
Allactivity
concerned
on Indent.
engineers are requested to mention Particular cost code of the particular
Allactivity
concerned
on Indent.
engineers are requested to mention Particular cost code of the particular activity on Indent.
Authorised signatories should check the Cost code prior to signing. Authorised signatories should check the Cost code prior to signing. Authorised signatories should check the Cost code prior to signing.
All Entries should be Legible in Indent. All Entries should be Legible in Indent. All Entries should be Legible in Indent.
NOTE:
All concerned engineers are requested to mention the Particular cost code of the Particular Activity on Indent.
If any queries, Please contact the Planning section.
365,812,493.24 365,812,493.24
68,856,425.50 68,856,425.50
0.00 0.00
0.00 0.00
41,520,272.00 41,520,272.00
0.00 0.00
0.00 0.00
0.00 0.00
1,960,000.00 1,960,000.00
0.00 0.00
11,299,250.00 11,299,250.00
10,365,750.00 10,365,750.00
8,484,300.00 8,484,300.00
0.00 0.00
0.00 0.00
16,922,940.77 16,922,940.77
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
16,922,940.77 16,922,940.77
143,907,067.07 143,907,067.07
875,000.00 875,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
3,000,000.00 3,000,000.00
0.00 0.00
0.00 0.00
0.00 0.00
10,900,000.00 10,900,000.00
7,350,000.00 7,350,000.00
0.00 0.00
7,350,000.00 7,350,000.00
0.00 0.00
9,470,758.00 9,470,758.00
0.00 0.00
0.00 0.00
30,273,521.26 30,273,521.26
8,918,750.00 8,918,750.00
980,000.00 980,000.00
0.00 0.00
3,394,000.00 3,394,000.00
931,500.00 931,500.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1,800,000.00 1,800,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
44,770,480.64 44,770,480.64
17,928,730.64 17,928,730.64
7,398,000.00 7,398,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
9,210,000.00 9,210,000.00
3,300,000.00 3,300,000.00
5,910,000.00 5,910,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
S
Item Group Activity
l.N Recon code Cost code Item Description Duration From To Unit Unit Cost Total Cost
Code Code
o.
DC DC Direct Cost 2,971,536,260.55
1 X349401R A Dam works 1,616,399,847.63
2 X349402R 349402 349401 A1 Excavation Dam Works 205 days 15-Mar-05 5-Oct-05 Cum 88.82 37,127,842.49
3 X349403R 349403 349402 A2 Drilling for Grouting 90 days 6-Oct-05 3-Jan-06 Rmt 630.68 49,192,801.76
4 X349404R 349404 349403 A3 Grouting 455 days 11-Oct-05 8-Jan-07 Bags 502.07 38,207,711.49
5 X349405R 349405 349404 A4 Concrete Dam Works 626 days 18-Oct-05 5-Jul-07 Cum 1,190.72 1,258,684,937.12
6 X349406R 349406 349405 A5 Form work 566 days 17-Dec-05 5-Jul-07 Sqm 235.75 51,865,098.52
7 X349407R 349407 349406 A6 Reinforcement 500 days 2-Dec-05 15-Apr-07 MT 34,026.7 81,664,102.63
8 X349408R 349408 349407 A7 Fill with excavated muck 120 days 26-Jan-06 25-May-06 Cum 37.12 556,729.69
9 X349409R 349409 349408 A8 Misc. 921 days 21-Feb-05 30-Aug-07 LS 99,100,623.95
10 X349410R B Canal Works 131,127,156.80
11 X349411R 349411 349409 B1 Excavation Canal Works 300 days 1-Aug-05 27-May-06 Cum 48.38 27,228,191.44
12 X349412R 349412 349410 B2 Concrete Canal Works 335 days 30-Oct-05 29-Sep-06 Cum 1,806.56 18,071,025.29
13 X349413R 349413 349411 B3 Reinforcement 350 days 15-Oct-05 29-Sep-06 MT 34,026.71 5,104,006.41
14 X349414R 349414 349412 B4 Form work 350 days 15-Oct-05 29-Sep-06 Sqm 235.75 2,358,211.73
15 X349415R 349415 349413 B5 Filling 150 days 29-Mar-06 25-Aug-06 Cum 170.42 596,470.22
16 X349416R 349416 349414 B6 Pitching 95 days 27-Jun-06 29-Sep-06 Cum 357.14 1,285,703.23
17 X349417R 349417 349415 B7 Misc. 425 days 1-Aug-05 29-Sep-06 LS 483,548.47
18 X349418R 349418 349416 B8 Distributory system 420 days 6-Apr-06 30-May-07Acres 8,000.00 76,000,000.00
19 X349419R C Contingency 435,728,456.37
20 X349420R 349420 349417 C1 Contingency for others 921 days 21-Feb-05 30-Aug-07 LS 289,766,476.55
21 X349421R 349421 349418 C2 Contingency over Qty 921 days 21-Feb-05 30-Aug-07 LS 90,624,426.32
22 X349422R 349422 349419 C3 Contingency for others 1.45% 921 days 21-Feb-05 30-Aug-07 LS 55,337,553.50
23 X349423R 349423 349420 D Design And Engineering 921 days 21-Feb-05 30-Aug-07 LS 38,000,000.00
24 X349424R E Escalation 46,766,275.95
25 X349425R 349425 349421 E1 Escalation for Other materials 921 days 21-Feb-05 30-Aug-07 LS 46,766,275.95
26 X349426R 349426 349422 E2 Escalation on POL 921 days 21-Feb-05 30-Aug-07 -
27 X349427R F Crusher 703,514,523.80
28 X349428R 349428 349423 F1 Crushing Cost 650 days 21-Sep-05 2-Jul-07 Cum 282.75 298,893,298.00
29 X349429R 349429 349424 F2 Handling Cost at Batching Plant 650 days 21-Sep-05 2-Jul-07 Cum 11.39 12,044,953.80
30 X349430R 349430 349425 F3 Quarrying and Transportation to Crusher 650 days 21-Sep-05 2-Jul-07 Cum 371.38 392,576,272.00
31 X349431R 349431 349426 G Cost of Re-work 921 days 21-Feb-05 30-Aug-07
32 X349432R 349432 349452 Batching plant
Indirect Cost 365,812,493.24
32 IDC.1200 1200 349427 Temporary Structures (site office etc.) 10,233,750.00
33 IDC.1150 1150 349428 P&M Site operations (Hire) 16,922,940.77
34 IDC.1060 1060 349429 Water Power 875,000.00
35 IDC.1090 1090 349430 Conveyance(staff) 9,470,758.00
36 IDC.1201 1201 349431 Preliminaries 17,928,730.64
37 IDC.1020 1020 349432 Miscellaneous Labour 8,484,300.00
38 IDC.1170 1170 349433 Miscellaneous 1,800,000.00
39 IDC.1100 1100 349434 OPE 7,350,000.00
40 IDC.1030 1030 349435 PF 1,960,000.00
41 IDC.1080 1080 349436 Staff transfer Expenses 3,550,000.00
42 IDC.1202 1202 349437 Staff and labour accomodation 7,398,000.00
1,295,993,818.00 3,596,745,725.00
37,127,825.84 16.65 418,000.00 137.79 57,598,000.00
49,296,523.00 103,721.25 78,000.00 978.38 76,314,000.00
41,563,297.84 3,355,586.35 76,100.00 779.00 59,281,900.00
1,258,687,319.34 (2,382.22) 1,057,080.00 2,877.97 3,042,247,180.00
52,523,476.69 658,378.17 220,000.00 366.00 80,520,000.00
81,656,704.00 7,398.63 2,400.00 52,775.00 126,660,000.00
556,800.00 70.31 15,000.00 58.00 870,000.00
99,100,624.00 0.05 153,254,645.00
131,138,833.39 11,676.58 203,254,275.00
27,227,296.40 895.04 562,780.00 74.81 42,101,340.00
18,071,019.68 5.61 10,003.00 2,802.01 28,028,486.00
5,116,606.50 12,600.09 150.00 52,775.00 7,916,250.00
2,358,207.25 4.48 10,003.00 366.00 3,661,098.00
596,470.00 0.22 3,500.00 58.00 203,000.00
1,285,704.00 (0.77) 3,600.00 755.03 2,718,100.00
483,548.50 (0.03) 750,001.00
75,999,981.06 18.94 9,500.00 12,408.00 117,876,000.00
435,728,455.50 0.87
289,766,476.00 0.55
90,624,426.00 0.32
55,337,553.50 0.00
0.00 38,000,000.00
46,766,276.00 (0.05) 16,383,260.00
46,766,276.00 (0.05)
16,383,260.00
703,514,429.79 94.01
298,893,328.50 (30.50) 1,057,080.00
12,044,959.17 (5.37) 1,057,080.00
392,576,142.12 129.88 1,057,080.00
3,816,383,260.00
-
479,034,506.20
12.55%
Quantity Unit Rate Amount
48029400.0
###