You are on page 1of 32

PROGRESS

PRECAST CRACK
INVESTIGATION
MEETING AGENDA 30 MAY 2013
1. WHAT IS PROGRESS WE HAD ACCOMPLISHED SO FAR
2. WHAT IS NEXT PLANS FOR IMPROVEMENT

By Mr.Narate Meksook 30 May 2013 FAS MANAGER

1. WHAT IS PROGRESS WE HAD


ACCOMPLISHED SO FAR
1.1 KU STUDY PHASE I : REBAR AROUND OPENING
(DONE )
1.2 PRUKSA CRACK INSPECTION MANUAL REV2 (DONE )
1.3 KU STUDY PHASE II : PROCESS OF PRECAST WORK
(ONGOING , PROGRESS 30% )
By Mr.Narate Meksook 30 May 2013

PS27

Type

143

PC53

120

4.17

()
0.2

144

PC53(R)

156

1.92

0.4

13 . 2013

145

PC53(L)

156

168

PC53(L)

156

5.13

0.2

13 . 2013

173

PC53(R)

156

17

10.9

0.3

13 . 2013

203

PC53(R)

156

1.92

0.4

13 . 2013

204

PC53(L)

156

3.21

0.4

13 . 2013

205

PC53(R)

156

2.56

0.3

13 . 2013

AVERAGE

6.4

4.26

0.31

12

21.43

0.3

4 . 2013

71

BVP53a (L)

56

12

21.43

0.2

4 . 2013

69

BPmo54 (L)

64

10

15.63

0.3

4 . 2013

96

BPmo54 (R)

64

14.06

0.3

4 . 2013

BPmo54 (R)

64

13

20.31

0.2

4 . 2013

60.8

11.2

18.6

0.3

250

BPmo53-R

132

3.0

0.4

13 . 2013

251

BPmo53-L

132

6.8

0.4

13 . 2013

252

BP53(R-L)

145

19

13.1

0.3

13 . 2013

136

11

7.82

0.4

1.4

0.3

19 . 2013

AVERAGE
242

BVP 53a-R

144

234

BVP 53a-L

132

1.5

0.3

19 . 2013

230

BP 53a-L

144

17

11.8

0.3

19 . 2013

231

BP 53a-R

144

4.9

0.3

19 . 2013

244

BP 53a-R

144

6.3

0.3

19 . 2013

243

BP 53a-L
144

144

13

9.0

0.3

142

5.6

0.3

245

BP 53a-L

232

BP MO 53a-L

233

BP MO 53a-R

AVERAGE
PS30

13 . 2013

56

70

PS34

173.1

AVERAGE

PS24

BVP53a (R)

68
PS32

134

BVP-53a (R)

144203 Best
Practice !!!!

88
25
26.67%

253
185

(254 255 256 ) 9.3


6.43%

Best Practice!!

4.2

0.3

19 . 2013

19 . 2013

19 . 2013

4 H
ighlight
.



H ighlight BEST PRACTICE (Work
Guideline ) (Base Line)

MORE FOCUS ON PRODUCTION,TRANSPORTATION AND


ERECTION
Investigate by Failure analysis and Solution(FAS)/ RDD /KU!

Date 27 March 2013

FIND OUT THE BEST PRACTICE OF WORK AT STARTING


FIRST HOUSE!!


3.2 m

1
No.
1
2
3
4
5
6
7
8
9
10
11
12

3.0 m
(ksc)

1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50

1.00
1.00
1.00
1.50
1.50
1.50
2.00
2.00
2.00
2.50
2.50
2.50

68.73
48.68
35.83
83.14
56.15
40.42
76.07
51.63
38.42
89.73
62.05
45.50

20 Cm
45.57
32.53
24.46
50.34
34.89
26.04
49.37
34.32
25.89
54.10
38.40
28.69

1-

1-

1-

1-

1DB12

3.2 m

2
No.
1
2
3
4
5
6
7
8
9
10
11
12

4.0 m
(ksc)

1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50

1.00
1.00
1.00
1.50
1.50
1.50
2.00
2.00
2.00
2.50
2.50
2.50

72.57
61.36
58.21
92.01
74.49
72.26
85.90
68.36
63.56
101.72
82.11
80.96

20 Cm
50.15
42.46
38.82
58.54
47.61
42.94
57.79
46.37
41.76
63.95
52.23
47.81

1-DB16

11111111-

1DB12

3.2 m

No.

5.0 m
(ksc)

1
2
3
4
5
6
7
8
9

1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50

1.00
1.00
1.00
1.50
1.50
1.50
2.00
2.00
2.00

76.92
69.51
70.84
100.29
88.53
93.56
95.55
83.07
83.18

20 Cm
53.17
48.10
47.14
63.82
56.35
54.80
64.21
55.95
53.81

10
11
12

1.00
2.00
2.50

2.50
2.50
2.50

113.92
100.07
106.15

71.37
62.99
61.41

111111111111-

1DB12

3.2 m

No.

6.0 m
(ksc)

1
2
3
4
5
6
7
8
9
10

1.00
2.00
2.50
1.00
2.00
2.50
1.00
2.00
2.50
1.00

1.00
1.00
1.00
1.50
1.50
1.50
2.00
2.00
2.00
2.50

79.25
73.88
77.50
104.76
96.71
106.40
101.00
92.61
96.92
120.98

20 Cm
54.77
51.14
51.59
66.69
61.54
62.21
67.87
62.29
62.44
75.70

11
12

2.00
2.50

2.50
2.50

112.36
124.72

70.47
71.56

111111111212-

PS37

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

PRUKSA LITE DONMUANG

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

CRACK

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013

By Mr.Narate Meksook 30 May 2013


PRECAST KU
PS37 22 28 DONE !!

NO CRACK AT ALL !!!

PRUKSA LITE 10 19

20 20
KU PS37 1 .
KU PS37 1 .
KUPRUKSA LITE
1 .
KUPRUKSA LITE 1 .
KU 1
1
By Mr.Narate Meksook 30 May 2013

PRUKSA CRACK INSPECTION MANUAL REV2

Pruksa Crack Inspection Manual

1.
2.

3.

4.
5.
6.
7.
: QC , PP , ENG , SBU , CONTRACTOR

:
FAILURE ANALYSIS & SOLUTION MANAGER

link http://www.sendspace.com/file/dlb2sp

Date : May 28, 2556 BE , REVISION2

By Mr.Narate Meksook 30 May 2013

1.

1.

PRUKSA CRACK INSPECTION MANUAL


REV 2

DATE xx MAY 2013

DATE xx MAY 2013

Joint Sealant
Sealant 1-2

REV 2

Plastic

Shim (PURI3)

(PS 29 3)

Sealant

Sealant

By Mr.Narate Meksook 30 May 2013

1.

REV 2

PRUKSA CRACK INSPECTION MANUAL


DATE xx MAY 2013

1.3 (
, )
PT06 3 7
, ,

By Mr.Narate Meksook 30 May 2013

PRUKSA CRACK INSPECTION MANUAL


1.

4.2.

REV 2
1.

REV 2
DATE xx MAY 2013



DATE
xx MAY2013
[9] 3
3

- 0.3


0.3

(.)
ACI 224R.90 [10]

0.41
,
0.30

0.25

0.10
ACI 318-89 [11]

0.41

0.33

ACI 350R-89 [12]

0.27

0.22

1990
[13]
Elastodeck Crack Bridging
CEB/FIPModal
Code

Membrane

0.30

4.3.
[14]

0.3


By Mr.Narate Meksook 30 May 2013

PRUKSA CRACK INSPECTION MANUAL


1.

1.

REV 2

REV 2
DATE xx MAY 2013

DATE xx MAY 2013

2. All Plan

2.1

Supplier

2.2

2.3

3.

4.

Elastodeck S Cormix

0.3 THE PLANT PASORN32 86

- 0.3

5. Joint Sealant

, , ,

- Precast

- 1 2

- Backing rod 1 cm

- MS silicone (Selax )

1.

1.1 0.3-0.6 High Pressure Epoxy Injection


Sika

1.2 0.7-1.0 Low Pressure Epoxy Injection

Sika

- Skim coat Skim coat

By Mr.Narate Meksook 30 May 2013

2. WHAT IS NEXT PLANS FOR IMPROVEMENT?


2.1 KU STUDY PHASE III : IMPROVE PROCESS OF QUALITY
CONTROL FOR PROCESS OF PRECAST WORK
2.2 KU STUDY PHASE IV : COMMUNICATION IN PROCESS
OF PRECAST WORK (DESIGN PRODUCE+QA/QC +SBU + IT

By Mr.Narate Meksook 30 May 2013

OVERVIEW IMPROVEMENT PRECAST QUALITY


KU STUDY PHASE I : REBAR AROUND OPENING

+
PRUKSA CRACK INSPECTION MANUAL REV2

- REDUCE CRACK FROM SHRINKAGE


- REDUCE COST OF REPAIRING AFTER SALE
- UNDERSTANDING HOW CRACK DEVELOP
- CORRECT METHOD OF REPAIR
- ENHANCE AWARENESS OF POOR WORKMANSHIP
- REDUCE COST OF REPAIRING AFTER SALE

- NO CRACK AT ALL
- OBTAIN BEST PRACTICE TO PRECAST TEAM
KU STUDY PHASE II : PROCESS OF PRECAST WORK - DEMONSTRATE EXAMPLE OF GOOD QUALITY
CONTROL
- PROVIDE INFORMATION FOR FURTHER
IMPROVEMENT

KU STUDY PHASE III : IMPROVE PROCESS OF QUALITY CONTROL FOR PROCESS OF


PRECAST WORK

KU STUDY PHASE IV : COMMUNICATION IN PROCESS OF PRECAST WORK (DESIGN


PRODUCE+QA/QC +SBU + IT

GOOD QUALITY OF PRUKSA PRECAST WORK

OUR GOAL
INTERNAL
RECOGNITION
GOOD QUALITY OF PRUKSA PRECAST WORK

EXTERNAL
RECOGNITION

ACHIEVEMENT CLIENT SATISFACTION


LEADER IN PRECAST CONSTRUCTION