Mecklenburg LNG stakeholders / players (1)


Nordic Yards Products portfolio:

(former Aker Yards Wismar, Wadan Yards)

Ice-breaking and Ice-going Tonnage

Offshore constructions

Specialized tankers

Passenger vessels projects

RoRo and RoPax projects

Container Ships

Klaipeda LNG Forum

Mecklenburg LNG stakeholders / players (1)


Production capacities
Nordic Yards Wismar Location Rostock Location

Manufacturing and production completely independent from weather conditions * High steel throughput (up to approx. 60,000 t/p.a.) Crane capacity (up to 1,000 t) Large vessel and offshore projects can be built with standard assembly procedures at the dry dock (dry dock surface: 340 x 67 x 13.2 m., completely roofed)

Substantial space available for transportation and interim storage (850,000 sq. m. total shipyard area, thereof 85,000 sq. m. roofed) High steel throughput (up to 55,000 t/p.a.) Large space available at the final assembly Large offshore projects can be built by special assembly procedures at the dry dock Long water edge, close to the open sea

Klaipeda LNG Forum

Research and Development


Products innovations / optimization Arctic ships / LNG tankers Offshore WEA Jack-ups LNG containment systems E.g. ADBT Aluminium Double Barrier Tank Procedures Numerical simulation Holistic optimization Risk-based design Welding and manufacturing techniques During the past 10 years extensive investments in research and development have been made at the yards.
Page 4

Klaipeda LNG Forum

Mecklenburg LNG stakeholders / players (2)


Products portfolio
Concept development for new shipyards / terminals Development and production of technical equipment for shipbuilding yards Specialized mechanical engineering, incl. ship and oversize transport systems Feasibility studies Logistics and software solutions Installation, maintenance and after-sale service

Klaipeda LNG Forum

Mecklenburg LNG stakeholders / players (3)


Products portfolio

Mecklenburg LNG relevant Projects (1)


Klaipeda LNG Forum 7

cooperative project of 8 companies and 2 research institutions duration 3 years (2007 - 2009) CTS goals: development of a new LNG-containment system with low production costs and time low boil off rate high operating safety (sloshing, grounding) CTS results: development of a new membrane type LNG containment system - approval in principle (LR) - mock up built development of a prismatic LNG containment system (ADBT) - approval in principle (ABS, BV, DNV, LR) - general/design approval (BV, DNV) - mock up built CTS financing: co financiered by German government total project costs ca. 15,5 Mio
7 7

Mecklenburg LNG relevant Projects (2)


Klaipeda LNG Forum 8

cooperative project of 11 companies and 3 research institutions duration 3 years (2010 - 2013) POLAR goals:

System Solutions for Harsh and Arctic Environment


- development of:
- ice going/breaking LNG Carrier, FPSO and Platforms (ARC 77-8) - living quarters for arctic regions - high lifetime corrosion protection - anti icing systems - maintenance, access and rescue devices

- optimization of:
- production processes - transportation equipment - topside LNGLNG-equipment - LNG pipe systems

POLAR financing: co financiered by German government total project costs ca. 21,5 Mio
8 8

Klaipeda LNG Forum

ADBT
General information: Double wall LNG tank for marine application

GBS tank and barges

Tank top

Self carrying structure


Tank walls

Tank bottom

Klaipeda LNG Forum

10

layouts for LNG containment fabrication Moss spherical, Mark III, NO 96 System:
- different general layouts for prefabrication shops - specification of main equipment - estimation of investment costs

ADBT System:

- general layouts of stand alone and yard integrated fabrication sites - estimation of investment costs - specification of main equipment - basic design for friction steer welding equipment - evaluation of transportation operations and workflow

10 10

Klaipeda LNG Forum

11

If reality doesn't fit the theory, change the reality

Albert Eistein

ready to start production of arctic LNG systems ready to start production of LNG containment system

Projects progress Product maturity

arctic LNG
first concepts

Carrier

FPSO

Platform

Mock up / Prototype Development Tank system


Gro Grotanksysteme tanksysteme*

Material Tests Conceptual Design


DIFFERENT PILOT PROJECTS
11 11

today

* planned

Klaipeda LNG Forum

12

Contacts

Nordic Yards Wismar GmbH Wendorfer Weg 5 D-23966 Wismar

IMG - Ingenieurtechnik und Maschinenbau GmbH Industriestrae 8 D-18069 Rostock Reinhart Kny Tel.: +49 3841 77-0 Fax: +49 3841 76 36 24 E-Mail: info@img-tech.de

Hochschule Wismar University of Applied Sciences Philipp-Mller Strae D-23966 Wismar Anatoli Beifert Tel.: +49 3841 753 634 Fax: +49 3841 753 131 E-Mail: anatoli.beifert@hs-wismar.de

Tel.: +49 3841 77-0 Fax: +49 3841 76 36 24 Nordic Yards Warnemnde GmbH Werftallee 10 D-18119 Rostock-Warnemnde Tel.: +49 381 510-0 Fax: +49 381 5 25 74

You might also like