SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder ABB 17.02.2013

Page 1 2

CT Secondary Injection for HV REF Core Transformer HV REF protection Core:In old system the existing T1 CT core1 common for HV REF and O/C&E/F protection ABB installed new Ring type CT for REF through power cable under GIS basement Secondary Current injected from Sverkar 650 to each phase of Ring CT directly Test-1:- R-500mA, Y-500mA, B-500mA CT Details
Phase Injected Sec Current (mA)

Secondary Current [mA] Monitored at:


SWGR E03+S R 575 506 0 0 Y 577 0 506 0 B 579 0 0 504 N 581 508 507 504 R 21 512 0 0 E03+R1, TB XA= 132kV Relay Panel Y B 22 23 0 0 506 0 0 503 Test plug F64HV X64HV(RTXP18) Y B 5A 7A 0 0 504 0 0 504

T3 1S1-1S2 Tr.REF 300/1A

Injection from Line CT S1,S2 R 508 Y 508 B 505

N 24 514 506 506

R 3A 504 0 0

N 9A 502 509 504

Secondary Current [mA] Monitored at:


F64HV (RET615) (TB X120) 13 14 508 510 507 508 503 503 F64HV Display (A) 158 156 155.5 Stabilizing Resistor RSHV A82 A83 503 503 510 510 511 511 Metrosil RSMV A82 0 0 0 A85 0 0 0

Over Current and Earth fault CTcore


Tested by ABB Transmission & Distribution Date Name Signature 17.02.20132 R.Krishna Murthy Witnessed by ENERGO 17.02.2013 Mohammad Rasheed Approved by

SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder ABB 17.02.2013

Page 2 2

Test-:- R-500mA, Y-500mA, B-500mA CT Details


Phase Injected Sec Current (mA)

Secondary Current [mA] Monitored at:


SWGR E03+S R 502 502 0 0 Y 505 0 503 0 B 508 0 0 501 N 514 504 503 501 E03+R1, TB XC= 132kV Relay Panel R Y B N 01 02 03 04 503 0 0 499 0 513 0 510 0 0 505 505 X51/51NHV(RTXP18) R 3A 504 0 0 Y 5A 0 510 0 B 7A 0 0 498 N 9A 499 508 501

T1-CORE-2 1S1-1S2 O/C,E/F 300/1A

Injection from R Y B 502 502 501

Secondary Current [mA] Monitored at:


F51/51NHV-TB:X120 R Y B N 504 0 0 502 0 509 0 510 0 0 500 499 R 155 0 0 F51/51NHV Display Y B N 0 0 155 158 0 158 0 155 155

Remarks: Single Point Earthing confirmed before starting of current injection

Tested by ABB Transmission & Distribution Date Name Signature 17.02.20132 R.Krishna Murthy

Witnessed by ENERGO 17.02.2013 Mohammad Rasheed