You are on page 1of 39

DRAFT as of 9 January 2009

ENGINEERING TEAM PROJECT (MAB 3013)

GUIDELINES

------
JANUARY 2009
UNIVERSITI TEKNOLOGI PETRONAS
Bandar Seri Iskandar, 31750 Tronoh, Perak Darul Ridzuan
TABLE OF CONTENTS

Contents Page
_______________________________________________________________________

1. INTRODUCTION . . . . . . . 4

2. OBJECTIVES . . . . . . . 4

3. SCOPE OF PROJECT . . . . . . 5

4. SUMMARY OF PROJECT WORK . . . . . 5

4.1 Project Proposal . . . . . . 5

4.2 Progress Report . . . . . . 5

4.3 Development of Prototype / Model . . . . 6

4.4 Poster Presentation . . . . . . 6

4.5 Demonstration of Working Prototype / Model . . . 6

4.6 Engineering Design Exhibition (EDX) . . . 7

4.7 Oral Presentation . . . . . . 7

4.8 Final Report . . . . . . . 7

5. ETP COORDINATORS . . . . . . 8

6. SUPERVISORS . . . . . . . 8

7. ETP ANNOUNCEMENTS . . . . . . 9

8. ATTENDANCE AND MEETINGS . . . . . 9

9. EVALUATION . . . . . . . 9

10. PROJECT EXPENDITURE . . . . . 9

11. LABORATORY . . . . . . . 13

12. PLAGIARISM . . . . . . . 13

13. WRITING FORMAT FOR FINAL REPORT . . . 13

APPENDICES . . . . . . . 18

2 ETP Guidelines: January 2009 semester


APPENDICES:
Page

APPENDIX I IMPORTANT DATES.......................................... ..........................18

APPENDIX II PROJECT PROPOSAL SCORE SHEET.....................................19

APPENDIX III PROGRESS REPORT SCORE SHEET.......................................20

APPENDIX IV FABRICATION SCORE SHEET.............................. ....................21

APPENDIX V POSTER EVALUATION SHEET................................................. .22

APPENDIX VI DEMO. OF WORKING PROTOTYPE/MODEL........................23

APPENDIX VII ORAL PRESENTATION: GROUP ASSESSMENT ............24

APPENDIX VIII ORAL PRESENTATION: INDIVIDUAL...................... .........25

APPENDIX IX FINAL REPORT SCORE SHEET...................... ..........................26

APPENDIX X CALCULATION OF F-FACTOR ......................................... ........27

APPENDIX XI RESULT COMPILATION........................................... ..................28

APPENDIX XII LOGBOOK SUMMARY....................................................... .........29

APPENDIX XIII PROJECT PROPOSAL CONTENT...................... .......................30

APPENDIX XIV SAMPLE OF REFERENCING FORMAT...................................31

APPENDIX XV SAMPLE OF COVER PAGE FOR FINAL REPORT.................32

APPENDIX XVI STUDENTS’ REQUISITION FORM (UTP 03)....................... .....33

APPENDIX XVII STUDENTS’ REQUISITION FORM (UTP 03) – SAMPLE.......34

APPENDIX XVIII JUSTIFICATION LETTER.................................................... .......35

APPENDIX XIX JUSTIFICATION LETTER – SAMPLE......................................36

APPENDIX XX ETP CLAIM BREAKDOWN FORM........................................ ....37

APPENDIX XXI UTP CLAIM FORM – SAMPLE............................................. ......38

APPENDIX XXII PEER EVALUATION TEMPLATE ......................... ....................39


.............................................................................................. ................

3 ETP Guidelines: January 2009 semester


1. INTRODUCTION

This course is offered to the 3rd year engineering students. The subject is designed to
ensure that students will acquire the knowledge in conducting research and development
by working in a team. This includes conducting literature research, preparing project
proposal, performing preliminary design concepts, simulation, and evaluation for the best
concept and designing the selected concept.

Students will be divided into groups that consist of four to six members of various
disciplines namely Mechanical, Electrical & Electronics, Chemical, Civil and Petroleum
Engineering. Please note that in view of the dissimilar number of students registering for
this module from each engineering program, there are groups that may not have students
from all five engineering disciplines. A supervisor and theme of project will be assigned
to each group.

2. OBJECTIVES

The objectives of the Engineering Team Project (ETP) course are as follows:

• To inculcate teamwork spirit.

• To develop leadership skills as well as technical competency in:


o delegation of various tasks
o analysing engineering problems
o performing engineering design
o enhancing software related skills

• To broaden the knowledge on commercially available off-the-shelf equipment as


well as industrial equipment.

• To develop knowledge in integrating components into a comprehensive working


system.

• To provide a platform for advanced design courses.

• To nurture creativity, innovativeness, and business acumen.

• To provide exposure on project management skills

Note: These are NOT the objectives of the project work you are working on.

4 ETP Guidelines: January 2009 semester


3. SCOPE OF PROJECT

The scope of the project includes:

• To generate conceptual designs


• To perform necessary engineering calculations
• To generate engineering drawings of the selected concept
• To develop a working model or prototype

The final result of the project shall be exhibited in the form of engineering drawings,
reports, and a WORKING MODEL or PROTOTYPE. The conceptual design should
incorporate as many as possible elements or components of Electrical / Electronic /
Mechanical / Chemical / Civil / Petroleum engineering. The approach to solutions and
methodologies such as selection of materials, problem analysis etc., shall be based on
fundamental engineering calculations.

4. SUMMARY OF PROJECT WORK

Please refer to Appendix I for the schedule of the present semester.

4.1 Project Proposal

Each group shall discuss among members to come out with a suitable and feasible project
within the assigned theme and more importantly within the time frame as specified in
Appendix I. When an agreement has been reached among the team members and also the
supervisor, a project proposal must be submitted for assessment. Prior to submission, the
project proposal must be discussed with the respective supervisors to determine the
scope, problems, and practicality of the proposed project. The content of the proposal
must be based on the format in Appendix XIII. The report shall not exceed 12 pages
including the appendices.

Each group must submit the project proposal to the supervisor by the due date specified
in Appendix I. The proposal will be assessed based on the marking scheme in
Appendix II.

Note: Supervisors need to ensure that any draft proposal be reviewed and returned
promptly to ensure that students are able to submit their work on time.

4.2 Progress Report

A progress report must be submitted to the supervisor by the due date specified in
Appendix I. The report will be assessed based on the marking scheme in Appendix III.
The report, which shall not exceed 12 pages including the appendices, shall comprise:
• details of the activities that need to be carried out

5 ETP Guidelines: January 2009 semester


• identification of potential problems
• a few conceptual designs that have been considered
• necessary preliminary engineering calculations, data collection and benefit-cost
analysis that have been used in deciding the final design.

4.3 Development of Prototype / Model

Throughout the project, the supervisor will monitor the overall progress and development
of the project through meetings and logbooks as well as progress report. The prototype or
model of the project must be completed by the date specified in Appendix I. Upon
completion, the group must make an arrangement with the supervisor for assessment of
the prototype or model. The assessment will generally be based on the planning,
execution and the quality of the prototype or model. Please refer to the format in
Appendix IV for the guidelines of the assessment.

4.4 Poster Presentation

Each group will be required to present their results and findings in the form of ONE A-1
size poster with a portrait-layout. The poster presentation provides an opportunity for
students to expose or share their work, knowledge and experience with other students and
also with lecturers. The poster from each group will be examined, unmanned, by one or
more examiners in a session that will be advised further. Appendix V provides the
guidelines on the poster exhibition assessment criteria. The tentative time for the session
is indicated in Appendix I. The use of more than one poster will be penalised.

All posters must be handed over to the ETP Coordinators at the end of the Poster
Presentation session. Failure to do so may result in final marks being withheld.

Selected posters will be exhibited in the Engineering Design Exhibition (EDX), which is
described in Section 4.6. The selection will be made based on the scores given by the
examiners for the posters and the demonstration/simulation of the working
prototype/model.

4.5 Demonstration / Simulation of Working Prototype/Model

All groups are also required to demonstrate or simulate a working prototype or model of
their project before one or more examiners (non-supervisor). An actual model
demonstration is preferable, however, in certain cases, a computer simulation might be
acceptable depending on the nature of the project. This demonstration/simulation will be
assessed based on the criteria specified in Appendix X.

The scores for the demonstration/simulation, together with the poster, will be used by the
ETP Coordinators in selecting groups that will participate in the EDX.

6 ETP Guidelines: January 2009 semester


4.6 Engineering Design Exhibition (EDX)

The Engineering Design Exhibition (EDX) is an event organized by the university


towards the end of every semester. It provides opportunities for students to present
their project works, mainly through the ETP and Final Year Project (FYP) courses.
Only selected projects will be allowed invited to participate. For ETP, selection will
generally be made based on the score obtained by groups in the evaluations for posters
and demonstrations.

All participants will be given certificates, and in addition winners will be awarded.
Projects with certain outstanding quality and innovation will be selected to represent
the university at national and international level competitions. It must be noted that the
operational matters of the EDX is beyond the responsibility of ETP supervisors and
coordinators. There shall also be no extra marks for groups that participate or win
awards in the EDX. Certificates, awards and details of the EDX should be obtained
only from the EDX Committee.

4.7 Oral Presentation

During the demonstration session, students shall deliver a presentation on their findings.
Assessment on visual aspects, clarity of presentation, logic, knowledge of subject matter
and the overall content of the presentation will be made on a group basis (Appendix VII)
as well as on an individual basis (Appendix VIII). Each group member must present
some portion of the material. Each group will be allocated 30 minutes for the
presentation, and another 10 minutes for a question and answer session. The examiners
will be appointed lecturers, other than the group supervisor.

4.8 Final Report

Each group shall submit a final report by the due date specified in Appendix I. The
report will be assessed based on the marking scheme in Appendix IX. In this report, the
ultimate results and findings of the project shall be presented. The report shall be assessed
based on:
• Critical review of current problems/solutions
• Literature review
• Development of alternatives and options
• Decision making processes
• Final Design (engineering drawing)
• Technical/Scientific aspects/support
• Business and economic considerations
• Application/Viability of selected design
• Suggestion for area of improvements
• Recommendations for future work
Please note that the report must be limited to thirty (30) pages excluding appendices,
figures and drawings.

7 ETP Guidelines: January 2009 semester


5. ETP COORDINATORS

The following lecturers are appointed by the Head of the Mechanical Engineering
Programme as the ETP Coordinators.

1. Dr. Ir. Shaharin Anwar Sulaiman (05-368 7013, shaharin@petronas.com.my)


2. Pn. Rosmawati Mat Zin (05-368 7147 rosmawati@petronas.com.my)

The responsibilities of the Coordinators can be summarised as follows:

• Managing and implementing the ETP course.

• Assigning student groups and supervisors.

• Advising supervisors on the project assessment or any other problems


encountered during the project work.

• Assigning examiners and coordinate seminar presentation and poster exhibition.

• Facilitate expenditure claims.

• Compiling students’ results.

6. SUPERVISORS

A supervisor, whose appointment is approved by the respective Department Heads, will


supervise each group. The responsibilities of the supervisors are:

• Evaluating the project proposal.

• Advising students on the preparation of their design projects, including the


technical, economical and management aspects.

• Monitoring student's progress through their weekly progress report.

• Measuring of progress against Gantt Chart.

• Assessing progress reports.

• Certifying students’ expenditure claims.

8 ETP Guidelines: January 2009 semester


7. ETP ANNOUNCEMENTS

All announcements regarding ETP will be made through e-Learning or posters at


strategic locations (e.g. Pocket C and Pocket D). Students MUST regularly visit these
sites to keep themselves updated and informed of all important dates and
announcements.

8. ATTENDANCE AND MEETINGS

Students are required to conduct meetings regularly among themselves on project


implementation. In addition, all groups are required to arrange weekly meetings with the
supervisor. The attendance of group members will be recorded. The logbook and the
attendance record will be used to calculate the F-Factor (see Section 9).

Each student must forward logbooks individually to the supervisor during weekly
meetings. The verified logbook shall be returned at the end of the meeting. Each student
shall bring the compilation of the logbooks to the weekly meeting.

9. EVALUATION

Students will be evaluated based on their capability in undertaking the project,


producing the written report and presenting the result. The main components of
evaluation are given in Table 1. In general, the evaluation of the group will be carried
out by supervisors
(55 %), appointed examiners (40 %), and peer evaluation (5 %), with a total of 100 %.
The evaluation forms for each component are given in the Appendices.

The individual score during oral presentation (Appendix VIII), the F-factor, described
in Section 8, and peer evaluation (Appendix XXII) will be used to differentiate the
individual score for each student in a group. The F-Factor (see Table 1 and
Appendix X) will be incorporated in the project proposal, progress report, fabrication
evaluation and final report as illustrated in Appendix XI. Each student will also be
evaluated based on prescribed criteria by other members of the team, by means of peer
evaluation (Appendix XXII). Instructions on peer evaluation will be provided
approximately in the last 3 weeks of the semester.

10. PROJECT EXPENDITURE

In building the prototype or model, each group may request project fund of up to RM 200
to purchase approved components or materials that are not available in laboratories at
UTP. Figure 1 shows the ETP Purchase Requisition Flow Chart that students need to

9 ETP Guidelines: January 2009 semester


follow in order to purchase project materials, in which failure to comply with this
procedure may result in non-payment of the claims. Table 2 provides further explanation
to the process flow chart.

Table 1: ETP Grading Structure.

Assessment Contribution
Tentative Components Evaluation
Time Supervisor Panel of Peer Forms
Examiners Evaluation
W3 Project Proposal Appendix II
10 %
W6 Progress Report Appendix III
10 %
Fabrication of Prototype or
W 11 10 % Appendix IV
Model
W 12 Poster Evaluation 10 % Appendix V
Demonstration of Prototype or
W 12 15 % Appendix VI
Model
W 12 Group Oral Presentation 10 % Appendix VII

W 12 Individual Presentation 5% Appendix VIII

W 14 Final Report 25 % Appendix IX

W 14 Peer Evaluation 5% Appendix XXII

Sub-Total 55 % -
Individual F-factor
Continuous 1 Appendix X
(Logbook & Meeting)

Total 55 % 40 % 5%

10 ETP Guidelines: January 2009 semester


Start

1. - Fill up FORM 03 (App XVI)


- Obtain verification from Lab Executive

Amount Y
exceed 2. Prepare justification letter (App XVIII)
RM200?
N
N

3. - Obtain signature from SV for FORM 03 and justification letter


(if exceed RM200)
- Submit FORM 03 and justification letter to coordinator
Deadline: 16 MAR 2009

4. Purchase items

5. - Arrange original receipts according to sequence in FORM 03


- Paste original receipts on A4 papers
(Students are strongly advised to make copy of all receipts)
- Fill up ETP Claim Breakdown Form (App XX)
- Fill up UTP Claim Form (Sample in App XXI)

6. Submit UTP Claim Form to SV to fill up relevant


info and obtain signature (Refer App XXI)

7. Submit UTP Claim Form, ETP Claim Breakdown Form and


receipts to coordinator
Deadline: 17 APRIL 2009

8. Collect claims from SV

Legend
End
SV Supervisor

Note: 1. Submission of FORM 03 does not guarantee approval.


2. All deadlines stated are complied with strictly. Late submissions will not be entertained.
Figure 1: ETP Purchase Requisition Flow Chart

11 ETP Guidelines: January 2009 semester


Table 2: Explanation to ETP Purchase Requisition Flow Chart.

Flow
Chart Description Remarks Deadline
Item #
- Fill up FORM 03 (App XVI) - Fill up FORM 03 completely. Refer sample, App XVII.
1
- Obtain verification from Lab Executive - Obtain verification from Lab Executive on availability of
the items in UTP.
- Justification letter is applicable for purchase exceeding
2 - Prepare justification letter (App XVIII)
RM200. Refer sample, App XIX.
- Obtain signature from SV for FORM 03 and - Incomplete or inaccurate information will result in delay or
justification letter (if exceed RM200) non-approval. 16 MAR
3
- Submit FORM 03 and justification letter to - Late submissions will not be entertained. 2009
coordinator
- Items purchased must be according to FORM 03 submitted.
- If additional items are required, a new FORM 03 must be
submitted to the coordinator.
4 Purchase items
- Claims of additional items not listed in the first FORM 03
will be honoured based on the discretion of coordinator.
- Purchases are made using students' own money in advance.
- Arrange original receipts according to - Receipts should be arranged according to sequence in
sequence in FORM 03 FORM 03.
- Paste original receipts on A4 papers - All original receipts are to be pasted on A4 papers.
(Students are strongly advised to make copy - Copies of receipts are to be retained by students.
5 of all receipts) - Fill up App XX completely, including Finance Reference
- Fill up ETP Claim Breakdown Form and Receipt No. for all items.
(App XX) - UTP Claim Forms are provided to students at the beginning
- Fill up UTP Claim Form (Sample in
of the semester. To fill up, refer sample in App XXI.
App XXI)
- Students must ensure that SV provide the following on the
UTP Claim Form:
a) Staff No
- Submit UTP Claim Form to SV to fill up
b) Grade
6 relevant info and obtain signature (Refer
App XXI)
c) Location (Office)
d) Extension No
e) Signature
f) Date
Submit UTP Claim Form, ETP Claim Late submissions will not be entertained. 17 APR
7
Breakdown Form and receipts to coordinator 2009
Students are responsible to follow up with SV on payment.
8 Collect claims from SV Please allow some time for payment to reach SV.

12 ETP Guidelines: January 2009 semester


11. LABORATORY

Students are allowed to use the laboratory for the purposes of experiments or fabrications
of their model or prototype. The technicians who are in-charged for the laboratory related
to this course are responsible in co-ordinating the lab operations, which include the
Health, Safety and Environment (HSE) aspects, scheduling of equipment, checking and
providing consumables. Students are required to notify the technicians on their intent to
use the lab in advance. All lab regulations must be complied. Lab coats and proper attire
shall be worn in the lab. Each group must carry out housekeeping and the technicians will
monitor this. Failure to comply with the regulations may result in deduction of marks by
the Coordinators.

12. PLAGIARISM

Plagiarism is strictly prohibited and is a serious offence. Kindly refer to Section 5.1 of the
UTP’s undergraduate handbook, A Guide to University Academic Policies and
Procedures. Any work that is found to have been copied or plagiarized will NOT be
marked.

13. WRITING FORMAT FOR FINAL REPORT

The writing format of the ETP final report should follow the UTP standard as described
below. The report consists of many parts arranged in a certain order. It is recommended
that the contents be in the following order, although not every report will include all the
items listed.
a) Title
b) Acknowledgement
c) Executive Summary / Abstract
d) Table of Contents
e) Background of Project Work
f) Identification and Definition of Problem
g) Objective and Scope
h) Project Management
i) Literature Review
j) Theory
k) Procedure / Methodology
l) Engineering Analysis
m) Business / economic analysis
n) Discussion of Results
o) Conclusion
p) Recommendation
q) References
r) Appendices

13 ETP Guidelines: January 2009 semester


General Writing Format

Students must follow specific guidelines for writing the report as stated below.

a) Language

The report must be written in English Language.

b) Font and Spacing

All text should be double-spaced (Times New Roman regular font-style, size 12)
written on one side of each white A4 paper. However, foot note, computer
program codes (must be reduced to font size 8), and captions for tables and
figures should be single-spaced.
c) Length

The report shall not be more than 30 pages, excluding the appendices. Students
are encouraged to be brief and concise in their writing and avoid jargon and
passive voice as much as possible.

d) Numbering

All pages must be numbered in proper sequence from introduction to the end of
the report including pages on figures, tables, computer programs and appendices.
Page numbers appear by themselves and are not to be enclosed in parenthesis,
hyphens or other decorative symbols. Page number must be positioned at the
bottom and centred.

e) Margin

The top, bottom and right margins are 25 mm. The left margin must be 40 mm.

f) Mathematical Text

Mathematical text must be spaced out, superscript and subscript must be clearly
shown as such.

g) Heading

Major headings, such as INTRODUCTION, should be in capitals. Times New


Roman and font size 14 should be used. Secondary headings such as Example, the
first letter should be capitalised, bold and font size 12 should be used, and tertiary
heading should be in Times New Roman.

14 ETP Guidelines: January 2009 semester


h) Tables and Figures

Tables and figures less than a page in size should be inserted into the text near the
point of reference with a three-line space above and below. Tables should be
continuous and not carried over to the succeeding page. Margins’ limits are the
same as text full-page. All tables and figures should be numbered consecutively.
Tables and figures are must be within the main text. Table captions should be
positioned at the top middle of each table. The captions for figures should be
positioned at the bottom middle of each figure.

i) References

The method of writing references must follow the standard format. See
Appendix XIV for samples of reference format.

j) Title Page

The title page should be set out in accordance with the Appendix XV and should
include the followings:
- name of the group members in FULL complete with the Matrix Number.
- title of the ETP project
- month and year in which the ETP final report is submitted

Students must submit one copy of their ETP final report to the respective
supervisor on week 14.

General Content

This section will elaborate more about the general content needed in each part of the
report format.

a) Title

The project title should reflect the focus on core issues of the research work.

b) Acknowledgements

Acknowledgements should include the names of the contributors to the project


work including the supervisors and members of the group, preferably not more
than one page.

15 ETP Guidelines: January 2009 semester


c) Summary / Abstract

The summary or abstract briefly covers the content of the work. It should contain
the (i) Objectives of the project; i.e., state the core issue, research question or
objective of the design work, (ii) Methodology; i.e., briefly describe the methods
or techniques used in achieving the objectives, (iii) Results; i.e., describe the
results obtained from the methodology employed, and (iv) Conclusions; i.e.,
interpretation of the results in relation to the theory or hypotheses. Draw
conclusions and state the implications. The summary or abstract is presented so
that any other reader, who is attracted by the title of the project, can know a little
more without having to read the whole report. Any reference to the literature is
not made in the abstract but if such references are necessary, they should be
footnoted. Abstract should not be more than one page.

d) Table of Contents

Table of contents lists all headings and sub-headings, tables, figures, appendices,
bibliography with the page numbers.

e) Background of Project Work

The background covers the research project, the definition of the problem, the
achievement expected from the project, the importance of the project as well as
the range and depth of the study.

f) Objective and Scope

The aim of the study includes main/general matter that needs to be achieved or
implemented. Objectives are more detailed and closely related to aim. Scope is the
boundary for the research work planned by the students to ensure the feasibility of
the project to be carried out within the given time frame.

g) Project Management

Project management should focus on progress monitoring and task allocation with
the usage of Gantt chart.

h) Literature Review

Literature review includes the review of written materials on the topic and area
chosen. It gives the background of the current studies of the problem area chosen
from various written sources of references. This section reviews the previous
research analytically, critically and objectively.

16 ETP Guidelines: January 2009 semester


i) Theory, Methodology and Procedure

This section shall contain all the relevant theories, hypotheses, facts and data
obtained from references and literature reviews. The theories included must be
relevant with the objectives and the findings of the project, thus allowing the
comparison between the results achieved and the theory to be outstanding. The
methodology must be relevant and used in the project.

j) Engineering Analysis

This section should include data gathering, data analysis, tools required, possible
solutions to problems, decision making on the selected solution and project
benefits.

k) Discussion on Result and Findings

This section presents the finding or outcome of the research work. It is suggested
that the results obtained be presented clearly in the form of tables and figures such
as graphs, diagrams or others.

l) Conclusions

Conclusion highlights whether the work completed complies with the set
objective and the significance of the findings. Recommendation for future work
should be stated in this section to ensure the set objective can be achieved and
improved or even expanded.

m) References

This section is to record all references used for preparing the proposed project.
Use the standard format as given in the appendix.

n) Appendices

Lengthy calculations, figures, raw data, computer programs/source codes, outputs,


etc. are to be enclosed as appendices. They should be titled and numbered
according to chronological order. Each appendix is preferably named using capital
letters and the appendices need to be listed down in the Table of Contents.

17 ETP Guidelines: January 2009 semester


APPENDIX I: IMPORTANT DATES

Week Number
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Activities
Seminar I (and Briefing) 21/1

Seminar II 28/1

Project proposal due 2/2

Issuance of Final List * 11/2

Seminar III 18/2

Progress Report due 23/2

Seminar IV 11/3

Due: Submission of FORM 03 16/3

Evaluation on Fabrication

Poster & Demonstrations TBA

Due: Submission of Claim Form 17/4

EDX TBA

Oral Presentations 22/4

Submission of Final Report 29/4

* By co-ordinator: List of students, groups, supervisors, themes and topics

Note: The above schedule is subject to changes. Please check in the elearning regularly for updates.

18 ETP Guidelines: January 2009 semester


APPENDIX II: PROJECT PROPOSAL SCORE SHEET FORM E1

MAB 3013 – ENGINEERING TEAM PROJECT

Group No Name ID
Supervisor 1.
2.
3.
Title 4.
5.
6.

Marks
Breakdown Guidelines for Marking Marks
Allocated
- Background analysis
- Objective statement
1 Introduction
- Problem definition 30
- Design approach /
methodology
- Gantt Chart
2
- Task / work allocation
Project planning
- Project flow showing 30
involvement of all project
members
- Preliminary information
(Behaviour trend and
Data gathering and
3 analysis) 30
analysis
- Documentation: references /
survey / site visit
- In-time submission
Compliance to
4 - Report complies to 10
requirement
requirement/format
TOTAL 100

Weightage in course: 10%

_________________________
Supervisor’s signature

Date: ____________________
Note: Supervisors shall forward the completed form (hardcopy) to Department Representatives by the deadline given.

19 ETP Guidelines: January 2009 semester


APPENDIX III: PROGRESS REPORT SCORE SHEET FORM E2

MAB 3013 – ENGINEERING TEAM PROJECT

Group No Name ID
Supervisor 1.
2.
3.
Title 4.
5.
6.

Marks
Breakdown Guidelines for Marking Marks
Allocated
- Project definition and problem
statement
1 Introduction - Identification of potential solutions
30
- Literature review
- Design concept
- Justification in choosing design
- Task listing and distribution
2 Project
- Logic of sequence of task 20
planning
- Feasibility of plan
- Identification of suitable tools or
3 Methodology 20
software
- Application of fundamental
Data gathering engineering knowledge in solving or
4
and analysis analysing design problem 20
- Validity & suitability of data
Economical / - Capital cost considerations
5 business - Operational cost considerations 5
consideration - Alternatives in materials
- Summary of progress and findings
6 Conclusion 5
- Next plan of action
TOTAL 100

Weightage in course: 10%

_________________________
Supervisor’s signature

Date: ____________________
Note: Supervisors shall forward the completed form (hardcopy) to Department Representatives by the deadline given.

20 ETP Guidelines: January 2009 semester


APPENDIX IV: FABRICATION SCORE SHEET FORM
E3

MAB 3013 – ENGINEERING TEAM PROJECT


Group No
Title
Group Leader ID

No. Component 4 3 2 1 Marks


Understanding of
ALL members have clear Most members have Most members have
scientific principles Most members DID NOT
1 and accurate clear and accurate relatively accurate
understand
underlying the understanding understanding understanding
fabrication/product
Proper planning. Improper planning. Improper planning.
Proper planning.
2 Fabrication Plan Follows plans accurately.
Sometimes able to follow Some flaws in the Major flaws in the
plan implementation of plan. implementation of plan.
Very neat Neat. Quite neat.
Clear dimensioning. Clear dimensioning. Clear dimensioning. No dimensioning. Poor
3 Drawings Major components Some components Some components labeling.
labeled. labeled. labeled.
4 Materials Appropriate materials Materials were selected Materials were partly Inappropriate materials
were carefully selected based on scientific facts. selected based on were selected.
based on scientific facts. scientific facts.

5 Fabrication Great care taken. Fabricated as per the Slightly as per the Not fabricated as per the
Fabricated as per the construction drawing. construction drawing. construction drawing.
Process construction drawing.

6 Testing & Clear evidence. Sufficient evidence. Some evidence. Data not taken in a
Data taken several times Data taken twice in a Data taken once in a reliable manner.
Measurements in a careful, reliable careful, reliable manner. careful, reliable manner.
manner.
7 Functionality Functions extraordinarily Functions well. Functions pretty well, but Major flaws in function.
well. with minor defects

8 Finishing Quality Excellent assembly. Neat assembly. Neat assembly. Poor assembly
Cuttings are very neat. Cuttings are quite neat. Poor cuttings. Poor cuttings.
Excellent jointing. Proper jointing. Satisfactory jointing. Poor jointing.

9 Structure of Excellently rigid structure. Satisfactorily rigid Marginally stable Unstable structure.
structure structure
Prototype

10 Aesthetics Excellent geometry. Attractive color and Proper color chosen. Poor overall look and
Attractive color and overall look. color.
overall look.

Total (Max = 40)

Weightage: 10%

________________________ ____________________

21 ETP Guidelines: January 2009 semester


Examiner’s signature Name & Date
APPENDIX V: POSTER EVALUATION SHEET FORM E4

MAB 3013 – ENGINEERING TEAM PROJECT


Group No
Title
Group Leader ID

Weightage: 10%
No. Component 4 3 2 1 Marks

All images are in focus. Most images are in focus Most images are in focus Many images are not
1 Clarity of Images Identifiable 2m away. Identifiable 2m away Identifiable 1m away clear or are too small.

The graphics used reflect One or two of the The graphics are made No graphics made by the
Originality of an exceptional degree of graphics used reflect by the student, but are student are included.
2 student creativity. student creativity. based on the designs of
Graphics
others.
All graphics relevant. Most graphics relevant. Most graphics irrelevant. All graphics not relevant.
Relevance of
3 All borrowed graphics All borrowed graphics Most borrowed graphics Most borrowed graphics
Graphics
have a source citation. have a source citation. have a source citation. without a source citation.
Overall Creatively composed.
4 Composition: Suitable choice of colors.
Creatively composed. Satisfactorily composed Messy and distracting
Figures, text, background.
Over 90% accurate Up to 70% accurate Up to 50% accurate Less than 50% accurate
Accuracy of
5
Content / Facts Citation provided Citation provided Citation provided Citation not provided

Introduction:
6 Problem statement, Clear & concise Satisfactory but lengthy Unclear No description at all
background & objective.

7 Methodology Clear & concise Satisfactory but lengthy Unclear No description at all

Results &
8 Clear & concise Satisfactory but lengthy Unclear No description at all
Conclusions

Business/Economic Clear & concise


9 Satisfactory but lengthy Unclear No description at all
Considerations

Suitable text sizes Suitable text sizes Unsuitable text sizes Unsuitable text sizes
10 Texts & Grammar
No grammatical errors Some grammatical errors Some grammatical errors Many grammatical errors

Weightage: 10%

________________________ ____________________
Examiner’s signature Name & Date

22 ETP Guidelines: January 2009 semester


APPENDIX VI: DEMONSTRATION OF WORKING PROTOTYPE/MODEL FORM E5

MAB 3013 – ENGINEERING TEAM PROJECT


Group No
Title
Group Leader ID

No. Component 4 3 2 1 Marks

Completion of
1 100 % 90 – 99 % 80 – 89 % < 80%
prototype
Excellent geometry.
Attractive color and Poor overall look and
2 Aesthetics Attractive color and
overall look.
Proper color chosen.
color.
overall look.
Neat assembly. Poor assembly
Excellent assembly. Neat assembly.
Poor cuttings. Poor cuttings.
3 Finishing Quality Cuttings are very neat. Cuttings are quite neat.
Satisfactory jointing. Poor jointing.
Excellent jointing. Proper jointing.

Structure of Excellently rigid structure. Satisfactorily rigid Marginally stable


4 structure structure
Unstable structure.
Prototype

Functions extraordinarily Functions pretty well, but


5 Functionality well.
Functions well.
with minor defects
Major flaws in function.

Appropriate materials Materials were partly


Materials were selected Inappropriate materials
6 Materials were carefully selected
based on scientific facts.
selected based on
were selected.
based on scientific facts. scientific facts.
Clear evidence.
Sufficient evidence. Some evidence.
Testing & Data taken several times Data not taken in a
7 in a careful, reliable
Data taken twice in a Data taken once in a
reliable manner.
Measurements careful, reliable manner. careful, reliable manner.
manner.
Understanding of
Members have
scientific principles Members understand Members have little Members generally DID
8 completely clear and
most understanding NOT understand
underlying the accurate understanding
fabrication/product

Ability to
9 implement the 100% 90 – 99 % 80 – 89 % < 80%
desired task

10 Demonstration skill Highly convincing Quite convincing Quite dubious Highly dubious

Total (Max = 40)

Weightage: 15%

________________________ ____________________
Examiner’s signature Name & Date

23 ETP Guidelines: January 2009 semester


APPENDIX VII: ORAL PRESENTATION: GROUP ASSESSMENT FORM E6

MAB 3013 – ENGINEERING TEAM PROJECT


Group No
Title
Group Leader ID

No. Component 4 3 2 1 Marks

Clarity of
1 Very clear Quite clear Quite vague Very vague
Presentation
Logical sequence. Logical sequence.
Sequence & Time Acceptable continuity Poor continuity.
2 Good continuity Acceptable continuity
Exceed the time limit. Exceed the time limit.
Limit Compliance to time limit. Exceed the time limit.

Composition of
3 Very Good Good Marginal Poor
Slides

Suitable
4 Visual Aids Reasonable quality Reasonable quality Low quality
High quality
(drawings & illustrations) Adequate Inadequate Inadequate
Adequate

Introduction
5 (Background, problem Very clear Quite clear Quite vague Very vague
statement and objective)

Literature Review / Highly adequate and


6 relevant
Adequate Marginal Poor
Data Gathering
Questionable design
Justified design selection No design selection No design selection
selection
7 Methodology Adequate engineering
Adequate engineering
Some engineering Minimal engineering
analysis analysis analysis
analysis

Good work flow Reasonable work flow Quite poor work flow Poor work flow
8 Project Planning Good scheduling Proper scheduling Proper scheduling Poor scheduling
Proper task distribution Proper task distribution Proper task distribution Improper task distribution

Prototype well tested.


Good discussions on Prototype tested. Prototype tested.
Results & Prototype not tested.
9 results. Reasonable discussions Inadequate discussions
Minimal discussions.
Discussions Business/Economic on results on results
considerations

Conclusion &
10 Highly convincing Quite convincing Quite dubious Highly dubious
Recommendations

Total (Max = 40)

Weightage: 15%

________________________ ____________________
Examiner’s signature Name & Date
APPENDIX VIII: ORAL PRESENTATION: INDIVIDUAL SCORE FORM E7

24 ETP Guidelines: January 2009 semester


MAB 3013 – ENGINEERING TEAM PROJECT

Group No
Supervisor
Title

INDIVIDUAL ASSESSMENT

Marks Allocated

ID:1.

ID:2.

ID:3.

ID:4.

ID:5.

ID:6.
Breakdown Guidelines for Marking

- Enthusiasm
Presentation
1 - Attire
skills 40
- Language
- Communication (Interactive)
- Able to show solid understanding
Knowledge /
2 of the project 60
understanding
- Ability to respond to questions
TOTAL 100
Weightage in course:5%
_________________________
Examiner’s signature

Name: ____________________

Date: ____________________

25 ETP Guidelines: January 2009 semester


APPENDIX IX: FINAL REPORT SCORE SHEET FORM E8

MAB 3013 – ENGINEERING TEAM PROJECT


Group No Name ID Prog.
Supervisor
Title

Marks
Breakdown Guidelines for Marking Marks
Allocated
1 Layout and - Summary
presentability - Table of contents 10
- Appendices (compilation of relevant
information)
2 Introduction - Background of project work
- Objective 20
- Problem definition and identification
- Literature review
3 Procedure and - Approach to solutions / methodology 20
analysis - Fundamental engineering analysis
4 Results - Technical specification and
engineering drawing
- Project output 40
- Discussion on result
- Conclusion
- Recommendations
Project - Progress monitoring (Gantt Chart) 10
5
management - Task allocation
TOTAL 100
/ 25

Weightage in course: 25%

_________________________
Supervisor’s signature

Date: ____________________
Note: Supervisors shall forward the completed form (hardcopy) to Department Representatives by the deadline given.

26 ETP Guidelines: January 2009 semester


APPENDIX X: CALCULATION OF F-FACTOR (FOR INDIVIDUAL GRADES) FORM E9

MAB 3013 – ENGINEERING TEAM PROJECT

Group No
Supervisor
Title

N Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Logbook Meetings
Name ID F-factor
o LB M LB M LB M LB M LB M LB M LB M LB M LB M LB M 70% 30%
1
2
3
4
5
6

LB – Logbook M – Meeting Attendance


Logbook marking guideline: Meeting Attendance:

Weekly task completed in time :1 Attend meeting on time :1


Partial completion of weekly task : <1 Late attendance : <1
No task performed (without reason) : 0 Absence (without reason) :0

_________________________
Supervisor’s signature
Date: ____________________

CALCULATION OF F FACTOR FOR INDIVIDUAL GRADES (EXAMPLE)

N Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Logbook Meetings
Name ID F-factor
o LB M LB M LB M LB M LB M LB M LB M LB M LB M LB M 70% 30%
1 John Doe 1234 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 70.0 30.0 1.00
2 Jane Doe 5678 0.5 1 0.6 0.5 0.7 1 0.8 1 0.9 0 1 1 1 1 1 1 1 1 1 1 59.5 25.5 0.85
3 J. Slacker 007 0 0 0 0 0.5 0.5 0.7 0.5 0.5 1 0.7 1 0 0 0 0 1 1 1 1 30.8 15.0 0.46
4
5
6
ote: Supervisors shall forward the completed form (hardcopy) to Department Representatives by the deadline given.

27 ETP Guidelines: January 2009 semester


APPENDIX XI: RESULT COMPILATION FORM E10

MAB 3013 – ENGINEERING TEAM PROJECT

Group No
Supervisor
Title

SUPERVISOR OTHER EXAMINERS


Proj. Prog. Final F- Subtotal Grp Ind. Subtotal
No ID Student Name Prog. Prop. Rpt. Fab. Rpt factor 1 Demo Poster Oral Oral 2 Total
10% 10% 10% 30% 1.00 60% 15% 10% 10% 5% 40% 100%
1
2
3
4
5
6

ASSESSMENT FOR EACH STUDENT (EXAMPLE)

SUPERVISOR OTHER EXAMINERS


Proj. Prog. Final F- Subtotal Grp Ind. Subtotal
No ID Student Name Prog. Prop. Rpt. Fab. Rpt factor 1 Demo Poster Oral Oral 2 Total
10% 10% 10% 30% 1.00 60% 15% 10% 10% 5% 40% 100%
1 XXXX STUDENT 1 CH 9.3 9.2 9.0 27.0 0.90 49.1 12.9 8.2 9.0 4.5 34.6 84
2 XXXX STUDENT 2 CH 9.3 9.2 9.0 27.0 0.87 47.4 12.9 8.2 9.0 4.0 34.1 82
3 XXXX STUDENT 3 CV 9.3 9.2 9.0 27.0 0.79 43.1 12.9 8.2 9.0 3.5 33.6 77
4 XXXX STUDENT 4 EE 9.3 9.2 9.0 27.0 0.95 51.8 12.9 8.2 9.0 4.8 34.9 87
5 XXXX STUDENT 5 ME 9.3 9.2 9.0 27.0 0.97 52.9 12.9 8.2 9.0 2.8 32.9 86
6 XXXX STUDENT 6 ME 9.3 9.2 9.0 27.0 1.00 54.5 12.9 8.2 9.0 4.5 34.6 89

Note: Supervisors shall forward the completed form (softcopy) to Department Representatives by the deadline given.

28 ETP Guidelines: January 2009 semester


APPENDIX XII: LOGBOOK SUMMARY FORM E11

MAB 3013 – ENGINEERING TEAM PROJECT

Group No Week No
Supervisor
Title
Student Name ID

Completed Activities (from last week)

Planned Activities (for next week)

Overall group progress vs. Gantt Chart:

Problems encountered:

Note: 1) Maximum 2 pages only


2) Supervisor needs to verify each student’s activities during the weekly meeting.

_______________________
Supervisor’s signature

Date: ____________________
Note: Supervisors shall retain the forms for five consecutive years.

29 ETP Guidelines: January 2009 semester


APPENDIX XIII: PROJECT PROPOSAL CONTENT

The project proposal must have the followings at minimum:

Details of the Project Team (front page)

Group Number
Project:

Matric Number
Team Leader
Member
Member

Approved for submission: (signature)

Short Summary/Abstract

Problem Statement

Project Objectives

Background Study

Design Approach/Methodology
Procedures
Plan and Schematic Flow Process of the Project
Hardware/Tools and Software

Project Management
Task Allocation and Activities
Schedule/Gantt Chart

30 ETP Guidelines: January 2009 semester


APPENDIX XIV: SAMPLE OF REFERENCING FORMAT

The format of references for the respective sources is as follows:

1. journal refer to Meguid and Zhu (1995)


2. book refer to Glister P. (1993)
3. book in series refer to Ochoa, O.O and Reddy, J.N. (1989)
4. article in book/conference proceedings refer to Eskey, D and Grabe, W. (1988)
5. thesis refer to Mohd Shariff, A. (1995)
6. interview refer to Hamouda, A.M.S. (1994)
7. website refer to Duncan, Donna. (1998)

Meguid, S.A. and Zhu, Z.H., 1995, "A novel finite element for treating inhomogeneous solids,"
International Journal Numerical Methods Engineering 38 (2): 1579-1592

Glister P. 1993, The Internet Navigator, New York, John Wiley & Sons

Eskey, D and Grabe, W. 1988, "Interactive models for second language reading" in
P. Carrell, J. Devine and D. Eskey (Eds) Interactive approaches to Second Language Reading ,
Cambridge; Cambridge University Press

Hitam, P., 1995, Fundamental Study of X-111 Soil Characteristics, Ph.D. Thesis, Universiti
Teknologi PETRONAS, Malaysia.

Hamouda, A.M.S. 1994. LUSAS Ltd., UK, Private communication.

Websites (with author):


Author, Year, Title, Date accessed, from URL
Duncan, D. M., 2008, How to Eat Humble Pie, 6 Sept 2009, from http://www.geovillage.com

Websites (without author):


Title, Year, Date accessed, from URL

31 ETP Guidelines: January 2009 semester


APPENDIX XV: SAMPLE OF COVER PAGE FOR FINAL REPORT

ENGINEERING TEAM PROJECT

TITLE OF PROJECT

BY

GROUP NUMBER

Member 1 ( Matric Number)


Member 2 ( Matric Number)
Member 3 ( Matric Number)
Member 4 ( Matric Number)
Member 5 ( Matric Number)
Member 6 ( Matric Number)

Supervisor:

January 2030

Universiti Teknologi Petronas


Bandar Seri Iskandar
31750 Tronoh,
Perak Darul Ridzuan

32 ETP Guidelines: January 2009 semester


APPENDIX XVI: STUDENTS’ REQUISITION FORM FORM UTP 03

Student's Name Student's ID


E-mail Address Contact No
ETP Group No Date

Note: The cost of preparing project reports and posters including photocopying and stationeries are to be borne by the
students themselves.
Dimension (L X W X H)/ Unit
Vendor / Amount
No. Item Brand & Model description / material / Price Qty
supplier (RM)
specification (RM)

Total

Verified by: Certified by: Endorsed by: Approved by:


(Lab Executive) (Project Supervisor) (ETP Coordinator) (Programme Head)
Signature

Official
Stamp

Date

33 ETP Guidelines: January 2009 semester


APPENDIX XVII: STUDENTS’ REQUISITION FORM - SAMPLE FORM UTP 03

Student's Name Suhana Bt Ramli Student's ID 12345


E-mail Address Suhana_ramli@utp.edu.my Contact No 012-345 6789
ETP Group No 91 Date 14 Feb 2008

Note: The cost of preparing project reports and posters including photocopying and stationeries are to be borne by the
students themselves.
Dimension (L X W X H)/ Unit
Vendor / Amount
No. Item Brand & Model description / material / Price Qty
supplier (RM)
specification (RM)
1 Photovoltaic module Kyocera 120 X 10 X 10 mm / 250W Sunny Boy 88.90 1 88.90
2 Inductor Sumida CDH53 68 uH 1.5Arms 0.18DCR Xcel Circuit 63.50 1 63.50
3 Padding N/A 50 X 11 X 6 mm / rubber Eng Huat 5.00 6 30.00
4 Dividers N/A 3" X 6" sheet metal / steel Eng Huat 8.50 3 25.50
5 Spray paint Net Paint 1 liter / Oil-based paint Eng Huat 10.00 2 20.00
6 Galvanised washers N/A 3/8" / steel Eng Huat 3.50 4 14.00
7 Ply wood N/A 100 X 80 X 6 mm / wood Eng Huat 12.80 1 12.80
8 Hinges N/A 30 X 90 mm / brass Eng Huat 2.00 2 4.00

Total 258.70

Verified by: Certified by: Endorsed by: Approved by:


(Lab Executive) (Project Supervisor) (ETP Coordinator) (Programme Head)
Signature

Official
Stamp

Date

34 ETP Guidelines: January 2009 semester


APPENDIX XVIII: JUSTIFICATION LETTER

MAB 3013 – ENGINEERING TEAM PROJECT

To : Dr. Ahmad Majdi Abdul Rani


Head, Department of Mechanical Engineering
From : (Student’s Name)
ETP Group No Contact : (mobile phone no)
CC (Supervisor) : (Supervisor’s Name) Date :

Dear Sir,

RE: JUSTIFICATION FOR PURCHASE EXCEEDING ETP BUDGET

Referring to the above, we wish to request your approval to allow purchases more than RM200 for our ETP project.
The table below shows the list of items to be purchased, in descending order of price and corresponding justifications
or supporting remarks.

Is there any
Price cheaper
No Item Supplier Justifications / supporting remarks
(RM) alternative
source?

Total

Thank you for your consideration.

Yours sincerely, Endorsed by (Supervisor):

___(Signature)_____________ ___(Signature)_____________

Decision: tick ( ✓ )

Approved Not Approved

Sign: __________________________ Date: __________________________

Remarks (if any): ______________________________________________________________________________

35 ETP Guidelines: January 2009 semester


APPENDIX XIX: JUSTIFICATION LETTER - SAMPLE

MAB 3013 – ENGINEERING TEAM PROJECT

To : Dr. Ahmad Majdi Abdul Rani


Head, Department of Mechanical Engineering
From : Suhana Bt Ramli
ETP Group No 88 Contact : 012 – 345 6789
CC (Supervisor) : Dr Mohd Jefri Date : 14 Feb 2008

Dear Sir,

RE: JUSTIFICATION FOR PURCHASE EXCEEDING ETP BUDGET

Referring to the above, we wish to request your approval to allow purchases more than RM200 for our ETP project.
The table below shows the list of items to be purchased, in descending order of price and corresponding justifications
or supporting remarks.

Is there any
Price cheaper
No Item Supplier Justifications / supporting remarks
(RM) alternative
source?
1 Photovoltaic Sunny There is only one sole supplier (Sunny Boy) in
88.90 No
module Boy Malaysia.
2 Three quotations were obtained (RM77.50,
Xcel
Inductor 63.50 No RM72.00 and RM63.50) and Xcel Circuit provided
Circuit
the lowest price based on the same specification.
3 Padding 30.00
4 Dividers 25.50 For Items #3 - #8, Eng Huat is selected as the
5 Spray paint 20.00 location is near UTP, it has a complete range of
6 Galvanised Eng Huat products meeting the specifications, hence is
14.00 convenient and helps reduce traveling time and
washers
7 Ply wood 12.80 cost.
8 Hinges 4.00
Total 258.70

Thank you for your consideration.

Yours sincerely, Endorsed by (Supervisor):

___(Signature)_____________ ___(Signature)_____________

Decision: tick ( ✓ )

Approved Not Approved

Sign: __________________________ Date: __________________________

Remarks (if any): ______________________________________________________________________________

36 ETP Guidelines: January 2009 semester


APPENDIX XX: ETP CLAIM BREAKDOWN FORM

MAB 3013 – ENGINEERING TEAM PROJECT

PREPARED BY
Student's Name Student's ID

E-mail Address Contact No


ETP Group No Date
Finance Reference (Refer Finance Reference from UTP Claim Form)
Please attach the completely endorsed Form UTP 03 and all the receipts.
Please use additional pages if necessary.

Dimension (L x W x H)/ description / material /


No. Item Receipt No. Qty Amount
specification

Total

Prepared by,

___________________________

37 ETP Guidelines: January 2009 semester


APPENDIX XXI: UTP CLAIM FORM – SAMPLE Finance Reference

To be filled up
by supervisor

To be filled up
by supervisor
38 ETP Guidelines: January 2009 semester
APPENDIX XXII: PEER EVALUATION TEMPLATE

Peer Evaluation : Engineering Team Project ETP GRP:

Student to be evaluated

Name: ID:

CATEGORY 4 3 2 1 Score
Contributions Routinely provides Usually provides useful Sometimes provides Rarely provides useful
useful ideas when ideas when participating in useful ideas when ideas when participating
participating in the group the group work and participating in group in group work and
work and discussion. A discussion. A strong group work and discussion. A discussion. May refuse
definite leader or member who tries hard! satisfactory group to participate.
member who contributes member who does what
a lot of effort. is required.
Quality of Provides work of the Provides high quality Provides work that Provides work that
Work highest quality. work. occasionally needs to usually needs to be
be checked/redone by checked/redone by
other group members to others to ensure quality.
ensure quality.
Time- Routinely uses time well Usually uses time well Tends to procrastinate, Rarely gets things done
management throughout the project to throughout the project, but but always gets things by the deadlines AND
ensure things get done may have procrastinated done by the deadlines. group has to adjust
on time. Group does not on one thing. Group does Group does not have to deadlines or work
have to adjust deadlines not have to adjust adjust deadlines or responsibilities because
or work responsibilities deadlines or work work responsibilities of this person's
because of this person's responsibilities because of because of this inadequate time
procrastination. this person's person's management.
procrastination. procrastination.
Problem- Actively looks for and Refines solutions Does not suggest or Does not try to solve
solving suggests solutions to suggested by others. refine solutions, but is problems or help others
problems. willing to try out solve problems. Let
solutions suggested by others do the work.
others.
Attitude Always has a positive Often has a positive Usually has a positive Often has a negative
attitude about the attitude about the task(s). attitude about the attitude about the
task(s). Never is publicly Rarely is publicly critical of task(s). Occasionally is task(s). Often is publicly
critical of the project or the project or the work of publicly critical of the critical of the project or
the work of others. others. project or the work of the work of other
other members of the members of the group.
group.
Reliability Consistently stays Focuses on the task and Focuses on the task Rarely focuses on the
focused on the task and what needs to be done and what needs to be task and what needs to
what needs to be done. most of the time. Other done some of the time. be done. Lets others do
Very self-directed. group members can count Other group members the work.
on this person. must sometimes nag,
prod, and remind to
keep this person on-
task.
TOTAL

Adapted from: http://coe.nevada.edu/slefevre/grouprubric.html

39 ETP Guidelines: January 2009 semester