Location : Prayer Room (male) CMN building PD2 Defect : exhaust fan did not function - exaust fan is use to absorb hot air in the room to out. - it cannot function because it did not connect to supply - no calbe connected to it. supposely, there are cable connect for supply Location : Generator Transformer 1B Function GTx : to step-up voltage from 15kV to 275kV OLTC (on load tap changer) : to change transformer output voltage Breakdown Voltage (BDV) test - to check either the oil is good insulator or not. - in the transformer, oil is use as a insulator. - test : inject 60kV to the oil - the oil already put inside the machine - it has a specific machine for this test - the test is repeated 5 to 6 times. to get the accurate result. - gap 2.5mm oil put inside the white box Location : Gas storage building Defect : CCTV have problem solution : change with new cctv Location : GT1B OAP Work : change contactor - change contacter in the breaker because the contacter altready broken and overload - motor protection realy : protect breaker and motor if there is overload, overcurrent new contactor contactor had problem motor protection relay Location : Transformer Work : Generator Tx GT1B and station Tx ST1B servicing works. Location : Breaker Bus-Tie PD1 Work : Servicing 415V breaker bus-tie - 425V UAB1A BRD bus-tie -check continuity = open 99.9 ohms, close = 0.08, 0.07, 0.08, 0.08 ohms -ohm balance (phase to phase) = cannot short - servicing 415V UAB1A BRD incoming = 0.22, 0.22, 0.32, 0.32 ohms Procedure to service breaker bus-tie and incoming. 1. off ATS 2. select local mode 3. rack-out breaker 4. service breaker 5. rack-in breaker 6. reset alarm 7. select remote mode 8. on ATS 9. close bus-tie breaker 10. then incoming breaker will automatically open 11. select local breaker incoming 12. rack-out breaker 13. service breaker 14. rack-in breaker 15. reset alarm 16. select remote 17. close breaker incoming 18. the automatic the bus-tie breaker will open Location : HRSG 1A Work : Control valve ( motorize valve ) cannot open 100%

- use WD 40 to smooth the valve function - when the valve is close ( zero) it will send red light, if open (100%) send green light (signal). - use variable resistor to adjust the valve (open/close) - valve 'berkarat", therefore spray with WD 40 - normally, motorize valve is for isolating Location : GT Package 1A Work : Service and clean-up air conditioner - the air conditioner in the GT Package use 3-phase system. Normally, for house it only use 1-phse. -clean the air-cond fan (filter) - if the filter is dirty, it will automatically off (stop) - the compressor will function after 3 minutes the switch on. - if in the GT Package already cold, the air cond fan will automatically stop (off) Location : HRSG 1A Work : Repair CCTV - change with new one ( high resolution color cctv camera ) Location : Battery Room (PD1) Work : clean-up the battery from dust and check the level of the water in the battery. - if the water level is too low, under the rate, it have to be top up Location : Administration Building Work : pasang and adjust sportlight Location : Theaterate Work : Troubleshoot air-conditioner - supposely, both motors function for the air cond but only one motor can function. The other one have problem. - the problem is the connection is wrong and therefore have to change the connection - compressor 1 (run), compressor 2 ( not run) the connection compressor of the air cond Location : Auxilary transformer Work : Clean up the transformer Generator transformer - to step-up the generator voltage of 15kV to the system voltage of 275kV Station transformer - to step-down the system voltage of 275kV to the station board voltage of 6.6kV

You might also like