You are on page 1of 98

A Project Report On

DESIGN AND ESTIMATION OF HIGH LEVEL BRIDGE


A project report submitted in partial fulfillment of the requirement for the award of Bachelor in Technology in Civil Engineering

By M. NAGARAJU S.CHANDRA SEKHAR V.NITIN SANTHOSH B.VENKATESH Under the esteemed guidance of Smt. G.ARUNA LATHA (M. Tech, Ph. D) Professor 09671A0126 09671A0145 09671A0148 09671A0152

DEPARTMENT OF CIVIL ENGINEERING J.B.INSTITUTE OF ENGINEERING AND TECHNOLOGY (AFFILIATED TO JNTUH) YENKAPALLY, MOINABAD, HYDERABAD-500075 2012-2013

DEPARTMENT OF CIVIL ENGINEERING CERTIFICATE

This is to certify that the project entitled DESIGN AND ESTIMATION OF HIGH LEVEL BRIDGE has been carried out by students mentioned below in partial fulfillment of the degree of bachelor of technology in civil engineering. J.B.INSTITUTE OF ENGINNERING AND TECHNOLOGY during the academic year 2012-2013. BY M.NAGARAJU S.CHANDRA SEKHAR V.NITIN SANTHOSH B.VENKATESH 09671A0126 09671A0145 09671A0148 09671A0152

INTERNAL GUIDE

EXAMINER

HEAD OF THE DEPARTMENT

ACKNOWLEDGEMENT
We are extremely beholden and own an irredeemable debt of gratitude to and we shall never be able to express our gratefulness in words to our guide who not only shared technical knowledge but has a constant source of inspiration throughout our project work. We express our sincere gratitude to Smt. G.ARUNA LATHA, Professor, Department of Civil Engineering, J.B.I.E.T.

We express our deep sense of gratitude, respect and indebtedness to Er. T.L. RAMADASU, Head of Department, Civil for providing a good environment for completing our project work. We express our sincere thanks to Dr. K.V.J RAO, Principal, Dr. G. JAGMOHAN DAS, Advisor and Dr. KOTHARI, Director General, J.B.I.E.T for providing us the beloved lectures, parents and friends for their encouragement and well wishes during our project work.

We here by express our profound sense of gratitude to my external guide Mr. V.NIRANJAN RAO, ASSISTANT ENGINEER in Tribal Welfare Department Bhadrachalam (ITDA), accomplish our project successfully. for taking pain in helping us to

DECLARATION

We, the following students of J.B.I.E.T M. NAGARAJU S.CHANDRA SEKHAR V.NITIN SANTHOSH B.VENKATESH 09671A0126 09671A0145 09671A0148 09671A0152

Studying IV year II semester B.Tech Civil Engineering hereby declare that the project entitled DESIGN AND ESTIMATION OF HIGH LEVEL BRIDGE has been carried out by us under the guidance of Smt. G.ARUNA LATHA. This work has been submitted in partial fulfillment of the requirements for the award of Bachelor of Technology in Civil Engineering by Jawaharlal Nehru Technological University during the academic year 20122013

Name of the candidate M. NAGARAJU S.CHANDRA SEKHAR V.NITIN SANTHOSH B.VENKATESH

Signature of the candidate

CONTENTS
ABSTRACT 1. INTRODUCTION 2. PURPOSE 3. LOCATION OF THE PROJECT 4. HISTORY 5. CLASSIFICATION OF BRIDGES 6. TERMINOLOGY AND NOMENCLATURE 6.1 SUPER STRUCTURE 6.1 .1 Wearing surface 6.1.2 Lateral Bracing 6.1.3 Deck 6.1.4 Primary members 6.1.5 Secondary Members 6.2 SUB STRUCTURE 6.2.1 Abutments 6.2.2 Piers 6.2.3 Bearings 6.2.4 Pedestals 6.2.5 Wing wall

Pg. No.

1 2 3 4 5 11 11 11 12 13 13 14 14 14 15 16 16 17

7. DATA COLLECTION 7.1 Preliminary data to be collected 7.2 Selection of Bridge site 7.3 Stages of Investigation 7.4 Bridge Alignment 7.5 Traffic Requirement of Highway Bridges 7.6 Waterway of a Bridge 7.7 Maximum Flood Discharge 7.8Loads and Load Combinations 7.9Foundations 7.10 Cofferdams

19 19 20 22 24 25 26 27 29 36 38

8. DESIGN DATA

39 42 43 44 44 49 50 52 53 54 54 56 64

8.1 Design procedure Adopted


8.2 Live Load eccentricity calculations 9. CALCULATIONS 9.1Calculation of Discharge 9.2 Calculation of Linear Waterway 9.3 Calculation of Scour Depth 9.4 Span Arrangement 9.5 Salient features 10. INITIAL PREPARATION 10.1 Removal of structures and obstructions 10.2 Excavation and embankment 10.3 Rock Blasting

11. AUTO CADD VIEWS 12. ESTIMATE DATA 13. BRIDGE ACCESSORIES 13.1 Parapets 13.2 Expansion joints 13.3 Drainage 13.4 Water Proofing 13.5 Bearings 14. CONCLUSION 15. REFERENCES

70 76 81 81 82 84 86 86 89 90

ABSTRACT
This project we have done is under the aegis of Integrated Tribal Development Agency (ITDA), Government of Andhra Pradesh. The site is located in Yellandu Mandal about 14.80 km from the town. It is located at a distance of 64.80 km from Khammam town of Khammam District. Its satellite location on map is given as Latitude 17 - 65 Longitude 80 - 25. The careful investigation at the preliminary stage avoids many expensive errors at a later stage. We have collected preliminary data which helps in arriving at the design procedure to be selected.

1. INTRODUCTION
8

A bridge is an arrangement made to cross an obstacle in the form of a low ground or a stream or a river or over a gap without closing the way beneath. The bridges are required for the passage of railways, roadways, footpaths and even for the carriage of fluids. It is quite evident that the development of the science of bridge engineering has taken place with the development of human civilization. In the beginning, the men used fallen trees or wooden logs to function as bridges. The bridges serve as the most useful links on the land connecting big towns and cities and hence, in case of war or calamities, the destruction of bridges stops the mobility of army or essential goods. The site of a bridge should therefore be properly selected with respect to strategic considerations and all proper precautions and measures should be taken to maintain the bridges in the perfect working order. The construction of bridge in a road or rail project is the costliest part and hence, it calls for the utmost economy. It takes the longest time for completing and requires careful planning, considerable amount of forethought and detailed study of various aspects. It may also be noted that the bridges across rivers and streams are the most vulnerable because any major damage to the structure can completely upset the total communication system. It is for this reason that no undue risk can be taken in their design and construction. The economy in bridge construction as well as its long life can be successfully achieved only by the use of proper materials, effective supervision and economic method of construction.

2. PURPOSE

A bridge is a structure built to span physical obstacles such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. There are many different designs that all serve unique purposes and apply to different situations. Designs of bridges vary depending on the function of the bridge, the nature of the terrain where the bridge is constructed, the material used to make it and the funds available to build it. Mainly to achieve more direct paths of circulation between two points, sorting out obstacles such as gaps, treacherous terrain, bodies of water, etc.

Strategical View of the bridge

3. LOCATION
10

The site is located in Yellandu Mandal about 14.80 km from the town. It is located at a distance of 64.80 km from Khammam town of Khammam District. Its satellite location on map is given as Latitude 17 - 65 Longitude 80 - 25

The bridge was constructed by Integrated Tribal Development Agency (ITDA) Department, recognized by Govt. of Andhra Pradesh.

Location of bridge

4. HISTORY
11

The earliest construction of permanent bridges started around 4000 B.C. The lake dwellers of Switzerland are said to be the pioneers of timber-trestle construction. The Indians also developed the prototype of the modern suspension bridge at about the same time. The Arthashastra of Kautilya mentions the construction of dams and

bridges a Mauryan bridge near Girnarwas surveyed by James Princep. The bridge was swept away during a flood, and later repaired by Puspa gupta, the chief architect of Emperor Chandragupta I. The bridge also fell under the care of the Yavana Tushaspa, and the Satrap Rudradaman. The use of stronger bridges using plaited bamboo and iron chain was visible in India by about the 4th century. A number of bridges, both for military and commercial purposes, were constructed by the Mughal administration in India. The science of bridge engineering developed with varied degrees in different countries. Some of the Roman bridges in Italy are among the fine bridges of the past. In the eighteenth century, France was the most powerful country of continental Europe and because of its prosperity and taste in art, it has produced numerous and the finest bridges during this period. It is really a pleasure to see the existing century bridges in France. The bridge over the river Nile built by Means, the king of Egypt about 2650 B.C. was the earliest bridge on record. After five centuries, another bridge was built by Queen Semiramio of Babylon across the River Euphrates. The oldest existing arch dating back to about 350 B.C. and consisting of 20 pointed arches each of 7.5m span is at Khorsbad in Babylonia. The Roman arch bridges date back to 200 B.C. The ChaoChow Bridge situated at a distance of about 350 km from Beijing is supposed to be built around 600 A.D. and is perhaps the longest single span of 37.4 m vehicular bridge at present. Timber gave place to iron as building material in eighteenth century. The first iron bridge of 30.5 m span was built in 1779 over the Severn in Coalbrookdale, England.

5. CLASSIFICATION OF BRIDGES
12

The bridges can be classified by many ways with respect to particular quality or condition. Following are such various classifications of the bridges: CRITERIA FLEXIBILITY OF SUPER STRUCURE TYPES OF BRIDGES FIXED SPAN BRIDGE MOVABLE BRIDGE

POSITION OF BRIDGE FLOOR

DECK BRIDGES THROUGH BRIDGES SEMI-THROUGH BRIDGES

INTERSPAN RELATIONS

SIMPLE BRIDGES CONTINUOUS BRIDGES CANTILEVER BRIDGES

TYPE OF SUPERSTRUCTURE

ARCH BRIDGE BOW-STRING BRIDGE RIGID FRAME BRIDGE SUSPENSION BRIDGE

MATERIALS OF CONSTRUCTION

CEMENT CONCRETE BRIDGES MASONRY BRIDGE STEEL BRIDGE TIMBER BRIDGE

METHOD OF CLEARANCE FOR NAVIGATION

BASCULE BRIDGE CUT-BOAT BRIDGE LIFT BRIDGE

13

SWING BRIDGE TRAVERSING BRIDGE

MAIN FUNCTION OF BRIDGE

ROAD BRIDGE RAILWAY BRIDGE ROAD-CUM-RAILWAY BRIDGE PIPE-LINE BRIDGE

METHOD OF CONNECTIONS ADOPTED

RIVETED BRIDGE WELDED BRIDGE PIN-CONNECTED BRIDGE

LENGTH OF SPAN

CULVERT MINOR BRIDGE MAJOR BRIDGE LONG SPAN BRIDGE

DEGREE OF REDUNDANCY

DETERMINATE BRIDGE INDETERMINATE BRIDGE

LEVEL OF CROSSING

OVER BRIDGES UNDER BRIDGES

14

ALIGNMENT OF BRIDGE

STRAIGHT BRIDGES SKEW BRIDGES

Bridges may be classified by how tension, bending, compression, and shear are distributed through their structure. Most bridges will employ all of the principal forces to some degree, but only a few will predominate. The separation of forces may be quite clear. In a suspension or cable-stayed span, the elements in tension are distinct in shape and placement. In other cases the forces may be distributed among a large number of members, as in a truss, or not clearly discernible to a casual observer as in a box beam.

Beam

Bridge

Beam bridges are horizontal beams supported at each end by substructure units and can be either simply when the beams only connect across a single span or continuous when the beams are connected across two or more spans. When there are multiple spans, the intermediate supports are known as piers. The earliest beam bridges were simple logs that sat across streams and similar simple structures. In modern times, beam bridges can range from small, wooden beams to large, steel boxes. The vertical force on the bridge becomes a shear and flexural load on the beam which is transferred down its length to the substructures on either side. They are typically made of steel, concrete or wood. Beam bridge spans rarely exceed 250 feet (76 m) long, as the flexural stresses increase proportional to the square of the length (and deflection increases proportional to the 4th power of the length). However, the main span of the Rio-Niteroi Bridge, a box girder bridge, is 300 meters (980 ft).The world's longest beam bridge is Lake Pontchartrain Causeway in southern Louisiana in the United States, at 23.83 miles (38.35 km), with individual spans of 56 feet (17 m). Beam
15

bridges are the most common bridge type in use today. Truss bridge A truss bridge is a bridge whose loadbearing superstructure is composed of a truss. This truss is a structure of connected elements forming triangular units. The connected elements (typically straight) may be stressed from tension, compression, or sometimes both in response to dynamic loads. Truss bridges are one of the oldest types of modern bridges. Cantilever bridges are built using cantilevershorizontal beams supported on only one end. Most cantilever bridges use a pair of continuous spans that extend from opposite sides of the supporting piers to meet at the center of the obstacle the bridge crosses. Cantilever bridges are constructed using much the same materials & techniques as beam bridges. The difference comes in the action of the forces through the bridge. The largest cantilever bridge is the 549-metre (1,801 ft) Quebec bridge in Quebec, Canada. Arch bridges have abutments at each end. The weight of the bridge is thrust into the abutments at either side. The earliest known arch bridges were built by the Greeks, and include the Arkadiko Bridge. With the span of 220 meters (720 ft), the Solkan Bridge over the Soca River at Solkan in Slovenia is the second largest stone bridge in the world and the longest railroad stone bridge. It was Arch bridge completed in 1905. Its arch, which was constructed from over 5,000 tonnes (4,900 long tons; 5,500 short tons) of stone blocks in just 18 days, is the second largest stone arch in the world, surpassed only by the Friedensbrucke (Syratalviadukt) in Plauen, and the largest railroad stone arch. The arch of the Friedensbrcke, which was built in the same year, has the span of 90 m (300 ft) and crosses the valley of the Syrabach River. The difference between the two is that the Solkan Bridge was built from stone blocks, whereas the Friedensbrcke was built from a mixture of crushed stone and cement mortar. The world's current largest arch bridge is the Chaotian Bridge over the Yangtze River with a length of 1,741 m (5,712 ft) and a span of 552 meters (1,811 ft). The bridge was open April 29, 2009 in Chongging, China. Tied arch Tied arch bridges have an arch-shaped superstructure, but differ from conventional arch bridges. Instead of transferring the weight of the bridge and traffic loads into thrust forces into
16

Cantilever

bridge

the abutments, the ends of the arches are restrained by tension in the bottom chord of the structure. They are also called bowstring arches. bridge

Suspension bridge

Suspension bridges are suspended from cables. The earliest suspension bridges were made of ropes or vines covered with pieces of bamboo. In modern bridges, the cables hang from towers that are attached to caissons or cofferdams. The caissons or cofferdams are implanted deep into the floor of a lake or river. Sub-types include the simple suspension bridge, the stressed ribbon bridge, the under spanned suspension bridge, the suspended-deck suspension bridge, and the selfanchored suspension bridge The longest suspension bridge in the world is the 12,826 foot (3,909 m) Akashi Kaikyo Bridge in Japan.

Cable-stayed

Cable-stayed bridges, like suspension bridges, are held up by cables. However, in a cable-stayed bridge, less cable is required and the towers holding the cables are proportionately shorter. The first known cable-stayed bridge was designed in 1784 by C.T. Loescher] The longest cable-stayed bridge is the Sutong bridge over the Yangtze River in China.

bridge

According to the road engineers, the bridges are classified on the linear waterway as follows: 1) Culverts (Up to 6m) 2) Minor bridges (6 to 30 m) 3) Major bridges (over 30m)

According to the Indian Railways, the bridges are classified as follows: 1) Major bridges : Total waterway more than 18m or having any span of clear water way of 12m or over.
17

2) Minor bridges

: Total waterway less than 18m or having any span of clear waterway less than 12m. : Those major bridges having total waterway of 18m and more.

3) Important bridges

6. TERMINOLOGY AND NOMENCLATURE


As is the case with any profession, bridge engineering possesses its own unique language which must first be understood by the designer in order to create a uniform basis for discussion. A span is defined as of bridge from support to support. The following offers a brief overview of some of the major bridge terms we will be using throughout the text.

18

6.1 Superstructure The superstructure comprises all the components of a bridge above the supports. The basic superstructure components consist of the following:

6.1.1 Wearing Surface The wearing surface (course) is that portion of the deck cross section which resists traffic wear. In some instances this is a separate layer made of bituminous material, while in some other cases it is a of concrete deck. The integral wearing surface is typically 1/2 to 2 in(13 to 51 mm). The bituminous wearing course usually varies in thickness from 2 to 4 in (51 to 102 mm).

FIG: WEARING COAT

6.1.2 Lateral Bracing Lateral bracing is a type of secondary member used to resist lateral deformation caused by loads acting perpendicularly to a bridge's longitudinal axis. Wind forces are an example of this type of loading. In addition to these inherit structural benefits, lateral bracing also simplifies the construction process by allowing girders to be connected prior to erection and installed as a unit larger due to resurfacing of the overpass roadway, which occurs throughout the life cycle of a bridge.
19

FIG: LATERAL BRACING

6.1.3 Deck The deck is the physical extension of the roadway across the obstruction to be bridged. In an orthotropic bridge, the deck is a stiffened steel plate. The main function of the deck is to distribute loads transversely along the bridge cross section. The deck either rests on or is integrated with a frame or other structural system designed to distribute loads

20

longitudinally along the length of the bridge.

FIG: DECK SLAB

6.1.4 Primary Members Primary members distribute loads longitudinally and are usually designed principally to resist flexure and shear. In some instances, the outside or fascia primary members possess a larger depth and may have a cover plate welded to the bottom of them to carry heavier loads. Beam type primary members such as this are also called stringers or girders. These stringers could be steel wide flange stringers, steel plate girders (i.e., steel plates welded together to form an I section), pre stressed concrete, glued laminated timber, or some other type of beam. Rather than have the slab rest directly on the primary member, a small fillet or haunch can be placed between the deck slab and the top flange of the stringer. The primary function for the haunch is to adjust the geometry between the stringer and the finished deck. It is also possible for the bridge superstructure to be formed in the shape of a box (either rectangular or trapezoidal). Box girder bridges can be constructed out of steel or pre stressed concrete and are used in situations where large span lengths are required and for horizontally curved bridges.
21

6.1.5 Secondary Members Secondary members are bracing between primary members designed to resist cross-sectional deformation of the super structure frame and help distribute part of the vertical load between stringers. They are also used for the stability of the structure during construction. A detailed view of a bridge superstructure shows channel-type diaphragms used between rolled section stringers. The channels are bolted to steel connection plates, which are in turn welded to the wide flange stringers shown. Other types of diaphragms are short depth, wide flange beams or crossed steel angles. Secondary members, composed of crossed frames at the top or bottom flange of a stringer, are used to resist lateral deformation. This type of secondary member is called lateral bracing. 6.2 Substructure The substructure consists of all elements required tosupport the superstructure and overpass roadway. this would be Items 3 to 6. The basic substructure components consist of the following 6.2.1 Abutments Abutments are earth-retaining structures which support the superstructure and overpass roadway at the beginning and end of a bridge. Like a retaining wall, the abutmentresist the longitudinal forces of the earth underneath the overpass roadway.

Fig: Abutment

6.2.2 Piers Piers are structures which support the superstructure at intermediate points between the end supports (abutments). Like abutments, piers come in a variety of forms, some of which are illustrated in the sidebar. From an aesthetic standpoint, piers are one of the
22

most visible components of a highway bridge and can make the difference between a visually pleasing structure and an unattractive one.

Fig: Piers under construction

The bridge pier itself can vary in size and shape. This part of the bridge is essentially a supporting pylon, and it can be shaped like a beam, or it may feature a more sweeping shape, like a V. Generally, modern piers are made from concrete, though some can be made of stone or even metal. A bridge pier designed to be submerged in water is likely to be made of concrete, as metal can rust or otherwise corrode due to the constant exposure to moisture. Before the bridge pier can be installed into the water, the river bottom or bottom of the waterway must be dredged so the soil can support the weight of the pier and bridge surface.

6.2.3 Bearings Bearings are mechanical systems which transmit the vertical and horizontal loads of the superstructure to the substructure, and accommodate movements between the superstructure and the substructure. Examples of bearings are mechanical systems made of steel rollers acting on large steel plates or rectangular pads made of neoprene. The use and
23

functionality of bearings vary greatly depending on the size and configuration of the bridge. Bearings allowing both rotation and longitudinal translation are called expansion bearings, and those which allow rotation only are called fixed bearings.

6.2.4 Pedestals A pedestal is a short column on an abutment or pier under a bearing which directly supports a superstructure primary member. The term bridge seat is also used to refer to the elevation at the top surface of the pedestal. Normally pedestals are designed with different heights to obtain the required bearing elevations.

6.2.5 Wing wall In a bridge, the wing walls are adjacent to the abutments and act as retaining walls. They are generally constructed of the same material as those of abutments. The wing walls can either be attached to the abutment or be independent of it. Wing walls are provided at both ends of the abutments to retain the earth filling of the approaches. Their design period
24

depends upon the nature of the embankment and does not depend upon the type or parts of the bridge. The soil and fill supporting the roadway and approach embankment are retained by the wing walls, which can be at a right angle to the abutment or splayed at different angles. The wing walls are generally constructed at the same time and of the same materials as the abutments.

Fig: Wing walls

Classification of wing walls Wing walls can be classified according to their position in plan with respect to banks and abutments. The classification is as follows:

25

1.Straight Wing walls: They are used for small bridges, on drains with low banks and for railway bridges in cities (weep holes are provided). 2. Splayed Wing walls: These are used for bridges across rivers. They provide smooth entry and exit to the water. The splay is usually 45. Their top width is 0.5 m, face batter 1 in 12 and back batter 1 in 6, weep holes are provided. 3. Return Wing walls: They are used where banks are high and hard or firm. Their top width is 1.5 m and face is vertical and back battered 1 in 4. Scour can be a problem for wing walls and abutments both, as the water in the stream erodes the supporting soil.

7. DATA COLLECTION
7.1 Preliminary Data To Be Collected

26

The careful investigation at the preliminary stage avoids many expensive errors at a later stage. Hence, the investigation process should be carried out diligently and with extreme care to avoid the occurrence of serious mistakes in the bridge project. Following data should be collected and suitably analyzed by the engineer-in-charge of the investigation of a bridge site: Availability of electric power; Availability of materials of construction; Availability of skilled and unskilled labor for different jobs of bridge construction; Characteristics and hydraulic data of stream or river; Details of public utility services such as telephone cables, water supply lines, etc. to be accommodated in the bridge cross-section; Details of existing bridges on the same river; Facilities required for housing labor during bridge construction; Location of the nearest G.T.S. bench mark with its reduced level; Means of transport to carry the materials; Name of the river and location of the bridge site; Navigational requirements; Need for large scale training works; Possibility of earthquake disturbances Present and future traffic; Reasons for constructing the bridge; Safety and aesthetic considerations; Subsoil conditions; etc.

7.2 Selection of Bridge Site Following are the factors to be carefully considered while selecting the ideal site for a proposed bridge:
27

Connection with roads: The bridges are constructed to connect the roads on either side of the river. The bridge site should therefore form a proper link between the roads on either side of a river. The bed of approaches connecting ends of bridge with the roads should be dry and hard. The approaches at the bridge site should be such that they do not involve heavy expenditure. The approaches should avoid the cutting across the built-up area or religious structures because the acquisition of the land and structures will be expensive, time-consuming and sometimes may cause social problems. Firm embankments: The embankments on the upstream side and downstream side of bridge site should be firm, high, permanent, solid, straight and well-defined. Such embankments are not disturbed at the time of heavy floods and they do not allow the course of river to alter. Foundations: The nature of soil at the bed of river at bridge site should be such that good foundations are available at reasonable depths for the substructures of bridge. The site subject to minimum scour preferably is chosen. Materials and labor: The site of the proposed bridge should be located that the materials and labor required for the reconstruction of bridge are easily available. The transport charges for materials and labor at bridge site should be minimum. Right angle crossing: At bridge site, the direction of flow of water should be nearly perpendicular to the centre-line of bridge. Such a crossing is known as the right-angle crossing or square crossing or normal crossing and it is desirable to have such a crossing as far as possible because of the following facts: It grants a smooth flow of water. It permits the construction of segmental wing walls and return walls with minimum sharp angled structures and thereby, the formation of eddies and cross currents are avoided, It provides the shortest length of the bridge span as well as the length of the pier and abutments.

The skew or slanting bridges are not desirable and they are usually avoided for the following reasons: It is difficult to construct the skew bridges, especially the skew arch bridges. The depth of bridge foundations is likely to be more as foundations are to be subjected to the scour. The design of skew bridges is complicated.
28

The maintenance of skew bridges is difficult. The passage of water under the skew bridges is not smooth and whirls or currents are produced. The piers of skew bridge have to resist excessive water pressures.

Straight stretch of river: The River should have a straight stretch over reasonable long distance on the upstream side and downstream side of the bridge site. Such a straight stretch of river ensures smooth and uniform flow of water and it allows smooth navigation. The curved stretch of river is not desirable as it creates problems during construction and maintenance of bridge. Velocity of flow: It is very important to check that the velocity of flow at bridge site is proper. If velocity of flow is less than a particular value, the silting will occur and on the other hand, if it is more than a particular value, the scouring will occur. As a matter of fact, the velocity of flow at bridge site should be between the range of nonsilting and non-scouring velocities. Width of river: It is quite evident that the width of river indicates length of bridge. It is desirable to have minimum width of river at the bridge site. The smaller the width of river, the cheaper will be the bridge.

The conditions stated above are for an ideal site of a bridge. But in practice, it is difficult to obtain a site which full fulfill all these conditions. Hence, every case has to be studied independently and out of a number of alternatives, that site is to be recommended which satisfies most of the conditions for an ideal site.

7.3 Stages of Investigation The investigations for important or very major bridges are carried out in the following three stages:

29

Reconnaissance or technical feasibility stage: In this stage, the entire length of the entire length of the river within the area to be interconnected has to be studied so as to find out a number of probable sites satisfying the various considerations for locating a bridge. The numbers of factors satisfied by each site are noted and those sites which satisfy most of the favorable factors are selected for further considerations in the next stage. The factors to be studied in this stage can be mentioned as follows: Estimating the benefits that will accrue from the likely traffic to pass over the bridge; Gathering data about the behavior of the river at such sites by studying the valuable reports; Holding discussions with local knowledgeable people; Making an assessment of construction problems; Study of available maps; Studying the existing pattern of traffic; Visits to various possible sites so as to understand local features; etc. It should be possible at this stage to narrow down the choice to three or four alternative sites for the proposed bridge. Preliminary or techno-economic feasibility stage: In the second stage, an attempt is made to bring out in full detail the comparative merits and demerits of the various alternative sites which are considered feasible in the first stage. The study of such a table would help in choosing the best site of the bridge. It is also necessary to work out the estimated costs of various alternative sites and such estimation should be done carefully so that final cost may be within a range of plus or minus 15 per cent of the final cost. For this purpose, some minimum field measurements are taken and detailed study maps of the area is made.

The details to be obtained for each site should be tabulated with respect to the following aspects: Construction and maintenance problems; Distance from important city or town; Expected duration of construction;
30

Length of approaches; Length of bridge; Nature of flow at site; Nature of foundation strata; Rate of return or benefit cost ratio; Saving in detours involved, if any; Total construction cost of bridge; Volume of anticipated traffic; etc. Depending upon the length of the river to be covered, the techno-economic

feasibility study can generally be completed in a period of about four to five months. Detailed survey and project report stage: Out of possible alternatives, the final selection of bridge site is made and in this stage, full investigations with respect to all items are carried out for the selected site. The detailed studies are made for ground survey, hydrological data, soil exploration, period of construction, volume of traffic, structural design, detailed estimate, return on investment, construction schedule, etc. Finally, the project report containing large number of drawings and necessary details is prepared in such a shape that the sanction to the project can be issued; funds can be allotted; field organization can be set up; and the work regarding the preparation of tenders can be immediately started. In case of very major bridges, it is necessary to carry out the model studies because it is difficult to predict behavior of the river after a structure is put up across it. A scale model prepared in a hydraulic research station is helpful in forecasting the behavior of the river due to obstructions caused by embankment on either side and by piers.

7.4 Bridge Alignment After the site of bridge is decided, the next step is to set out of align the centerline of bridge. Following aspects of the bridge alignment should be carefully studied:

31

Alignment on curve: In hilly areas, it is not possible to avoid the alignment of bridge on a curve. In such cases, it is necessary to adopt R.C.C or steel girders for the superstructure and it should be seen that the axis of each pier is nearly parallel to the centre-line of river. Control of highest flood level: The highest flood level or H.F.L. of river plays a great role in fixing the height of the bridge. It is possible to control H.F.L. either by diverging the extra flood water or by constructing a storage reservoir on upstream side of the river. It is found that with controlled H.F.L., the design of bridge with adverse alignment can be accurately made. Effects of silting and scouring: The necessary precautions should be taken along the bridge alignment to bring down the effects of silting and scouring to the minimum possible extent.

Layout of approaches: If the existing road alignment is such that it results in an inclined alignment, the curved approaches may be adopted to form right-angle or square crossing. The layout of approaches is made with suitable curve radii so as to cause least inconvenience to the traffic using such approaches. River training works: If necessary, the river training works should be carried out to form what are known as nodal points i.e., points of minimum displacement in a system of stationary waves, along the bridge alignment. A nodal point is defined as the location where the river regime does not normally shift. The natural nodal points are established by the river flow over the years. The channels of the river shifting its course at the nodal points will be minimum and thus, the stability of the structure is insured. For this purpose, it is desirable to carry out experiments on models to decide the exact location of artificial river training works along the river. Skew bridges: As far as possible, the skew bridges should be avoided. However, if it is not possible to adopt the right-angle crossing, great care should be taken in the design and execution of skew bridges. The analysis and design of a skew bridge, especially when the skew angle is more than 15 degrees, are more complicated and rigorous than those of a right-angled bridge. The conditions which force the adoption of skew bridges are

32

excessive cost of land, acquisition for approaches, existing road alignment, length of bridge, nature of flow, importance of bridge, etc. Following precautions should be invariably taken in the design of skew bridges: It is preferred to arrange the piers parallel to the axis of river. The entry and exit of water below the skew bridge should be smooth. The skew alignment should not be curved as it is difficult to construct and maintain the curved bridge. The additional force due to the centrifugal action will come into play in case of the curved bridge. The skew should be restricted to 30 degrees.

7.5 Traffic Requirement of Highway Bridges Following are the requirements of traffic which are to be considered in the design of highway bridges: Alignment: The sitting or location of bridge should fit in with the general road alignment. It may require the adoption of skew bridges. It is the general practice to adopt the skew bridges of small angle for small bridges and to adopt square crossings with suitable approaches for long bridges. Central verge: In interest of safety and traffic flow, it sometimes becomes desirable to segregate or separate traffic flow of two directions by the provision of central verge. The width of this strip should be kept low from the economic point of view. But it should not be less than 1200 mm. Footpath: The provision of footpaths on either side of the bridge will make movements of pedestrian safe on the bridge and it will result in the reduction of fatal accidents on the bridge. The width of the footpath will be decided by the volume of pedestrian traffic and importance of the bridge. For rural areas, the minimum width of footpath should be kept as 1500 mm and it should be suitably in the case of urban areas. The capacity of 1500 mm wide footpath can taken as 108 persons per minute and it should be increased at the rate of 600 mm for every additional capacity of 54 persons per minute.

33

Lighting: The lighting on bridge should be carefully designed with respect to distance between adjacent posts, height of post, surrounding environment, importance of bridge, etc. Parapets and handrails: The provision of solid parapets or handrails should be made on either side of the bridge to grant safety to the bridge users and to define the width of bridge. Roadway width: The minimum roadway widths required for vehicular traffic are mentioned in codes. General roadway width for a two-lane bridge for vehicular traffic is 7.5m. Safety kerbs: It is desirable to provide a safety kerb of size about 600 mm x 225 mm on either side of roadway. Sight distance: The provision of enough site distance on the highway bridges will ensure the stopping of vehicles without collision. It is measured between points 1200 mm above the roadway along the centerlines of both the nearside and offside lanes of the bridge. It should be seen that the sight distance is not reduced below the minimum limit due to obstructions such as shrubs, piers, abutments, etc. This precaution is necessary especially in case of underpasses

7.6 Waterway of A Bridge

The most important factor to be decided in the design of bridges is the determination of the waterway required for the bridge or culvert. The area under a bridge through which the water flows is called the natural waterway of a bridge. For important and big bridges, it should be designed to carry water at the time of maximum flood discharge. The length of bridge available between the extreme edge of a water surface at the highest flood level, measured at right angles to the abutment faces is known as linear waterway.

Following is the relation between waterway, maximum flood discharge and permissible velocity:

A= Q / V where A= waterway in m2 Q=Maximum flood discharge in m3 per second

34

V=Permissible velocity in m per second. The linear waterway is obtained as follows: L=A / d Where L=Length of linear waterway d= Average depth of water at bridge site.

The value of linear waterway so obtained is provided under a bridge. If piers or intermediate supports are provided for the bridge, the sum total of spans between successive supports should be equal to the linear waterway. The natural waterway is thus the total of linear waterway and widths of supports of bridge.

To workout waterway of a bridge, it is necessary to arrive at a suitable value of maximum flood discharge of the river. 7.7 Maximum Flood Discharge Wherever possible, the maximum flood discharge at bridge site is found out from at least two different methods and the higher of the two values is adopted as the discharge for designing the bridge. If the values by two different methods differ by more than 50% than maximum design discharge is limited to 1.5 times the lower estimate. This is due to the fact that from point of view of economy, it is not desirable to design the bridge for flood of extraordinary high intensity which will rarely occur due to reasons such as failure of dam or tank on the upstream side of bridge site. It is considered reasonable to design bridges for floods occurring once in 100 years and to design culverts for floods occurring once in 20 years. The design aspects should however ensure that the likely damages due to rarer floods are brought down to the minimum possible extent. Following are the two methods of calculating the maximum flood discharge: Direct method: In direct method, the area of cross section upto the H.F.L. and the velocity of flow are determined. The multiplication of area and velocity gives the maximum flood discharge. Following procedure is adopted to measure the area of cross-section upto the H.F.L. at bridge site:

35

The information regarding height of the highest flood level is carefully gathered and it is confirmed, wherever possible, by flood marks. If there is railway track near the bridge site, the signs of the highest flood discharge would usually be available in the form of markings on railway cross-drainage works. However, in case of new road formation in undeveloped or sparsely inhabited areas, the engineer during investigation has to decide the height of the highest flood discharge by contacting elderly inhabitants of the area and by observing the river banks, deposits of debris on tree trunks, etc.

Usually, three widths of river are selected. In addition to one at bridge site, one extra is selected on upstream side as well as on downstream side. The distance between the bridge site and the position of extra width is about 1600 m.

Along the widths so marked, the levels of bed of river are taken. These levels are plotted to a scale and cross-sections are obtained. The hydrographic surveying is used for measuring the soundings which are vertical downward distances from the surface of water to the river bed. The soundings are located by observations entirely from boat or entirely from the shore or from boat as well as from shore. The sounding machines in the form of battery-operated and electronic echo sounders are now available. They directly measure the depth of water.

The height of H.F.L. is marked on the cross-sections. The areas of cross-sections upto H.F.L. are then worked out. If A1, A2 and A3 represent the areas of cross-sections 1-1, 2-2 and 3-3 respectively, the average area of cross-section is obtained as follows: Average area of cross-section=( A1+ A2+ A3)/3

Measurement of velocity of flow is done by the following methods: By using Chezys formula, V=C (m i)1/2; where V=velocity of flow in m per second C= Chezys constant

36

m= hydraulic mean depth i= slope of hydraulic grade line. By direct observation also the velocity is obtained by following some methods: The time taken by a surface float or velocity rod to travel from one line to the other is noted. The surface float is to be adopted for small rivers. The velocity rod is adopted for large rivers. The surface floats are made of light materials such as cork or drift wood and they are generally of diameter varying from 80 mm to 160 mm. The velocity rods are made of hollow metal tube or wood and they are generally of diameter varying from 30 mm to 50 mm. The velocity rods are provided with weight at their bottom so that they can float vertically with their top just above water surface. They are made of adjustable lengths to suit different depths of water. The velocity rods directly measure the mean velocity hence no correction is necessary, when they are used. But, when surface floats are used, they give surface velocity and hence, to obtain mean velocity a correction factor is applied which varies from 0.8-0.9.

Indirect method: There are two indirect ways of estimating the maximum flood discharge. They are rational method and by the use of empirical formulae.

7.8 Loads and Load Combinations The following are the various loads to be considered for the purpose of computing stresses, wherever they are applicable. Dead load Live load Impact load Longitudinal force Thermal force Wind load Seismic load Racking force Forces due to curvature. Forces on parapets Frictional resistance of expansion bearings Erection forces
37

Dead load The dead load is the weight of the structure and any permanent load fixed thereon. The dead load is initially assumed and checked after design is completed. Live load Bridge design standards specify the design loads, which are meant to reflect the worst loading that can be caused on the bridge by traffic, permitted and expected to pass over it. In India, the Railway Board specifies the standard design loadings for railway bridges in bridge rules. For the highway bridges, the Indian Road Congress has specified standard design loadings in IRC section II. The following few pages brief about the loadings to be considered. For more details, the reader is referred to the particular standard. Railway bridges: Railway bridges including combined rail and road bridges are to be designed for railway standard loading given in bridge rules. The standards of loading are given for: Broad gauge - Main line and branch line Metre gauge - Main line, branch line and Standard C Narrow gauge - H class, A class main line and B class branch line The actual loads consist of axle load from engine and bogies. The actual standard loads have been expressed in bridge rules as equivalent uniformly distributed loads (EUDL) in tables to simplify the analysis. These equivalent UDL values depend upon the span length. However, in case of rigid frame, cantilever and suspension bridges, it is necessary for the designer to proceed from the basic wheel loads. In order to have a uniform gauge throughout the country, it is advantageous to design railway bridges to Broad gauge main line standard loading. The EUDLs for bending moment and shear force for broad gauge main line loading can be obtained by the following formulae, which have been obtained from regression analysis: For bending moment: EUDL in kN = 317.97 + 70.83l + 0.0188l2 449.2 kN (7.1) For shear force: EUDL in kN = 435.58 + 75.15l + 0.0002l2 449.2 kN (7.2)

38

Fig: IRC AA Loading

Highway bridges: In India, highway bridges are designed in accordance with IRC bridge code. IRC: 6 - 1966 Section II gives the specifications for the various loads and stresses to be considered in bridge design. There are three types of standard loadings for which the bridges are designed namely, IRC class AA loading, IRC class A loading and IRC class B loading. Fig.7.10 IRC AA loading IRC class AA loading consists of either a tracked vehicle of 70 tonnes or a wheeled vehicle of 40 tonnes with dimensions as shown in Fig. 7.10. The units in the figure are mm for length and tonnes for load. Normally, bridges on national highways and state highways are designed for these loadings. Bridges designed for class AA should be checked for IRC class A loading also, since under certain conditions, larger stresses may be obtained under class A loading. Sometimes class 70 R loading given in the Appendix - I of IRC: 6 - 1966 - Section II can be used for IRC class AA loading. Class 70R loading is not discussed further here. Class A loading consists of a wheel load train composed of a driving vehicle and two trailers of specified axle spacings. This loading is normally adopted on all roads on which permanent bridges are constructed. Class B loading is adopted for temporary structures and for bridges in specified areas. For class A and class B loadings, reader is referred to IRC: 6 - 1966 Section II. Foot Bridges and Footpath on Bridges The live load due to pedestrian traffic should be treated as uniformly distributed over the pathway. For the design of footbridges or footpaths on railway bridges, the live load including dynamic effects should be taken as 5.0 kN/m2 of the footpath area. For the design of footpath on a road bridges or

39

road-rail bridges, the live load including dynamic effects may be taken as 4.25 kN/m2 except that, where crowd loading is likely, this may be increased to 5.0 kN/m2. The live load on footpath for the purpose of designing the main girders has to be taken as follows according to bridge rules: (i) For effective spans of 7.5 m or less - 4.25 kN/m2 (ii) The intensity of load is reduced linearly from 4.25 kN/m2 for a span of 7.5 m to 3.0 kN/m2 for a span of 30m (iii) For effective spans over 30 m, the UDL may be calculated as given below:

Where, P = Live load in kN/m2 l = Effective span of the bridge in m. W = Width of the foot path in m. Where foot-paths are provided on a combined rail-road bridge, the load on foot-path for purpose of designing the main girders should be taken as 2.0 kN/m2.

Impact load

Fig :Impact percentage curve for highway bridges for IRC class A and IRC class B loadings The dynamic effect caused due to vertical oscillation and periodical shifting of the live load from one wheel to another when the locomotive is moving is known as impact load. The impact load is determined as a product of impact factor, I, and the

40

live load. The impact factors are specified by different authorities for different types of bridges. The impact factors for different bridges for different types of moving loads are given in the table.

Fig. shows impact percentage curve for highway bridges for class AA loading. Note that, in the above table l is loaded length in m and B is spacing of main girders in m. Longitudinal forces Longitudinal forces are set up between vehicles and bridge deck when the former accelerate or brake. The magnitude of the force F, is given by

Where, W weight of the vehicle g Acceleration due to gravity V change in velocity in time d t This loading is taken to act at a level 1.20 m above the road surface. No increase in vertical force for dynamic effect should be made along with longitudinal forces. The possibility of more than one vehicle braking at the same time on a multi-lane bridge should also be considered.

41

Thermal forces The free expansion or contraction of a structure due to changes in temperature may be restrained by its form of construction. Where any portion of the structure is not free to expand or contract under the variation of temperature, allowance should be made for the stresses resulting from this condition. The coefficient of thermal expansion or contraction for steel is 11.7 x 10-6 / oC

Wind load Wind load on a bridge may act Horizontally, transverse to the direction of span Horizontally, along the direction of span Vertically upwards, causing uplift Wind load on vehicles Wind load effect is not generally significant in short-span bridges; for medium spans, the design of sub-structure is affected by wind loading; the super structure design is affected by wind only in long spans. For the purpose of the design, wind loadings are adopted from the maps and tables given in IS: 875 (Part III). A wind load of 2.40 kN/m2 is adopted for the unloaded span of the railway, highway and footbridges. In case of structures with opening the effect of drag around edges of members has to be considered. Racking force This is a lateral force produced due to the lateral movement of rolling stocks in railway bridges. Lateral bracing of the loaded deck of railway spans shall be designed to resist, in addition to the wind and centrifugal loads, a lateral load due to racking force of 6.0 kN/m treated as moving load. This lateral load need not be taken into account when calculating stresses in chords or flanges of main girders.

Forces on parapets - Railings or parapets shall have a minimum height above the adjacent roadway or footway surface of 1.0 m less one half the horizontal width of the top rail or top of the parapet. They shall be designed to resist a lateral horizontal force and a vertical force each of 1.50 kN/m applied simultaneously at the top of the railing or parapet.

42

Seismic load If a bridge is situated in an earthquake prone region, the earthquake or seismic forces are given due consideration in structural design. Earthquakes cause vertical and horizontal forces in the structure that will be proportional to the weight of the structure. Both horizontal and vertical components have to be taken into account for design of bridge structures. IS: 1893 1984 may be referred to for the actual design loads.

Forces due to curvature - When a track or traffic lane on a bridge is curved allowance for centrifugal action of the moving load should be made in designing the members of the bridge. All the tracks and lanes on the structure being considered are assumed as occupied by the moving load. This force is given by the following formula:

Where, C - Centrifugal force in kN/m W - Equivalent distributed live load in kN/m V - Maximum speed in km/hour R - Radius of curvature in m Erection forces There are different techniques that are used for construction of railway bridges, such as launching, pushing, cantilever method, lift and place. In composite construction the composite action is mobilised only after concrete hardens and prior to that steel section has to carry dead and construction live loads. Depending upon the technique adopted the stresses in the members of the bridge structure would vary. Such erection stresses should be accounted for in design. This may be critical, especially in the case of erection technologies used in large span bridges.

43

Load combinations Stresses for design should be calculated for the most sever combinations of loads and forces. Four load combinations are generally considered important for checking for adequacy of the bridge. These are given in below table and are also specified in IS 1915 - 1961.

7.9 Foundations Foundations of the bridges have always been a matter of great concern to Civil Engineers. In many instances actual strata met with at the foundation level turned out to be quite different than that found at the time of geological and geotechnical investigation. The experiences of the past serve as a guide for the future. Spread footings Spread footings shall be proportioned and designed such that the supporting soil or rock provides adequate nominal resistance, considering both the potential for adequate bearing strength and the potential for settlement, under all applicable limit states in accordance with the provisions of this Section. Spread footings shall be proportioned and located to maintain stability under all applicable limit states, considering the potential for, but not necessarily limited to, overturning (eccentricity), sliding, uplift, overall stability and loss of lateral support. When sound soil materials exist near the surface, shallow foundations in the form of spread footings are commonly used. For foundation units situated in a stream, spread footings may be used when they can be placed on non-erodible rock. Spread footings used as bridge
44

foundations shall not be supported by embankment fill material including embankments consisting of mechanically or otherwise stabilized earth systems. Pile foundations Piling should be considered when spread footings cannot be founded on rock, or on competent soils at a reasonable cost. At locations where soil conditions would

normally permit the use of spread footings but the potential exists for scour, liquefaction or lateral spreading, piles bearing on suitable materials below susceptible soils should be considered for use as a protection against these problems. Piles should also be considered where right-of-way or other space limitations would not allow the use of spread footings, or where removal of existing soil that is contaminated by hazardous materials for construction of shallow foundations is not desirable. Piles should also be considered where an unacceptable amount of settlement of spread footings may occur. The geotechnical engineer is responsible for recommending when driven piles can be considered, the type of driven pile to be used, the service, strength or extreme event limit states capacity of the pile. The geotechnical engineer is also responsible for recommending the estimated pile tip elevation and any special requirements necessary to drive the piles. When steel piles are used, the corrosive life of the pile should be reported in the geotechnical report. Driven piles could be classified as follows: Battered Pile: A pile driven at an inclined angle to provide higher resistance to lateral loads. Friction Pile: A pile whose support capacity is derived principally from soil resistance mobilized along the side of the embedded pile. Point Bearing Pile: A pile whose support capacity is derived principally from the bearing resistance of the foundation material on which the pile tip rests. Combination Friction and Point Bearing Pile: A pile that derives its capacity from contribution of both friction resistance mobilized along the embedded pile and point bearing developed at the pile tip.

45

7.10 Coffer Dams A cofferdam is defined as a temporary structure which is constructed so as to remove water and soil from an area and make it possible to carry on the construction work under reasonable dry conditions. Following are the requirements of a cofferdam: The cofferdam should be reasonably water tight. It may either rest on impervious soil or may extended to impervious strata through pervious soils. It should be noted that absolute water tightness is not desired in a cofferdam. The cofferdam should be designed for the maximum water level and other destructive forces. The coffer dams are constructed with advantage where a large area of site is to be enclosed and hard bed is at reasonable depth

Fig: Example of coffer dam

46

8. DESIGN DATA 1. Overview


1. Type of crossing 2 Design Discharge = 3. MFL 4. Sill Level 5. Velocity of flow 6. Afflux 7. Vertical clearance 8. Silt Factor, Ksf = = Normal 1120.37 cum / sec +100.000 M

= + 93.500 = = = 1.408 m/sec 0.15 1.20 M

= 2.00

9. Normal Scour depth, dsm = 7.5 m (MFL-Soft rock level) 10. Foundation Levels = Soft rock level -1.5m For piers = + 91.000 m

For abutments = + 91.000 m

L.W.W and Vents Provided


1. L.W.W required 2. Vent Way Provided = 80 M = 5 Vents of 16.5 m (eff) without footpaths

3. Length of bridge (Back to Back of abutments) = 86.23 m (5*17.07+6*.03+2*.35= 86.23 m) Foundation Strata, SBC and Type of foundations adopted: Soft Rock/SDR is available at a shallow depth of 1.0 m below sill level as per excavation carried at site for piers and abutments. The SBC considered is 25.0 t/m2. Open Foundations are adopted. Piers

47

Open foundations in VCC M 15 are provided duly fixing the foundation level with 1.5 m embedment in SDR/Soft Rock Abutments: Open foundations in VCC M 15 are provided duly fixing the foundation level m embedment in SDR/Soft Rock Wing Walls: Box wings in VCC M 15 are proposed. Foundation Levels and strata of resting:All the Piers = (+) 91.000 Abutments A1, A2 Substructure:Abutments: Wall type abutments in VCC M 15 mix with skin reinforcement. Piers: Wall type piers in VCC M 15 mix with skin reinforcement. Wingwalls: Box wings in VCC M 15 mix with skin reinforcement. R.C.L Calculations:MFL V.C Afflux Deck Th. = = = = + 100.0 1.2 0.15 1.675 = (+) 91.000 (resting in SDR/SR) (resting in SDR/SR) with 1.5

Wearing coat = Bearings:-

0.100 +103.125 M Neoprene Rubber bearings of size 630X220X061 mm.

Type of Superstructure and Drawings adopted) : RCC T beam girder and RCC slabs of 16.5 m (eff) span , without footpaths are provided as per MOST BD drawing Nos. BD / 13-76,14-76A,15-76A. Expansion Joints :- Single Strip Seal Expansion Joints of standard make Wearing Coat :- As per BD drawing No. BD / 1- 69 A in VRCC M 30.
48

Thickness = 100mm at center and 50mm at edges Approach Slabs :- As per CE drawing No. 4- 71 in VRCC M30

Length = 4.0m,

Width = 7.5m, Thickness =0.30m

Hand Rails: As per drawing no. BD / 5-69 , type II in RCC M20 Data adopted from Standard Superstructure drawings for Design Purpose Drawing Nos. referred (without footpaths) a. BD/13-76 b. BD/14-76A c. BD/15-76A Dead Load : @ Pier Live Load : LL @ Pier = (DL+LL) - DL = 82.25 T @ Abutment = 70.0 T = 174 T @ Abutment = 87 T

Concrete Quantity / Span: Steel Quantity / Span

61.2 cum

(ii)Reinforcing steel: 10.373 T (Including 5 % extra for wastage and laps)

49

8.1 Design Procedure adopted


Substructure including foundations : Abutments and their foundations: Abutment: Wall type in VCC M 15 concrete with open foundations is designed as per IRC codes for 2 lanes.

Piers and their foundations: pier: Wall type in VCC M15 with open foundations is designed as per IRC codes for 2 lanes.

Wing walls and their foundation: Box wing wall in VCC M15 with open foundations as per IRC codes.

Bed blocks over abutments and piers: Computer MS EXCEL program is used for design of Bed block over abutment.

Backing walls: over abutment.

Computer MS EXCEL program is used for design of backing wall

50

8.2 Live Load eccentricity calculations (As per BD drawings of MORTH)

Transverse:(7.5/2) - ( 1.2 + (2.79/2) )

= 1.155m

Longitudinal: .285+.015

= .3 m

51

9. CALCULATIONS

9.1

Calculation of Discharge

Catchment Area Calculations

AS PER CA MAP SEPERATELY DRAWN Area = 325.000 . Sqkm approximate

Calculation of Discharge by Catchment Area Method Q = where c x M 3/4 Q= c= M= Q = Discharge in cumecs Constant = 14 325.000 = 1071.62 Cumecs

Catchment Area in Sqkm = 14 x 325


3/4

Calculation of Bed Slope Reduced level at Reduced level at Total Distance Slope = ( 93.259 92.983 250.00 ) 150.000 100.000 m Upstream m Downstream = = = = 93.259 m 92.983 m 250.000 m 0.00100

52

Calculation of Discharge by Area Velocity Method : Cross section @ Site of crossing MFL = + 100.000 m

HFL

G.L

Depth of Flow 0.000 1.019 1.705 2.017 2.071 2.048 1.945 1.817 1.663 1.589 1.572 1.611 1.650 1.946 2.462 3.091 3.612 4.899 5.773 6.705

Distance 0.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000

Mean Depth 0.000 0.510 1.362 1.861 2.044 2.060 1.997 1.881 1.740 1.626 1.581 1.592 1.631 1.798 2.204 2.777 3.351 4.256 5.336 6.239

Area 0.000 5.095 13.620 18.610 20.440 20.595 19.965 18.810 17.400 16.260 15.805 15.915 16.305 17.980 22.040 27.765 33.515 42.555 53.360 62.390

Perimeter 0.000 10.052 10.024 10.005 10.000 10.000 10.001 10.001 10.001 10.000 10.000 10.000 10.000 10.004 10.013 10.020 10.014 10.082 10.038 10.043

100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000 98.981 98.295 97.983 97.929 97.952 98.055 98.183 98.337 98.411 98.428 98.389 98.350 98.054 97.538 96.909 96.388 95.101 94.227 93.295

53

100.000 100.000 100.000 100.000 100.000 100.000 100.000 100.000

93.351 94.116 94.837 95.683 96.541 97.453 98.365 99.277

6.649 5.884 5.163 4.317 3.459 2.547 1.635 0.723 0.000

10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000

6.677 6.267 5.524 4.740 3.888 3.003 2.091 1.179 0.361

66.770 62.665 55.235 47.400 38.880 30.030 20.910 11.790 3.615

10.000 10.029 10.026 10.036 10.037 10.042 10.042 10.042 10.026

100.000 100.000

795.720 280.577 Mean Radius, R = A / P = Slope of drain bed, S = Rugosity Coefficient, n = Velocity V = 1 / n x R 2/3 x S 1/2 Discharge, Q = A * V = 795.720 280.577 0.0010 0.045 = 1120.374 1.408 Cumecs m / sec ` = 2.836 m

54

Cross section at 100m Upstream HFL G.L Depth of Flow 0.000 1.739 2.191 3.622 5.755 6.824 5.775 4.656 2.174 1.673 0.000 Distance 0.000 100.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 100.000

MFL

= + 100.100 m Area 0.000 86.950 9.825 14.533 23.443 31.448 31.498 26.078 17.075 9.617 83.650 Perimeter 0.000 100.015 5.020 5.201 5.436 5.113 5.109 5.124 5.582 5.025 100.014

Mean Depth 0.000 0.869 1.965 2.906 4.689 6.290 6.299 5.215 3.415 1.923 0.836

100.100 100.100 100.100 100.100 100.100 100.100 100.100 100.100 100.100 100.100 100.100 98.361 97.909 96.478 94.345 93.276 94.325 95.444 97.926 98.427

100.100 100.100

334.115 241.639 Mean Radius, R = A / P = Slope of drain bed, S = Rugosity Coefficient, n = Velocity V = 1 / n x R 2/3 x S 1/2 Discharge, Q = A * V = 334.115 241.639 0.0010 0.045 = 291.348 0.872 Cumecs m / sec 1.383 m

55

Cross section at 100m Downstream HFL 99.900 99.900 99.900 99.900 99.900 99.900 99.900 99.900 99.900 99.900 99.900 99.900 G.L 99.900 96.985 95.235 94.866 93.434 92.983 93.399 94.883 95.323 97.015 98.960 99.900 Depth of Flow 0.000 2.915 4.665 5.034 6.466 6.917 6.501 5.017 4.577 2.885 0.940 0.000 Distance 0.000 100.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.000 100.000

MFL

+99.900 m Area 0.000 145.750 18.950 24.248 28.750 33.458 33.545 28.795 23.985 23.378 9.563 47.000 Perimeter 0.000 100.042 5.297 5.014 5.201 5.020 5.017 5.216 5.019 6.150 5.365 100.004

Mean Depth 0.000 1.458 3.790 4.850 5.750 6.692 6.709 5.759 4.797 4.676 1.913 0.470

417.420

247.346

Mean Radius, R = A / P = Slope of drain bed, S = Rugosity Coefficient, n = Velocity V = 1 / n x R Discharge, Q = A * V


2/3

417.420 247.346 0.0010 0.045

1.688

xS

1/2

= 415.750

0.996 Cumecs

m / sec

SUMMARY OF DISCHARGE

S.No

Location

HFL (m)

Discharge

1 2 3

100m U/ S Site of crossing 100 m D/S

100.100 100.000 99.900

291.348 Cumecs 1120.374 Cumecs 415.750 Cumecs

56

Design Discharge The Discharge obtained from Area velocity method at upstream, site of crossing and downstream are mentioned above. The Discharge obtained from Catchment area is = 1071.62 Cumecs. Hence, the design dishcarge is considered as = 1120.37 Cumecs

9.2 Calculation of Linear Waterway

Discharge HFL =

Q =

1120.374 Cumecs

100.000 m

Sill level = 93.500 Velocity of flow Depth of flow Afflux (x)= = 1.408 m / Sec = 6.500 m

d = 100 - 93.5 m ( Assumed) = =

0.15

Head due to Afflux ha

V2 d2] / [(d+x)2 * 2 * 9.81] ( 1.408 ^ 2 ) x ( 6.5 ^ 2 ) ( 6.5 + 0.15 ) ^ 2 x ( 2 x 9.81 ) 0.097 m

57

Combined Head (ha + x) = Velocity through vents Vv = = Linear Water Way =Q / (Vv * d)
=

0.15+ 0.097 = 0.9 v [2*g*(ha+x)]

0.247

0.9 x SQRT { 2 x 9.81 x ( 0.247 ) } 1.981 = m / Sec 1120.374 = ( 1.981 x 6.5 ) 87.009 m

Skew Angle is = Linear water way in skew is = PROVIDE LWW =

87.009

SAY

87.000 m

80 as per site condition

9.3 Calculation of Scour Depth


Normal Scour Depth HFL = 100.000 m

Sill level = 93.500 Db = Q/L = 1120.37 80.00 = 12.878 m

dsm

1.34 * (Db2 / ksf)1/3 ksf = 2.00 1.34 x = dsm ( 12.878 ^ 2 / 2 ) =


1/3

Silt factor dsm =

= 5.835

5.835

Normal Scour Depth

m below HFL

58

Pier Max Scour Depth = 2.0xdsm = Grip length = 11.670 m 3.890 = m = 15.560 m

( 1 / 3 ) x 11.67 =

Max Scour Depth including grip length

11.67 + 3.89

Foundation Level =HFL - Max Scour Depth including grip length = 100 - 15.56 = Say Depth below sill level= = ABUTMENT Max Scour Depth = 1.27xdsm= Grip length = ( 1 / 3 ) x 7.41 = = 7.410 m 2.470 m 9.880 m 84.440 84.400 m m

Sill level - Foundation Level 9.100 m

93.5 - 84.4 =

Max Scour Depth including grip length Foundation level =

7.41 + 2.47 =

= HFL - Max Scour Depth including grip length 100 - 9.88 = Say 90.120 90.100 m m

Depth below sill level= =

Sill level - Foundation Level = 3.400 m

93.5 - 90.1

Soft Rock is availble at shallow depth of 1.0m below sill Propose OPEN FOUNDATION with 1.5 m embedment in soft rock FOUNDATION LEVEL 93.5 = - 2.5 = 91.000 m

59

9.4 Span Arrangement


Linear Water way requried in normal direction = 80.000 m

Economical span = 1.5 ( HFL + 1.2 + 0.15 - 91 ) = = Provide 5 1.5 ( 100 + 1.2 + 0.15 - 91 ) 15.525 Vents of m 16.5 FIXING OF RCL m (eff.) with Open foundation

HFL Vertical Clearance Afflux Deck slab thickness

= = = =

100.000 1.200 0.15 1.675

m m m m

Bottom of Deck

= =

HFL + AFFLUX + VC ( 100 + 1.2 + 0.15 ) = 101.350 m

RCL

= =

Bottom of Deck + Deck thickness + wearing coat ( 101.35 + 1.675 + 0.100 ) = 103.125 m

60

9.5 Salient Features

1) 2) 3) 4) 5) 6) 7) 8) 9)

Design Discharge, Q HFL Velocity Sill Level Carriage way width Span arrangement RCL Bottom of Deck Type of Sub Strcuture Pier Abutment Return Wall

= = = = = = = =

1120.37 Cumecs 100.000 m 1.408 93.500 7.50 m/sec m m

5 vents of 16.5 m ( eff )without footpath 103.125 m 101.350 m

= = = =

VCC M15 WALL TYPE with skin rft VCC M15 Wall Type with skin rft VCC M15 BOX Type with skin rft Open foundation for Piers, Abutments and wingwalls

10) 11)

Type of Foundation Foundation Levels Pier Abutment Return wall

= = =

91.000 91.000 94.500

m m m

SR-1.5m SR-1.5m GL-3.0m

61

10. INITIAL PREPARATION


10.1 Removal of structures and obstructions This work consists of salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions. Material Conform to the following Section and Subsection: Backfill material Concrete

Construction Requirements
Salvaging Material. Salvage, with reasonable care, all material designated to be salvaged. Salvage in readily transportable sections or pieces. Replace or repair all members, pins, nuts, plates, and related hardware damaged, lost, or destroyed during the salvage operation. Wire all loose parts to adjacent members or pack them in sturdy boxes with the contents clearly marked. Match mark members of salvaged structures. Furnish one set of drawings identifying the members and their respective match marks. Stockpile salvaged material at a designated area on the project. Removing Material. Saw cut sidewalks, curbs, pavements, and structures when partial removal is required. Construct structurally adequate debris shields to contain debris within the construction limits. Do not permit debris to enter waterways, travel lanes open to public traffic, or areas designated not to be disturbed. Raze and remove all buildings, foundations, pavements, sidewalks, curbs, fences, structures, and other obstructions interfering with the work and not designated to remain. Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 4 feet of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete. Remove structures and obstructions in the roadbed to 3 feet below subgrade elevation. Remove structures and obstructions outside the roadbed to 2 feet below finished ground or to the natural stream bottom. Abandon existing manholes, inlets, catch basins, and spring boxes Except in excavation areas, backfill and compact cavities left by structure removal with backfill material to the level of the finished ground. Backfill excavated areas . Compact backfill
62

Disposing of Material. Dispose of debris and unsuitable and excess material as follows: (a) Remove from project. Recycle or dispose of material legally off the project. Furnish a statement documenting the nature and quantity of material processed or sold for recycling. Otherwise, furnish a signed copy of the disposal agreement before disposal begins. (b) Burn. Obtain necessary burning permits. Furnish a copy of the burning permits before burning begins. Burn using high intensity burning processes that produce few emissions. Examples include incinerators, high stacking, or pit and ditch burning with forced air supplements. Provide a competent watchperson during the burning operations. When burning is complete, extinguish the fire so no smoldering debris remains. Dispose of unburned material according to (a) above. (c) Bury. Bury debris in trenches or pits in approved areas within the right-of-way.Do not bury debris inside the roadway prism limits, beneath drainage ditches, or inany areas subject to free-flowing water. Place debris in alternating layers of 4 feet of debris covered with 2 feet of earth material. Distribute stumps, logs, and other large pieces to form a dense mass and minimize air voids. Cover the top layer of buried debris with at least 1 foot of compacted earth. Grade and shape the area. Seed and mulch disposal areas on Government property (d) Hazardous material. Furnish a copy of all disposal permits. Dispose of material according to Federal, State, and local regulations Acceptance. Removal of structures and obstructions will be evaluated under Backfilling and compacting cavities left by structures will be evaluated Concrete will be evaluated.

Measurement Measure the items listed in the bid schedule

Payment The accepted quantities will be paid at the contract price per unit of measurement for pay items listed in the bid schedule. Payment will be full compensation for the work prescribed

63

10.2 Excavation and Embankment

This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material. Definitions:-

(a) Excavation. Excavation consists of the following: (1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation Roadway excavation includes all material encountered regardless of its nature or characteristics. (2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by, (3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping. (b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes: (1) Preparing foundation for embankment; (2) Constructing roadway embankments; (3) Benching for side-hill embankments; (4) Constructing dikes, ramps, mounds, and berms; and (5) Backfilling subexcavated areas, holes, pits, and other depressions. (c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation. Material Conform to the following Subsections: Backfill material Select borrow Select topping
64

Topping Unclassified borrow Water

Construction Requirements: Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections Conserved Topsoil. Conserve topsoil from roadway excavation and embankment foundation areas. Stockpile conserved topsoil in low windrows immediately beyond the rounding limits of cut and embankment slopes or in other approved locations. Separate topsoil from other excavated material. Place conserved topsoil on completed slopes.

Roadway Excavation.
(a) General. Do not disturb material and vegetation outside the construction limits. Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water. (b) Rock cuts. Blast rock Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material . (c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections . Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection Backfill the subexcavation with topping, or other suitable material. Compact the material. Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity. Obtain borrow source acceptance. Develop and restore borrow sources Do not excavate beyond the established
65

limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete. Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows: (a) Embankment less than 4 feet high over natural ground. Remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface (b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface. (c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment. (d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench. Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Construct embankments as follows: (a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material. Compact embankment side slopes with a tamping foot roller, by walking with a dozer, or by overbuilding the fill and then removing excess material to the final slope line. For slopes 1V:1H or steeper, compact the slopes as embankment construction progresses. Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure. Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so
66

compacted embankment material is at the same elevation on both sides of the structure. Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.

(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer before placing the next layer. Material composed predominately of boulders or rock fragments too large for 12-inchlayers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually according to (c) below. Place sufficient earth and smaller rocks to fill the voids. Compact each layer before placing the next layer.

(c) Individual rock fragments and boulders. Place individual rock fragments and boulders greater than 24 inches in diameter as follows: (1) Reduce rock to less than 48 inches in the largest dimension. (2) Distribute rock within the embankment to prevent nesting. (3) Place layers of embankment material around each rock to a depth not greater than that permitted by (b) above. Fill all the voids between rocks. (4) Compact each layer before placing the next layer. (d) Embankment outside of roadway prism. Where placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer

Compaction For the purpose of compaction, use AASHTO T 27 to determine the amount of material retained on a No. 4 sieve. Compact as follows: (a) More than 80 percent retained on a No. 4 sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as

67

practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation. (1) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute. (2) Eight roller passes of a 20-ton compression-type roller. (3) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute. Increase the compactive effort for layers deeper than 12 inches as follows: For each additional 6 inches or fraction thereof, increase the number of roller passes in (1) above by four passes. For each additional 6 inches or fraction thereof, increase the number of roller passes in (2) and (3) above, by eight passes. (b) 50 to 80 percent retained on a No. 4 sieve. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to (a) above. (c) Less than 50 percent retained on a No. 4 sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 180, method D. For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C. . Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter. Maintain all ditches in an open condition and free from leaves, sticks, and other debris. Form furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the

68

ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow. Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows: (a) Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. (b) Stepped slopes. Where required by the contract, construct steps on slopes of 1V:1H to 1V:2H. Construct the steps approximately 18 inches high. Blend the steps into natural ground at the end of the cut. If the slope contains nonrippable rockout crops, blend steps into the rock. Remove loose material found in transitional area. Except for removing large rocks that may fall, scaling stepped slopes is not required.

(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground. (d) Finishing. Remove all material larger than 6 inches from the top 6 inches of the roadbed. Remove unsuitable material from the roadbed, and replace it with suitable material. Finish roadbeds that are compacted according to Subsection 204.11(b) and (c) to within 0.05 feet of the staked line and grade. Finish roadbeds that are compacted according to Subsection 204.11(a) to within 0.10 feet of the staked line and grade. Finish ditch cross-sections to within 0.10 feet of the staked line and grade. Maintain proper ditch drainage. Disposal of Unsuitable or Excess Material. Dispose of unsuitable or excess material legally off the project. When there is a pay item for waste, shape and compact the waste material in its final location. Do not mix clearing or other material not subject to payment with the waste material. Material for embankment and conserved topsoil will be evaluated. Excavation and embankment

69

construction will be evaluated under Clearing and removal of obstructions will be evaluated Placing of conserved topsoil will be evaluated

Measurement Measure the Section items listed in the bid schedule and the following as applicable. (a) Roadway excavation. Measure roadway excavation in its original position as follows: (1) Include the following volumes in roadway excavation: (a) Roadway prism excavation; (b) Rock material excavated and removed from below subgrade in cut sections; (c) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule; (d) Ditches, except furrow ditches measured under a separate bid item; (e) Conserved topsoil; (f) Borrow material used in the work when a pay item for borrow is not shown in the bid schedule; (g) Loose scattered rocks removed and placed as required within the roadway; (h) Conserved material taken from stockpiles and used in Section 204 work except topsoil measured under Section 624; and (i) Slide and slipout material not attributable to the Contractor's method of operation.

(2) Do not include the following in roadway excavation: (a) Overburden and other spoil material from borrow sources; (b) Over breakage from the back slope in rock excavation; (c) Water or other liquid material; (d) Material used for purposes other than required; (e) Roadbed material scarified in place and not removed; (f) Material excavated when stepping cut slopes; (g) Material excavated when rounding cut slopes; (h) Preparing foundations for embankment construction; (i) Material excavated when benching for embankments;

70

(j) Slide or slip out material attributable to the Contractor's method of operation; (k) Conserved material taken from stockpiles constructed at the option of the Contractor (3) When both roadway excavation and embankment construction pay items are shown in the bid schedule, measure roadway excavation only for the following: (a) Unsuitable material below sub grade in cuts and unsuitable material beneath embankment areas when a pay item for sub excavation is not shown in the bid schedule; (b) Slide and slip out material not attributable to the Contractors method of operations; and (c) Drainage ditches, channel changes, and diversion ditches. (b) Unclassified borrow, select borrow, and select topping. When measuring by the cubic yard measure in its original position. If borrow excavation is measured by the cubic yard in place, take initial cross-sections of the ground surface after stripping overburden. Upon completion of excavation and after the borrow source waste material is returned to the source, retake cross-sections before replacing the overburden. Do not measure borrow excavation used in place of excess roadway excavation.

(c) Embankment construction. Measure embankment construction in its final position. Do not make deductions from the embankment construction quantity for the volume of minor structures. (1) Include the following volumes in embankment construction: (a) Roadway embankments; (b) Material used to backfill sub excavated areas, holes, pits, and other depressions; (c) Material used to restore obliterated roadbeds to original contours; and (d) Material used for dikes, ramps, mounds, and berms.

(2) Do not include the following in embankment construction: (a) Preparing foundations for embankment construction; (b) Adjustments for subsidence or settlement of the embankment or of the foundation on which the embankment is placed; and (c) Material used to round fill slopes. (d) Rounding cut slopes. Measure rounding cut slopes horizontally along the centerline of the roadway. (e) Waste. Measure waste by the cubic yard in its final position. Take initial crosssections

71

of the ground surface after stripping over burden. Upon completion of the waste placement, retake cross-sections before replacing overburden. (f) Slope scaling. Measure slope scaling by the cubic yard in the hauling vehicle. Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.

10.3 Rock Blasting


This work consists of fracturing rock and constructing stable final rock cut faces using controlled blasting and production blasting techniques. Controlled blasting uses explosives to form a shear plane in the rock along a specified backslope. Controlled blasting includes presplitting and cushion blasting. Production blasting uses explosives to fracture rock. Material: Conform to the following Subsection: Explosives and blasting accessories Construction Requirements Regulations. Furnish copies or other proof of all-applicable permits and licenses. Comply with Federal, State, and local regulations on the purchase, transportation, storage, and use of explosive material. Federal regulations include the following: (a) Safety and health. OSHA, 29 CFR Part 1926, Subpart U. (b) Storage, security, and accountability. Bureau of Alcohol, Tobacco, and Firearms (BATF), 27 CFR Part 181. (c) Shipment. DOT, 49 CFR Parts 171-179, 390-397. (d) National Park Service regulations. For projects in National Parks, also comply with NPS Directors Order #65, Explosives Use and Blasting Safety. Blaster-in-Charge. Designate in writing a blaster-in-charge. Submit evidence that the blaster-in-charge has a valid State blasters license or other license accepted by the State where the project is located and issued by an equivalent licensing body for the type of blasting required. Blasting Plans. Blasting plans are for quality control and record keeping purposes and are to be signed by the blaster-in-charge. The review and acceptance of blasting plans does not relieve the Contractor of the responsibility for using existing drilling and blasting technology,
72

and for obtaining the required results. Do not deliver explosives to the project until the general blasting plan is accepted.

(a) General blasting plan. Submit a general blasting plan for acceptance at least 14 days before drilling operations begin. Include, as a minimum, the following safety and procedural details: (1) Working procedures and safety precautions for storing, transporting, handling, and detonating explosives. (2) Proposed product selection for both dry and wet holes. Furnish Manufacturers Material Safety Data Sheets for all explosives, primers, initiators, and other blasting devices. (3) Typical plan and section views for both production and controlled blasting, including maximum length of the shot, burden, hole spacing, hole inclination, hole depth, hole diameter, subdrill depth, and powder factor. (4) Proposed initiation and delay methods and delay times. (5) Proposed format for providing all the required information for the site specific blasting plans.

(b) Site-specific blasting plans. After the general blasting plan is accepted, submit sitespecific blasting plans for acceptance before drilling operations begin. Allow upto three days for review of these plans. Include the following information in the site specific blasting plan. (1) Site drawings showing a scaled map of the blast area and cross-sectional views which indicate beginning and ending stations, free face location, hole spacing, hole diameter, hole depth, burden, hole inclination, and sub drill depth. Include on the drawings any significant joints or bedding planes within the blast zone and incorporate this geology into the blast design. (2) Where blasting may affect nearby structures or utilities, provide method of monitoring and controlling blast vibrations (3) Loading pattern diagram showing the location and amount of each type of explosive to be used in the holes including primer and initiators and the location, type, and depth of stemming, column heights, and overall powder factor for each type of loading. (4) Delay and initiation diagram showing delay pattern, sequence, and delay times.

73

205.06 Preblast condition survey and vibration monitoring and control. When blasting near buildings, structures, or utilities that may be subject to damage from ground or airblast vibrations, provide a blast vibration specialist. Provide a specialist with at least 5 consecutive years experience in vibration monitoring for at least 3 projects. Fourteen days before blasting, submit the name and qualifications of the blast vibration specialist including the following: (a) Project names, locations, and services performed. (b) Name and phone number of owner/agency contact who can verify the experience of the specialist. Before blasting, arrange for a preblast condition survey of nearby buildings, structures, or utilities, which could be at risk from blasting damage. Use a survey method acceptable to the Contractors insurance company. Damage resulting from blasting is the Contractors responsibility. Make all preblast condition survey records available to the CO. Notify the CO and occupants of nearby buildings at least 24 hours before blasting. Control vibrations with properly designed delay sequences and allowable charge weights per delay when blasting near buildings, structures, or utilities that may be subject to damage from blastinduced vibrations. Base allowable charge weights per delay by carrying out trial blasts and measuring vibration levels. . Test Blasting. Drill, blast, and excavate one or more test sections as proposed in the blasting plan before full-scale drilling and blasting. Test blasts may be made away from or at the final slope line. Space blast holes for the cushion (trim) method of controlled blasting no more than 60 inches apart for the initial test blast. Space blast holes for the presplitting method of controlled blasting no more than 30 inches apart for the initial test blast.

74

Blasting:
(a) General. Drill and blast according to the blasting plan. Before drilling, remove overburden soil and loose rock along the top of the excavation for at least 30 feet beyond the hole drilling limits or to the end of the cut. Cap all holes to prevent unwanted backfill. Place a stake next to each hole with hole number and total depth drilled. Use the types of explosives and blasting accessories necessary to obtain the required results. A bottom charge may be larger than the line charges if no overbreak results. Free blast holes of obstructions for their entire depth. Place charges without caving the blast hole walls. Stem the upper portion of all blast holes with dry sand or other granular material passing the 3/8-inch sieve. Repair or stabilization may include removal, rock bolting, rock dowels, or other stabilization techniques. Halt blasting operations when any of the following occur and perform additional test blast: (1) Slopes are unstable; (2) Slopes exceed tolerances or overhangs are created; (3) Backslope damage occurs; (4) Safety of the public is jeopardized; (5) Property or natural features are endangered; (6) Fly rock is generated; or (7) Excessive ground or air blast vibrations occur in an area where damage to buildings, structures, or utilities is possible.

(b) Drill logs. Submit drill logs. Include the following: (1) Blast plan map showing designated hole numbers; and (2) Individual hole logs completed and signed by the driller that show total depth drilled, depths and descriptions of significant conditions encountered during drilling that may affect loading such as water or voids, and date drilled.

(c) Controlled blasting. When test blasts indicate the need for controlled blasting, use controlled blasting methods to form the final rock cut faces when the rock height is more than 10 feet above ditch grade and the staked slope is 2V:1H or steeper. Controlled blasting includes only those holes drilled on the row furthest from the free face and that are drilled on the design slope. Use downhole angle or fan drill blast holes for pioneering the tops of rock cuts or
75

preparing a working platform for controlled blasting. Use the blast hole diameter and hole spacing established for controlled blasting during the test blasts. Drill controlled blast holes not greater than 4 inches in diameter along the final rock face line. Drill controlled blast holes within 3 inches of the proposed surface location. Drill controlled blast holes at least 30 feet beyond the production holes to be detonated or to the end of the cut.

Use drilling equipment with mechanical or electrical-mechanical devices that accurately control the angle the drill enters the rock. Select a lift height and conduct drilling operations so the blast hole spacing and downhole alignment does not vary more than 9 inches from the proposed spacing and alignment. When more than 5 percent of the holes exceed the variance, reduce the lift height and modify the drilling operations until the blast holes are within the allowable variance after blasting the nearest production row.

(d) Production blasting. Drill the row of production blast holes closest to the controlled blast line parallel and no closer than 6 feet to the controlled blast line. Do not drill production blast holes lower than the bottom of the controlled blast holes. Detonate production holes on a delay sequence toward a free face.

After Blast Reports. Within 3 days after a blast and before the next blast, submit an after-blast report that includes the following: (a) Results of the blast and whether or not blasting objectives were met. If blasting objectives were not met, submit proposed changes to future site-specific blasting plans that will produce acceptable results and proposed repair or stabilization plan for unstable or blast damaged backslopes. (b) Blasting logs that include the following: (1) All actual dimensions of the shot including blast hole depths, hole diameter, burden, spacing, subdrilling, stemming, powder loads, and timing; and (2) A drawing or sketch showing the direction of the face, or faces, and the physical shot layout. (c) If a seismograph was used, provide the following: (1) Identification of instrument used; (2) Name of qualified observer and interpreter; (3) Distance and direction of recording station from blast area;

76

(4) Type of ground recording station and material on which the instrument is sitting; (5) Maximum particle velocity in each direction; (6) A dated and signed copy of the seismograph readings; and (7) Post-blast condition survey. (d) Results of airblast monitoring. (e) Results of post blast condition survey. Acceptance. Material for rock blasting will be evaluated under Subsections Rock blasting work and services will be evaluated.

77

11. AUTO CADD VIEWS

78

79

80

81

82

83

12. ESTIMATE DATA


Name of work:- Construction of Bridge across Masivagu on Narayanapuram to Mittapalli road at km 10/800 in Yellandu Mandal of Khammam District Detailed Estimate and Abstract Estimate Description of Work No Length Bredth Depth Quantity unit S.No 1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per MORTH specification no.304 Avg.depth a In ordinary soils upto SDR soils using Machinery Abutments 2 10.000 7.650 2.000 306.00 Piers 4 11.000 6.500 2.000 572.00 Wing walls 4 10.000 5.000 2.650 530.00 Toe walls (3.14*6.3*2/4) 4 9.891 0.600 0.600 14.24 1422.243 say 1430.000 cum b In ordinary rock using Machinery Abutments Piers Avg.depth 1.650 1.650 say 2 PCC (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal mechanically mixed, Placed in foundation compacted including curing complete as per approved drawing & technical specification as per MORT&H spn.no.2100 Abutments Piers Wing walls Rate/Per Amount

61.20

87516.00

2 4

10.000 7.650 11.000 6.500

252.45 471.90 724.350 725.000 cum

250.00

181250.00

2 4 4

10.000 7.650 11.000 6.500 10.000 5.000

0.150 0.150 0.150 say

22.95 42.90 30.00 95.85 96.00 cum

3342.70

320899.00

3 Vibrated cement concrete in Open foundation complete as per Drawing and technical specifications as per MORT&H specification Nos.1500, 1700 & 2100 VCC M-15of abutments, piers & wing walls Abutments trep footing (3.65+5.65)/2 Piers I footing II footing III footing First Footing trep footing (2.5+4.0)/2

2 2 4 4 4 4 4

10.000 7.650 8.450 4.650 11.000 6.500 10.000 4.500 10.000 3.000 12.000 5.000 12.000 3.250

1.000 2.000 1.000 0.750 0.750 0.500 2.000 say

153.00 157.17 286.00 135.00 90.00 120.00 312.00 1253.17 1254.00 cum

3606.20

4522175.00

84

4 Vibrated cement concrete in sub structure complete as per Drawing and technical specifications as per MORT&H specification Nos.1500, 1700 & 2100 VCC M-15-Substructure for abutmentss piers & wing walls Abutments (1.15+3.65)/2 Piers cutwaters (22/7/4*1.5*1.5) wing walls (0.5+2.5)/2

2 4 4 4

8.450 2.400 7.500 1.500 1.768 1.000 12.000 1.500

6.839 7.339 7.339 6.125 say

277.39 330.26 51.90 441.00 1100.54 1101.00 cum

3814.20

4199434.00

5 Vibrated Reinforced cement concrete in Sub structure complete as per approved Drawing and technical specifications as per MORT&H nos 1500, 1700 & 2200 VRCC M-20a For Bed blocks and Backing walls Abutments 2 Backing wall over Abutments 2 -2 Piers 4 cutwaters (22/7/4*1.8*1.8) 4

8.450 8.450 7.500 7.500 2.546

1.200 0.35 0.35 1.800 1.000

0.300 1.886 0.300 0.300 0.300 Say

6.08 11.16 -1.58 16.20 3.05 34.92 cum 35.00 cum

5136.50

179778.00

6 Vibrated Reinforced cement concrete in Sub structure complete as per approved Drawing and technical specifications as per MORT&H nos 1500, 1700 & 2200 VRCC M-30for Bearing pedastals Bearing pedastals- (5*6) 30

0.930

0.520

0.150 Say

2.18 3.00 cum

5548.30

16645.00

7 Suplying ,fitting and fixing in position true to line and level elastomeric neoprene bearing confirming to IRC: 83 (Part -II ) ,section IX and Clause 2005 of MoRTH Specifications complete including all accessories as per approved drawing and Technical Specifications and MORTH Spn.2000&2200 size 630x220x61mm Over piers Over abutments

4 2

6.000 3.000

24.00 6.00 30.00 no

5920.00

177600.00

8 Furnishing and placing reinforced cement concrete VRCC M20 Super structure as per approved Drawing and technical specifications as per MORT&HNos.1500, 1600 & 1700 and as per M.O.T DRG No BD/13-76, BD/14-76A & BD/15-76A excluding cost of steel and fabrication T-BEAM GIRDER SLABS 5

61.20 or say

306.00 306.00 cum

5136.50

1571769.00

85

9 PCC M15 grade levelling course below approach slabcomplete as per approved drawing andtechnical specificationsas per MORT&H spn no.2700 under Approach slab

7.500

4.00

0.150 Say

9.000 9.00 cum

0.00

10 Reinforced cement concrete approach slab excluding reinforcement and form work complete as per approved drawing and technical specifications as per MORT&H nos 1500, 1700 & 2100.---VRCC M30 For Approach slab as per drg.CE/4-71 Approach slab 2 7.500

4.35

0.300 Say

19.58 20.00 cum

6749.60

134992.00

11 Providing and laying cement concrete wearing coat M30grade excluding reinforcement complete as per drawing and technical specifications as perM.O.T.Drg.No.BD.1/69as per MORT&H spn nos.1500,1600,1700,2702 Wearing coat over Deck 5 over Approach slab 2

17.070 4.350

7.50 7.50

0.075 0.075 Say

48.01 4.89 52.90 53.00 cum

8816.20

467259.00

12 Construction of precast RCC railing of M20 grade , aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to center spacing between vertical post not to exceed 2000 mm , leaving adequate space between vertiacal post for expansion, complete as per approved drawings and Technical Specifications as per MoRTH spn nos.2703,1500,1600,&1700 excluding cost HAND RAILS WITHOUT FOOT PATHS (5*17.07+2*12.35) 13 Supplying ,fitting and placing uncoated steel reinforcement in foundations complete per drawing approved drawing and Specifications as per MORTHNo. SUPER STRUCTURE T-beam Girder slabs approach slab wearing coat hand rails

110.05 or say

220.10 221.00 Rm

2120.90

468719.00

1 1 1 1

5 19.58 52.90 220.10

10373 85.000 35.000 9.000 or say

51.87 1.66 1.85 1.98 57.36 58.00 MT

45141.20

2618190.00

86

14 Supplying ,fitting and placing uncoated steel reinforcement in foundations complete per drawing approved drawing and Specifications as per MORTHNo. SUB STRUCTURE Bed block & backing walls & screen walls Bearing pedastals Skin reinforcement in abutments (8.45*2*6.839+6.839*(3.65+1.15)) Skin reinforcement in wing walls (12*2*6.125+6.125*(2.5+0.5)) Skin reinforcement in Piers (7.5*2*7.339+7.339*3.14*1.5)

1 1 2 4 4

34.92 100.00 Kg/cum 2.18 100.00 Kg/cum 148.41 5.00 Kg/sqm 165.38 144.65 5.00 Kg/sqm 5.00 Kg/cum or say

3.49 0.22 1.48 3.31 2.89 11.39 12.00 MT

45141.20

541694.00

15 Supplying ,fitting and placing uncoated steel reinforcement in foundations complete per drawing approved drawing and Specifications as per MORTHNo. FOUNDATIONS Skin reinforcement in wing walls 4 159.936 (12*(2+1+5+1+2*1.414)+5+2*(2.5+4)) Skin reinforcement in abutments 2 206.50 (8.45*(2+2*1.414)+2*(3.65+5.65)+10*(2+7.65+2)+7.65*2*2) Skin reinforcement in Piers 4 182.75 (10*2*1.5+4.5*2*0.75+3*2*0.75)+11*(2+6.5+2)+6.5*2*2

5.00 Kg/sqm 5.00 Kg/sqm 5.00 Kg/sqm or say

3.20 2.06 3.66 8.92 9.00 MT

45141.20

406271.00

16 Providing grouted rough stone revetment 300 mm thick with 300mm size rough stone grouted with0.25 Cum.ofC.C.1:4:8 mix 40mm sizeHBGmetal / chips (SS5)graded includingcost,seignorage cess conveyance ofallmaterialstosite, labour charges curing complete. For Revetment 3.142*6*6*1.414/4

39.985 Say

0.30

47.98 48.00 cum

1676.20

80458.00

17 Providing rough stone revetment 300 mm thick using 300mm size rough stonevariety including cost, seigniorage,cess andcon-veyance of all materials tosite, labourcharges etc., complete Toe wall Toe wall (3.142*2*6.3)/4 18 Providing filter material underneath slopescomplete as per MOST specification 305, 309 &2504. 3.142*6*6*1.414/4 19 Backfilling behind abutments, wing walls returnwall complete as per drawing and technicalas per MORT&H specification No ,Cl 710.1.4 of IRC :78 behind abutments

9.90

0.60 Say

0.60

14.25 15.00 cum

0.00

39.985 Say

0.15

23.99 24.00 cum

1221.90

29326.00

2x1/2

7.450

4.951

8.575 Say

316.28 317.00 cum

351.40

111394.00

87

20 Providing and laying of filter media with Granular materials /stone crushed satisfyingthe requirements laiddown in 2504.2.2 of MORTH Specifications to a of not less than 600 mm with smaller size towards the soil and bigger size towards the and proviede over the entire surface behind abutment, wingwalland return wall to the full height compactedto a firmcondition per drawing andTechnicalSpecifications and per MORT&Hspecification Nos.2200and Cl.710.1 2 behind abutments 21 Providing weep holes in plain/ reinforced concrete abutment,wing wall/ return wall with 100 mm dia AC pipe, extendingthrough the full width of thestructure with slope of 1V : 20Htowards drawing face.Complete as per drawing and technicalspecifications and as per MORT&H specification No 2706 & 2200 Abutments 2 Wing walls 4

7.450 0.600

10.575 Say

94.54 95.00 cum

1221.90

116081.00

8.000 6.000 12.000 6.000

avg.length 2.400 1.500 Say

230.40 432.00 662.40 663.00 Rm 384.00 No

173.40

66586.00

22 Drainage spouts complete as per drawing and technicalspecifications and as per approved drg no. BD/1-69A.as per MORT&H specification No 2705 Drainage spouts 5 23 Providing Strip seal type expansion Joints per manufactures specification including all labour charges etc complete Over piers Over abutments

4.00

20.00 no

4592.20

91844.00

4 2

8.45 8.45 Say

33.80 16.90 50.70 51.00 Rm 8500.00 433500.00 16823380.00

24 Provision for Pre survey estimate for taking bores and sub-soil investigation and test results 25 Provision for Masticpads 26 Provision to Pylon construction 27 Provision to Painting to Railing and rounding off

LS LS LS LS

88

13. BRIDGE ACCESSORIES


Bridge accessories are various additional elements that are so important in bridge design and construction. They are: Parapets Expansion joints Drainage Waterproofing

13.1 Parapets Parapets are provided on highway bridges and similar structures such as retaining walls for the safety of errant vehicles and their occupants, pedestrians and other road users. They also serve to provide protection to the areas beneath and adjacent to structures, for example other roads, railways, buildings, etc. The variation in types of vehicles using highways is considerable and constantly changing. Vehicles vary in size, both in length and height, overall weight, axle spacing and weight distribution. A vehicles response to an impact can also vary considerably from model to model due to such features as engine position, provision of crumple zones, suspension type, etc. Parapets should be designed to have a reasonable appearance and should not detract from the overall aesthetics of the structure to which they are attached. They should further not cause forces to be applied to the supporting structure that would significantly affect its structural requirements. Since extensive damage can occur to a parapet during an impact, structural members of a bridge should not be used as vehicle parapets. Parapets should be designed such that joints being made from continuous welds of structural quality.

89

13.2 Expansion joints Wherever two elements of a structure are moving relative to each other, it is often necessary to provide an expansion joint which seals the gap between the two elements while accommodating the relative movements. For bridges the gap is usually that between the deck end and the abutment ballast wall. However, on long viaducts additional joints will often be needed between sections of deck in order to limit the movement at any one point. Expansion joints are by virtue of their function a point of weakness within a bridge and history has highlighted many examples of joints leaking. As water, laden with de-icing salts, has leaked onto bearing shelves or pier supports, corrosion of the reinforcement has frequently resulted. The repairs which are required cost significantly more than the capital cost of the joint alone, especially when the cost of traffic delays is taken into account. It is therefore important to give full consideration to the design, detailing and installation of bridge expansion joints in order to minimize the risk of the bridge owner being faced with high repair bills in the future.

Fig: An expansion joint provided

90

An expansion joint must exhibit a number of characteristics for it to perform satisfactorily. It must sustain loads and movements without being damaged itself or causing damage to other parts of the structure. It should be water tight, give a good ride quality and not be hazardous to road users, who could include cyclists, pedestrians and equestrians. The skid resistance of the joint should match that of adjacent surfacing and noise emission from the joint should be limited, especially if it is to be used in residential areas. Finally, any joint should be easily inspected and maintained. The final choice of joint type will depend on a number of factors. Joint types should not be mixed on an individual joint, and this will often dictate the form of maintenance works on an existing joint. For new applications the joint must clearly be able to accommodate the predicted movements, but there are other factors related to the joints performance which should be considered. These include the treatment of the verges and footways, which may contain many services, the road alignment (gradient, cross-fall and curvature), the proximity of junctions (where longitudinal loads will be more frequent) and how heavily trafficked the joint will be. All of these factors can affect the performance and hence life of an expansion joint, and need to be taken into account when considering the whole-life cost of the joint. While a joint chosen purely on the basis of its initial capital cost and speed of installation may perform perfectly well, some joints have been shown to fail prematurely in adverse conditions. Replacing joints can prove to be very expensive once all the associated traffic management and delay costs are taken into account. Such costs can easily outweigh the initial capital expenditure in whole-life costing terms.

13.3 Drainage
91

Expansion joints do not generally fail because their movement capacity is exceeded. Safety factors built into their design ensure this. Occasionally elements of joints may deteriorate more rapidly because they are locally subject to higher than expected loads, perhaps due to increased dynamic factors on wheel loads caused by uneven surfacing. The main cause of failure is that water starts to leak through the joints. This can arise from poor detailing of the joint, poor workmanship during its installation and simply the inherent difficulty of completely sealing any joint between two elements moving relative to each other. The management of water on the bridge deck is key to the successful functioning of an expansion joint, and should be addressed early in any bridges design and not as an afterthought. Back-of-wall drainage is provided to prevent the build-up of hydrostatic pressure on the rear face of the walls. It usually takes the form of a 150mm diameter porous drain pipe located on top of the wall base which can be enclosed in no fines concrete. Above this, for the full height of the wall, a drainage medium is provided. Weep holes should be provided in all high walls in case the porous drainpipes become inoperative for any reason. They should outfall just above the external paved surface and, ideally, have a reverse fall to prevent continual dripping. In urban areas, small-diameter pipes, say 50mm at 3m centres, should be used; larger pipes often attract vermin and are also frequently blocked by

litter, such as cans and bottles. Fig: Weep holes provided in abutment and wingwall.

92

Fig : Drain holes provided on pavement of bridge

93

13.4 Waterproofing In the case of bridge decks, waterproofing membranes normally comprise sheet systems or liquid systems which are bonded to the concrete surface. In addition, mastic asphalt has been used in the past but is now rarely used and is not recommended. Sheet systems are mainly bituminized fabrics, polymer- or elastomeric-based membranes. They can consist of sheets or boards, either incorporated into the membranes, or used to protect them. Sheet membranes are pre-formed factory manufactured and are generally hand applied by the pour-and-roll method or by torch or are self-adhesive. They are bonded to the surface in overlapping strips and must not tear, puncture, rupture, or come apart at the\ seams, corners and edges of the structure. Liquid systems are mainly acrylic, epoxy, polyurethane or bitumen based. They are one or two part moisture or chemically curing solutions and can be applied by brush. 13.5 Bearings Bridge decks are subject to translational and rotational movements and to forces from gravity, traffic, wind and friction. In supporting bridge decks, bearings have to cater for these forces and movements. Translational movements principally arise from temperature changes, creep, shrinkage and pre stress. Rotational movements arise principally from dead and superimposed loading and from traffic loading. However, as the deck bends under loading the bottom chord extends, resulting in additional translational movements on the bearing. Conversely differential temperature changes through the depth of the deck and parasitic effects of pre stress cause additional rotational movements at the bearings. The bearings are usually fixed on a strong support capable of carrying the longitudinal loads near the middle of the structure, with the remaining bearings free to move longitudinally to accommodate temperature movements in either direction away from the fixed pier towards the ends of the viaduct. With river valley crossings this may not be suitable as the highest piers may be in the middle and due to their flexibility be inappropriate for carrying the longitudinal forces, unless they are of heavy design to carry much longer central spans. If the piers are tall and slender, the piers themselves may be capable of flexure to cater for longitudinal deck movements, enabling fixed bearings to be installed, provided the resulting eccentricity of vertical loading can be accommodated. Such a design enables the

94

longitudinal loading to be distributed between a number of supports. If any deck is inclined longitudinally it is usual to install the fixed bearing at the lower end. Elastomeric bearings can be vulcanized rubber or neoprene. The material is essentially incompressible volumetrically, but an elastomeric pad bulges sideways under vertical pressure and so provides elastic support or rotational capacity. In addition, elastomeric pads have shearing movement capacity and so can accommodate horizontal movement. By inserting horizontal steel plates spaced within the height of the pad a laminated bearing is formed. This restricts the bulging on the sides and provides a stiffer bearing under vertical load while accommodating similar shearing movement capacity. The rotational capacity of an elastomeric bearing is limited to the compression applied by the minimum vertical load to avoid uplift at the edge and is also limited by the maximum compression. The shearing resistance needs to be taken into account in the design of the supports. As a general guide for shorter-span bridges, and particularly those with concrete decks, where rotations are small, elastomeric bearings are economical. For medium spans and more particularly for steelconcrete composite bridges, pot bearings are appropriate and economical. For longer spans, for greater vertical stiffness or to accommodate greater rotations in relation to the vertical load, spherical bearings are used. For longer spans where very low friction is required, roller bearings might be used, but see the caution under the section entitled Roller bearings above. For rotation about a single axis where high vertical loads have to be accommodated, rockers might be used. Where restraints in the form of down stands would not provide adequate capacity, separate guide or restrain bearings may be used. Leaf bearings may be used to transmit uplift forces. Bearings should be installed such that they can be replaced with another suitable bearing if and when required. The method of so doing needs to be carefully planned during the original design of the structure. A decision needs to be taken as to what live loading the structure will be carrying during jacking and bearing replacement. Provision for jacking to enable replacement requires: adequate clearance between the support and the deck for jacks of adequate capacity with locking ring facility to be inserted; sufficient space on the support adjacent to the bearing for jack placement; the support and deck to be strong enough to carry the jacking loads; the bearing installed by means enabling it to be slipped out with minimal lifting of the deck; and anchor points provided to which temporary restraints can be attached to replace fixity lost during bearing replacement. It may also be necessary to provide
95

temporary bearings in conjunction with the jacks to permit translational and/or rotational movement during replacement.

Fig: Elastomeric bearings provided

96

14. CONCLUSION
Main importance of constructing a bridge here is to cross a stream, which closes the route to many villages during floods. Now the interior villages are easily accessible in any flood condition. The floods which have occurred

15.BIBILOGRAPHY

Several encyclopedias on the subject of bridge have provided bibliographies of bridge related publications

TEXT BOOKS
97

1. Highway Bridge Structures by Tata McGraw hill. 2. Bridge Engineering by S.C. Rang wala. 3. IRC:78-2000 - Standard Specifications and Code of Practice for Road Bridges.

4. IRC:SP:66-2005 - Guidelines for Design and Construction of Continuous Bridges.

WEBSITES
http://en.wikipedia.org/wiki/Bridge http://www.bridgeweb.com/ http://en.wikipedia.org/wiki/The_Official_Encyclopedia_of_Bridge

98

You might also like