Professional Documents
Culture Documents
1
Consulting by HIR GmbH
Power
Main processes
Level 1 Alignment of processes & SAP + NN functions
Sub processes
Level 2
Customized Objects Custom Development Objects (RICEFW)
Level 3
Process steps
Level 4
Detailing
Sub processes
2
Consulting by HIR GmbH
Power
2.
3.
4.
Power
Factory Requirements
Organisation structures
SAP Performance
Data structures
Business processes
Prozess Kundenauftrge erfassen und verwalten
System functions
4
Consulting by HIR GmbH
Power
Factory Requirements
Organisation structures
Business processes
Prozess Kundenauftrge erfassen und verwalten
System functions
5
Consulting by HIR GmbH
Power
SAP Performance
Geschftsprozesse
Prozess Kundenauftrge erfassen und verwalten
Systemfunktionen
6
Consulting by HIR GmbH
Power
Analysis / Evaluations
Materialwirtschaft Gesamt
System 1
System 2
System 3
System 4
7
Consulting by HIR GmbH
Power
8
Consulting by HIR GmbH
Power
Requirement Profiles
In each chapter you can tick/check an own Requirement Profile for each factory and one or more additional common profiles for factory groups: - Not relevant - Nice to have - Important - Very important - Must (KO)
9
Consulting by HIR GmbH
Power
Performance Profiles
For each process (= question) the Development Team has to deliver the rigth answer: - No, not covered (out of scope or covered in a complete other way) - Yes, but (with comment, e.g. RICEFW - object) - Yes, fully covered (by customized or developed objects)
10
Consulting by HIR GmbH
Power
11
Consulting by HIR GmbH
Power
Benchmark Analysis
Evaluation on all levels as a summary or specific for each chapter: Result as Degree of Performance %
12
Consulting by HIR GmbH
Power
Benchmark Analysis
The Star Diagram is one way to show the differences and the gaps of the releases in an overview. Here an other example with FELIOS and Primavera. FELIOS supports Production Planning und Shop Floor processes very much better, but on the other hand PRIMAVERA supports Project Controlling.
13
Consulting by HIR GmbH
Power
Benchmark Analysis
The Bar Chart is an other way to show the differences on a summarized process level.
14
Consulting by HIR GmbH
Power
Benchmark Analysis
The Traffic Ligth Chart shows the details on the lowest process level.
15
Consulting by HIR GmbH
Power
Last Step
16
Consulting by HIR GmbH
Power
Project Steps
Power
Power
We have to define the KPIs for central organisation and local interfaces tasks and responsibilities relation to standard line organisation
19
Consulting by HIR GmbH
Power
Level 2
Its the same APML checklist, but normaly we use a higher level to check the other KPIs
Power
21
Consulting by HIR GmbH
Power
22
Consulting by HIR GmbH