You are on page 1of 1

HYDRAULIC PROGRAM, Chihuido de la Sierra Negra G11 (I)

HOLE DATA Hole Size Depth = Casing Depth Casing ID = Max SPP

8.75 1550 1500 9.001 3000

in ft ft in psi

MUD DATA MW = 0.424416 psi/ft PV = 25 cp YP= 14 lbs/100ft^2 Rate = 320 gpm

8.17 lb/gal

TUBULAR LOSSES: LENGTH ft 990 190 590 590 190 -510 1500
VELOCITY ID OD in in fpm 3.826 4.5 536 2.750 4.5 1,037 2.812 6.25 992 8.75 6.25 209 8.75 4.5 139 8.75 4.5 139 9.001 4.5 129 Total Tubular Pressure Drop =

Drill Pipe ID HWDP ID Drill Collar ID Drill Collar Annulus HWDP Annulus Drill Pipe Annulus DP Ann Inside Casing

PDROP Turbulent psi Flow 43 Yes 40 Yes 112 Yes 20 No 3 No -9 No 23 No 233 psi PDROP 0 5 5 psi 300 psi 300 psi 200 psi ========

SURFACE LOSSES: HOSE ID LENGTH VELOCITY 3 0 871 4 130 490 Total Surface Pressure Drop = Pressure Drop Inside MWD = Pressure Drop Inside Mud Motor = Miscellaneous Pressure Drop = Predicted Stand Pipe Pressure = NOZZLE SIZE OPTIMIZATION: OPTIMUM JET SIZE TO BE USED: #1 #2 #3 16 #4 #5 #6 TFA = 0.20 in2

1221 psi

NOZZLE SIZE EVALUATION: ACTUAL NOZZLE SIZE USED: #1 #2 #3 13 13 13 #4 #5 #6 13 13 0 TFA = 0.65 in2 PRESS. DROP ACROSS THE BIT: = 183 psi HYDRAULIC HORSE POWER: HHP = 34 hp HSI = 0.57 hp / in2 JET IMPACT FORCE ON THE BOTTOM HOLE: JIF =

PRESS. DROP ACROSS THE BIT: = 1963 psi HYDRAULIC HORSE POWER: HHP = 366 hp HSI = 6.09 hp / in2 JET IMPACT FORCE ON THE BOTTOM HOLE: JIF =

702 lbs

215 lbs

All Calulations are based on Shell's Drilling Engineers Notebook, March 1989

You might also like