You are on page 1of 28

Drilling & Workover Rig

POBEDIT 4000 DS 205


POBEDIT - 4000 DS 205

Drilling & Workover Rig

POBEDIT - 4000 DS 205

Drilling & Workover Rig

TECHNICAL SPECIFICATION
205 metric Tons RIG WITH HYDRAULIC TOP DRIVE
CHAPTER 1. POBEDIT - 4000 DS 205 HYDRAULIC DRILLING RIG (TIGER) Mobile hydraulic rig type DS 205(Tiger) for drilling & workover operations, driven by two(2) diesel engines Caterpillar C-18 DITA. Total mast height - 88,6 ft (27 m), hook load - 205 metric tones. Top Drive maximum torque - 39,000 Nm(28,210 lbs/ft), Automatic driller system(max. pull down - 25 mt). Equipment mounted on three-axle semitrailer. Hydraulically raised - up substructure with height 20 ft (6,1 m). Manufactured according to CEE Directive 98/37/EEC Machine Directive, 89/336/EEC Electromagnetic Compatibility Directive, 73/23/EEC Low Voltage Directive, 2000/14/EEC Noise Directive with the application of CE mark and the relative labels and API 4F, 7, 8C Spec. where applicable. The drilling rig is complete of anti collision system in all components movable. Drilling performance: 12.000 ft - 5 in/19.5 lbs. Workover performance: 20.000 ft - 3.1/2 in/13.3 lbs. Well service performance 26.000 ft - 3.1/2 in /9.5 lbs. The rig is suitable for API standard zone for oil and gas and composed as follow:
POBEDIT - 4000 DS 205

Drilling & Workover Rig

1.1 SEMITRAILER AND MAIN FRAME with tree axles fixed, total weight with mast 75 mt, dimensions: 3000 mm wide x 15000 mm length x 4500 mm height. Frame manufactured with high strength low carbon steel double T electrically welded, complete of extensible and folding walkways and handrails, ladders to achieve drilling floor and rig deck. Pneumatic suspensions, twin tires each axle 14.00 R20, brake system pneumatic with independent loops with ABS, 24V electric circuit. Stabilizers in front position, screw type manual, 3-1/2" pin, one spare tire. Main frame complete of plates for hydraulic stabilizers, and lower mast support for erection operation and mast support for horizontal position during rig moving. 1.2 DRILLING FLOOR Manufactured with electrically welded steel, connected to mast forming one body. Arranged for API 27-1/2" (700 m) rotary table installation, complete of 27-1/2" (700 m) rotary table, suitable to contain all bushing series, bowls, slips or automatic slips according to API Spec. Rotary table removable to have a passage of 40" ( 1016 mm ) on center well. Standard drill floor height - 20 ft (6100 mm) complete of mechanical jacks with screw adjustable. Clearance between rotary table and the ground for installation of BOP stack - 5500 mm. 1.3 MAST LATTICE TYPE Sliding type, manufactured with high strength steel pipe welded. Lower section with the cradle for main hydraulic cylinder and pad eyes to erection system, complete of sliding mast guide. Upper section with top drive applied to mast section. Top end structure suitable to receive the crown block. Maximum pull up 205 metric Tons (225 Short Tons), Maximum pull down 25 metric tons (27.5 Short Tons), Total top drive stroke 16 meters (52.5 ft). 1.4 CROWN BLOCK Frame manufactured with high strength low carbon steel, electrically welded, complete of sheaves supports, with safety run pulley bars. Eight steel sheaves with groove hardened for 13/4" (44.45 mm) ropes, complete of lubricating system. Rotating system at 90 for transport position, with hydraulic cylinder.
POBEDIT - 4000 DS 205

Drilling & Workover Rig

The lines are sized with a safety factor against breaking of 4 compared to an API rig with a safety factor of 2.0 when pulling on stuck pipe. 1.5 SUBSTRUCTURE Composed by No. 3 skid base to support 4 hydraulic stabilizers and 2 mechanical adjustable screw type stabilizers. Cross member and girder of joining with semitrailer frame complete of locking pins. BOP trolleys, complete of binary, mounted on skid base in center well area including hydraulic cylinders group suitable to lift BOP (Blow out preventer) during casing sticking. 1.6 BOP HANDLING SYSTEM Having the capacity of 20 ton is composed of trolley on binaries, to move the B.O.P. stack. The two hydraulic cylinders lift the B.O.P. stack. 1.7 PULL UP AND DOWN SYSTEM Hydraulic block to action the main cylinder. Automatic driller system or pull down system, manual, adjustable with manipulator positioned on control panel. 1.8 HYDRAULIC POWER TONG double body, suitable to screw and unscrew the drill pipes, drill collars and casing. Manufactured with carbon steel welded and working finished to achieve the drill pipe from 31/2"(89 mm) to 13-3/8"(340 mm) . Centralizer for drill pipe, positioned on power tong top side. The power tong is connected to mast structure with pins. Maximum make up and break out torque 160000 Nm. Vertical stroke 1016 mm (40" ). 1.9 CASING MANUAL TONGS Manual tong for casings of diameter 16-3/4"(426 mm) and 20-7/8" actuated by brake-out and make-up cylinder on the rig. 1.10 HYDRAULIC ROTARY TABLE (with 4 hydraulic motors) Manufactured with carbon steel, electrically welded. Complete of API taper opening 27-1/2" ( 700 mm ), suitable to contain all bushing series, bowls, slips for drill pipes, drill collars and casing or automatic slips according to API Spec. Removable to have a passage of 40" ( 1016 mm ) on center well. Load capacity 205 metric tons (225 short Tons). Maximum torque 14400 Nm at 83 RPM. 1.11 TOP DRIVE
POBEDIT - 4000 DS 205

Drilling & Workover Rig

Hydraulically powered, manufactured in carbon steel, electrically welded, powered by hydraulic motors, complete of shock absorbers on main shaft. Gooseneck and wash pipe 3" inside diameter, hammer union for rotary hose. Tilting system suitable to add and unload the drill pipes from drilling string. Main shaft, sliding type pin 6-5/8" Reg lower connection, full passage 3" , complete of saver sub. Maximum torque - 39000 Nm at 100 RPM. Maximum torque - 21000 Nm at 180 RPM. RPM - from 0 to 180. Total hydraulic motor capacity is 545 HP(400 Kw). Traveling stroke 16 meters. Maximum speed: up low - 0,6 m/s, up high 1,2 m/s; down - 1,2 m/s. Pull up 205 metric Tons. Pull down 25 metric Tons. 1.12 DOLLY For top drive manufactured with carbon steel welded, suitable to support and guide the top drive, complete of rack for flexible hoses and rotary hose. Tilting mechanism hydraulically powered to position the drill pipes on rack or vice versa to feed the drilling string. 1.13 SERVICE JIB CRANE Positioned on side of lower mast, rotation of 90 with hydraulic cylinder. Hook maximum load capacity 5 metric tons . Hook running speed up and down 0,6 m/s. Rope O.D. 16 mm. The crane is complete of 50 meters of wire rope 16 mm diameter and hook with swivel 5 metric Tons capacity Crosby or equivalent model. The service jib crane is controlled by the main panel. 1.14 RIG STABILIZERS Two(2) front, two(2) rear ) hydraulic positioned on main frame by plate bolted. Pull down max. 30 metric Tons, mechanical stop in working position, controlled with a control panel positioned on rig frame. 1.15 POWER UNIT Mounted on rig deck composed of : two Diesel engines industrial type, Caterpillar C18 model, 630 CV at 1800 RPM each, EPA certified, 6 cylinders in line turbocharged /aftercooled, water heat exchanger, complete of pneumatic starter, rpm counter, hours counter, high water temperature control, lower oil pressure control, emergency stop, muffler. Gear coupler directly connected to engine for hydraulic piston and gear pumps driving type Twin Disc Tecnodrive, complete of heat exchanger type air-oil hydraulically powered.
POBEDIT - 4000 DS 205

Drilling & Workover Rig

Piston hydraulic pumps Denison trade mark, mounted directly on gear coupler. Skid base carbon steel suitable to support the engines. 1.16 SOUND PROOF HOOD

in

Mounted on rig deck, complete of panels for noise absorbing, filters for engine air aspiration and heat exchanger air-oil muffler support. The hood is complete of opening doors for maintenance operations. 1.17 HYDRAULIC SYSTEM Composed of pumps and hydraulic motors, pipes and hoses, blocks, distributors, valves, hydraulic cylinders and fitting. All components mounted and connected to any user. Oil tank capacity 2000 liters approx., complete of suction pipes and oil filter on return. Optical oil level, thermometer for oil temperature control. Each suction pipe is connected to a ball valve. The hydraulic power unit is composed of : - Six (6) piston pumps- PARKER DENISON or equivalent; - Four(4) gear pumps; - Two(2) gear pumps; - Three(3) piston motors - PARKER DENISON or equivalent; - Four(4) gear motors; - Four(4) orbital motors. Each piston pump discharges 5,83 l/s at 350 bar.
POBEDIT - 4000 DS 205

Heat exchanger type air-oil radiator Emmegi model or equivalent, double GR.2 with dual fans, hydraulically driven. The AGIP trade mark hydraulic oil is suitable for low temperature. 1.18 PNEUMATIC SYSTEM The air capacity is 800 lt/min at 8 bar, complete of air drier, filter, lubricator, pipes, valves and air tank 500 liters capacity. 1.19 DOG HOUSE Located on rig deck on rear position left side near to center well, with the following dimensions: L 4063 mm x W 2438 mm x H 2591mm 1.20 CONTROL PANEL mounted into the dog house, complete of: - Pressure Hydraulic service indicator;
POBEDIT - 4000 DS 205

Drilling & Workover Rig

- Pull up indicator (Adjustable); - Pull down indicator (Adjustable); - Top Drive torque indicator (Adjustable); - Top Drive RPM indicator Eexd; - Mud Pressure indicator; - Mud Pump SPM (stroke per minute) indicator EExd; - Power tong torque indicator (Adjustable); - Power tong closure force indicator (Adjustable); - Weight Indicator Type D/Series AW for 10 lines; Deadline load 50,000 lbs(22680 kg); - Mud Pressure Indicator GM6A Series Capacity Range 5,000 PSI Complete of Diaphragm Protector Mounts with 2" NPT sub and Hose 20' Length; - Drilling Recorder at 4 Pen to record: Weight, ROP, Rotary torque, rotary RPM Control levers and manipulators, starter panel for engine with instrumentation, emergency stop and remote emergency stop. Lighting system and closure in front of protection. 1.21 MANIPULATOR HANDLING SYSTEM For lifting tubulars (DP, DC and Casing max 13-3/8" (340 mm) ) from pipe rack to the drill floor and suitable to connect tubulars to the top drive. The top drive lift rod in vertical position on center well. The manipulator handling system is composed by: - Binary positioned on the ground equipped with proper dolly for support and sliding tubulars of length suitable for running Range 3. - Elevator with pliers suitable for lifting tubulars. The elevator system connects tubulars to the Top Drive on drill floor. The locking pliers and lifting arm are hydraulically operated and controlled by control panel from the dog house. 1.22 ELECTRICAL SYSTEM EEx-d composed of two(2) lamps of 100 W positioned on mast front toward the center well, two(2) lamps of 100 W on rear toward rig deck, two(2) lamps on drilling floor. 1.23 TOOL BOX positioned on main frame complete of tongs and tools for standard rig maintenance. 1.24 PIPE RACK SYSTEM For racking pipes during drilling and tripping operations. Manufactured with carbon steel, electrically welded. The pipe rack system in complete with: eight (8) tubular pipe racks, L 9400 mm x W1000 mm x H1000 mm; pipe dolly with four (4) wheels of machined steel with galvanized surfaces c\w bronze
POBEDIT - 4000 DS 205

Drilling & Workover Rig

bushings; guide track for pipe dolly c/w binary pad eyes and pins, L 15000 mm x W1100 mm x H1000 mm; guide support to facilitate the rack element positioning and drill pipe rolling movement; pipe ramp in complete with stairs and handrails L 8150 mm x W 2180 mm. Remark: Pipe

ramp is designed for in case if pipe manipulator fails. 1.25 WINTERIZATION Rig trailer: 1) Light steel panels around drill floor of 2600 mm height, complete with sliding doors and windows; 2) Folding winterization made of canvas with framing around trailer deck, complete with doors and windows.

CHAPTER 2. MUD PUMPS


POBEDIT - 4000 DS 205

2.1 EWECO E-800 MUD PUMPS Two(2) Eweco 800 H.P. Triplex Pumps, Type 17 , with CAT 3412 DITTA Diesel Engine drives, with "PZ-9 STYLE" Module Assemblies installed, 8-1/2" Stroke Continuous Duty all Roller Bearing full size Mud Pumps, packaged, and, as follows: - fully balanced forged steel eccentric crankshaft failsafe; - AGMA 424-01 4.04:1 herringbone gear set for your application ; - fully reversible (renewable) gear design, crossheads, crosshead guides, crankshaft; - PZ-9 style module assemblies including liners, and all expendables, including discharge and suction manifold, utilizing PZ interchangeable fluid ends and components; - double redundant internal lubrication system, splash collected, gravity feed to all locations, and externally mounted electric positive displacement lube pump, with filter; - full electric liner wash system, 1 x 1-1/2 centrifugal pump, powered by 1 H.P. XP AC motor 380 V, 50 Hz, 3-phase ; - discharge Manifold API 5" , 5000 RTJ either side; DISCHARGE ACCESSORIES: - Pulsation Dampener MATTCO 20 Gallon (interchangeable with Hydril) Fully Installed, complete with gauging & charging set, bladder. Bladder pressure gauge to be calibrated in MPa or Bar;
POBEDIT - 4000 DS 205

Drilling & Workover Rig

- Discharge Combination Dampener Mount Block & Disch Strainer ; - 2" Flange Mount Oteco Big Face Pressure Gauge Installed, with indications calibrated in MPa or Bar; - 2" Oteco Shear Relief Valve Flange Mount Installed, complete with set of pins for full pressure range of the mud pump; - 4" Discharge Long Sweep XXS Ell, with 4" Gate Valve Installed. UNITIZATION: - All steel wide flange oilfield skid construction; - Easy winch skid ends; - Diamond Deck Plate around pump and engine; - 100 Gal ASME air tank receiver complete with air gauge and all necessary piping, hoses, fittings fully installed; - Belt Adjusting Bolt Provision sliding engine skid; - Kevlar POWER BAND Belt Drive, approved by Dayco; - Pedestal Mounted Control Station consisting of: Air throttle regulator; Clutch In and Out; Emergency shut down; Air Gauge; - WPT Flywheel Mounted Air Clutch Assembly; - Full Belt Rattle Proof Belt Guards Installed; - Supercharging Centrifugal Pump 5 x 6 x 14 Electric driven, complete with 30 HP XP AC Motor, 380V, 50 Hz, 3-phase, with suction connection to end of master skid, with filter screen and bypass provision, fully installed at the same master skid with mud pump; POWER UNIT: Caterpillar model 3412E DITTA, 2004 CARB tier I and EC stage I non road emissions certified, direct injection turbocharged and aftercooled industrial diesel rated 800 H.P. at 2100 R.P.M. industrials "B" rating with the following standard attachments: air inlet system , air compressor(34 m3/min, actuation pressure 620 kPa, deactuation pressure 827 kPa, charging system, control system, cooling system, exhaust system, flywheel, fuel system, instrumentation, lube system , electric starting system ALSO INCLUDED IN PUMP PACKAGE: - EWECO Suction Pulsation Dampener, Installed; - 4" Discharge Gate Valve, 5000 PSI weldneck; - 400 Gallon Diesel Tank (day tank), complete with fuel level sight glass and all necessary piping, hoses, valves, fittings fully installed;

CHAPTER 3. SUCTION MANIFOLD


12 " (304.8 mm) low pressure suction manifold is mounted on the oilfield skid 6.5 m(L) x 2.5 m(W) and includes: two (2) suction line filters, 12 " (304.8 mm) connective flexible
POBEDIT - 4000 DS 205

10

Drilling & Workover Rig

sleeves, one (1) 12 " (304.8 mm) gate valve, flanges, manifold supports, mounted on the skid. The suction manifold is designed and built for using with two mud pumps. Suction manifold is connected with general suction system, that provides possibility for mud pumps to suck the mud from any of the following mud tanks: suction tank(#3), intermediate tank (#2), storage tank(#4), shearing tank(#5) and mixing & weighting tank(#6). Suction lines are built in the mentioned tanks complete with necessary flanges, intraconnections, sealed connectors between tanks, gate valves with control rods and levers on top of the tanks.

CHAPTER 4. HIGH PRESSURE MUD DISCHARGE SYSTEM


High pressure mud discharge system, maximum work pressure 5,000 PSI (35.0 MPa). consist of : 4.1 One (1) stand-pipe manifold 4" ID(102 mm), 5000 PSI(35Mpa) WP , located on the rig floor, inlet connection for mud pump and one inlet for air compressor (2" ID). The manifold is completed of exclusion valve to separate air - mud. Wing union, rotary hose 4" ID 5000 PSI WP approximate length 35 ft (11000 mm). 4.2 One (1) vibrator hose 3-1/2 "(89 mm) id x 35 ft (11 m), wp 5000 psi (35 mpa), testing pressure 10,000 psi (70 mpa) , c/w hammer unions 4" - 6000 fig. 602 male x female on each end, between standpipe manifold and ground-based rigid high pressure manifold. 4.3 One (1) ground-based high pressure rigid manifold 3-1/2 "(89 mm)ID, 5,000 PSI(35.0 MPa) WP, sectional by rigid pipe sections 5 m long each, c/w hammer unions, supports, between rear of rig(well area) to mud pump area. 4.4 Two (2) shock hoses 3-1/2 "(89 mm) ID x 15 ft (4.5 m) long, WP 5000 PSI(35 MPa), testing pressure 10,000 PSI (70 MPa), c/w hammer unions 4" - 6000 fig. 602 male x female on each end, between mud pump discharge manifolds and ground-based high pressure manifold. 4.5 One(1) "T"- type connector 3-1/2 "(89 mm) ID, WP 5000 PSI(35 MPa), to connect two shock hoses with rigid ground-based high pressure manifold. 4.6 Two (2) mud pump discharge manifolds 4" (102 mm) discharge manifolds assemblies consist of 4" discharge long sweep XXS ELLs, 4" (102 mm) gate valves, 5000 PSI(35 MPa)WP, c/w flanges and nipples, and "Y" type connector on the end of discharge manifolds(beside mud pump #1 master skid edge).

CHAPTER 5. MUD CIRCULATION SYSTEM


Six (6) - tank mud system with total active volume ~ 1350 bbls (215 m3), with capacity 280 m3/h(77.8 l/s), complete with solid control equipment fully installed. The solid control equipment is equivalent to Derrick(USA) equipment and provides 4-phases of
POBEDIT - 4000 DS 205

11

Drilling & Workover Rig

solids-liquid separation: shale shakers, de-sander, de-silter(mud cleaner), centrifuge and possibility of mud degassing by vacuum de-gasser. De-sander and de-silter are combined in one unit installed on the same frame and above shale shaker, which is called Mud Cleaner. TECHNICAL PARAMETERS OF SOLID CONTROL EQUIPMENT a) Two(2) Shale Shakers QZS830x 1080x3 : - Vibration model - linear; - Vibration frequency - 23 Hz; - Capacity of vibration motors - 6.88 Kw; - Vibration force - 76 kN; - Screen size - 830mm x 1080mm x 3(40~ 150 mesh); - Output capacity - 45 l/s(viscosity <40s, density<1.2g/cm3); - Dimension - 2850mmx1800mmx1630mm. b) One(1) Mud Cleaner QZS210 : - Vibration model of deck screen - linear; - Vibration frequency of deck screen - 23 Hz; - Vibration force of deck screen - 76 kN; - Capacity of vibration motors - 3.44 Kw; - Screen size of deck screen - 700mm x 1050mm x 3(120~250 mesh); - Output capacity - 67 l/s(vicosity<40s, density<1.2g/cm3); - Size & number of desander cyclones - 250mm x 2; - Size & number of desilter cyclones - 100mm x 10; - Separation size of desander - 44 (im ~ 74(im; - Separation size of desilter -15 (im~44(im; - Size & number of matched sand pumps : SB55x2; - Dimension - 2050 mm x 2945 mm x 2400mm. c) One(1) Vacuum Degasser ZCQ270 : - Capacity -75 l/s(vicosity<40s density<1.2g/cm3); - Vacuum degree - 0.05 - 0.03MPa; - Air capacity - 13 l/s; - Capacity of main motor - 22Kw; - Capacity of vacuum pump motor - 2.2 Kw ; - Dimension -1740 mm x 965 mm x 1680mm. d) One(1) Centrifuge LW450 x 1000 - N - Output capacity 11 l/s(vicosity<40s, density<1.2g/cm3); - Capacity of main motor - 30 Kw; - Capacity of auxiliary motor - 7.5 Kw; - Drum speed - 1800 RPM; - Drum length - 1000 mm; - Diameter of drum - 450 mm;;
POBEDIT - 4000 DS 205

12

Drilling & Workover Rig

- Separation factor - 820; - Separation point - 4 (im - 7 (im; - Dimension - 2580 mm x 1700 mm x 1840mm; - Feeding pump flow capacity - 11 l/s(vicosity<40s, density<1.2g/cm3) - Feeding pump motor capacity - 7.5 Kw; Equipment meets the requirements of SY/T6276, ISO/CD14690, HSE MS. AC motors & control circuit, 380V / 220V / 50Hz, used in this system meet the requirements of explosion proof : mark - Exd. BT4, protection degree - IP54. Tank bodies are made of corrugated steel sheets with thickness of 8 mm and walls are reinforced to carry (withstand) hydrostatic pressure created by mud with weight of 20 ppg (2400 kg/ m3). Tank ceilings are made of steel gratings(25mm), with manholes and wall ladders in each tank compartment. Cleanout gates in each tank compartment, complete with control rods and levers on the top of tank. Tanks have 2 " (50.8 mm) water supply line and 3 " (76.2 mm) mud gun supply line, connected by flexible hoses with hammer unions between tanks . Walkways and passages of steel plate mesh (8mm) on top and between tanks. Handrails on tanks, walkways and passages have 1000 mm in height and made of square steel pipe (30x40mm). The height of foot line is 100 mm. Ladders with handrails from top of tank to the ground on tanks #1, #3, #5. The normal work like mud mixing, weighing , solids-liquid separation, circulation & control is ensured by mud system, consisting of: 5.1 FLOWLINE Flowline, 0 12"(305 mm) x 33 ft(10 m) long, from wellhead to shale shaker tank is set on the supporting frame, complete with manifold dividing mud flow for two shale shakers and at the same time or separately, after adjusting the manifold , can direct the mud flow to the waste pit, bypassing shaker tank. 5.2 SHALE SHAKER TANK(#1) One(1) Shaker tank with dimensions 12m(L)x2.5m(W)><2.3m (H) has four compartments: sand store, vacuum degasser store, desander store & desilter store. - sand store is arranged in front of the shaker tank complete with two(2) QZS830x1080x3 shale shakers; - vacuum degasser store complete with one(1) ZCQ270 vacuum degasser & one(1) WNJ15 agitator; - desander store complete with one WNJ15 agitator as well as one(1) mud gun. - desilter store complete with QZS210 cleaner; There are overflow gutters separately for vacuum degasser store, desander store and desilter store of tank. Two(2) SB55 6 x 8 x 14 centrifugal sand pumps, complete with two(2) electrical motors 55 Kw each, 1480 rpm, are provided in the base of end of tank. Two(2) explosion proof lights are installed on the shaker tank. Walkways & handrails are installed on two sides and buttends of tanks. The stair with handrails is installed in the end of tank. The sand-sliders of shale shakers are provided on side of tank. One sand cleanout gate is installed in bottom of same side
POBEDIT - 4000 DS 205

13

Drilling & Workover Rig

for each store . 5.3 INTERMEDIATE TANK(#2) One(1) Intermediate tank with dimensions 9 m(L)x2.5m(W)><2.3m (H) has two compartments: of centrifuge feeding pump store & centrifuge store. - centrifuge feeding pump store is arranged in the front of tank, one(1) WNJ15 agitator & one(1) 80YZ(S) 40-10 feeding pump are installed in the face of tank; one(1) mud gun and overflow gutter are provided in the inner of store ; - centrifuge store consists of one(1) LW 450x1000 centrifuge , one(1) pill tank & two(2) WNJ15 agitators as well as two(2) mud guns. One(1) LNJ 2.2 agitator is installed in the pill tank; One(1) liquid meter with scale calibrated in L(liters) is provided on the side of pill tank. Two(2) explosion proof lights are installed on the intermediate tank. Walkways & handrails are installed on the tank sides. The sand-sliders of centrifuge is installed on side of tank. Two(2) sand cleanout gates are installed at the bottom of outside of each store. 5.4 _SUCTION TANK(#3) One(1) Suction tank with dimensions 9 m(L)x2.5m(W)x2.3m (H) has one compartment. Three(3) WNJ15 agitators and three(3) mud guns are installed in the suction tank. Suction lines complete with gate valves, control rods and levers on the top of tank, provided in the suction tank. The suction lines are combined in one general suction system connected with suction lines of other tanks - #2, #4, #5, #6 and suction manifold of mud pumps. Two(2) explosion proof lights are provided on the tank. Walkways & handrails are installed on the tank sides. Two(2) sand cleanout gates are installed at the bottom of outside of the tank; Passageways & handrails are installed between 2nd & 4 th tanks. The stair with handrails is provided from passageway to the ground. 5.5 MUD STORAGE TANK(#4) One(1) Storage tank with dimensions 9 m(L)x2.5m(W)x2.3m (H) has one compartment. Three(3) WNJ15 agitators and three(3) mud guns are installed in the storage tank. Two(2) explosion proof lights are provided on the tank. Handrails are installed on two ends and one side of the tank. Two(2) sand cleanout gates are installed at the bottom of inner side. Passageways & handrails are installed between 3nd & 5 th tanks.

5.6 MUD SHEARING TANK(#5) One(1) Shearing tank with dimensions 9 m(L)x2.5m(W)x2.3m (H) has two compartments: pill store & mud store.
POBEDIT - 4000 DS 205

14

Drilling & Workover Rig

- one(1) shearing jet mud mixer, complete with one(1) JQB6545(5x6x...) centrifugal pump, electrical motor 55 Kw, 2000 rpm, is installed in the bottom end of base of shearing tank. The jet funnel is installed on the top end of tank; the pill compartment is arranged in the middle. There is one(1) WNJ15 agitator and one(1) NJQ-50 mud gun installed in the pill compartment. - one(1) WNJ 15 agitator and two(2) NJQ-50 mud guns are installed in the inner of mud store; Two(2) explosion proof lights are provided on the tank. Handrails are installed in the two ends. The stair & handrails are installed in the end of tank. Two sand cleanout gates are installed in bottom of each store; Passageways & handrails are installed between 4th & 6 th tanks. 5.7 MUD MIXING & WEIGHTING TANK(#6) One(1) Mixing & weighting tank with dimensions 9 m(L)x2.5m(W)><2.3m (H) has one compartment. Two(2) jet mud mixers (twin jet mud mixer), complete with two(2) centrifugal pumps 2SLH55(6x8x...), two(2) electrical motors 55 Kw each, 1480 rpm, are installed in the bottom end of tank base. Two(2) jet funnels are also installed in the bottom end of tank base . Two(2) NJQ-50 mud guns are installed in the inner of tank. Two(2) explosion proof lights are provided on the tank. Handrails are installed in the two ends. Two sand cleanout gates are installed in bottom of tank. Passageways & handrails are installed between 5th & 7th tanks. 5.8 WATER TANK(#7) One(1) Water tank with dimensions 9 m(L)x2.5m(W)><2.3m (H) has one compartment. Two(2) centrifugal water pumps SB11(3x4x.),complete with two(2) electrical motors 11 Kw each, 1480 rpm, are installed in the bottom end of tank base. Two(2) explosion proof lights are provided on the tank. Handrails are installed in the two ends & outside of tank. One(1) liquid meter with scale calibrated in 1000 L(liters/m3) is provided on the side of water tank. Passageways & handrails are installed between 7th & 6th tanks. Water pipelines are provided for each tank and for drill floor, complete with 1 " water valves. The pressure bypass valve is provided in outlet of water pumps. When water pressure is rising over preset pressure, the water will flow back into water tank by pressure bypass valve. 5.9 TRIP TANK(#8) One(1) Trip tank with dimensions 2 m(L)x2m(W)><1.5m (H) has one compartment. One(1) WNJ-7.5 agitator is installed in trip tank; . One(1) liquid meter with scale calibrated in 50 L(liters) is provided on the side of trip tank.
POBEDIT - 4000 DS 205

15

The trip tank can be filled with mud before and during tripping operations by any one of twin jet mud mixer centrifugal pumps via mud gun line, that to be extend from shaker tank to trip tank in parallel with 12" flowline. 5.10 DIESEL FUEL STORAGE TANKS(#9, #10)
POBEDIT - 4000 DS 205

15

Drilling & Workover Rig

Two(2) Diesel fuel storage tanks have dimensions 11 m(L)x2.5m(W)x2.7m (H). Diameter of tank body - 2 m. Volume of each tank ~ 30 m3. Total volume ~ 59 m3. Each diesel fuel tank is composed of two tank bodies - one of them is refueling tank with capacity of 1 m3 and main fuel storage tank with capacity of ~ 30 m3. Each refueling tank has a fuel transferring pump S-125(1 x 1.25x...) with capacity of 2,08 l/s, which is capable to transfer fuel from refueling tank to main fuel storage tank and main fuel pump of the same model which supplies fuel from main tank to consumers(diesel engine day tanks) via flow meter, fuel filter and fuel pipelines laid on into the duct. Each fuel storage tank is equipped with a liquid meter fixed on the tank side complete with calibrated dial by 1000L(m ). The diesel fuel tanks are equipped with discharging sewage outlets, manholes, fuel tank air breathers, platforms & ladders. The pressure bypass valves are provided in outlet of the main fuel pumps. When fuel pressure in fuel discharge line is rising over preset pressure, the fuel will flow back into main fuel storage tank by pressure bypass valve. 5.11 WINTERIZATION The winterizing of mud circulation system consists of the following: Tarpaulins complete with steel framing are supplied for mud tanks #1, #2, #3, #4, #5, #6, #7. The framing are made of square steel pipes and the tarpaulins are made of high durability material. The furniture of winterizing is quick dismountable. The steam line(direct and condensate lines) circuits are supplied in each mud tank to protect the mud in mud tanks from freezing during could weather.

CHAPTER 6. BOP EQUIPMENT


6.1 One(1) 13-5/8" x 5,000 ANNULAR BLOWOUT PREVENTER. Annular blowout preventer,135/8"(350 mm) x 5,000 PSI, (35.0 MPa) WP, H2S TRIM; Top connection: studded 13 /8" x 5,000 PSI WP, BX-160, Bottom connection: Flanged 135/8" x 5,000 PSI WP, BX-160; 6.2 One(1) 13-5/8" x 5,000 SINGLE RAM BLOWOUT PREVENTER. 135/8" x 5,000psi WP single ram BOP, 13 Vertical Bore. 13 x 5,000 PSI studded top x 135/8" x 5,000 PSI Flanged bottom. Manual lock cylinder. With 5" Rams. With 1 41/16" x 5000 PSI studded outlet. - BOP Rams, ready-assembled: One(1) set of 135/8" 5" (127 mm) x 5 000 PSI (35.0 MPa) WP, H2S trim rams; One(1) set of 135/8" x 4-1/2"(114 mm) x 5 000 PSI (35.0 MPa) WP, H2S trim rams;

6.3 One(1) DRILLING SPOOL. Flanged drilling spool: 135/8" (350 mm) 5 000 PSI (35.0 MPa) WP, with two (2) outlets at 180 degrees from each other for 3 - 1/16" ID. 10 000 PSI WP. H2S TRIM; 6.4 One(1) TOP ADAPTER. Flanged adapter 135/8" (350 mm) 5 000 PSI (35.0 MPa) WP, H2S TRIM;
POBEDIT - 4000 DS 205

16

Drilling & Workover Rig

6.5 One(1) CHOKE MANIFOLD. 3-1/16 " ID 10 000 PSI WP, H2S trim; Consists of: - one(1) hydraulic choke valve 3-1/16 " 10 000 PSI , c/w remote control panel; - one(1) manual choke valve 3-1/16 " 10 000 PSI; -eleven(11) 3-1/16 " 10 000 PSI manual gate valves; - one(1) manual gate valve 2-1/16 " 10 000 PSI; - one(1) pressure gauge; 6.6 One(1) KILL MANIFOLD. 3-1/16 " ID 10 000 PSI WP, H2S trim; Consists of: - two(2) manual gate valves 3-1/16 " 10 000 PSI; - one(1) manual gate valve 2-1/16 " 10 000 PSI; - one(1) pressure gauge; - one(1) 2" WECO hammer union; - one(1) check valve. 6.7 One(1) BOP CONTROL SYSTEM FKQ640-6. Consist of the following: 1 Control system for surface-mounted BOP stacks in accordance with API Spec 16D "Drilling control equipment and control system standard" and SY/T5053.2-2001 "Surface-mounted BOP stacks control system"; 2.0 FKQ640-6 BOP Control System (Total volumes of accumulators are 640L and numbers of controlled objects are six; 2.1 Remote Control Panel - 1 piece; 2.2 Driller's Panel -1 piece; 2.3 Air Cable Assembly(23 hoses><50meters) - 1 set; 2.4 Protecting Room -1 room; 3 Main Technical Parameters: System nominal pressure: 21MPa(3000PSI); System pressure-regulating range: 0-14MPa( 0-2000PSI); Accumulators pressure: 70.7MPa (1000100 PSI); Pressure-regulating range of pressure controller: 18.9-21MPa (2700-3000PSI); Pressureregulating range of liquid/air switch: 18.9-21MPa (2700-3000PSI); Air supply pressure: 0.65POBEDIT - 4000 DS 205

17

Drilling & Workover Rig

0.8MPa( 93-115PSI); Accumulators' volume: (40Lx16) - 640 Liters; Power supply: 380V/50HZ; Connection outlets of FKQ640-6 control system for surface-mounted BOP stacks is 1"; Outline Size of Remote Control Panel: 6058mmx2438mmx2700mm (LxWxH); Weight: 9500(Kg); 4. Others; 4.1 Accumulators of FKQ640-6 control system for surface-mounted BOP stacks are side type and each one is controlled by a valve; 4.2 The blind operation handles on FKQ640-6 BOP control panel are equipped with maloperation protecting shield; 4.3 All circuits and electrical equipment on control system are explosion-proof; 4.4 The pressure gauge on Remote Control Panel is an anti-shock pressure gauge; 4.5 The external surface of BOP control system should be painted red corrosion-proof painting. 5. Fire-proof and High-Pressure Hose(10 meters/each) - 48pcs; 6.8 One(1) BOTTOM TRANSFER ADAPTER. Flanged adapter 13-5/8" (350 mm) 5 000 PSI (35.0 MPa) WP x 11 "(280 mm) x 5000PSI WP, H2S TRIM; 6.9 GATE VALVES. - Two (2) manual flanged gate valves for 3 - 1/16" ID. x 10 000 PSI WP , H2S trim; - Two (2) hydraulic flanged gate valves for 3 - 1/16" ID. x 10 000 PSI WP , H2S trim; 6.10 INSIDE PIPING. Each set is 4 m long flanged pipe, 3-1/16"x 10,000PSI. Total 4 sets. 6.11 ONE(1) 9 x 5,000/10, 000 ANNULAR BLOWOUT PREVENTER. Annular Blowout Preventer, 9 "(230 ) x 5,000 PSI, (35.0 MPa) WP, H2S TRIM; Top opening: 9 "(230 ) x 5,000 PSI, (35.0 MPa) with API studded and ring groove, threaded holes for studs. Bottom opening: 9 "(230 ) x 10,000psi, (70.0 MPa) with API flange and ring groove; Included: Nitrile elements (installed), sling ready-assembled, eye bolts and safety plate. 6.12 ONE(1) 9 x 10, 000 DOUBLE RAM BLOWOUT PREVENTER. Double Ram Blowout Preventer: 9 "(230 ) x 10 000 PSI (70.0 MPa) WP, H2S TRIM. Top opening - 9" with API studded and ring groove. Bottom opening - 9" with API flange and ring groove. Complete with 5" Rams. - BOP Rams, Ready-Assembled:
POBEDIT - 4000 DS 205

18

Drilling & Workover Rig

One(1) set of 9 "(230 ) 4-1/2"(114 mm) x 10 000 PSI (70.0 MPa) WP, H2S TRIM; One(1) set of 9 "(230 ) 5"(127 mm) x 10 000 PSI (70.0 MPa) WP, H2S TRIM; One(1) set of 9 "(230 ) Blind x 10 000 PSI (70.0 MPa) WP, H2S TRIM. 6.13 One(1) TOP ADAPTER. Flanged adapter 9" (230 mm) 5 000 PSI (35.0 MPa) WP, H2S TRIM; 6.14 One(1) DRILLING SPOOL. Flanged drilling spool: 9" (230 mm) 10 000 PSI (70.0 MPa) WP, with two (2) outlets at 180 degrees from each other for 3 - 1/16" (80 mm) ID. 10 000 PSI WP. H2S trim; 6.15 One(1) BOTTOM TRANSFER ADAPTER. Flanged adapter 9" (230 mm) 10 000 PSI (70.0 MPa) WP - 11"(280 mm) x 10 000PSI (70.0 MPa) WP, H2S TRIM; 6.16 One(1) BOP Test Stand, complete with testing base & HPU; 6.17 One(1) BOP Transportation Stand, complete with transport base and accessories for clamping the BOP during transportation in vertical position/

CHAPTER 7. DIESEL GENERATOR SET


One(1) Diesel Generator Module assembled in container with dimensions 12000 mm(L) x 2500 mm(W) x 2400 mm(H) and consists of two (2) self excited CAT generators SR-4 with voltage regulator, load adjustment module and capacity 320 - 350 Kw each and total capacity up to 700 Kw in lock mode (synchronization). The generators are driven by two(2) diesel engines CAT 3456. The container's walls are provided with internal heat insulation made of combustion resistant material ISOVER, with thickness of the layer - 100 mm . The container's design provides two diesel generator compartments and one fuel compartment with day fuel tank for 990 liters and including the following: working and emergency lighting system; fire alarm installation complete with automatic sprinkler fire control system; plenum & exhaust ventilating system; heating system; control panel.

Each diesel generator provided with CAT EMCP Control Panel consisting of: Emergensy stop pushbutton; Voltage adjustment; Digital speed adjustment; Panel illumination lights; Digital AC metering 3-phase; Digital indication for: - RPM;
POBEDIT - 4000 DS 205

19

Drilling & Workover Rig

DC volts; operating hours; oil pressure, kPa; coolant temperature; others.

Warning / shutdown with indicating lights for: - low oil pressure; - high coolant temperature; - overspeed; - emergensy stop; - failure to start (overcrank); - others.

Weight of the diesel generator set module - 7000 kg. CHAPTER 8.

MASTER CONTROL CONSOLE (MCC)


The MCC housing has dimensions 4000 mm(L) x 2500 mm(W) x 2200mm(H). Electric control system(MCC) consists of power accepting cubicle, soft start cubicle (reduced-current start) and explosion proof switch cubicle of supplying power for all equipment. The soft start cubicle is controlling two(2) AC motors of 22 Kw each and five(5) AC motors of 55 Kw each. The other equipment (including centrifuge, degasser, lighting system, the motors of 7.5kw etc.) are all controlled by explosion proof switch cubicle.

CHAPTER 9. PIPELINE & CABLE DUCT


The Pipeline & Cable Duct consists of 14 boxes / sections 5000 mm(L) x 800 mm(W) x 350 mm(H) each, with total length - 67.5 m, when is assembled, in working position on well site. All electrical cables, water and fuel pipelines are laid in and fixed in the cable & pipeline ducts. Between each other, boxes / sections are connected by bolts and fixed by stopping plate. The boxes are separated in two stories. The lower story is used to lay in water pipelines and fuel pipelines and fixed by pawl. The upper story is used to put cables from MCC to all the consumers, that should be closed by cover plate side by side; Head slab structure is adopted in each box for convenient operation & inspection. When is assembled, in working position on well site, the Pipeline & Cable Ducts serves as walkways for drilling rig personnel.

CHAPTER 10. PAINTIG OF DRILLING RIG


Main components of the rig are painted with the following cycle :
POBEDIT - 4000 DS 205

20

Drilling & Workover Rig

sandblasting; first hand epoxy 60 - 75 micron; second paint - up to 200 micron; final hand polyuretanic 50 - 75 micron.

Total paint thickness 110 - 350 micron. TONALITY OF MAIN RIG COMPONENTS: 1. Rig trailer and basement beams, mast lower section, drill floor, pipe rack system, pipe ramp blue ultramarine color (RAL 5002); 2. Top drive, crown block, rotary table, power tongue, handling equipment, handrails - red color (RAL 3002); 3. Mast top section, dog house, folding steel panels around drill floor - aluminum (RAL 9006); 4. Mud pumps - EWECO Gold; 5. Diesel engines - Caterpillar Yellow; 6. Master skids - Black; 7. Mud tanks & tank bases, walkways - blue ultramarine color (RAL 5002);
POBEDIT - 4000 DS 205

21

8. Solid control equipment & bases - green color (RAL 6002); 9. Handrails - red color (RAL 3002); 7. Diesel- Generator Module, MCC House, Electrical cable, water & fuel pipeline cabinets are blue ultramarine (RAL 5002). 8. BOP equipment - red color (RAL 3002);

CHAPTER 11. DRILL PIPES & DRILL COLLARS


Drill Pipes in accordance with Production Standard API Spec. 5D: 11.1 DP 5"(127 mm) x 0.361"(9.19mm), Range III(12.5 m), Grade S 135, q = 33 kg/m, toll joint type - IEU, OD of TJ - 6-5/8", connection - NC50, box taper - 18 -115 Mt; 11.2 DP 5"(127 mm) x 0.5"(12.7 mm), Range III(12.5 m), Grade S 135, q = 42 kg/m, toll joint type - IEU, OD of TJ - 7-1/4", connection - 5-1/2FH, box taper - 18 - 8 Mt; 11.3 DP 5"(127 mm) x 0.5"(12.7 mm), Range III(12.5 m), Grade E 75, q = 42 kg/m, tool joint type - IEU, OD of TJ - 7", connection - 5-1/2FH, box taper - 18 12 Mt; Note: Drill pipes of OD 5"(127 mm) are supplied with threading protectors for Pin & Box and produced with BoTn 3000 hardbanding & TC 2000 internal coating and with Cooperized Thread
POBEDIT - 4000 DS 205

21

Drilling & Workover Rig

Finishing; 11.4 DP 3-1/2"(89 mm) x 0.368"(9.35 mm), Range III(12.5 m), Grade G 105, q = 20.88 kg/m, toll joint type - EU, OD of TJ - 4-3/4", connection - HLDS38, box taper - 18 - 73 Mt; 11.5 DP 3-1/2"(89 mm) x 0.368"(9.35 mm), Range III(12.5 m), Grade E 75, q = 20.88 kg/m, toll joint type - EU, OD of TJ - 4-3/4", connection - HLDS38, box taper - 18 - 6 Mt; Note: Drill pipes of OD 3-1/2"(89 mm) are supplied with threading protectors for Pin & Box and produced with TC 2000 internal coating and with Cooperized Thread Finishing; Drill Collars in accordance with Production Standard API Spec. 7: 11.6 DC 228.6 x 71.4, 7-5/8" REG, 4145H, with spiral grooves and slip and elevator recesses with hard banding, Length 31 Ft(9450m) - 3 jts; 11.7 DC 203.2 x 71.4, 6-5/8" REG, 4145H, with spiral grooves and slip and elevator recesses with hard banding, Length 31 Ft(9450m) - 2 jts; 11.8 DC 177.8 x 71.4, NC 50, 4145H, with spiral grooves and slip and elevator recesses with hard banding, Length 31 Ft(9450m) - 16 jts; 11.9 DC 146.05 x 57.15, NC 44 LH(Left-Hand Threaded), 4145H, with spiral grooves and slip and elevator recesses with hard banding, Length 31Ft(9450m) - 5 jts; 11.10 DC 120.65 x 50.8, NC 35 , 4145H, with spiral grooves and slip and elevator recesses with hard banding, Length 31Ft(9450m) - 10 jts.

CHAPTER 12. DOWN HOLE MOTORS


12.1 5LZ 244 C x 7.0 LL - 2 sets; - technical specification: rotor/stator - 5x6, stages-5, fluid output - 30.8 - 55 l/s, RPM -70 - 140, work pressure - 4.0 MPa, maximum pressure - 5.65 MPa, work torque -11.393 kNm, max. torque - 16.092 kNm, axial load - 220 kN, max. axial load - 330 kN, capacity - 219 Kw(300 h.p.); 12.2 7ZL172C x 7.0 LL - 3 sets; - technical specification: rotor/stator - 7x8, stages-5, fluid output - 19.7 - 39.4 l/s, RPM -70 140, work pressure - 4.0 MPa, maximum pressure - 5.65 MPa, work torque -7176 Nm, max. torque - 10137 Nm, axial load - 100 kN, max. axial load -170 kN, capacity - 149 Kw(203 h.p.); 12.3 9LZ105C x 7.0 LL - 2 sets; - technical specification: rotor/stator - 9x10, stages-5, fluid output - 8.3 - 16.6 l/s, RPM -130 POBEDIT - 4000 DS 205

22

Drilling & Workover Rig

260, work pressure - 4.0 MPa, maximum pressure - 5.65 MPa, work torque -2040 Nm, max. torque - 2700 Nm, axial load - 60 kN, max. axial load - 65 kN, capacity - 85 Kw(116 h.p.);

CHAPTER 13. HANDLING TOOLS


13.1 Special drill pipe elevator (overshot type) for DP 5"(127 mm), controled by hydraulic cylinders and complete with inserts for DP 4-1/2"(114 mm), DP 3-1/2"(89 mm), DP 2-7/8"(76 mm) with box tapered 18 - 1set; 13.2 Special casing elevator (overshot type) for casing 13-3/8"(340 mm), controled by hydraulic cylinders and complete with inserts for casings 12-3/4"(324 mm), 9-5/8"(245 mm), 7-5/8"(194 mm), 6-5/8"(168 mm), 5-3/4"(146 mm), 5-1/2"(140 mm) 1set; 13.3 Single joint elevator, for DP 5"(127 mm) with box tapered 18, complete with inserts for DP 4-1/2"(114 mm), DP 3-1/2"(89 mm), DP 2-7/8"(76 mm) with box tapered 18 and with wire rope links; 13.4 Casing handling complete with swivel double hook 2-1/4" x 60", 250 t, with elevator links, for casing elevators diameter over 13-3/8"(340 mm); 13.5 Manual tongs Varco type(HT65), 65000 ft.lbs(88 158 Nm), complete with jaws 3-1/2" 17" - two(2) sets; 13.6 Master bushing type MSP, pin drive split, complete with bowl for API rotary table 271/2" - one(1) set; 13.7 5" Drill Pipe rotary slips, c/w inserts for 5" DP, inserts for 4-1/2" DP one(1) set; 13.8 3-1/2" Drill Pipe rotary slips, c/w inserts for 3-1/2" DP, inserts for 2-3/8" DP, inserts for 2-7/8" DP - one(1) set; 13.9 Drill Collar Slips - Drill Collar slips DCS-L, - Drill Collar slips DCS-L, - Drill Collar slips DCS-R, - Drill Collar slips DCS-R, 13.10 Casing Slips - Casing solid body bushing 20" - one(1) set; - Casing insert for casing OD 16-3/4" - 1 pc;
POBEDIT - 4000 DS 205

8" - 9-1/2" - one(1) set; 63/4" - 8-3/4 - one(1) set; 51/2" - 7" - one(1) set; 4-1/2" - 6" - one(1) set;

23

Drilling & Workover Rig

- Casing insert for casing OD 12-3/4" - 1 pc; - Casing insert for casing OD 9-5/8" - 1 pc; - Casing slips CMS-XL 20"- one(1) set; - Casing slips CMS-XL 16" - one(1) set; - Casing slips CMS-XL 13-3/8" - one(1) set; - Casing slips CMS-XL 9-5/8" - one(1) set; - Casing slips CMS-XL 7-5/8" - one(1) set; - Casing slips CMS-XL 6-5/8" - one(1) set; 13.11 Multi-Purpose Safety Slamps - Multi-purpose safety clamp MP-S 4" - 5", - one(1) set; - Multi-purpose safety clamp MP-R 6-3/4" - 8-1/4", - one(1) set; - Multi-purpose safety clamp MP-R 8" - 9-1/4", - one(1) set; - Multi-purpose safety clamp MP-L 15-7/8" - 17", - one(1) set; - Multi-purpose safety clamp MP-L 15-7/8" - 17", - one(1) set; 13.12 Drill Collar subs for DC 30" long: - Box 50 NC x Pin 7-5/8" API Reg. - 1 pc; - Box 50 NC x Pin 6-5/8" API Reg. - 1 pc; - Box 50 NC x Pin 50 NC API - 1 pc; - Box 50 NC x Pin 44 NC LH API - 1 pc; - Box 50 NC x Pin 38 NC API - 1 pc; - Box 50 NC x Pin 35 NC API - 1 pc; 13.13 Drill Collar Bail Subs for DC: - Pin 7-5/8" API Reg. - 1 pc; - Pin 6-5/8" API Reg. - 1 pc; - Pin 50 NC API - 1 pc; - Pin 44 NC LH API - 1 pc; - Pin 38 NC API - 1 pc; - Pin 35 NC API - 1 pc; 13.14 Drill Collar Elevators: - DC elevator for DC - 229 x 71 - 1 pc; - DC elevator for DC- 203 x 71 - 1 pc; - DC elevator for DC- 178 x 71 - 1 pc; - DC elevator for DC- 146 x 57 - 1 pc; - DC elevator for DC- 121 x 51 - 1 pc. 13.15 Saver Subs : - Box 6-5/8" API Reg. x Pin 38 NC API - 1 pc;
POBEDIT - 4000 DS 205

24

Drilling & Workover Rig

- Box 6-5/8" API Reg. x Pin 31 NC API - 1 pc; 13.16 Lifting Subs : - Box 50 NC x Pin 50 NC - 1 pc; - Box 38 NC x Pin 50 NC - 1 pc; - Box 31 NC x Pin 50 NC - 1 pc;

CHAPTER 14. AUXILIARY EAQUIPMENT


14.1 SADDLE - TOW TRUCK, for transportation of the rig trailer complete with mast and without the mast. - One (1) Saddle - tow truck model MAZ 6422A8 -330, Euro-3, c/w diesel engine YMZ-6581.10, 400 H.P., three axles (6x4), tires 12.00R20, reinforced frame and suspension, with maximum load on the saddle - 24.6 t, fuel tank 500 l; 14.2 SPECIAL SEMI-TRAILER, for transportation the mast separately from the rig trailer and for transportation the pipe manipulator. - One (1) special type - three axles - Semi-Trailer, with frame suitable to support mast DS 205 R, modified for saddle - tow truck with 3-1/2" "king pin" and with height of "king pin" - 1450 mm; 14.3 FORK-LIFT, for loading, unloading, and auxiliary operations at the drilling rig site. - One (1) fork-lift truck FD50T9, with diesel engine Mitsubishi S6S, 88 h.p., automatic transmission, standard height of lift - 3000 mm, capacity 5000 kg; 14.4 WELDING MACHINE - One (1) welding machine MOSA TS 400 PS/EL, 400 A DC, with diesel engine Perkins 404 C-22G, 16.3 H.P., with electric starter, dimensions - 1720 mm(L) x 980 mm(W) x 1110(H) mm, weight - 780 kg;

CHAPTER 15. CAMP


15.1 Mobile Skid Living Accommodation CREW TRAILER IZK-230, size 8000(L) x 2500(W) 2200(H) - 12 sets;

POBEDIT - 4000 DS 205

25

Drilling & Workover Rig

15.2 Mobile Skid Living Accommodation TOOLPUSHER TRAILER IZK230, size 8000(L) x 2500(W) 2200(H) - 1 set; 15.3 Mobile Skid Living Accommodation TECHNOLOGIST TRAILER IZK-230, size 8000(L) x 2500(W) 2200(H) - 1 set; 15.4 Mobile Skid CANTEEN, IZK-230, size 8000(L) x 2500(W) 2200(H) - 1 set; 15.5 Mobile Skid LAUNDRY/DRYING TRAILER, IZK-230, size 8000(L) x 2500(W) 2200(H) - 2 sets;

POBEDIT - 4000 DS 205

26

You might also like