ESTIMATE FOR CONSTRUCTION OF A PHADI HOUSE

IN ROURKELA (KL) DIVISION


SPECIFICATIONS:
Room Space

45 ft x 15 ft

Verandah

8 ft wide (total space from godown wall to outer edge of verandah)


7 ft wide (clear space from godown wall to inner edge of brick ver. pillar)

Wall height

10 ft

Gabble height

13 ft

Brick masonry

Cement mortar [1:6]

Brick wall thickness & pillars

10"

Pillar dimension

15" x 15"

Outside plastering

12mm cement mortar [1:6]

Inside plastering

16mm cement mortar [1:6]

Reinforced concrete pillar

2ft above brick pillars

Roof

GCI sheet with iron trusses


Verandah GCI sheet on 50 x 50 x 6 mm angle

Plinth height above ground

1'-0"

Floor

Sand filling only

GI sheet door

1 no.

(7 ft x 4 ft)

CENTER LINE
Main room

2 x (45' 10"+ 15' 10") =

Verandah

2 x ( 8' 0" ) + 45' 10" =

123'- 4"
61'- 10"
185'- 2"

Sl.
No.

Description of Work
[All Dimensions in ft-in]

1.

Excavation of foundation in hard soil dressing


and levelling the bed etc. complete.

Quantity of Work Volume/ Area/wt.


No

Total

Wall C/L

1x

185' 2" x

2' 6" x

2' 6" =

1157.29 Cft

Steps

1x

6' 0" x

1' 6" x

0' 8" =

6.00 Cft

Unit Rate

Total Cost

1163.29 Cft
32.94 Cum @ Rs.
2.

78.95 Rs.

2,600.00

274.51 Rs.

10,534.00

2591.69 Rs.

11,653.00

Filling in Foundation & Plinth with sand


watered and rammed
Wall C/L

1x

185' 2" x

2' 6" x

0' 4" =

1st footing

1x

185' 2" x

0' 6" x

1' 0" =

92.58 Cft

2nd footing

1x

185' 2" x

1' 0" x

0' 10" =

154.31 Cft

Room

1x

44' 7" x

14' 7" x

1' 0" =

650.17 Cft

Verandah

1x

44' 7" x

6' 9" x

1' 0" =

300.94 Cft

6' 0" x

1' 6" x

0' 4" =

3.00 Cft

Steps

154.31 Cft

1355.31 Cft
38.37 Cum @ Rs.
3.

CC [1:4:8] with 4 cm. metal in Plinth &


Foundation work.
Wall C/L

1x

185' 2" x

2' 6" x

0' 4" =

Steps

1x

6' 0" x

2' 3" x

0' 4" =

154.31 Cft
4.50 Cft
158.81 Cft
4.50 Cum @ Rs.

4.

RRHG stone masonary in CM [1:6] in Plinth &


Foundation work.
Wall C/L

1st Footing

1x

185' 2" x

2' 0" x

1' 0" =

370.33 Cft

2nd Footing

1x

185' 2" x

1' 6" x

0' 10" =

231.46 Cft

3rd Footing

1x

185' 2" x

1' 3" x

1' 0" =

231.46 Cft
833.25 Cft
23.59 Cum @ Rs.

5.

1897.69 Rs.

44,769.00

2648.58 Rs.

14,529.00

2648.58 Rs.

72,755.00

0.42 Cum @ Rs.

4090.77 Rs.

1,737.00

0.42 Qtl @ Rs.

5744.41 Rs.

2,440.00

108.61 Rs.

2,237.00

Brick work with K.B. brick in Cement mortar


[1:6] mortar in super structure, including
cost, carriage, royalty etc.
Room pillar

8x

1' 3" x

1' 3" x

10' 0" =

125.00 Cft

Gabble

2x

1' 3" x

1' 3" x

13' 0" =

40.63 Cft

Verandah pillar

4x

1' 3" x

1' 3" x

6' 6" =

40.63 Cft

Deduct for CC work in pillars

4x

1' 3" x

1' 3" x

2' 0" =

206.25 Cft
12.50 Cft
193.75 Cft
5.49 Cum @ Rs.
6.

Brick work with K.B. brick in Cement mortar


[1:6] mortar in super structure, including
cost, carriage, royalty etc.
Room wall

1x

123' 4" x

0' 10" x

10' 0" =

1027.78 Cft

Gabble

2x

16' 8" x

0' 10" x

1' 6" =

41.67 Cft

Parapet

4x

9' 1" x

0' 10" x

1' 0" =

30.28 Cft

Steps

1x

6' 0" x

1' 6" x

0' 6" =

4.50 Cft

1x

6' 0" x

0' 9" x

0' 6" =

2.25 Cft
1106.47 Cft

Deduct for Opening

1x

6' 0" x

0' 10" x

0' 6" =

2.50 Cft

CC lintel

8x

1' 3" x

0' 10" x

10' 0" =

83.33 Cft

Pillar portion brick wall & RCC

2x

1' 3" x

0' 10" x

13' 0" =

27.08 Cft

1x

4' 0" x

0' 10" x

7' 0" =

23.33 Cft

Door

136.25 Cft

Net Volume

27.47 Cum @ Rs.

970.22 Cft

7.

RCC [1:2:4] in top portion of pillars using 12


mm chips including laying, compacting,
curing, etc complete.
CC above brick pillar to receive truss

4x

1' 3" x

1' 3" x

2' 0" =

12.50 Cft

Lintel

1x

6' 0" x

0' 10" x

0' 6" =

2.50 Cft
15.00 Cft

8.

9.

Supplying ,fitting and placing uncoated HYSD


bar reinforcement complete as per drawing
and technical specification.

20 mm thick cement plaster [1:6] over


stone masonary.

Verandah

2x

47' 1" x

1' 0" =

94.17 Sqft

2x

25' 1" x

1' 0" =

50.17 Sqft

1x

61' 10" x

1' 3" =

77.29 Sqft
221.63 Sqft
20.60 Sqm @ Rs.

10. 12 mm thick cement plaster [1:6] over brick


work.
Outside
Phadi outside wall

2x

47' 1" x

10' 0" =

941.67 Sqft

2x

17' 1" x

10' 0" =

341.67 Sqft

Gable

2x

17' 1" x

1' 6" =

51.25 Sqft

Parapet

8x

9' 1" x

1' 0" =

72.67 Sqft

4x

10' 1" x

0' 10" =

33.61 Sqft

Door lintel portion

1x

4' 0" x

0' 10" =

3.33 Sqft

Verandah pillars

4x

5' 0" x

6' 6" =

130.00 Sqft

Steps

4x

6' 0" x

0' 6" =

12.00 Sqft

4x

6' 0" x

0' 9" =

18.00 Sqft

2x

5' 3" x

0' 6" =

5.25 Sqft
1609.44 Sqft

Deduct for Opening


Door

1x

4' 0" x

7' 0" =

28.00 Sqft
28.00 Sqft

Net Area

1581.44 Sqft
146.97 Sqm @ Rs.

71.58 Rs.

10,521.00

98.81 Rs.

11,283.00

369.44 Rs.

2,747.00

1.02 Sqm @ Rs.

169.79 Rs.

174.00

400.00 Kg. @ Rs.

80.00 Rs.

32,000.00

70.00 Rs.

52,756.00

11. 16 mm thick cement plaster [1:6] over


brick masonary.
Inside
Phadi inside wall

2x

45' 0" x

10' 0" =

900.00 Sqft

2x

15' 0" x

10' 0" =

300.00 Sqft

Gable

2x

15' 0" x

1' 6" =

45.00 Sqft

Door side wall

2x

7' 0" x

0' 10" =

11.67 Sqft
1256.67 Sqft

Deduct for Opening


Door

0.00 Sqft
1x

4' 0" x

7' 0" =

28.00 Sqft
1228.67 Sqft

Net Area

114.19 Sqm @ Rs.

12. Rigid and smooth centering & shuttering for


RCC work including false works &
dismentalling then after casting including
cost of malerials complete in ground floor.
Super Structure columns

8x

5' 0" x

2' 0" =

80.00 Sqft
7.43 Sqm @ Rs.

Lintel

1x

6' 0" x

1' 10" =

11.00 Sqft

13. Supply of MS Angular Truss including cost


but excluding carriage charges.
2 nos. x

200.00 Kg =

14. Supply of MS Angle Purlines [50x 50 x6]


including cost but excluding carriage charges.

Main room

8 nos. x

14.23 m =

113.82 Rmt

Verandah

3 nos. x

14.23 m =

42.68 Rmt

4 nos. x

2.74 m =

10.98 Rmt
167.48 Rmt
753.66 Kg. @ Rs.

15. Supply of MS Flat Wind Tie [50x5] including


cost but excluding carriage charges.

14.23 m =

8 nos. x

113.82 Rmt
227.64 Kg. @ Rs.

70.00 Rs.

15,935.00

16. Labour for fixing GCI Sheet in roof including


fixing of ridges wind ties etc. complete but
excluding cost of fitting including drilling
holes in wind ties.
Main Room
Ridges

2x

46' 8" x

10' 7"

987.78 Sqft

2x

46' 8" x

1' 0"

93.33 Sqft

1x

46' 8" x

10' 5"

486.11 Sqft
1567.22 Sqft

Add 10% for lapping

156.72 Sqft

Total

1723.94 Sqft

17. Cost of GCI Sheet [ 0.50mm thick]

160.22 Sqm @ Rs.

66.13 Rs.

10,595.00

629.66 Kg. @ Rs.

70.00 Rs.

44,076.00

20.11 Qtl @ Rs.

389.51 Rs.

7,833.00

Rs.

3,000.00

6000.00 Rs.

6,000.00

L.S

Rs.

4,000.00

L.S

Rs.

5,000.00

160.22 Sqm

@ 3.93 Kg.

18. Labour for hoisting joists & trusses & purline


in position.

19. Cost of Paint for Iron work in two coat


including transportation charges & tax.

L.S

20. Cost of M.S. GI shutters including frame


fitting, fixing and painting.
Door

1 x 4' 0" x

21. Cost of all materials, J- hooks, HD bolt,GI


washer,Bitumen washer, etc.
22. Transpoartation Charges for Iron truss,
purlin, wing ties, GCI sheet, etc.

7' 0"

@ Rs.

23. White washing 3 coats with shell lime.


Item No. 9 & 10

Area outside wall

167.56 Sqm

Item No. 11

Area inside wall

114.19 Sqm
281.75 Sqm @ Rs.

8.69 Rs.

2,448.00

Rs.

3,71,622.00

Total
Labour cess 1% vide resolution No.12653 Dt.15.12.2008 of Govt. in Labour and Employment Department under B&OCWWC Act, 1996

(Rupees Three Lakhs Seventy five Thousand) only.

Rs.

3,750.00

Grand total

Rs.

3,75,372.00

Or Say

Rs.

3,75,000.00

Certified that the estimate has been prepared basing on the Schedule of Rates 2012 and the enhanced Labour Rates of 2012 vide Notification
No. 8536 LL-I(AR)-2/12/LESI dt.06.10.2012 of Govt.of Odisha. No overhead charges are taken in to consideration in any item.

LEAD STATEMENT OF MATERIALS

Sl.
No.

Name of the Materials

Cost of conveyance by Truck as per Schedule of


Rates '2012'
Unit
Up to 5
kms.

Every extra
Every extra
kms.
kms. up to
beyond 50
50 kms.
kms.
7

Total
[6 to 8]

Cost of
materials
Total Cost
[As per
[9+10]
Schedule of
Rates
'2012']
10

Total Cost
[11+12]

12

13

Approx.

15

cum

124.00

73.00

0.00

197.00

Approx.

15

cum

124.00

73.00

0.00

197.00

44.00

241.00

19.60

260.60

Metal cbg 4 cm.

Approx.

15

cum

124.00

73.00

0.00

197.00

502.00

699.00

70.56

769.56

Approx.

15

cum

124.00

73.00

0.00

197.00

201.00

398.00

70.56

468.56

RRHG Stone
Chips cbg 10 mm

Approx.

15

cum

124.00

73.00

0.00

197.00

961.00

1,158.00

70.56

1,228.56

Chips cbg 12 mm

Approx.

15

cum

124.00

73.00

0.00

197.00

924.00

1,121.00

70.56

1,191.56

Chips cbg 20 mm

Approx.

15

cum

124.00

73.00

0.00

197.00

901.00

1,098.00

70.56

1,168.56

K.B.Bricks
K.B.Bricks Khoa 4 cm

Approx.

15

2000 No.

799.00

330.00

0.00

1,129.00

6,838.00

7,967.00

0.00

7,967.00

Approx.

15

cum

124.00

73.00

0.00

197.00

278.00

475.00

0.00

475.00

10

Cement

Approx.

15

MT

134.00

69.00

0.00

203.00

5,500.00

5,703.00

742.50

6,445.50

11

MS Rod

Approx.

15

MT

134.00

69.00

0.00

203.00

50,000.00

50,203.00

2,000.00

52,203.00

39.00

Certified that the lead provided in the statement is correct and shortest to the best of my knowledge.

11

Rayalty/
VAT, etc.

Sand for filling


Sand for mortar

Name of the
Quarry

Distance to be carried in
kms.

PHADI KL

236.00

19.60

255.60

ANALYSIS OF RATES ( AS PER 2006)


FOR CONSTRUCTION OF PHADI KL
Sl.
No.
1.
1.

Description of Work

Unit

Quantity
required

Rate

Amount

2
Earth work in hard soil within 50m.initial lead and 1.5m initial
lift including rough dressing and breaking clods to maximum 5
cm to 7 cm and laying in layers not exceeding 0.3m in depth.
in foundation work per 100 cum.

Man/Female Mulia

Each

43.00

150.00 Rs.

2% T & P,Sundries

129.00

Rs.

6,579.00

Rs.

1,315.80

Rs.

7,894.80

Or Say

Rs.

78.95

100.00

39.00 Rs.

3,900.00

Rs.

21,660.00

Rs.

25,560.00

150.00 Rs.

1,854.00

20% extra for foundation work


Rate per 100cum.
2.

Rate per 1 cum.


Filling in foundation & plinth with sand watered and rammed
per 100 cum.

Materials
Sand for filling

Cum

6,450.00

Rs.

Add Carriage, Royalty


Sand for filling
II

Labour
Female Mulia

Each

12.36

2% T & P,Sundries supervision charges


Cost for 100 Cum
3.

Cost for 1 Cum


Cement concrete[1:4:8] with 4 cm. metal in plinth &
foundation work per cum.

Materials

Rs.

37.08

Rs.

1,891.08

Rs.

27,451.08

Rs.

274.51

Metal cbg 4 cm

Cum

0.96

502.00 Rs.

481.92

Sand for mortar

Cum

0.48

44.00 Rs.

21.12

Qtl

1.72

550.00 Rs.

946.00

Rs.

256.86

Sand for Mortar

Rs.

103.97

Cement

Rs.

162.63

Rs.

1,972.49

Cement
Add Carriage, Royalty
Metal cbg 4 cm

II

Labour
Mason 2nd class

Each

0.18

190.00 Rs.

34.20

Man/Female Mulia

Each

3.90

150.00 Rs.

585.00

Cost for 1 Cum


Or Say
4.

RRHG stone masonary in cement mortar [1:6] in foundation &


Plinth per 1 cum.

Materials

Rs.

619.20

Rs.

2,591.69

Rs.

2,591.69

201.00

Rough stone

Cum

1.00

201.00 Rs.

Sand for mortar

Cum

0.34

44.00 Rs.

14.96

Qtl

0.82

550.00 Rs.

448.31

Cement

Add Carriage, Royalty

II

Rough stone

Rs.

267.56

Sand for Mortar

Rs.

73.64

Cement

Rs.

77.07

Rs.

1,082.54

Labour
Mason 1st class

Each

0.35

205.00 Rs.

71.75

Mason 2nd class

Each

1.41

190.00 Rs.

267.90

Mulia

Each

3.17

150.00 Rs.

475.50

Cost for 1 Cum


Or Say
5.

Brick work with K.B. brick having crushing strength not less
than 75 Kg/sqcm in cement mortar [1:6] in plinth & foundation
work per 1 cum

Materials

Rs.

815.15

Rs.

1,897.69

Rs.

1,897.69

K.B. brick

No.

350.00

6838.00 Rs.

1,196.65

Sand for mortar

Cum

0.28

44.00 Rs.

12.32

Qtl

0.67

550.00 Rs.

369.60

K.B. brick

Rs.

197.58

Sand for mortar

Rs.

60.65

Cement

Rs.

63.54

Rs.

1,900.33

Cement
Add Carriage, Royalty

II

Labour
Mason 1st class

Each

0.35

205.00 Rs.

71.75

Mason 2nd class

Each

1.05

190.00 Rs.

199.50

Man/Female Mulia

Each

2.96

150.00 Rs.

444.00

Rs.

715.25

Rs.

2,615.58

Rs.

2,615.58

Cost for 1 Cum


Or Say
Add for Superstructure work
Cost for 1 Cum
Or Say
6.

Rigid and smooth centering & shutering for RCC work


including false works & dismentalling then after casting
including cost of malerials complete in ground floor.

R.C.C. floor and roof slabs, landings, balconies, projecting sun


shades and chajjas up to 4.3m height

Rs.

33.00

Rs.

2,648.58

Rs.

2,648.58

Details for 9 sqm.


i.Non Sal Wood Scantling

Cum

0.11

16828.00 Rs.

1,884.74

ii.Planks 38 mm

Cum

0.34

16828.00 Rs.

5,721.52

Mt

56.00

83.00 Rs.

4,648.00

Cum

1.14

122.42 Rs.

139.81

Rs.

12,394.06

Rs.

1,239.41

iii.Bullah 120 mm dia


iv.Carriage of wood within 5 km
Considering 10 times use of the materials
Carpenter 2nd class

Each

2.75

190.00 Rs.

522.50

Sangi mulia

Each

2.75

170.00 Rs.

467.50

Cost for 9 Sqm

Rs.

2,229.41

Cost for 1 Sqm

Rs.

247.71

Rs.

247.71

Or Say

RCC stairs excluding landing but including railing


Details for 5 sqm.
i.Planks 38 mm

Cum

0.23

ii.Non sal wood scantling

Cum

0.04

Mt

6.50

Cum

0.35

iii.Bullah 120 mm dia


iv.Carriage of wood within 5 km

16828.00 Rs.
16828.00 Rs.

3,836.78

83.00 Rs.
37.52 Rs.

539.50

Rs.

5,045.71

Rs.

504.57

Considering 10 times use of the materials

13.13

Carpenter 2nd class

Each

2.75

190.00 Rs.

522.50

Sangi mulia
Cost for 5 Sqm

Each

2.75

170.00 Rs.

467.50

Rs.

1,494.57

Cost for 1 Sqm


Or Say
c

656.29

Rs.

298.91

Rs.

298.91

RCC foundation and plinth band footings,bases of columns.


Mass concrete & pre cast slabs
Details for 10 sqm.
i.Planks 25 mm
ii.Non-sal Bullah 80 mm dia
iii.Carriage of wood within 5 km

Cum

0.27

16,828.00 Rs.

4,493.08

Mt

12.60

49.00 Rs.

617.40

Cum

0.33

35.20 Rs.
Rs.

11.56
5,122.04

Rs.

512.20

Considering 10 times use of the materials


Carpenter 2nd class

Each

0.50

190.00 Rs.

95.00

Sangi mulia

Each

0.50

170.00 Rs.

85.00

Rs.

692.20

Cost for 10 Sqm


Cost for 1 Sqm
Or Say
d

Rs.

69.22

Rs.

69.22

R.C.C. beams, column, grider and bressmer, etc


Details for 4.20 sqm.
i. 38 mm thick non sal Planks

Cum

0.22

16,828.00 Rs.

3,668.50

ii. 120 mm dia sal Bullah

Cum

15.20

83.00 Rs.

1,261.60
664.00

iii. 80 mm dia Bullah for bracing

Mt

8.00

83.00 Rs.

iv. Carriage of wood within 5 km

Cum

0.46

48.88 Rs.

22.29

Rs.

5,616.39

Rs.

561.64

Considering 10 times use of the materials


Carpenter 2nd class

Each

2.75

190.00 Rs.

522.50

Sangi mulia

Each

2.75

170.00 Rs.

467.50

Cost for 4.20 Sqm

Rs.

1,551.64

Cost for 1 Sqm

Rs.

369.44

Rs.

369.44

Or Say
e

RCC Lintels
Details for 7.80 sqm.
i. 38 mm thick non sal Planks
ii. 120 mm dia sal Bullah
iii. Carriage of wood within 5 km

Cum

0.41

16,828.00 Rs.

6,949.96

Mt

21.00

83.00 Rs.

1,743.00

Cum

0.69

73.86 Rs.

50.89

Rs.

8,743.85

Rs.

874.39

Considering 10 times use of the materials


Carpenter 2nd class

Each

1.25

190.00 Rs.

237.50

Sangi mulia

Each

1.25

170.00 Rs.

212.50

Cost for 7.80 Sqm

Rs.

1,324.39

Cost for 1 Sqm

Rs.

169.79

Rs.

169.79

Or Say

7.

Supplying ,fitting and placing uncoated HYSD bar


reinforcement complete as per drawing and technical
specification.

Materials
HYSD bars including 5 percent overlaps and wastage

Unit - 1 MT

Binding wire

Mt

1.05

52203.00 Rs.

Kg

8.00

66.00 Rs.

528.00

Rs.

213.15

Rs.

55,554.30

Add Carriage
II

54,813.15

Labour
Mate

Each

0.44

170.00 Rs.

74.80

Blacksmith (special)

Each

3.00

205.00 Rs.

615.00

Man Mulia

Each

8.00

150.00 Rs.

1,200.00

Total [I+II]

Rate per MT.


Rate per 1 Qtl.

8.

Cement concrete [1:2:4] with 12 mm size cbg chips per one


cum.

Materials

Rs.

1,889.80

Rs.

57,444.10

Rs.
Or Say Rs.

5,744.41
5,744.41

831.60

Chips cbg 12 mm

Cum

0.90

924.00 Rs.

Sand for mortar

Cum

0.45

44.00 Rs.

19.80

Qtl

3.23

550.00 Rs.

1,776.50

Cement
Add Carriage, Royalty

II

Chips cbg 12 mm

Rs.

240.80

Sand for Mortar

Rs.

97.47

Cement

Rs.

305.40

Rs.

3,271.57

Labour
Mason 2nd class

Each

0.68

190.00 Rs.

129.20

Man/Female Mulia

Each

4.60

150.00 Rs.

690.00

Rs.

819.20

Cost for 1 Cum


Or Say
9.

12 mm thick cement plaster [1:6] over brick work per sqm.

Materials
Sand for mortar

Rs.

4,090.77

Rs.

4,090.77

Cum

0.02

44.00 Rs.

0.66

Qtl

0.04

550.00 Rs.

19.69

Sand for mortar

Rs.

3.25

Cement

Rs.

3.38

Rs.

26.98

Cement
Add Carriage, Royalty

II

Labour
Mason 2nd class

Each

0.14

190.00 Rs.

26.60

Man/Female Mulia

Each

0.12

150.00 Rs.

18.00

Rs.

44.60

Total [I+II]

Rs.

71.58

Rs.

71.58

Materials
Sand for mortar
Cement

Cum

0.02

44.00 Rs.

0.79

Qtl

0.04

550.00 Rs.

23.65

Add Carriage, Royalty

II

Sand for mortar

Rs.

3.90

Cement

Rs.

4.07

Rs.

32.41
30.40

Labour
Mason 2nd class

Each

0.16

190.00 Rs.

Man/Female Mulia

Each

0.24

150.00 Rs.

36.00

Rs.

66.40

Rs.

98.81

Rs.

98.81

Total [I+II]
11. 20 mm thick cement plaster [1:6]
sqm.
I

over stone masonary per

Materials
Sand for mortar
Cement

Cum

0.02

44.00 Rs.

0.92

Qtl

0.06

550.00 Rs.

31.35

Add Carriage, Royalty

II

Sand for mortar

Rs.

4.55

Cement

Rs.

5.39

Rs.

42.21
30.40

Labour
Mason 2nd class

Each

0.16

190.00 Rs.

Man/Female Mulia

Each

0.24

150.00 Rs.

36.00

Rs.

66.40

Rs.

108.61

Rs.

108.61

205.00 Rs.
205.00 Rs.
150.00 Rs.

205.00

Total [I+II]
12. Labour for fixing G.C.I. Sheet in roof drilling hole in wind ties
including fixing of ridges valleys wind ties etc. excluding cost of
fitting per 1 Sqm.
Data for 9.3 sqm.
Labour
Carpenter (Special)

Each

0.50

Fitter(Secial)

Each

1.00

Man Mulia

Each

2.00

102.50
300.00

2 % sundries and T&P etc.

Rs.

7.47

Total

Rs.

614.97

Rs.

66.13

Rate per 1 Sqm


13. Hoisting joists and trusses and placing in position (labour only)
Per 1 Qntl.
Data for 0.508 Qntl.
Labour
Sangi Mulia for conveying joist from outside to the
Each

0.25

170.00 Rs.

42.50

with ropes, etc.

Each

0.75

170.00 Rs.

127.50

Man Mulia for placing joists in position

Each

0.17

150.00 Rs.

25.50

buildings.
Sangi Mulia for lifting joists up to top of the walls

2% Scaffolding ropes, Sundries, T&P etc.


Total
Rate per 1 Qntl.

Rs.

2.37

Rs.
Rs.

197.87
389.51

14. White washing 3 coats with shell lime per 1 Sqm


Data for 93 Sqm.
Material
Shell lime unslaked

Kg

23.32

16.00 Rs.

373.12

Painter (2nd class)

Each

1.50

190.00 Rs.

285.00

Man Mulia

Each

1.00

150.00 Rs.

150.00

Rs.

808.12

Rs.

8.69

Labour

Rate per 1 Sqm.