This document explains the rack placement requirements for a Telco


Rail Self-Supporting Rack and installation procedures for the EMC
CX-Series Fibre Channel devices listed on page 2. This document also
describes the kits available for mounting these devices. These kits are
for Telco Rail Self-Supporting Racks only.
Major sections are
Introduction..................................................................................................... 2
CX-Series Fibre Channel Devices ............................................................ 2
Telco Rail Self-Supporting Rack .............................................................. 3
Device Placement Requirements and Dimensions ................................. 4
Device Dimensions.................................................................................... 5
Sample Cabinet Installations ................................................................... 6
Mounting Kits................................................................................................. 8
SPS Mounting Kit (SPST-2GB)................................................................. 8
DPE2 and DAE Mounting Kit ............................................................... 10
SPE Mounting Kit (FRAME-T-SPE) .......................................................11
1U Switch Mounting Kit (DS2-RK1U-T) .............................................. 12
1.5U Switch Mounting Kit (DS2-RK2U-T) ........................................... 14
Mounting Hardware Installations ............................................................ 16
Installing the SPS and DPE2 or SPE Mounting Trays ........................ 16
Installing 3U DAE Mounting Trays ...................................................... 23
Installing Switch Mounting Trays......................................................... 25
Enclosure Installations................................................................................ 28
Installing the SPS Enclosure................................................................... 28
Installing the DAE2, DAE2P, DPE2, or SPE Enclosures..................... 31
Installing the Switch Enclosures............................................................ 33

Introduction

Introduction
This section lists the EMC CX-Series Fibre Channel devices that the
Telco Rail Self-Supporting Rack (Telco rack) supports and provides
an illustration of the rack.

CX-Series Fibre Channel Devices


The following EMC devices are supported in the Telco rack.
Device

Device Model

Mounting Kit Model

DPE2 (2-Gigabit Disk Processor Enclosure) and


SPS (Standby Power Supply) tray.

CX500-FD
CX400-FD
DCX300-FD
CX200-FD

FRAME-T-DAE2 for DPE2;


SPST-2GB for SPS

SPEa (Storage Processor Enclosure);


DAE2/DAE2P (Disk Array Enclosure) and
SPSs (Standby Power Supply) tray.

CX700-FD
CX600-FD
CX-2GDAE-OSFD

FRAME-T-SPE
FRAME-T-DAE2/FRAME-T-2PDAE;
SPST-2GB

DAE2 (2-Gigabit Disk Array Enclosure)

CX-2GDAE-FD

FRAME-T-DAE2

DAE2P (2-Gigabit Point-to-Point Disk Array Enclosure)

CX-2PDAE-FD

FRAME-T-2PDAE

1U Switch Mounting Kit

DS-16M2-OD
DS-24M2-OD
DS-16B2-OD

DS2-RK1U-T

1.5U Switch Mounting Kit

DS-32M2-OD
DS-32B2-OD

DS2-RK2U-T

a. CX600-FD and CX700-FD models require the CX-2GDAE-OSFD or CX-2PDAE-OSFD device model because
the SPE does not contain any disk drives.

EMC Rails and Enclosures For Telco Racks Installation Guide

Introduction

Telco Rail Self-Supporting Rack


Figure 1 illustrates the Telco rack.

Flange edge to
flange edge:
450.85 mm
(17.75 inches)

Mounting hole to
mounting hole:
465.074 mm
(18.31 inches)
76.2 mm to 203.2 mm
(3 inches to 8 inches)

EMC2611

Figure 1

Telco Rail Self-Supporting Rack


EMC Rails and Enclosures For Telco Racks Installation Guide

Device Placement Requirements and Dimensions

Device Placement Requirements and Dimensions


Before attaching the mounting rails or trays in the Telco rack, you
must decide where to put them. Where you install the devices
depends on the kinds of devices you will install.

Position in Rack

Devices with internal cooling fans that move air from front to back
(or vice versa) and not from beneath or above have no special cooling
requirements that direct placement in the rack. All of the storage
systems and enclosures mentioned in this document have fans that
move air from front to back.
Requirements are as follows:

SPSs (required for write caching) must be located immediately


below the DPE2 or SPE whose power it will provide.
IMPORTANT: The DPE2 or SPE ac power cords connect to the SPS
output ac receptacle.

DAEs should be above their respective DPE2 or SPE to facilitate


cable routing in the rear of the Telco rack.

Power distribution must support the number of outlets required


for the device and the device power rating. For power, cooling,
and weight information, refer to the appropriate documentation
for each device.

EMC Rails and Enclosures For Telco Racks Installation Guide

Device Placement Requirements and Dimensions

Device Dimensions
The table below lists the dimensions for the supported CX-Series
Fibre Channel devices. Device height requirements and rack
mounting measurements are based on NEMA units (U for short).
Device

Height

SPS

1U

40.132 mm

1.58 in

DPE2

3U

133.35 mm

5.25 in

DAE2/DAE2P

3U

133.35 mm

5.25 in

SPE

4U

177.8 mm

7.00 in

1U

43.18 mm

1.7 in

1.5 Ua

64.77 mm

2.55 in

Switches
DS-16M2, DS-24M2,
and DS-16B2
DS-32M2 and DS-32B2
a.Requires a 2U bezel.

Maximum unit projection is 190.5 mm (7.5 inches).

EMC Rails and Enclosures For Telco Racks Installation Guide

Device Placement Requirements and Dimensions

Sample Cabinet Installations


The following illustration is a sample device installation.
1.5U with switch tray
DS-16B2 (1U)
DS-32B2 (1.5U)
DAE (3U)

2U with switch tray


3.5U with DAE tray

DAE (3U)
DAE (3U)
36.5U

DAE (3U)
DAE (3U)
DAE (3U)

1.52 mm (.060 inch)


space needed for
clearance between
all units.

DAE (3U)
5.5U with
SPE/SPS
tray

SPE (4U)
1.5U with SPS tray
SPS (1U)
EMC2615

EMC Rails and Enclosures For Telco Racks Installation Guide

Device Placement Requirements and Dimensions

The following illustration is a sample power cord wiring


configuration.
Typical High-Availability Wiring Configuration
(ensures ac line current/PDU < 16 Amps @ 120 V ac input)
DS - 16B2 switch
DS - 32B2 switch

4 PDUs,
2 per side

DAE

DAE

DAE

DAE

DAE

DAE

DAE

SPE

SPS

SPS

4 ac line cords, 2 per side


C19 to compatible rack power ac service
16 Amps per cord @120V

EMC2614

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

Mounting Kits
This section describes the mounting kits that are available with the
Telco rack. These kits are for Telco racks only.

SPS Mounting Kit (SPST-2GB)


The following table lists and describes the components in the
SPS (1U) Mounting Kit. The quantity listed below is per SPS.
Component

Quantity Use

Front SPS support tray - see illustration on


page 16.

Attaches to the DPE2 front support tray (3U) or the SPE front support tray
(4U). Then the combined front support trays are attached to the front of
the Telco rack.

Rear SPS support tray - see illustration on


page 19.

Attaches to the DPE2 rear support tray (3U) or the SPE rear support tray
(4U). Then the combined front support trays are attached to the front of
the Telco rack.

Mounting bracket

Attaches to the ends of the rear SPS tray once the SPSs are installed.
For a single SPS, only one mounting bracket is used.

SPS filler panel

For a single SPS only. Covers the area in which a second SPS would be.

Center mounting bracket

For dual SPSs only. Attaches the two SPSs together and to the SPS rear
tray.

Latch bracket

Attaches to the front tray of the SPS.

M5 x 12 SEMS screw

11

4 to hold the SPS front tray to the DPE2 or SPE front tray.
4 to hold the SPS rear tray to the DPE2 or SPE rear tray.
1 to hold the center mounting bracket to the SPS rear tray.
2 to hold the latch brackets to the front SPS tray.

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

Component

Quantity Use

Phillips M4 x .7 x 8 SEMS screw

18

Dual SPSs
8 to hold the SPS mounting brackets to the rear SPS tray.
4 to hold the center mounting bracket to the SPS.
4 to hold the SPS rail cover.
2 to hold the short SPS bracket.
Single SPS
4 to hold the SPS mounting brackets to the rear SPS tray.
4 to hold the SPS and filler panel.
4 to hold the SPS rail cover.
2 to hold the short SPS bracket.

1U Bezel - see illustration on page 30.

Attaches to the front of the SPS by lining up the bezel with the latch
brackets.

Cordset 16/3, 125 V 13 A, 7 1/2 long

Use the appropriate cord for your PDU.

Cordset 18/3 10 A 250 V CEE CONN 8


long

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

DPE2 and DAE Mounting Kit


The following table lists and describes the components in the
DPE2 (3U) and DAE (3U) Mounting Kits. The quantity listed below is
per 3U device.

10

Component

Quantity

Use

Front 3U support tray - see illustration


on page 17.

DPE2 - The DPE2 front support tray is attached on top of the SPS front
support tray. Then the combined front support trays are attached to the front of
the Telco rack.
DAE - The DAE2/DAE2P front support tray is attached to the front of the Telco
rack.

Rear 3U/4U support tray - see


illustration on page 17.

DPE2 - The DPE2 rear support tray is attached on top of the SPS rear support
tray. Then the combined rear support trays are attached to the rear of the
Telco rack.
DAE2 - The DAE2 rear support tray is attached to the rear of the Telco rack.
DAE2P -The DAE2P rear support tray is attached to the rear of the Telco rack.

Rear fastening bracket (left and right)

Attaches to the rear corner of the DPE2 or DAE enclosure and DPE2 or DAE
rear tray. DAE2 fastening bracket shown - DAE2P slightly different)

M5 x 12 SEMS screw

12

6 to secure front DPE2 or DAE tray to the Telco rack.


6 to secure rear DPE2 or DAE tray to the Telco rack.

M5 flat washer

Secures the rear fastening bracket to the rear corner of the DPE2 or DAE.

M5 lock split washer

Secures the rear fastening bracket to the rear corner of the DPE2 or DAE.

M5 hex nut

Secures the rear fastening bracket to the rear corner of the DPE2 or DAE.

M5 x 12 flat-head

Secures the rear fastening bracket to the rear corner of the DPE2 or DAE.

M5 x 16 pan-head SEMS screw

Secures the DPE2 or DAE to the front tray.

Shape thread rolling screw (NEBS


only)

Secures the DPE2 or DAE to the front tray in NEBS-compliant environment

Cordset 16/3, 125 V 13 A, 7 1/2 long

Use the appropriate cord for your PDU.

Cordset 18/3 10 A 250 V CEE CONN


8 long

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

SPE Mounting Kit (FRAME-T-SPE)


The following table lists and describes the components in the
SPE (4U) Mounting Kit. The quantity listed below is per 4U device.
Component

Quantity

Use

Front 4U tray - see illustration on page 17.

The SPE front support tray is attached on top of the SPS front support
tray. Then the combined front support trays are attached to the front of
the Telco rack.

Rear 3U/4U tray - see illustration on


page 17.

The SPE rear support tray is attached on top of the SPS rear support
tray. Then the combined rear support trays are attached to the rear of the
Telco rack.

Rear fastening bracket (left and right)

Attaches to the rear corner of the SPE enclosure and SPE rear tray.

M5 x 12 SEMS screw

12

6 to secure front SPE tray to the Telco rack


6 to secure rear SPE tray to the Telco rack

M5 flat washer

Secures the rear fastening bracket to the rear corners of the SPE.

M5 lock split washer

Secures the rear fastening bracket to the rear corners of the SPE.

M5 hex nut

Secures the rear fastening bracket to the rear corners of the SPE.

M5 x 12 flat-head

Secures the rear fastening bracket to the rear corners of the SPE.

M5 x 16 pan-head SEMS screw

Secures the SPE to the front tray.

Shape thread rolling screw (NEBS only)

Secures the SPE to the front tray in NEBS-compliant environment

Cordset 16/3, 125 V 13 A, 7 1/2 long

Use the appropriate cord for your PDU.

Cordset 18/3 10 A 250 V CEE CONN 8


long

EMC Rails and Enclosures For Telco Racks Installation Guide

11

Mounting Kits

1U Switch Mounting Kit (DS2-RK1U-T)


The following table lists and describes the components in the
1U Switch Mounting Kit. The quantity listed below is per switch.
Component

Use

Front support tray - see illustration on page 25.

Attaches to the front of the Telco rack.

Rear support tray - see illustration on page 25.

Attaches to the rear of the Telco rack.

Mounting slide rail - see illustration on page 33.

4a

Attaches to the side of the switch.

Latch bracket

Attaches to the front switch tray to hold the bezel.

Phillips M5 x 16 mm flat-head screw

Attaches the latch brackets to the front switch tray.

M5 x 12 mm SEMS screw

Attaches the front and rear switch trays to the Telco rack.

M4 washer and kep nut

12

Quantity

2 each

Attaches the mounting slide rail to the rear switch tray.

Phillips M 4x 14 mm pan-head SEMS screw

Attaches the mounting slide rail to the front and rear switch
trays.

Phillips #6-32 x 5/16 flat-head screw

10

Used for the DS-16M2 or DS-24M2 switch only. Attaches the


mounting slide rails to the front and rear switch trays.
Note: Phillips flat-head TF screws #6 x .375 are also included
in this kit. You should use these screws only if you have an
older version of the DS-16M2 or DS-24M2 switch. Refer to the
physical kit for information on which screws you should use
with your switch.

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

Component

Quantity

Use

Phillips #8-32 x 5/16 pan-head SEMS screw

Used for the DS-16B2 switch only. Attaches the mounting slide
rails to the front and rear switch trays.

1U Bezel - see illustration on page 36.

Attaches to the front of the switch by lining up the bezel with


the latch brackets.

Cordset 16/3, 125 V 13 A, 7 1/2 long

Use the appropriate cord for your PDU.

Cordset 18/3 10 A 250 V CEE CONN 8 long

a.Four mounting slide rails are included in this kit; only two are required for installation. Make sure you use the appropriate
mounting slide rails for your switch.

EMC Rails and Enclosures For Telco Racks Installation Guide

13

Mounting Kits

1.5U Switch Mounting Kit (DS2-RK2U-T)


The following table lists and describes the components in the
1.5U Switch Mounting Kit. The quantity listed below is per switch.
Component

Use

Front support tray - see illustration on page 25.

Attaches to the front of the Telco rack.

Rear support tray - see illustration on page 25.

Attaches to the rear of the Telco rack.

Mounting slide rail - see illustration on page 33.

4a

Attaches to the side of the switch.

Left and right latch brackets

14

Quantity

1 each

Attaches to the front left and right support tray to hold the bezel.

M5 x 12 mm SEMS screw

Attaches the front and rear switch trays to the Telco rack.

Phillips #6-32 x 5/16 flat-head screw

10

Used for the DS-32M2 switch only. Attaches the mounting slide
rails to the front and rear switch trays.
Note: Phillips flat-head TF screws #6 x .375 are also included in
this kit. You should use these screws only if you have an older
version of the DS-32M2 switch. Refer to the physical kit for
information on which screws you should use with your switch.

Phillips #8-32 x 5/16 pan-head SEMS screw

Used for the DS-32B2 switch only. Attaches the mounting slide rails
to the front and rear switch trays.

Phillips M5 x 16 mm flat-head screw

Attaches the latch brackets to the front switch tray.

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Kits

Component
M4 Washer and kep nut

Quantity
2 each

Use
Attaches the mounting slide rail to the rear switch tray.

Phillips M4 x 14 mm pan-head SEMS screw

Attaches the mounting slide rail to the front and rear switch trays.

2U Bezel - see illustration on page page 36.

Attaches to the front of the switch by lining up the bezel with the
latch brackets.

Cordset 16/3, 125 V 13 A, 7 1/2 long

Use the appropriate cord for your PDU.

Cordset 18/3 10 A 250 V CEE CONN 8 long

a.Four mounting slide rails are included in this kit; only two are required for installation. Make sure you use the appropriate
mounting slide rails for your switch.

EMC Rails and Enclosures For Telco Racks Installation Guide

15

Mounting Hardware Installations

Mounting Hardware Installations


This section describes how to assemble and install the mounting kit
hardware for an SPS, DPE2, SPE, DAE2P, and DAE2 in a Telco rack.
To assemble and install the SPS and DPE2 or SPE mounting trays to
the Telco rack, go to the next section.
If you have already assembled and installed the SPS and DPE2 or SPE
mounting trays and want to install a DAE or a switch, see Installing
3U DAE Mounting Trays on page 23 or Installing Switch Mounting Trays
on page 25.

Installing the SPS and DPE2 or SPE Mounting Trays


The SPS front and rear trays do not attach directly to the Telco vertical
rails; instead, they attach to the bottom of the corresponding sections
of the DPE2 (3U) or SPE (4U) front and rear trays. You must assemble
the SPS front and rear trays to the DPE2 or SPE front and rear trays
before you can install them to the Telco rack.
Assembling the
Front Trays

Follow the steps below to assemble the SPS front tray to the DPE2 or
SPE front tray.
NOTE: The DPE2 front tray is part of the FRAME-T-DAE2 kit. The SPE front
tray is part of the FRAME-T-SPE kit.

1. Place the SPS front tray on a table so that the front of the tray is
facing you, as illustrated below.
SPS front tray

EMC2641

Front

16

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Hardware Installations

2. Place the DPE2 or SPE front tray on a table, positioning the DPE2
or SPE tray rail screw holes to the rear, as illustrated below.
DPE2 or SPE
front tray

Rail screw
holes

EMC2569

Front

3. Place the DPE2 or SPE front tray on top of the SPS front tray, as
illustrated below.
NOTE: The SPSs must be located immediately below the DPE2 or SPE
whose power they will provide.

DPE2 or SPE
front tray

EMC2640

SPS front tray

EMC Rails and Enclosures For Telco Racks Installation Guide

17

Mounting Hardware Installations

4. Slide the DPE2 or SPE tray toward the front of the SPS front tray.
Ensure that the screw holes on the bottom of the DPE2 or SPE tray
align with the holes on each side of the SPS front tray.
5. Using four M5 x 12 SEMS screws, secure the front DPE2 or SPE
tray to the front SPS tray, as illustrated below.

Screws

Installing the Front


Tray Assembly

EMC2571

Follow the procedures below to install the front tray assembly (the
combined SPS front tray and DPE2 or SPE front tray) to the Telco
rack.
1. Determine where in the rack you intend to position the front tray
assembly (the combined SPS and DPE2 or SPE front trays).
2. Align the screw holes on the front tray assembly with the screw
holes on the Telco rack.
3. Secure the front tray assembly to the rack, with six M5 x 12
screws, three per side, for a DPE2 or SPE.

EMC2616

18

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Hardware Installations

4. Attach two latch brackets to the ends of the front tray assembly, as
shown below, using two M5 x 12 screws, one per side.
Latch bracket

EMC2617

Assembling the
Rear Trays

Follow the steps below to assemble the SPS rear tray to the DPE2 or
SPE rear tray.
NOTE: The DPE2 front tray is part of the FRAME-T-DAE2 kit. The SPE front
tray is part of the FRAME-T-SPE kit.

1. Place the SPS rear tray on a table so that the rear flanges are facing
you, as shown below.
SPS rear tray

EMC2618

Rear flanges

EMC Rails and Enclosures For Telco Racks Installation Guide

19

Mounting Hardware Installations

2. Place the DPE2 or SPE front tray on a table, positioning the DPE2
or SPE tray rail screw holes to the rear, as illustrated below.
DPE2 or SPE
rear tray

Rail screw holes


EMC2619

3. Place the DPE2 or SPE rear tray on top of the SPS rear tray,
positioning the DPE2 tray rail screw holes to the rear, as shown
below.

DPE2 or SPE
rear tray

SPS rear tray


EMC2575

4. Pull the DPE2 or SPE rear tray toward the front of the SPS rear
tray. Ensure that the screw holes on the bottom of the DPE2 or
SPE rear tray align with the holes on each side of the SPS rear tray.

20

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Hardware Installations

5. Secure the trays with four M5 x 12 screws, two per side, leaving
the screws loose for now.

EMC2620

Screws

Installing the Rear


Tray Assembly

Follow the procedures below to install the rear tray assembly (the
combined SPS rear tray and DPE2 or SPE rear tray) to the Telco rack.
1. Align the screw holes of the rear tray with the holes in the rack.
Ensure that the bottom of the tray lines up with the bottom of the
SPS/DPE2 or SPE front tray assembly.
2. Secure the tray to the rack with six M5 x 12 screws, three per side
for a DPE2 or SPE, as shown below.

DPE2 or SPE
rear tray secured
to rack.

EMC2576

EMC Rails and Enclosures For Telco Racks Installation Guide

21

Mounting Hardware Installations

3. Depending on the size of your rack (76.2-203.2 mm/3-8 inches),


adjust the SPS tray as needed by doing the following:
a. If not already loose, loosen the two screws in the slots on
either side of the DPE2 or SPE rear tray, as illustrated below.

loosen

EMC2576

SPS rear flange

Slide tray as needed.

b. Adjust the rear SPS tray so that the rear flange (with self-clinch
nuts) is 21.25 inches (539.75 mm) from the front flange (with
four clearance holes) of the SPS front tray.
c. Tighten the screws you loosened in step a in the DPE2 or SPE
rear tray.

22

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Hardware Installations

Installing 3U DAE Mounting Trays


This section describes how to install the front and rear DAE (DAE2 or
DAE2P) trays to the Telco rack.
Installing the DAE Front
Tray

Important: You must install the front DAE tray either directly above the front
DPE2 or SPE/SPS tray assembly or directly above another DAE.

1. Align the screw holes on the outer edges of the DAE front tray
with the holes on the rack.
2. Secure the tray to the rack with six M5 x 12 mm screws, three per
side. See the figure below.
If you are installing the unit in a NEBS-compliant environment, secure the tray
to the front channel with the shape thread rolling screw, supplied with your
installation hardware in part number 100-560-644.

EMC2582

EMC2581

Installing the DAE Rear


Tray

1. Align the screw holes on the outer edges of the DAE rear tray
with the holes on the rack. Ensure that the bottom of the front and
rear trays line up with each other.
DAE2 and DAE2P rear trays are similar in design and function; the
DAE2P tray supports a chassis that is ten inches shorter than the DAE2.

EMC Rails and Enclosures For Telco Racks Installation Guide

23

Mounting Hardware Installations

Comparison of DAE2P (Top) and DAE2 Rear Trays

2. Secure the tray to the rack with six M5 x 12 mm screws, three per
side, as shown below.

EMC2583

(DAE2 Rear Tray Shown)

24

EMC Rails and Enclosures For Telco Racks Installation Guide

EMC2584

Mounting Hardware Installations

Installing Switch Mounting Trays


This section describes how to install the front and rear 1U and 1.5U
switch trays (see illustrations below) to the Telco rack.
1U Front Switch Tray

1U Rear Switch Tray

EMC2627

EMC2626

1.5U Front Switch Tray

1.5U Rear Switch Tray

EMC2623

EMC2624

Installing the Front


Switch Tray

The switch trays are typically installed at the top of the Telco rack.
Note: The following procedure uses the 1.5U switch tray for illustration
purposes.

1. Align the screw holes on the outer edges of the switch front tray
with the holes on the rack (refer to the illustrations above).

EMC Rails and Enclosures For Telco Racks Installation Guide

25

Mounting Hardware Installations

2. Secure the front tray to the rack with six M5 x 12 mm screws,


three per side, for a 1U tray or with eight M5 x 12 mm screws,
four per side, for a 1.5U tray, as shown below.

EMC2639

3. Attach two latch brackets to the ends of the switch front tray, as
shown below, using four M5 x 16 mm screws, two per side. Be
sure to use the appropriate length latch bracket for your switch.
Note: The latch brackets for a 1.5U switch are marked with an L for the
left side and an R for the right side.

Latch bracket
EMC2628

26

EMC Rails and Enclosures For Telco Racks Installation Guide

Mounting Hardware Installations

Installing the Rear


Switch Tray

1. Align the screw holes on the outer edges of the rear switch tray
with the holes on the rack (refer to the illustrations on page 25).
Ensure that the bottom of the front and rear switch trays line up
with each other.
2. Secure the rear tray to the rack with six M5 x 12 mm screws, three
per side, for a 1.5U tray or with four M5 x 12 mm screws, two per
side, for a 1U tray, as shown below.

EMC2625

EMC Rails and Enclosures For Telco Racks Installation Guide

27

Enclosure Installations

Enclosure Installations
This section describes how to install the SPS, DAE2, DAE2P, DPE2,
and SPE enclosures to the Telco rack.

Installing the SPS Enclosure


The SPS tray can hold one or two SPS units. The steps below describe
how to install either a single SPS or dual SPSs.
1. Place the SPS on the right of the rear tray. Slide it forward until
the rear end of the SPS meets the back end of the SPS front tray.
2. Using four M4 x .7 x 8 mm screws, secure the outside edge of the
left SPS to the rear tray with the SPS mounting bracket, as
illustrated below.

Mounting bracket
EMC2621

3. If you are installing a second SPS on the left, repeat step 1 and 2
for the second SPS, as illustrated below.

EMC2577

Mounting
brackets

28

EMC Rails and Enclosures For Telco Racks Installation Guide

Enclosure Installations

If you are not installing a second SPS, you must install an SPS
filler panel, as follows:
Attach the SPS filler panel to the SPS and SPS rear tray as you
would an SPS. Note, however, that you need only four
M4 x .7 x 8 mm screws (two per side) to secure the SPS filler panel
to the tray, as illustrated below.

EMC2622

SPS filler panel

4. For dual SPSs, attach the center mounting bracket to the two SPSs
with four M4 x .7 x 8 mm screws. Secure the center mounting
bracket to the rear tray with one M5 x 12 mm screw, as illustrated
below.

EMC2578

Center mounting bracket

EMC Rails and Enclosures For Telco Racks Installation Guide

29

Enclosure Installations

5. Secure the front of the SPSs to the front of the SPS tray with four
M4 x .7 x 8 mm screws, as illustrated below.

EMC2579

Latch
bracket

Screws

6. Snap the 1U bezel onto the latch brackets as shown below.

EMC2629

7. Plug the appropriate power cord into each SPS.

30

EMC Rails and Enclosures For Telco Racks Installation Guide

Enclosure Installations

Installing the DAE2, DAE2P, DPE2, or SPE Enclosures


Follow the steps below to install a DAE2, DAE2P, DPE2 or SPE
enclosures into the Telco rack.
WARNING
The enclosure is heavy and should be installed into a rack by two
people. To avoid personal injury and/or damage to the equipment, do
not attempt to lift and install the enclosure into a rack without help
from another person.

WARNUNG
Das enclosure ist schwer und sollte nur von zwei Personen in einem
Gehuse installiert werden. Zur Vermeidung von krperlichen
Verletzungen und/oder der Beschdigung des Gertes, bitte die
enclosure nicht ohne die Hilfe einer zweiten Person anheben und
einbauen.
1. Attach the clip of the ESD strap to bare metal on the enclosure,
and put the wristband around your wrist with the metal button
against your skin.
2. With two people, lift the enclosure up and place it on the edge of
the enclosure front tray.
3. Push the enclosure in until the front flanges of the enclosure are
flush against the rack.
4. Attach the front of the unit to the front tray with four pan-head
M5 x12mm SEMS screws, two per side.
If you are installing the enclosure in a NEBS-compliant environment,
secure the unit to the front tray with the shape thread rolling screws
supplied with your installation hardware in part number 100-560-644.

EMC Rails and Enclosures For Telco Racks Installation Guide

31

Enclosure Installations

Left Side Front View

Top screw

Bottom screw

EMC2635

5. At the back of the enclosure, attach the two rear fastening


brackets to the rear corners of the enclosure tray, as illustrated
below. Insert one M5 x 12 mm flat-head screw through the screw
hole of the rear fastening bracket and through the rear tray
enclosure. Secure the screw with one M5 lock washer, one M5 flat
washer, and one M5 hex nut (in this order). Repeat this step for
the right side.
Left Side Rear View

Attaches to
the bottom
rear notch of
the enclosure.

Bottom notch

Rear tray
enclosure
Secured to the rear
enclosure tray.
EMC2639

Please note that this procedure covers only the physical installation of
the enclosure into the rack. Refer to the hardware reference manual
that shipped with the enclosure that you are installing for further
detailed installation procedures.
32

EMC Rails and Enclosures For Telco Racks Installation Guide

Enclosure Installations

Installing the Switch Enclosures


This section describes how to install a switch in the Telco rack. Before
you can install the switch, you must attach the mounting slide rails to
the switch.
Attaching the
Mounting Slide Rails

Mounting slide rails are attached directly to the switch. It is


important that you use the correct side mounting bracket for your
switch. The table below illustrates the appropriate side mounting
bracket for the switches that are supported in the Telco rack.
Switch

Mounting Slide Rails

DS-16B2 (1U) and DS-32B2 (1.5U)

Channel Mounting Slide Rails

DS-16M2 (1U), DS-24M2 (1U),


DS-32M2 (1.5U)

Flat Mounting Slide Rails

Follow the procedures below to install the mounting slide rails to


your switch.
1. Locate the appropriate left and right mounting slide rails for your
switch (refer to the table above).
2. Depending on your switch type, attach the left and right
mounting slide rails to the switch, as shown in the figures below.
For the DS-16B2 and DS-32B2 use six #8-32 x 5/16 pan-head
SEMS screws, three per side. For the DS-16M2, DS-24M2, and
DS-32M2, use ten #6-32 x .375 flat-head screws, five per side.
DS-16B2 or DS-32B2 Switch

EMC2633

Screws
Note: Be sure to install the mounting slide rails so the flat side
of the rail is against the switch, as illustrated above.

EMC Rails and Enclosures For Telco Racks Installation Guide

33

Enclosure Installations

DS-16M2, DS-24M2, or DS-32M2 Switch

EMC2631

Screws

Note: Secure the center screw first, then secure the


remaining two screws on each side.

Installing the Switch

Once you have attached the mounting slide rails to the switch, you
can install the switch in the Telco rack as described below.
1. Place the switch on the rear switch tray. Slide it forward until the
rear end of the switch (the end without the ports) meets the back
end of the front switch tray.
2. Using one M4 x 14 mm pan-head SEMS screw, secure the switch
mounting slide rails to the front switch tray. Secure the screw
with one M4 washer and one M4 kep nut (in this order), as shown
below. Repeat this step for the other side.
DS-16B2 or DS-32B2 Switch - Front View

Screw

Mounting slide rail

EMC2632

34

EMC Rails and Enclosures For Telco Racks Installation Guide

Enclosure Installations

DS-16M2, DS-24M2, or DS-32M2 Switch - Front View


Screw
Mounting slide rail

EMC2636

3. Using one M4 x 14 mm pan-head SEMS screw, secure the switch


mounting slide rails to the rear switch tray. Secure the screw with
one M4 washer and one M4 kep nut (in this order), as shown
below. Repeat this step for the other side.
DS-16B2 or DS-32B2 Switch - Rear View
Screw
Mounting slide rail

EMC2634

DS-16M2, DS-24M2, or DS-32M2 Switch - Rear View


Screw

Mounting slide rail

EMC2637

EMC Rails and Enclosures For Telco Racks Installation Guide

35

Enclosure Installations

4. Snap the 2U bezel (for a 1.5U switch only) onto the latch brackets,
as illustrated below.
2U Bezel

EMC2631

If you have a 1U switch, snap the 1U bezel onto the latch brackets,
as illustrated below.
1U Bezel

EMC2629

Please note that this procedure covers only the physical installation of
the switches into the rack. Refer to the hardware reference manual
that shipped with the switch that you are installing for further
detailed installation procedures.

Copyright EMC Corporation 2003 - 2005. All rights reserved


Revision A03, August, 2005
EMC believes the information in this publication is accurate as of its publication date. The information is subject to change
without notice.
THE INFORMATION IN THIS PUBLICATION IS PROVIDED AS IS. EMC CORPORATION MAKES NO
REPRESENTATIONS OR WARRANTIES OF ANY KIND WITH RESPECT TO THE INFORMATION IN THIS
PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR
A PARTICULAR PURPOSE.
Use, copying, and distribution of any EMC software described in this publication requires an applicable software license.
Trademark Information
EMC, EMC2, and Navisphere are registered trademarks, and Connectrix is a trademark of EMC Corporation. All other
trademarks used herein are the property of their respective owners.

36

EMC Rails and Enclosures For Telco Racks Installation Guide

You might also like