Asian Institute of Technology ELECTRONIC DOCUMENTATION FORM


This form will include the following details: 1. Report Title and Type (Thesis/Research Study/Special Study/etc) Application of Capital Structure Optimization Model for PPP Projects: The Case Study of Civil Aviation Training Center of Thailand (Thesis) 2. Name of the Author Aung Khin Tun 3. Name(s) of Advisor and Committee Members Dr. Chotchai Charoenngam (Chairperson) Dr. Pannapa Herabat Dr. Bonaventura H. W. Hadikusumo 4. Field of Study Construction Engineering and Infrastructure Management 5. Address (School) School of Engineering and Technology 6. 7. 8. External Examiner (for Dissertations only) Expert Comments on the Work and Facility for the Feedback from the Users Abstract of the Work

The development of PPP projects has been growing rapidly, and numerous projects have been implemented around the world. Public-Private Participation (PPP), in other words, is the initiated combination of capital investment from the public sector and the private sector. One key aspect to the successful implementation of the PPP project in any country is the raising of finance by project sponsors. Financial engineering techniques and capital structuring skills are required to find the proper mix of debt and equity and to

achieve successful financing for the proposed project. The objective of this research is to present a simplified model to determine the optimum equity level for decision-makers at the evaluation stage of the PPP project, which takes place after the completion of the feasibility study. The resulting model is the combination of optimization model developed in Microsoft Excel with the function of determining the optimal equity level from the equity holders point of view. To show versatility of the model, a real case study (Civil Aviation Training Center of Thailand) is conducted. Thus, this research is concerned with the determination of an equity funding level in PPP project development. There are different equity levels found in this kind of program, and there is a need for such a model to determine optimal capital structure, which would assist the project sponsors to ensure that the equity level necessary for optimal capital structure is available prior to the project implementation stage. 9. Keywords (minimum 5; maximum 10) Project Financing, PPP, Optimization Model 10. Bibliographic data

Abdul-Aziz, A.R., 2001. Unraveling of BOT scheme: Malaysias Indah Water Konsortium. Journal of Construction Engineering and Management, 127(6), 457460. AbouRizk, S. M., and Halpin, D. W., 1990. Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), 575594. A guide to the project management body of knowledge.,2000. Project Management Institute, Newton Square, Pa. Ahuja, H. N., Dozzi, S. P., and Abourizk, S. M., 1994. Project management: techniques in planning and controlling construction projects, J Wiley, New York. Bakatjan, S., Arikan, M. and Tiong, K.L., 2003. Optimal capital Structure Model for BOT Power Projects in Turkey. Journal of Construction Engineering and Management, January/ February 2003, 89-97. Barker, C.R. 1995. Financial Performance Measurement: not a Total Solution. Management Decision, Volume. 33, 31-99.

Benoit, P., 1996. Project finance at the World Bank: an overview of policies and instruments. World Bank Technical Paper Number 312, the World Bank, Washington, D. C. Binder, K., and Heermann., D. W., 2002. Monte Carlo simulation in statistical physics: An introduction, Springer, New York. Birge, J. R., and Zhang, R. Q., 1999. Risk-neutral option pricing methods for adjusting constrained cash flows. Journal of Engineering Economics, 44(1), 3649. Blackwell, M., 2000. The PFI/PPP and property, Chandos Publishing Ltd., Oxford, England. Brigham, E. F., and Gapenski, L. C., 1997. Financial management theory and practice, 8th Ed., Dryden Press, Fort Worth, Tex. Chakravarti, I. M., Laha, R. G., and Roy, J., 1967. Handbook of methods of applied statistics, Vol. I, J Wiley, New York. Chandra, P., 1980. Financial management: Theory and Practice. Fourth edition, Tata McGraw-Hill Publishing Company Limited. Chang, L. and Chen, P., 2001. BOT Financial Model: Taiwan Speed Rail Case. Journal of Construction and Management, May/June 2001, 214-222.

Chege, L., 2001.Recent trends in private financing of public infrastructure projects in South Africa. Launch Issue: July 2001.
Chen, P. H., 1999. Application of BOT financial model to Taiwan High Speed Rail Project. MS thesis, School of Civ. Engrg., Purdue University, West Lafayette, Ind. Chen, T. T., 1998. Brief description and operation of financial planning and modeling. Conf. of Private Investment on Transp. Constr., Ministry of Transportation and Communications, Taiwan. Cook, G.J. and Sawin, M.R., 1993. A Computerized Approach to Decision Process Tracing for Decision Support System Design, Decision Sciences, Vol. 24 No.5, 931-952 Cooper, D.R. and Schindler, P.S., 2003. Business Research Method. Eight edition, Mc. Graw Hill.

Culp, C. L., 2002. The art of risk management: Alternative risk transfer, capital structure, and the convergence of insurance and capital markets, J Wiley, New York. Curran, M. W., 1989. Range estimatingMeasuring uncertainty and reasoning with risk. Journal of Construction Engineering and Management, 31(3), 1826. Dias, A., Jr., and Ioannou, P. G., 1995. Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4), 404414. Edgardo, S.D., 1978. An aviation management information system for Thailan. AIT Thesis, Asian Institute of Technology. Bangkok.

Ellis J. Juan, 1996. Privatizing Airports-Options and Case Studies. Public Policy Journal, Issue 82. Esteban, C.B., 1999. Project financing and the international financial markets. Kluwer Academic Publications, Boston.
Finnerty, J.D., 1996. Project Financing: Asset-Based Financial Engineering. John Wiley & Sons, Inc. Frey, L.R., Boton, C.H. and Kreps, G.L., 1990. Investigating Communication: An Introduction to Research Methods. Prentice Hall, Engle Wood Clifs, U.S.A. Ganguly, S., 1995. Project financing : a case study approach in the power sector in India. AIT RSPR, Asian Institute of Technology, Bangkok. Ho, P.S. and Liu, Y.L., 2002. An option pricing-based model for evaluating the financial viability or privatized infrastructure projects, Construction Management and Economics Journal, Volume 20, 143-156. Holbert, N.B. and Speece, M.W., 1993. Practical Marketing Research. Prentice Hall, U.S.A. Kelton, W. D., Sadowski, R. P., and Sturrock, D. T., 2004. Simulation with arena, McGrawHill, New York. Koh, B. S., Wang, S. Q., and Tiong, L. K. R., 1999. Qualitative development of debt/equity model for BOT infrastructure projects. Proc., International Conf. on Construction Process Re-engineering, CPR-99, Sydney, Australia, 501512. Lohmann, J. R., 1988. The IRR, NPV and the fallacy of the reinvestment rate assumptions. Eng. Econom., 33(4), 303330.

Lohmann, J. R., and Baksh, S. N., 1993. The IRR, NPV and payback period and their relative performance in common capital budgeting decision procedures dealing with risk. Eng. Econom., 39(1), 1747. Lynch, A.P., 1996. Financial Modeling for Project Finance. First Edition, Euromoney Publications PLC, London. Malhotra, N.K., 1993. Marketing Research: An Applied Orientation. Prentice Hall, U.S.A. Mariano, R., Schuermann, T., and Weeks, M. J., 2000. Simulation-based inference in econometrics: Methods and applications, Cambridge Univ. Press, New York. Merna, T., and Dubey R., 1998. Financial engineering in the procurementof projects, Asia Law & Practice, Hong Kong. Miller, J. B., 1999. Applying multiple project procurement methods to a portfolio of infrastructure projects. Procurement systems: A guideto best practice in construction, E & FN Spon, London. Miller, J. B., Garvin, M. J., Ibbs, C. W., and Mahoney, S. E., 2000. Toward a new paradigm: simultaneous use of multiple project delivery methods. Journal of Management and Engineering. 16(3), 5867. Minassian, T., 2004. International Monetary Fund in Public-Private Partnerships. Fiscal Affairs Department Report, the World Bank. Musgrave, R.A. and Musgrave, P.B., 1987. Public Finance in Theory and Practice. Second edition, McGraw-Hill Book Company. Nevitt, K.P. and Fabozzi, F., 1995. Project Financing. Sixth Edition, Euromoney Publications PLC, London. Newnan, D. G., Eschenbach, T. G., and Lavelle, J. P., 2004. Engineering economic analysis, Oxford Univ. Press, New York. Ogunlana, S. O., 1997. Build operate transfer procurement traps: examples from transportation projects in Thailand. Proc., CIB W92 Symp. on Procurement, IF Research Corporation, Montreal, 585594. Palaneeswaran, E., Kumaraswamy, M. M., and Zhang, X. Q., 2001. Reforging construction supply chains: a source selection perspective. Eur. J. Purchasing Supply Management, 7(3), 165178.

Patton, G. and Quinn, M., 1990. Qualitative Evaluation Methods. Second Edition, Sage Publications, U.S.A. Project finance in developing countries.,1999. International Finance Corporation, Washington, D. C. Ranasinghe, M., 1996. Total project cost: A simplified model for decision makers. Construction Management Economics 14, 497505. Raju, P., 1996. Project financing in hydropower projects in Nepal : an assessment of risks and financial structures perceived by various parties. AIT RSPR, Asian Institute of Technology, Bangkok. Ross, S. A., Randolph, W. W., and Jordan, B. D., 1995. Project analysis and evaluation. Fundamentals of corporate finance, 3rd Ed., Richard D. Irvin Inc., Ill., 266273. Sengupta, U., 2005. Government Intervention and Public-Private Partnerships in Housing Delivery in Kolkata. Habitat international, Elsevire Press. Sherman, L.E., 2002. Introduction to Project Finance - A Guide for Contractors and Engineers. Infrastructure and Finance Practice Group, Thelen Reid & Priest LLP. Standard Rules and Procedures for the development of Aviation Training Centers., 1985. ICAO Publications, London. Steiner, H. M.,1996. Engineering economic principles, McGrawHill, New York. Streeter, W., 2004. Public-Private Partnerships: the Next Generation of Infrastructure Finance. Special Report, Fitch, Inc. and its subsidiaries, Tokyo. Taylor, H. M., and Karlin, S.,1998. An introduction to stochastic modeling, Academic, New York. Tiong, R. L. K., 1995. Impact of financial package versus technical solution in a BOT tender. Journal of Construction Engineering and Management, ASCE, 121(3), 304311. Vijaykrishnan, S., 1995. Project financing : a case study approach in the telecommunications sector in India. AIT RSPR, Asian Institute of Technology, Bangkok.

Walker, C., and Smith, A. J., 1995. Privatized infrastructure: The Build Operate Transfer approach, Thomas Telford, London. White, J. A., Agee, M. H., and Case, K. E., 1989. Principles of engineering economic analysis, 3rd Ed., Wiley, New York Wiest, J. D., and Levy, F. K., 1977. A management guide to PERT/CPM: with GERT/ PDM/ DCPM and other networks, PrenticeHall, Englewood Cliffs, N.J. Wynant, L., 1980. Essential elements of project finance, Harvard Business Rev., May-June, 1980, 165173. Ye, S. D., and Tiong, R. L. K., 2000. NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management. 126(3), 227233. Yin, R. K., 1994. Case Study Research: Design and Methods. Second Edition, SAGE Publications, Inc, London. Zhang, X., 2005. Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering and Management, June 2005, 656-668. Zhang, X., 2005. Critical Success Factors for Public-Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, January 2005, 3-14. 11. 12. 13. 14. Type of Project (Sponsored/Non-Sponsored), if applicable Details of the Sponsor/Donor, if applicable Specific Agreement involved in the Sponsorship Agreement, if applicable AIT Code Number

Each thesis/dissertation should have an ISBN Code Number, which would be the responsibility of the AIT Library. The requested details above have to be submitted in a single PDF file to the library.