Page Page 1 of 7
KQKS
DATE
11-05-2010
DOC NO
KQKS/Site_Com-P-01
DESCRIPTION
Tank Commissioning Procedure
REV
0
PPD
YWL
CKD
SKE
REVIEW / APPROVAL
TLP/TPM/RNZ
Rev.
Page Page 2 of 7
KQKS
CONTENTS
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. OBJECTIVE SCOPE DEFINITION PROCESS DATA CALIBRATION CABLE SAFE WORKING LEVEL GAUGING AND DIPPING CHECK VALVE POSITION ON RECEIPT OF PRODUCT CONTROL DOCUMENT DRAINING PROCEDURE FIGURE 11.1 TANK HEIGHT VS VOLUME 11.2 PRODUCT RECEIVING SEQUENCE
Rev.
Page Page 3 of 7
KQKS
4. PROCESS DATA Tank Diameter: 37.4 meter Tank Height: 20.12 meter Receiving Product: Gasoline Density: 0.7871 @ 15 oC Design Tank Pressure: 20 mbarg & 6 mbarg (Vacuum) Design Tank Temperature: 65oC Maximum Liquid Flow Rate (Receiving): 2,000 m3/hr Maximum tank volume: 20,290 m3 Maximum tank filling height: 18.47 m
Rev.
Page Page 4 of 7
KQKS
Rev.
Page Page 5 of 7
KQKS
10. CONTROL DOCUMENT Record accurately all tank measurement, i.e. product dips, water dips (if required), densities and temperatures, preferably in bound books showing tank number, product held, date, time and location of measurement.
Rev.
Page Page 6 of 7
KQKS
Rev.
Page Page 7 of 7
KQKS
12.2
BEFORE RECEIVING PRODUCT Determine the safety filling height of receiving tanks Check all tank roof free vent (Open) Check tank isolation valve positions
DURING RECEIVING PRODUCT Begin transfer at reduced rates Check receiving flow rates and tanks levels intervals Check IFR floatation Take product samples Reduce flow rate when nearing LAHH
AFTER RECEIVING PRODUCT Ensure valves are closed Record all tank measurement Check water contain at bottom tank