(WOW = Waiting on Weather) To be Remembered: We are operating within an extremely Hostile Environment at Sea this needs to be anticipated and managed properly All activities require an optimum of Planning ahead Units to handle become bigger gg @ distant sites Influence on programme depends on Transport- und Installationconcept (Processes) with "Weather Windows", Operational Limits of Key Plant, Period of offshore works within a year (Spring Summer Fall Winter?) Scope p / Number of Locations (Serial ( Effects) ) etc. Key Plant is a Key Issue for success!
PreFair FormArt ConTrust AdMore
E l Bird Early Bi d in i Construction C t ti In 2004 HOCHTIEF HOCHTIEF's s ODIN was ready for the market, market In 2006 HOCHTIEF took an early decision to develop a new Vessel with greater capacity: THOR Ideas were collected objectives defined
THOR - Chronicles
Contract with HELLENIC Shipyard: C Cancellation ll ti of f Contract: C t t Contract with CRIST / Gdansk: Steel delivery to Gdansk: Laying down Keel: Dock-out: g installation: Dock-in for Leg Dock-out: Heeling Test: Tow to Cuxhaven: Name Ceremony in Hamburg:
Dipl.-Ing. Knud Grimm
21.12.2007 16 10 2008 16.10.2008 21.01.2009 03.03.2009 22.03.2009 14.07.2009 02.03.2010 31.03.2010 06 04 2010 06.04.2010 11.04.2010
06 05 2010 06.05.2010
HRP Thruster Th t
T Tow t B to Bremerhaven h