HYDROLOGY
Hydrology is the study of water in the environment. Hydrology has evolved as a science to try and understand the complex water systems of the Earth, to study and predict how water will behave under different circumstances as it moves through the land phase of the water cycle. Water is one of the most important natural resources and although plentiful, is not always in the right place at the right time or of the right quality. An overall aim of hydrologists is to apply scientific knowledge and mathematical principles to mitigate water-related problems in society and environmental protection. This may mean working out the best use of water supplies for cities or for irrigation, controlling river flooding or soil erosion, protecting or cleaning up pollution, planning long-term water storage reservoirs, flood risk assessment and flood/drought warning Domains of hydrology include Hydrometeorology, hydrology, hydrogeology, drainage basin management and water quality, where water plays the central role. Oceanography and meteorology are not included because water is only one of many important aspects within those fields. Hydrological research can inform environmental engineering, policy and planning.
Rainfall
It is defined as the total condensation of moisture from the atmosphere that reaches the earth, including all forms of rains, ice and snow. Rain is liquid water in the form of droplets that have condensed from atmospheric water vapor and then precipitated that is, become heavy enough to fall under gravity. The major cause of rain production is moisture moving along three-dimensional zones of temperature and moisture contrasts known as weather fronts. If enough moisture and upward motion is present, precipitation falls from convective clouds (those with strong upward vertical motion) such as cumulonimbus (thunder clouds) which can organize into narrow rain band. In mountainous areas, heavy precipitation is possible where upslope flow is maximized within windward sides of the terrain at elevation which forces moist air to condense and
POWER PLANT ENGINEERING fall out as rainfall along the sides of mountains. On the leeward side of mountains, desert climates can exist due to the dry air caused by down slope flow which causes heating and drying of the air mass.
RAINFALL MEASUREMENT
Rain is measured using a rain gauge (also known as a udometer or a pluviometer which gathers and measures the amount of liquid precipitation over a set period of time. All rain gauges have their limitation .Attempting to collect rain data in high wind (hurricane conditions) can be nearly impossible and unreliable due to wind extremes preventing rain from entering the gauge .Rain gauges only indicate rainfall in a localized area. For virtually all gauges, drops will stick to the sides of the collecting device, resulting in slightly underestimated measurements .When the temperature is close to or below freezing, rain may fall on the funnel and freeze or snow may collect in the gauge and not permit any subsequent rain to pass through.
POWER PLANT ENGINEERING by the drop of water breaking the laser beam is detected as a sudden flash of light. The flashes from these photo detectors are then read and transmitted or recorded.
RUNOFF
Runoff is generated by rainstorms and its occurrence and quantity are dependent on the characteristics of the rainfall event, i.e. intensity, duration and distribution. There are, in addition, other important factors which influence the runoff generating process. R= P L Where R= runoff, P= precipitation, & L= All losses. Run-off = Total precipitation Total evaporation Part of the precipitation is absorbed by the soil and seeps or percolates into ground and will ultimately reach the catchment area through the underground channels. Thus. Total run-off = Direct run off over the land surface T Run-off through seepage. The unit of run-off is m3/s or day-second meter. Day-second meter = Discharge collected in the catchment area at the rate of 1 in 3/S for one day = 1 24 3600 = 86400 m3/day. The flow of run-off can also be expressed in cm. of water on the drainage area feeding the river site for a stated period, or km, cm of water per unit of time. Surface Runoff occurs when the intensity of precipitation exceeds the soil's infiltration rate.
POWER PLANT ENGINEERING The process of runoff generation continues as long as the rainfall intensity exceeds the actual infiltration capacity of the soil but it stops as soon as the rate of rainfall drops below the actual rate of infiltration.
FACTORSAFFECTING RUN-OFF
Apart from rainfall characteristics such as intensity, duration and distribution, there are a number of site (or catchment) specific factors which have a direct bearing on the occurrence And Volume Of runoff. 1. Nature of Precipitation. Short, hard showers may produce relatively little run-off. Rains lasting a longer time results in larger run-off. The soil tends to become saturated and the rate of seepage decreases. Also, the humid atmosphere lowers evaporation, resulting in increased run-off. 2. Topography of Catchments Area. Steep, impervious areas will produce large percentage of total run-off. The water will flow quickly and absorption and evaporation losses will be small. 3. Geology of Area. The run-off is very much affected by the types of surface soil and sub-soil, type of rocks etc. Rocky areas will give more run-offs while pervious soil and sub-soil and soft and sandy area will give lesser run-off. 4. Meteorology. Evaporation varies with temperature, wind velocity and relative humidity. Runoff increases with low temperature, low wind velocity and high relative humidity and vice versa. 5. Vegetation. Evaporation and seepage are increased by cultivation. Cultivation opens and roughens the hard, smooth surface and promotes seepage. Thick vegetation like forests consumes A portion of the rain fall and also acts as obstruction for run-off. 6. Size and Shape of Area. Large areas will give more run-offs. A wide area like a fan will give greater run-off, whereas, a narrow area likes a leaf will give lesser run-off. In an area whose length is more than its width, the flow along its width will give more run-off than if the flow is along its length, since in the former case, seepage and evaporation will be less.
10
MEASUREMENT OF RUNOFF Runoff can be measured by delineating a certain area of a field and collecting and measuring the volume of water passing the down slope border of that area. In view of the dynamic character of the process, the runoff rate will give the most useful information. From Rain-Fall Records The run-off can be estimated from rain-fall records by multiplying The rain fall with run-off coefficient for the drainage area. The run-off coefficient takes into account the various losses and will depend upon the nature of the catchment area, as given below: in Table 1.1 Table 1.1 Drainage Area Run-off-Coefficient Commercial and industrial 0.90 Asphalt or concrete pavement 0.85 Forests 0.05 to 0.30 Parks, farmland and pastures 0.05 to 0.30 Then, Run-off = Rain fall run-off co-efficient This is not an accurate method of measuring run-off since the estimation of run-off coefficient Can not be very accurate. 2. Empirical Formulas. Empirical relations to determine the stream flow relate only to a particular site and cannot be relied upon for general use. 3. Actual Measurement. Direct measurement by stream gauging at a given site for a long period is the only precise method of evaluation of stream flow. The flow is measured by selecting a channel of fixed cross-section and measuring the water velocity at regular intervals, at enough points in the cross-section for different water levels. The velocity of flow can
11
Fig.5 Stream gauging records Be measured with the help of current meter or float method. By integrating the velocities over the cross-section for each stage, the total flow for each stage can be calculated.
HYDROGRAPH
A hydrograph is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. The rate of flow is typically expressed in cubic meters or cubic feet per second (cams or cuffs). It can also refer to a graph showing the volume of water reaching a particular outfall, or location in a sewerage network, graphs are commonly used in the design of sewerage, more specifically, the design of surface water sewerage systems and combined sewers.
12
Fig.6 Hydrograph Types of hydrograph can include: 1. Storm hydrographs 2. Flood hydrographs 3. Annual hydrographs aka regimes 4. Direct Runoff Hydrograph 5. Effective Runoff Hydrograph 6. Raster Hydrograph 7. Storage opportunities in the drainage network (e.g., lakes, reservoirs, wetlands, channel and bank storage capacity)
UNIT HYDROGRAPH
A unit hydrograph (UH) is the hypothetical unit response of a watershed (in terms of runoff volume and timing) to a unit input of rainfall. It can be defined as the direct runoff hydrograph (DRH) resulting from one unit (e.g., one cm or one inch) of effective rainfall occurring uniformly over that watershed at a uniform rate over a unit period of
13
POWER PLANT ENGINEERING time. As a UH is applicable only to the direct runoff component of a hydrograph (i.e., surface runoff), a separate determination of the base flow component is required. A UH is specific to particular watershed, and specific to a particular length of time corresponding to the duration of the effective rainfall. That is, the UH is specified as being the 1-hour, 6-hour, or 24-hour UH, or any other length of time up to the time of concentration of direct runoff at the watershed outlet. Thus, for a given watershed, there can be many unit hydrographs, each one corresponding to a different duration of effective rainfall. The UH technique provides a practical and relatively easy-to-apply tool for quantifying the effect of a unit of rainfall on the corresponding runoff from a particular drainage basin. UH theory assumes that a watershed's runoff response is linear and time-invariant, and that the effective rainfall occurs uniformly over the watershed. In the real world, none of these assumptions are strictly true. Nevertheless, application of UH methods typically yields a reasonable approximation of the flood response of natural watersheds. The linear assumptions underlying UH theory allows for the variation in storm intensity over time (i.e., the storm hyetograph) to be simulated by applying the principles of superposition and proportionality to separate storm components to determine the resulting cumulative hydrograph. This allows for a relatively straightforward calculation of the hydrograph response to any arbitrary rain event. An instantaneous unit hydrograph is a further refinement of the concept; for an IUH, the input rainfall is assumed to all take place at a discrete point in time (obviously, this isn't the case for actual rainstorms). Making this assumption can greatly simplify the analysis involved in constructing a unit hydrograph, and it is necessary for the creation of a geomorphologic instantaneous unit hydrograph. The creation of a GIUH is possible given nothing more than topologic data for a particular drainage basin. In fact, only the number of streams of a given order, the mean length of streams of a given order, and the mean land area draining directly to streams of a given order are absolutely required (and can be estimated rather than explicitly calculated if necessary). It is therefore possible to calculate a GIUH for a basin without any data about stream height or flow, which may not always be available.
14
FLOW DURATION CURVE a flow duration curve shows the relation between flows and lengths of time during which they are available. The flows are plotted as the ordinates and lengths of time as abscissas. The flow duration curve can be plotted from a hydrograph.
MASS-CURVE
The use of the mass curve is to compute the capacity of the reservoir for a hydro site. The mass curve indicates the total volume of run-off in second meter-months or other convenient units, during a given period. The mass curve is obtained by plotting cumulative volume of flow as ordinate and time (days, weeks by months) as abscissa. A mass curve for a typical river for which flow data is given in Table 1.2.
The monthly flow is only the mean flow and is correct only at the beginning and end of the months. The variation of flow during each month is not considered. Cumulative daily flows, instead of monthly flows, will give a more accurate mass curve, but this involves an excessive amount of work. The slope of the curve at any point gives the flow rate in
15
POWER PLANT ENGINEERING second-meter. Let us join two points X and Y on the curve. The slope of this line gives the average rate of flow during the period between X and Y. This will be = (Flow at Y-Flow at X)/Time Span.
16
POWER PLANT ENGINEERING To select the site of the dam ; careful study should be made of the geology and topography of the catchment area to see if the natural foundations could be found and put to the best use. 3. Head of Water. The level of water in the reservoir for a proposed plant should always be within limits throughout the year. 4. Distance from Load Center. Most of the time the electric power generated in a hydro-electric power plant has to be used some considerable distance from the site of plant. For this reason, to be economical on transmission of electric power, the routes and the distances should be carefully considered since the cost of erection of transmission lines and their maintenance will depend upon the route selected.
5. Access to Site. It is always a desirable factor to have a good access to the site of the plant. This factor is very important if the electric power generated is to be utilized at or near the plant site. The transport facilities must also be given due consideration.