You are on page 1of 4

HALLIBURTON

Power Pack Hydraulic Quick Disconnect Skid PM Meter E quipm ent# 11101709-309769190 MO# Employee # Employee # Employee # 1 2 3
4 5 c fa /A /a 7

S12A Suggested interval: 120 DAYS Shop Location and #


& S '?

DATE (ddMMMyyyy)

(Hrs/Miles/KM)

P = OK

F = Fail (Create RPM order) N/A = not applicable| Date: Date: Date:
3 a /*> /2 0 /?

6 7 8

9
10 11 12 13 14

SAFETY ***** Lock out tag out unit as per HIV!S procedures. ***** Conduct safety huddle prior to work to identify safety hazards Wear appropriate PPE before beginning work. SAFETY EQUIPMENT P ass/Fail .. Check fire extinguisher mounting bracket and latch assembly y Check for current inspection date on fire extinguisher. Replace fire extinguisher if not COOLING SYSTEM P ass/Fail Clean radiator and check for damage. Check coolant level in radiator. Record antifreeze protection level: vS Change coolant filters and check DCA: Verify hoses are in good condition and have no leaks. Check fan and bearing assembly for excessive wear. Check fan belts and adjust tension if necessary. ENGINE P ass/Fail " Change engine oil and oil filter. Check engine air emergency shutdown system by tripping latch without engine running and reset to run position.

In itia l

In itia l

In itia l

15 Check engine throttle and governor shutdown movement with engine running. 16 Lubricate mechanical tach cable. N/A if not applicable.
STARTER SYSTEM (HYDRAULIC) 17 Check oil level in tank. 18 Check nitrogen charge pressure in accumulator. 19 Remove starter, inspect and never-seize bendix. FUEL SYSTEM 20 Change fuel filters. 21 Check fuel for contamination. 22 Check fuel hoses and tank for leaks. AIR SYSTEM 23 Check air filter elements and service if necessary. 24 Check hoses and fittings for leaks, and verify they are in good condition. EXHAUST SYSTEM 25 Check exhaust system for leaks and wrappings. P ass/Fail In itia l

..

P ass/Fail

In itia l

P ass/Fail

In itia l

P ass/Fail

In itia l

Page 1 of 4

Preventative Maintenance Check Sheet S12A

Revision Date: 12/15/2009

HALLIBURTON
Power Pack Hydraulic Quick Disconnect Skid 26 27 28 29 S12A Suggested interval: 120 DAYS
P ass/Fail A/Irt In itia l HYDRAULIC SYSTEM Check hydraulic oil level and for contamination. Check hydraulic tank for leaks. Change hydraulic return filters. Check hydraulic hoses and fittings for leaks, and verify they are in good condition. Repair all leaks.

tJ\0 / IP
In itia l

30 Verify hydraulic pumps and control valves appear to be in good condition and mounted securely.
FRAME P ass/Fail Check all structural members for damage, deformation or excessive corrosion. Caution: Do not weld on unit without first disconnecting all magnetic pickups and MCII. 32 Check all safety guards and Ensure they are in place and secure. 33 Verify that proper company logos and decals are installed as per the Branding initiative. Verify that the SAP eauipment number is clearlv marked on the unit (see the ESG Brandina web page for guidelines). 34 Touch up paint as necessary to Halliburton specifications.

31

LIFTING STRUCTURE 35 Visually inspect all lifting points and welds on frame. If repairs are required have NDE performed after repairs are made. ATTACH COPY OF INSPECTION REPORT TO THIS CHECK SHEET

P ass/Fail

In itia l

36 Check and Record date of visual inspection on all lifting slings and padeyes. Visual inspection of padeye and Slings required every six months by certify vender. If due before next PM, fail this line item and have inspection done. (Note: Create separate Certification (CERT) order to record visual inspection).
f^J) f t Date Last Visual Sling Inspection. Date Last Visual Padeye Inspection 37 Verify lifting sling certification tags in place on the sling. Record: (all should be noted on certification tag).

w h im

Invoice/Cert# Test Date Sling Capacity Sling unit# 38 Verify all lifting shackles, pins, and nuts are in place and secure. 39 Check and Record date of Last NDE on Padeyes. NDE required every year. If due before next PM, fail this line item and have NDE done. (Note: Create separate Certification (CERT) order to record NDE inspection. Date Last Padeye NDE 40 Check and Record date of Padeye Full Load Test. Padeye Full Load Test required every 2 years. If due before next PM, fail this line item and have test performed. Verify Load Test Tag is on unit. (Note: Create separate Certification (CERT) order to record Full Load test). 41 Date Last Full Load Test of Padeyes Verify that Lift Certification data plate is attached to unit.

n /i I m

Page 2 of 4

Preventative Maintenance Check Sheet S12A

Revision Date: 12/15/2009

HALLIBURTON
Power Pack Hydraulic Quick Disconnect Skid S12A Suggested interval: 120 DAYS
P ass/F ail In itia l FUNCTION TEST 42 Connect remote hydraulic relief valves between pumps pressure lines and return lines. * * * CAUTION: * * * DO NOT dead head pressure on hydraulic quick disconnects. 43 Assure engine starts properly and oil pressure gauge functions. 44 Assure engine responds to throttle and regular stop controls. 45 Assure hydraulic pressure for starter system pressures up if equipment with auxiliary pump. N/A if not applicable. 46 Assure engine temperature gauge functions and does not exceed 190 degrees F while engine is running. 47 Increase engine speed to full rpm and verify on tach. 48 Check for engine oil, water, and fuel leaks. Repair any leaks found after test. 49 Gradually adjust remote hydraulic relief valves and assure pumps pressure up to 2000 psi.

fN/i*

a/|A

1/

50 Check hydraulic system for leaks. Repair any leaks found after test. 51 Back out on remote hydraulic relief valves to 0 psi and slow engine down to idle before stopping engine. 52
ENVIRONMENTAL Dispose of all waste properly. Ensure all spills are cleaned up and properly contained.

CH

Page 3 of 4

Preventative Maintenance Check Sheet S12A

Revision Date: 12/15/2009

HALLIBURTON
Power Pack Hydraulic Quick Disconnect Skid S12A Suggested interval: 12Q_DAYS
LIS T A LL REPAIRS THAT WERE FOUND DURING THE INSPECTION. THIS LIS T W ILL BE USED AS A TOOL TO RESCHEDULE ANY REPAIRS THAT WERE FOUND DURING PM INSPECTION. 1

Mechanic name: Repair date: 2 Mechanic name Repair date: 3 Mechanic name: Repair date: 4 Mechanic name: Repair date: 5 Mechanic name: Repair date: 6 Mechanic name: Repair date: 7 Mechanic name: Repair date: 8 Mechanic name: Repair date: 9 Mechanic name: Repair date: 10 Mechanic name: Repair date: Report any errors found on check sheet to supervisor

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order#:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Page 4 of 4

Preventative Maintenance Check Sheet S12A

Revision Date: 12/15/2009