SCHEDULE OF TECHNICAL DATA

ENERGY METERS FOR GRID METERING (NTDC SPECIFICATION P-202:12)

Bid/Tender No. _________________________ 1. 2. 3. 4. 5. 6. Manufacturers name Manufacturers address. (Attach Manufacturers catalogue with the bid) Type/designation/Model No. of offered meter. Country of origin. Accuracy class of Energy Meter on which following type tests were performed. Type/designation of Energy Meter on which following type tests were performed. Date of Test A B Tests of mechanical requirements. Spring hammer test. Vibration test. Test of resistance to heat and fire. Test of protection against penetration of dust and water. Test of climate influence Dry heat test. Cold test. Damp heat cyclic test. Solar radiation test. Name of Lab.

C Tests of electrical requirements - Test of power consumption of voltage circuit - Test of power consumption of current circuit Test of effect of voltage dips and short interruptions. Test of influence of short time over current. Test of influence of self heating. Test of influence of heating. Impulse voltage test. A.C. voltage test.

SIGNATURE AND STAMP OF MANUFACTURER

D F 7. 8.

Tests for electromagnetic compatibility (EMC) Test of immunity to electrostatic discharges. Test of immunity to electromagnetic RF fields. Fast transient burst test. Test of immunity to conducted disturbances, induced by radio-frequency Surge immunity test. Damped oscillatory waves immunity test. Radio interference suppression test. Tests of Accuracy requirements Test of Accuracy. Test of influence quantities. Test of ambient temperature influence. Test of no load condition. Test of starting condition.

Accuracy Class (Active/Reactive) of the offered energy meter. Capability of offered energy meter to record: Active Energy Export Reactive Energy Export Active Energy Import Reactive Energy Import Apparent Energy Maximum Demand of Active Energy Maximum Demand of Reactive Energy Maximum Demand of Apparent Energy Active Energy Reactive Energy Apparent Energy Whether reactive energy measurement is stored in separate displayable registers? YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO

9.

SIGNATURE AND STAMP OF MANUFACTURER

10.

Permissible min/max ambient temperature: During operation During storage During operation
0 0 0

C C

11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.

No. of phases. No. of wires. No. of elements Reference Voltage (U ) Reference Temperature. Reference frequency (f) Rated current, In. Maximum current, Imax. Impulse withstand voltage. AC withstand voltage. Temperature-rise of the meter.

Nos. Nos. Nos. Volts C Hz Amp Amp kV kV C YES/NQ

22". Whether meter operates continuously at 1.2 In? 23. 24. 25. 26. 26. 27, 28. 29. 30. 31. 32 Sampling rate IP class of the meter. Main power supply voltage of the meter. Material of terminal block Material of case Material of terminal cover Whether the arrangements as required are available on the front cover? In case of any non conformance, give details. Whether terminal cover meet .the requirement of ISO 75, temp, of 135 & a pressure of 1.8M Type of display. No. of digits of display. Size of digits of display (H x W)

Volts

YES/NO YES/NO LCD/LEDs Nos. Mm

SIGNATURE AND STAMP OF MANUFACTURER

33.

Minimum retention period of back up nonvolatile memory.

Months

34. Type of Memory. 35. Memory storage capacity of display unit. 36. Memory storage capacity of each register. 37. Memory capacity for load profile. 38. Total memory storage capacity of all register. 39. Overall memory capacity for energy meter. 40. Minimum retention period of display unit. 41. Minimum retention period of registers. 42. Minimum numbers of programmable display modes. Nos. 3ytes Bytes Bytes Bytes Bytes

43. Battery life for display unit. 45. Whether facility for activating the display is provided on the front of the meter? YES/NO YES/NO

45. Whether display unit is reactivated in case failure of main/auxiliary supply? Whether display unit is able to record & display 46. data for a minimum period of 120 days corresponding to max. current at reference voltage and unity power factor? 47. Whether following data/information is displayed on with date & time stamped? Date and time CT & PT ratio Phase/Line voltages Phase/Line currents Active energies import and export (present &.preceding month), KWH. Reactive energies import and export (present & preceding month), KVARH. Apparent energies import and export (present & preceding month), KVAH.

YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO

Max. Demand of Active energies import and export (present & preceding month), KW. Demand of Reactive energies Max. import and export (present & preceding month), KVAR. Max. Demand Apparent energies import and export (present & preceding month), Power factor, PF. Frequency, Hz. Last Max. Demand reset Total No. of Max. Demands resets Meter serial No. Power Quadrant Indicator, Pulse Output for field testing of meter Error code

YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO

48. Pulse outputs for remote metering:Type of outputs. VA burden of outputs. No. of output terminals. Number of pulse outputs Pulse width, amplitude Whether pulse rate fixed/programmable? YES/NO YES/NO YES/NO Nos. YES/NO

Whether information as required is marked on the 49. energy meter? In case of any non conformance, give details. 50. Whether flashing LED indicators are provided on the meter for accuracy measurement? 51. Whether the Hashing rate of programmable? 52. Meter constant, imp/KWH/KVARH. LED is

53. Whether meter is capable to compensate for the ratio and phase angle errors of feeding CTs/VTs? Whether provision to program the meter is 54. available for any combination of CT & PI transformation ratios?

YES/NO

SIGNATURE AND STAMP OF MANUFACTURER

55.

Whether optical probes along with software on CD shall be supplied?

YES/NO

Whether facility to select different integration times ranging from 5 to 60 minutes, separately 56. for maximum demand and load profile is provided? 57. Whether calibration of meter at site through hardware or software is possible? Whether energy meter designation/model, accuracy class and Serial No. of the meter 58. printed/marked at the front frame is stored in the non-volatile memory and is retrievable through meter software? 59. Normal operating voltage range 60. Limit range of voltage operation 61. Power consumption. - Voltage circuits - Current circuits - Auxiliary power supply 62. 63. 64. 65. Permissible short time (0.5s) over-current Minimum starting current Initial start-up time Meter Clock - Accuracy of real time clock - Type of battery. - Battery voltage. - Life of battery. 66. 67. 68. No. of programmable dates to account for holidays and week ends. No. of Tariffs Type of Tariffs No. of registers

YES/NO

YES/NO

YES/NO

Volts Volts

VA VA VA

mA ms.

V Years

Nos.

Nos.

SIGNATURE AND STAMP OF MANUFACTURER

69.

Whether meter record the following events with Date and Time Stamped? Main supply failure. Main supply restored. Phase voltage failure. Phase voltage restored. Per phase current loss. Per phase current restored Disconnection of wires including neutral wire. Restoration of wires including neutral wire. Total number of power outages. Reverse energy flow. Reverse Polarity/CT reversal. Last meter programming. Last meter clock programming. Low battery. Frequency outside -5% to +5%. Current in-balance. Over/under voltage. Open case. Open cover. Open terminal cover. Last billing reset. Total count of strong external magnetic field influence. Last four months billing Data, KWH & KVARH, Last four months billing Data, KW & KVAR. Last four months billing Data, KVA & KVAH.

YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YESANO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO YES/NO

70.

Type of metrology indicator (visible light/IR)

SIGNAT URE AND STAMP OF MANUFACTURER

71. 72.

Type / arrangement of voltage loss Indication Accuracy curves (attached) YES/NO

73.

Whether energy meter have the following security features with Date and Time Stamped and can be Sr. No. in its memory and displayed. YES/NO The No. of times programmed. Identification of the last programmer. A programmable meter ID code. A meter reader ID code. YES/NO YES/NO YES/NO YES/NO

74. 75. 76. 78. 79. 80. 81. 82.

Meter keep on recording/operating as long as any phase voltage exists without neutral YES/NO connected. The meter is protected against loss of data and functional performance due to external interference such as influence of YES/NO Strong/Radar Magnet, CD drive, and Mobile phones. EMC Electrostatic discharge. kV VF magnetic field withstand level. Whether meter have upgraded option. Type of modem if supplied. Whether offered energy meter comply with YES/NO DLM/COSEM/SCADA protocols. Dimensions of energy meter (attach drawing) Weight of energy meter. Kg V/m YES/NO

83.

Whether installation, erection, maintenance and operation instruction book enclosed in water YES/NO proof material is provided with each meter? Details of deviations of the offered energy meter from NTDC specification P-202 amended to date YES/NO (Attach details if any).