Professional Documents
Culture Documents
:
FAILURE ANALYSIS & SOLUTION MANAGER
Date : May 8, 2556 BE , REVISION2
FAS
,
, , ,
, ,
, , , ,
, QC Precast
,
,
()
1.
2.
3.
4.
5.
6.
7.
1.
REV 1
DATE 8 MAY 2013
1. 1( )
1.
REV 1
DATE 8 MAY 2013
( PS)
1.
REV 1
DATE 8 MAY 2013
1.
REV 1
DATE 8 MAY 2013
(THE CONNECT16)
1.
REV 1
DATE 8 MAY 2013
Joint Sealant
Sealant Sealant
1.
REV 1
DATE 8 MAY 2013
Plastic
Shim
1.
REV 1
DATE 8 MAY 2013
1.
REV 1
DATE 8 MAY 2013
1.2
-
1.
REV 1
DATE 8 MAY 2013
- 3
-
Village Lite 32
Rev 0.
March 6, 2556 BE
5 6 2556
360 316
Village Lite Village
City , The connect 15 Pruksa
-
Vill Fenzer
Page 1of 16
1.
REV 1
DATE 8 MAY 2013
1.3 (
,
PT06 3 7
, ,
1.
REV 1
DATE 8 MAY 2013
THE CONNECT 8
PT02
1.
REV 1
DATE 8 MAY 2013
1.4 (
)
PS19
1.
REV 1
DATE 8 MAY 2013
THE CONNECT20
PS16
1.
REV 1
DATE 8 MAY 2013
- 0.3
0.3
4.2.
REV 1
1.
DATE
8 MAY 2013
[9] 3
3
(.)
ACI 224R.90 [10]
0.41
,
0.30
0.25
0.10
ACI 318-89 [11]
0.41
0.33
ACI 350R-89 [12]
0.27
0.22
1990
[13]
Elastodeck Crack Bridging
CEB/FIPModal
Code
Membrane
0.30
4.3.
[14]
0.3
4.4.
Elastodeck S Cormix
Tensile Stresses
0.3
[15] 1
1.
REV 1
DATE 8 MAY 2013
Elastodeck S Cormix
- 0.3
, , ,
1.
Sika
1.3 1.0
1.
REV 1
DATE 8 MAY 2013
2. All Plan
2.1
Supplier
2.2
2.3
3.
4.
5. Joint Sealant
- Precast
- 1 2
- Backing rod 1 cm
- MS silicone (Selax )
1.
REV 1
DATE 8 MAY 2013
- High Pressure
ALLPLAN
1.
REV 1
DATE 8 MAY 2013
PS32
1.
REV 1
DATE 8 MAY 2013
PV24 ()
PV24 ()
2.
REV 1
DATE 8 MAY 2013
, ,
4
2.
REV 1
DATE 8 MAY 2013
( a )
( c)
2.
REV 1
DATE 8 MAY 2013
Settlement crack
3.
REV 1
, ,
Figure13: Effect from settling of soil on the slab above it
The three
diagrams
belowEffect
show
how settlement
on
soil causing
cracks
on the
,,
Figure13:
from settling of soil onthe
slab above
it
wall resting above it
The three diagrams below show how settlement on soil causing cracks on the
wall resting above it
Corrosion crack
Steel reinforcement,
in the alkaline environment provided by concrete, is in a
stable condition because a protective oxide layer forms on the steel surface,
which stops corrosion. There are, however, two situations where this
passivating environment at the reinforcement can be disrupted. The first is
known as carbonation. This is when atmospheric carbon dioxide dissolves in
water to form carbonic acid, which neutralises the concrete alkalinity. The
3.
REV 1
DATE 8 MAY 2013
3.
REV 1
DATE 8 MAY 2013
3.
REV 1
DATE 8 MAY 2013
3.
REV 1
DATE 8 MAY 2013
3.
REV 1
DATE 8 MAY 2013
1
0.3
4.
REV 1
DATE 8 MAY 2013
, ,
0.3
PT01 188
4.
REV 1
DATE 8 MAY 2013
PT01 210
PS32
4.
REV 1
DATE 8 MAY 2013
PK65 2
PT02
4.
REV 1
DATE 8 MAY 2013
0.3
High Pressure Epoxy Injection
20x20
1
4.
REV 1
DATE 8 MAY 2013
THE CONNECT 23
THE CONNECT 23
4.
REV 1
DATE 8 MAY 2013
THE CONNECT16
THE CONNECT16
5.
REV 1
DATE 8 MAY 2013
1 =
2 =
!
,
!
!
3 =
4=
5=
6=
7=
Safety Factor
8=
, ,
9=
10=
11=
12=
13=
14=
15= Shop drawing
16= ,, ,
,
,,
,
17=
18=
19=
20 =
5.
REV 1
DATE 8 MAY 2013
21= Bughole
22=
23 = (Plastic shrinkage)
23 = (Drying shrinkage)
24=
25=
26=
27=
28 =
29 =
30=Blow count
31=
32 =
33= (construction joint)
34=
35=
36=
37=Non shrink Grout
38=
39=
40=
41=,, , ,
42=
43=
44=
45=
46=
47=
48=
49=
6.
REV 1
DATE 8 MAY 2013
QC
0.3
0.3
0.3
Precast Factory
Elastodeck
Precast Factory
QC FAS
- 0.3-0.6
High Pressure Epoxy Injection Sika
-0.7-1.0
Low Pressure Epoxy Injection Sika
()
- 1.0
FAS
, ,
Sika
FAS
FAS
6.
REV 1
DATE 8 MAY 2013
BIM
FAS
BIM
FAS
FAS
,
BIM
7.
REV 1
DATE 8 MAY 2013