You are on page 1of 4

Job N o :

Project:
Owner:
Item:

1
5/25/2013

Rev. No.
Date:
Designed by: L Ngc Hin
Checked by: Nguyn Vn Don

CITY GATE

BORE PILE DESIGN


A. GENERAL DATA
Bottom level of pilecap:
Diameter of pile:
Pile length:
Rebar diameter:
Rebar number:

Df =
d=
Lp =
f=
n=

6.9
0.8
50.1
22
18

m
m
m
mm

Hw =

0.5

layer

type

g dn
(T/m3)
1.500
0.476
0.476
0.961
0.938
0.892
0.975
1.012

C
(T/m2)
1.00
0.68
0.68
1.00
4.16
2.81
1.00
4.79

SPT

clay
clay
clay
sand
clay
sand
clay
sand
sand
sand
sand
sand
sand
clay

g tn
(T/m3)
1.500
1.476
1.476
1.961
1.938
1.892
1.975
2.012

1
1
3
4
5
6
8
7
8
9
10
11
8

hi
(m)
2.72
4.18
16.8
4.5
4.1
1.9
19.9
2.88

30.00
6.45
6.45
27.60
16.78
21.72
27.80
18.95

4
1
1
26
13
12
25
47

2.012

1.012

4.790

18.950

47

cm

B. SOIL DATA
Underground water
Position
ABOVE
PILECAP

BELOW
PILECAP

END PILE

C. PILE BEARING CAPACITY


Ptk = MIN(1,2,3)
Ptk
Chn
=
1. Refer to material
Material data :
- Concrete grade:

448

350

- Steel grade:
Pile capacity

Qvl=

M300

Rn =

60.00

Kg/cm2

A-III

Ra =

2200

Kg/cm2

448

(1)

3. Pile bearing capacity according to standard penetration test (TCXD 195-1997)


Allow Bearing Capacity:

Qa =

710

Ton

(3)

Qa = 1.5NTBAp + (0.15NcLc + 0.43NsLs)W - W p


With:
NTB

SPT index at bottom pile

Ns

SPT index in clay soil layer

Nc

SPT index in sand soil layer

Ls

Length of pile in clay soil layer

Lc

Length of pile in sand soil layer

Area of pile:
Parameter of pile:
layer
1
1
3
4
5
6
8
7
8
9
10
11
END
PILE
SUM

h
(m)
2.72
4.18
16.82
4.5
4.1
1.9
19.9
2.88

NTB

Ap =
W=

0.50
2.51

Nc

Lc
(m)

m2
m
Ns
4
1
1

26

4.5

12

1.9

47

2.88

Ls
(m)
2.72
4.18
16.82

NcLc

NsLs

16.82
117

13

4.1

53.3
22.8

25

19.9

497.5
135.36

Wp
(T)

17.112
3.481
3.219
1.536
15.254
2.154

47
275.16

567.62

42.75658

Job N o :
Project:
Owner:
Item:

1
5/25/2013

Rev. No.
Date:
Designed by: L Ngc Hin
Checked by: Nguyn Vn Don

CITY GATE

BORE PILE DESIGN


A. GENERAL DATA
Bottom level of pilecap:
Diameter of pile:
Pile length:
Rebar diameter:
Rebar number:

Df =
d=
Lp =
f=
n=

6.9
0.8
50.1
22
18

m
m
m
mm

Hw =

0.5

layer

type

g dn
(T/m3)
1.500
0.476
0.476
0.961
0.938
0.892
0.975
1.012

C
(T/m2)
1.00
0.68
0.68
1.00
4.16
2.81
1.00
4.79

SPT

clay
clay
clay
sand
clay
sand
clay
sand
sand
sand
sand
sand
sand
clay

g tn
(T/m3)
1.500
1.476
1.476
1.961
1.938
1.892
1.975
2.012

1
1
3
4
5
6
8
7
8
9
10
11
8

hi
(m)
2.72
4.18
16.8
4.5
4.1
1.9
19.9
2.88

30.00
6.45
6.45
27.60
16.78
21.72
27.80
18.95

4
1
1
26
13
12
25
47

2.012

1.012

4.790

18.950

47

cm

B. SOIL DATA
Underground water
Position
ABOVE
PILECAP

BELOW
PILECAP

END PILE

C. PILE BEARING CAPACITY


Ptk = MIN(1,2,3)

Ptk
Chn
=
1. Refer to material
Material data :
- Concrete grade:

448

350

- Steel grade:

M300

Rn =

60.00

Kg/cm2

A-III

Ra =

2200

Kg/cm2

Qvl=

Pile capacity

448

(1)

2. According to soil data (appendix B -TCXD 205-1998)


Qa =
Allowable pile capacity
244

(2)

Qa = QS / FSs + Qp/FSp
Ultimate pile capacity

Qu =

416

Qu = uSfsili + qpAp
With:
fsi:

skin friction

qp:
u:
Ap:

end bearing
pile diameter
pile cross section

FSs:

safety factor for skin friction

FSp:

safety factor for end bearing


FSs =

1.5

FSp =
u=
Ap =

2
2.513
0.503

m
m

+ fs = Ca + s'h tgja
Ca =

ja =

3j/4

s'h = kss'v = (1-sinj)s'v


s'v = Sgihi
+ qp = cNc + s'vNq + gdNg
Nc ,Nq ,Ng sub to j
layer

type

1
1
3
4
5

clay
clay
clay
sand
clay
sand

h
m
2.72
4.18
16.82
4.5
4.1
1.9

END
PILE

gi
(T/m)
1.5
0.476
0.476
0.961
0.938
0.892

Ci
(T/m)
1
0.68
0.68
1
4.16
2.81

ji
deg.
30
6.45
6.45
27.6
16.78
21.72

s'v
(T/m)

1.012

4.79

18.95

46.26

fs
(T/m)

fs*li
(T/m)

1.44
4.29
7.39
7.06

24.2
19.3
30.3
13.4

6.07
10.07
16.24
20.32
23.09

sum
j=

18.95 deg.
Nc
16.5
qp =

0.330739893
Nq
6.67
391.49

87.2

Ng
5.00
T/m2

3. Pile bearing capacity according to standard penetration test (TCXD 195-1997)


Allow Bearing Capacity:

Qa =

710

Ton

(3)

Qa = 1.5NTBAp + (0.15NcLc + 0.43NsLs)W - W p


With:
NTB

SPT index at bottom pile

Ns

SPT index in clay soil layer

Nc

SPT index in sand soil layer

Ls

Length of pile in clay soil layer

Lc

Length of pile in sand soil layer

Area of pile:
Parameter of pile:
layer
1
1
3
4
5
6
8
7
8
9
10
11
END
PILE
SUM

h
(m)
2.72
4.18
16.82
4.5
4.1
1.9
19.9
2.88

NTB

Ap =
W=

0.50
2.51

Nc

Lc
(m)

m2
m
Ns
4
1
1

26

4.5

12

1.9

47

2.88

Ls
(m)
2.72
4.18
16.82

NcLc

NsLs

16.82
117

13

4.1

53.3
22.8

25

19.9

497.5
135.36

Wp
(T)

17.112
3.481
3.219
1.536
15.254
2.154

47
275.16

567.62

42.75658