SIMPLEX INFRASTRUCTURES LIMITED

DLF REGAL GARDEN ,SECTOR-90 Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)

JOB TITLE : RCC at Height 34 Meter EL. Using Concrete pump.

FORMAT NO:

Sl ACTIVITY (JOB STEPS No IN SEQUENCE)

HAZARDS/RISK

CONSEQUENCES

PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY

RISK

CONTROLLED FINAL RESPONSIBILITY RISK RATING ASSESSMENT

1 Erection of staging for working plate form and approach.

1. Injury during transportation.

body injury

20

1.Full body harness with two Lanyard with two anchor should be used by all the worker and it will be anchored at suitable position. 2.Experienced manpower for transportation of materials should be deputed. 1. Barricading the area.

TOLERABLE

ACCEPTABLE

2. Fall of materials.

body injury/ Property damage body injury/ Property damage

20

2. Authorizes entry only. 1) Proper anchoring of staging is to be done. 1.Boom placer/ Pump to be rested on firm ground and firm base. 2. Placed away from heavy traffic area. 1. Proper manual handling method to be adopted.

TOLERABLE

ACCEPTABLE

3. Toppling of staging.

25

TOLERABLE

ACCEPTABLE Site Engineer / Manager Name: ACCEPTABLE Contact no:

2 Placing of concrete pump. 1. Toppling of concrete pump. 4 2. Struck by other moving vehicle. 3 Connecting concrete pump line. 1. Fall of pipe line while erecting. body injury/ Property damage 4 4 16 5 20

4 TOLERABLE

body injury/ Property damage 2. Leakage of pipe line at joints.

16

2. Leak proof coupler to be provided at joints. 1. Stop block are to be placed. 2. Proper signal to be given by signalman. 1. proper communication should be ensured. 2. Operation by trained pump operator should be ensured. 1) Proper anchoring of the pipeline with firm support should be ensured. 1. Regular concrete pump strokes should be maintained. 2. use of excessive sharp angle ends should be avoided. 1. The hose should not be bent more that 60'C with the concrete load. 2. Care should be taken to keep up the continuous flow of concrete. 3. When the floor is in up word direction, utmost care is to be taken. 4. The operation should be supervised by experienced supervisor.

TOLERABLE

ACCEPTABLE

4 Unloading of concrete into 1. Hitting the pump by transit pump by transit mixer. mixer. 2. Over pouring of concrete into body injury/ Property damage pump hopper. 4 5 20

TOLERABLE

ACCEPTABLE

5 Placing concrete

1. Excessive vibration at directional charge. 2. Chocking of pipeline

3. Busting of hose. body injury/ Property damage 4 4 16

TOLERABLE

ACCEPTABLE

Site Engineer / Manager Name: Contact no:

Prepared By

Reviewed By

Approved By

Name Designation