Pruksa Crack Inspection Manual

: QC , PP , ENG , SBU , CONTRACTOR

:
FAILURE ANALYSIS & SOLUTION MANAGER
Date : May 8, 2556 BE , REVISION2

FAS


,
, , ,
, ,
, , , ,

, QC Precast
,

,

()


1.
2.
3.
4.
5.
6.
7.

1.

REV 1
DATE 8 MAY 2013

1. 1( )

1.

REV 1
DATE 8 MAY 2013

( PS)

( Village Lite 32)

1.

REV 1
DATE 8 MAY 2013

( Village Lite 32)

( Village Lite 32)

1.

REV 1
DATE 8 MAY 2013

(THE CONNECT16)

1.

REV 1
DATE 8 MAY 2013

Joint Sealant
Sealant Sealant

1.

REV 1
DATE 8 MAY 2013

Plastic

Shim

1.

REV 1
DATE 8 MAY 2013

1.

REV 1
DATE 8 MAY 2013

1.2
-

1.

REV 1
DATE 8 MAY 2013

- 3
-

Village Lite 32

Rev 0.

March 6, 2556 BE

5 6 2556
360 316
Village Lite Village
City , The connect 15 Pruksa
-
Vill Fenzer

VILLAGE LITE PATTANAKARN 32


Pruksa Real Estate (Public) Co., Ltd

Page 1of 16

Document No. DV002

1.

REV 1
DATE 8 MAY 2013

1.3 (
,

PT06 3 7
, ,

1.

REV 1
DATE 8 MAY 2013

THE CONNECT 8

PT02

1.

REV 1
DATE 8 MAY 2013

1.4 (

)

PS19

1.

REV 1
DATE 8 MAY 2013

THE CONNECT20

PS16

1.

REV 1
DATE 8 MAY 2013

- 0.3


0.3

4.2.

REV 1
1.

DATE
8 MAY 2013
[9] 3
3

(.)
ACI 224R.90 [10]

0.41
,
0.30

0.25

0.10
ACI 318-89 [11]

0.41

0.33

ACI 350R-89 [12]

0.27

0.22

1990
[13]
Elastodeck Crack Bridging
CEB/FIPModal
Code

Membrane

0.30

4.3.

[14]

0.3

4.4.
Elastodeck S Cormix

Tensile Stresses

0.3


[15] 1

1.

REV 1
DATE 8 MAY 2013

Elastodeck S Cormix

0.3 THE PLANT PASORN32 86

- 0.3

, , ,

1.

1.1 0.3-0.6 High Pressure Epoxy Injection


Sika

1.2 0.7-1.0 Low Pressure Epoxy Injection

Sika

1.3 1.0

1.

REV 1
DATE 8 MAY 2013

2. All Plan

2.1

Supplier

2.2

2.3

3.

4.

5. Joint Sealant

- Precast

- 1 2

- Backing rod 1 cm

- MS silicone (Selax )

- Skim coat Skim coat

- 24 Crack bridging membrane "

Elastodeck S" Cormix 150 5cm

1.

REV 1
DATE 8 MAY 2013

- High Pressure

Epoxy Injection Sika

ALLPLAN

1.

REV 1
DATE 8 MAY 2013

PS32

High Pressure Epoxy Injection Sika PS32

1.

REV 1
DATE 8 MAY 2013

PV24 ()

PV24 ()

2.

REV 1
DATE 8 MAY 2013

, ,
4

2.

REV 1
DATE 8 MAY 2013

( a )

(Dead load)(Super impose dead load) (Live


load)
0.3 Hair Crack ( b)

( c)

2.

REV 1
DATE 8 MAY 2013

AUTHOR: AU YONG THEAN SENG


www.madisonvelocity.blogspot.com

Settlement crack

3.

AUTHOR: AU YONG THEAN SENG


www.madisonvelocity.blogspot.com

REV 1

Loss of support beneath concrete structures, usually caused by settling or


Settlement
washout
of crack
soils and sub base materials, can cause a variety of problems in
concrete structures, from cracking and performance problems to structural
Loss of
support
beneath
structures,
usually caused
or
failure.
Loss
of support
can concrete
also occur
during construction
due by
to settling
inadequate
washout
of
soils
and
sub
base
materials,
can
cause
a
variety
of
problems
in
formwork support or premature removal of forms.
concrete structures, from cracking and performance problems to structural
failure. Loss of support can also occur during construction due to inadequate
formwork support or premature removal of forms.

DATE 8 MAY 2013

, ,
Figure13: Effect from settling of soil on the slab above it
The three
diagrams
belowEffect
show
how settlement
on
soil causing
cracks
on the

,,
Figure13:
from settling of soil onthe
slab above
it
wall resting above it

The three diagrams below show how settlement on soil causing cracks on the
wall resting above it

AUTHOR: AU YONG THEAN SENG


www.madisonvelocity.blogspot.com

Figure 14: How different settlements affect the cracking mode

Corrosion crack

Steel reinforcement,
in the alkaline environment provided by concrete, is in a
stable condition because a protective oxide layer forms on the steel surface,
which stops corrosion. There are, however, two situations where this
passivating environment at the reinforcement can be disrupted. The first is
known as carbonation. This is when atmospheric carbon dioxide dissolves in
water to form carbonic acid, which neutralises the concrete alkalinity. The

3.

REV 1
DATE 8 MAY 2013

3.

REV 1
DATE 8 MAY 2013

3.

REV 1
DATE 8 MAY 2013

3.

REV 1
DATE 8 MAY 2013

3.

REV 1
DATE 8 MAY 2013


1
0.3

4.

REV 1
DATE 8 MAY 2013

, ,



0.3

PT01 188

4.

REV 1
DATE 8 MAY 2013

PT01 210

PS32

4.

REV 1
DATE 8 MAY 2013

PK65 2

PT02

4.

REV 1
DATE 8 MAY 2013

0.3
High Pressure Epoxy Injection


20x20
1

4.

REV 1
DATE 8 MAY 2013

THE CONNECT 23

THE CONNECT 23

4.

REV 1
DATE 8 MAY 2013

THE CONNECT16

THE CONNECT16

5.

REV 1
DATE 8 MAY 2013

1 =
2 =
!
,
!

!

3 =
4=
5=
6=
7=
Safety Factor

8=
, ,
9=
10=
11=
12=
13=
14=
15= Shop drawing

16= ,, ,
,
,,
,
17=
18=
19=
20 =

5.

REV 1
DATE 8 MAY 2013

21= Bughole
22=

23 = (Plastic shrinkage)

23 = (Drying shrinkage)
24=
25=
26=
27=
28 =
29 =
30=Blow count

31=
32 =
33= (construction joint)
34=
35=
36=
37=Non shrink Grout

38=

39=
40=
41=,, , ,
42=
43=
44=
45=
46=
47=
48=

49=

6.

REV 1
DATE 8 MAY 2013

QC
0.3

0.3

0.3

Precast Factory

Elastodeck

Precast Factory

QC FAS

- 0.3-0.6
High Pressure Epoxy Injection Sika
-0.7-1.0
Low Pressure Epoxy Injection Sika

()

- 1.0

High Pressure Epoxy Injection

FAS
, ,

Sika

FAS

FAS

6.

REV 1
DATE 8 MAY 2013

BIM

FAS

BIM

FAS

FAS
,

BIM

- 0.3-0.6 High Pressure Epoxy


Injection
- 0.7-1.0 Low Pressure Epoxy
Injection
-
-
-
-

7.

REV 1
DATE 8 MAY 2013