OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 1 of 1

FUNCTIONAL SPECIFICATION ORIFICE PLATE

OIL AND NATURAL GAS CORPORATION LTD.


INDIA

E.T. E.T. PREPARED BY

M.C. M.C. CHECKED BY

Reproduced from Rev. 0 with change of format Issued For Bid ISSUED AS

11 11 TOTAL PAGE DATE

1 0 REV No.

APPROVED BY

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 2 of 2

CONTENTS

Clause No. 1.0 2.0

ITEM Scope Of This Document Standards And Specifications 2.1 2.2 Reference Specifications Other Specifications to be followed

Page No. 3 3 3 3 3 4 4 4 4 5 5 5 6 6 6 6 7 8 8 8 8 8 8 9 10 11

3.0 4.0

Scope Of Supply Orifice Flow Meters 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 Application General Material Range Scales Flanges Meter Runs Orifice Plate Sizing

5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 Annexure I Annexure II Annexure III

Equipment Protection Installation Requirement Calibration, Inspection And Testing Documentation Tagging & Nameplates Review And Approval Vendor Pre-Qualification Requirements Preparation For Shipment Receipt And Storage Material Selection Chart For Orifice Plates Orifice Plate Hook-up Drawing Typical Data Sheet Orifice Plate

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 3 of 3

1.0 1.1 1.2

SCOPE OF THIS DOCUMENT: This specification describes the essential considerations in the selection, installation, calibration, testing and commissioning of Orifice Flow Meters. The Contractor shall be responsible for the procurement, packing, calibration, testing at yard and offshore, shipment to yard and offshore site, installation and commissioning at site of the Orifice Flow meter. STANDARDS & SPECIFICATIONS: Reference Specifications: a) b) Specification No. 3.6: Instrumentation Design Criteria Scope of Work

2.0 2.1

2.2

Other Specifications To Be Followed: NIL

3.0 3.1 3.2 3.3

SCOPE OF SUPPLY: The number of Orifice Flow Meters to be supplied and installed shall be as per the process requirements indicated in the Scope of Work and the P & IDs. The Orifice assembly shall include supply of plates, stud, bolts, nuts, jackscrews, gaskets, plate holders, plugs and all the accessories to make the system complete. The scope of supply shall also include commissioning spares and two years spares as required by clause 3.6.4.8 of Instrumentation Design Criteria, and as suggested by the Manufacturer.

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 4 of 4

4.0 4.1

ORIFICE FLOW METERS: Application:

4.1.1 Orifice Plates shall be used as the flow-measuring element wherever dictated by the process requirements. 4.1.2 In general, Orifice Plates shall be used where the rangeability required is 1:3. 4.2 General:

4.2.1 Fabrication of the orifice plate shall be in accordance with AGA Gas Measurement Committee, Report No. 3 and ISA RP 3.2. 4.2.2 The Orifice meter shall in general comprise of a concentric square edged orifice plate designed for flange tap except for particular process requirements. (Eccentric, segmental or quadrant edged orifices may be used for special services such as slurry, wet gas or highly viscous service 4.2.3 In general, the orifice plate flow element shall be coupled with a force balanced or bellows type meter. The bellows type meter shall be provided with a built-in adjustable dampening device. 4.2.4 The Orifice Plate Assembly shall be capable of withstanding differential pressure equal to full line pressure without zero or calibration change. 4.2.5 Orifice plate beta ratio (orifice diameter/ inside pipe diameter) shall be between 0.2 and 0.75. 4.3 Material:

4.3.1 The material requirements for orifice plates shall in general be according to clause 3.6.4.5 of Instrumentation Design Criteria and the material selection chart provided in Annexure I of this specification. 4.3.2 The Contractor shall ensure that all wetted parts are compatible with the process conditions. Plates shall be minimum SS 316, unless otherwise mentioned.

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 5 of 5

4.4

Range:

4.4.1 Differential ranges for orifice flow meters shall not exceed 5000 mm (200 inches) of water. Typical meter ranges for gas, steam, or vapor, streams shall be as follows: STATIC PRESSURE (Kg / cm2 g (PSIG)) 0.35 to 2.5 (5-35) 2.5 to 6 (35 - 85) Above 6 (Above 85) DIFFERENTIAL PRESSURE (mm of Water (inches)) 500 - 1250 (20 - 50) 1250 - 2500 (50 - 100) 2500 - 5000 (100 - 200)

4.4.2 The range 2500 mm (100 inches) is desirable where possible. 4.4.3 Orifice meter ranges shall be chosen such that the normal flow is between 60% and 80% of the meter range. 4.5 Scales:

4.5.1 Scales for orifice shall be 0 - 10 square root with multiplying factor to suit rate of flow requirements. 4.6 Flanges:

4.6.1 Orifice flanges and fittings shall be installed according to AGA - Gas Measurement Committee Report No. 3. 4.6.2 Orifice flanges shall be in accordance with piping classification with a minimum flange rating of 300# ANSI and a minimum of 1-inch pipe size. 4.6.3 Two pairs of flange taps located diametrically opposite shall be provided. These flange taps shall be of size NPT. The taps shall be 45o above the horizontal for gases and 45o below for liquids. Upstream and downstream tappings shall be oriented 90o to each other. The wetted part of the flange shall be of the same material as the plate. 4.6.4 Mating orifice flanges shall be so aligned that jackscrews are diametrically opposite. 4.6.5 Orifice flange shall be in general be weld neck.

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 6 of 6

4.7

Meter Runs:

4.7.1 All meter runs shall be designed for flange tap differential measurement unless otherwise specified and fabricated as per AGA - Gas measurement committee report No. 3. 4.7.2 A beta ratio of 0.75 shall be used to determine the required upstream/downstream straight runs as far as possible. 4.7.3 Orifice meter runs shall not be less than 1 - nominal pipe size. 4.7.4 Generally, the straight lengths of upstream and downstream pipe work run for an orifice installation shall be 15D and 8D respectively (10D and 5D minimum). No connections shall be made in either the upstream or downstream straight pipe work, other than the orifice flange tappings. In case sufficient straight run is not available for the given piping geometry, meter runs with straightening vanes may be used. These straightening vanes shall be of flanged type and shall be as per AGA 3. The straightening vane material shall be same as that of plate material. 4.8 Orifice Plate Sizing:

4.8.1 Orifice plate sizing shall be based on L.K. SPINK and AGA Report No. 3. Orifice plate sizing calculations shall be submitted to Company for review. 5.0 5.1 6.0 6.1 EQUIPMENT PROTECTION: Orifice Meter protection requirements shall in general be as per clause no. 3.6.4.4 of Instrumentation Design Criteria. INSTALLATION REQUIREMENTS: The installation of orifice plate meters shall in general be according to clause 3.6.4.6 of Instrumentation Design Criteria and as per Annexure II (Hook-up drawing for Orifice Meters) of this document. Orifice meter design and installation shall be in accordance with the AGA - Gas Measurement Committee Report No. 3. It is preferred that metering orifices be located in horizontal lines. Orifice flanges or meter tubes shall be installed horizontally near the deck or platform for ease of accessibility and safe changing of the orifice plate.

6.2

6.3

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 7 of 7

6.4 6.5 6.6 6.7

Orifice meters shall not be installed so that a person changing the orifice plate is required to stand directly over the top of the fitting. Orifice plates shall be installed after line flushing is completed, before hydrotesting. Prior to installing the orifice plate, it shall be checked against the Instrument Specification sheet and inspected by the Companys representative. The static pressure element shall be connected to the downstream pressure tap on gas flow measurement. The static sensing point shall be independent of the differential sensing points. Piping and equipment shall be arranged so that flashing does not occur at or upstream of orifice plates. In general, the straight lengths of upstream and downstream pipe work run for an orifice installation shall be 15D and 8D respectively (10D and 5D minimum). No connections shall be made in either the upstream or downstream straight pipework, other than the orifice flange tappings. The piping layout shall always be arranged such that straightening vanes are not required and gas meter runs are self-draining. Upstream elbows in more than one plane shall be avoided to minimize vorticity. Once the orifice plate is installed, it shall be checked for correct alignment, and correct orientation with respect to the process flow. CALIBRATION, INSPECTION & TESTING: Calibration, inspection and testing requirements shall in general be as per clause 3.6.4.7 of Instrumentation Design Criteria. In addition, the following shall also be taken care of: Orifice Plates shall be checked visually for nameplate data and for an upstream sharp edge. Bore shall be callipered to check for compliance with specifications. All socket-weldings shall be 100% Dye penetration / Magnetic particle tested. All other welding shall be 100% radiographed.

6.8 6.9

6.10 6.11 6.12 7.0 7.1

7.2 7.3

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 8 of 8

8.0 8.1 8.2 8.3 9.0 9.1 9.2

DOCUMENTATION: The documentation requirements shall in general be according to clause 3.6.6.2 of Instrumentation Design Criteria. Orifice Assembly: Sizing calculations for orifice plates including plates for senior orifice assemblies shall be furnished along with the purchase specification. Duly filled in data sheet shall be furnished along with the purchase specification. A typical blank data sheet is provided as Annexure III of this document. TAGGING & NAMEPLATES: Tagging & Nameplate requirements shall in general be according to clause 3.6.6.1 of Instrumentation Design Criteria. The orifice plates shall have an identification tag, external to the process, with the following information stamped on the upstream side: Tag Number Material Orifice bore size REVIEW & APPROVAL: Review and approval of purchase specifications and other related documents shall in general be according to clause 3.6.6.3 of Instrumentation Design Criteria. VENDOR PRE-QUALIFICATION REQUIREMENTS: The Vendor pre-qualification requirements shall in general be according to clause 3.6.6.4 of Instrumentation Design Criteria. PREPARATION FOR SHIPMENT: The Orifice Flow Meters shall be prepared for shipment in accordance to clause 3.6.6.5 of Instrumentation Design Criteria. RECEIPT & STORAGE: Receipt and storage of the Orifice Flow Meters shall be in accordance to clause 3.6.6.6 of Instrumentation Design Criteria.

10.0 10.1 11.0 11.1 12.0 12.1 13.0 13.1

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 9 of 9

ANNEXURE I Material Selection Chart for Orifice Plates S. No. Piping Class
A1, B1, D1, E1, F1, XF1, F1, PA1, PB1, PD1, PE1, PXF1, PF1, A2, B2, D2, E2, XG1, A1H, A3, B3, A8 (EXCEPT WAT. INJ. SERVICE)

Orifice Assembly Flange / Body Plate

CARBON STEEL

SS 316

2 3 4 5 6 7 8

INJECTION WATER SERVICE A4, A6, A9, B9, D9, E9 A5 A7 A1N, B1N, D1N, E1N, F1N, XF1N, PA1N, PB1N, PD1N, PF1N, XG1N A10, B10, D10, E10, F10 A11, B11, D11, E11, F11, PA11, PB11, PD11, PE11, PF11

CARBON STEEL SS 316 90-10 Cu Ni / MONEL TITANIUM

MONEL SS 316 MONEL TITANIUM

CARBON STEEL

SS 316

SS 316 L

SS 316 L

DUPLEX SS

INCONEL 625

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 10 of 10

ANNEXURE II Orifice Flow Meter Hook Up Drawing

OFFSHORE DESIGN SECTION MUMBAI REGION FORMAT NO : ODS/SOF/004

FUNCTIONAL SPECIFICATION ORIFICE PLATE RSPPM PROJECT

VOL No III REV No. 1 SPEC No. 3203 SHEET No. 11 of 11

ANNEXURE III - Typical Data Sheet For Orifice Plates


ORIFICE PLATES UNITS: Flow Liquid M /HR. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
3

Gas NM /HR.

Pressure Kg/cm2

Temperature oC

Level/Length - M

GENERAL

METER

Tag Number Line Number Line Size & Schedule Service Inlet Line ID Outlet Line ID Diff Range In mm H2O Meter Maximum Type Sizing As Per Material Thickness W In Mm Beta Ratio d/D Bore Dia. d Vent / Drain Center Distance R Type Tap Type Size Number Of Taps Per Flange Material Size & Rating Facing & Finish Line ID / OD Gasket Thickness Mm Gasket Material Plate Holder Plate Holder Material Stud Bolt Material Nut Material Wetted Part Material Straightening Vanes Connection Material Fluid State Flow Min. Maximum Flow Normal Inlet Pressure Operating Maximum Temperature Operating Maximum Sp. Gr. At Oper. Temp. 15 OC Molecular Weight Operating Viscosity (Cp) Compressibility Factor Pipe Reynolds Number IBR Certification Manufacturer Model Number Cp / Cv

PLATE

FLANGES

OPTIONS

SERVICE CONDITIONS

ITEM DETAILS