Technical Minimum Certification work carried out by M/S CPRI, Bangluru as per MERC Order dated 02nd August 2012.
Corresponding to Technical
Gross
Technical
Technical Minimum
Minimum
MCR
Generation
Minimum load load for Scheduling
Auxiliary
Auxiliary
Station
Unit No. Capacity at Technical
for Monitoring
& SMP Calculation
Power
Power
Minimum
( Rounded off )
( Rounded off )
(UAT+ST)
(UAT only)
MW
MW
MW
MW
MW
MW
1
MSPGCL BHUSAWAL
MSPGCL CHANDRAPUR
MSPGCL NASHIK
MSPGCL KHAPERKHEDA
MSPGCL PARALI
MSPGCL PARAS
7=4-6
8=4-5
2*
210
160.00
16.11
12.66
147
210
160.00
16.11
12.66
147
210
145.00
12.92
9.86
135
210
150.00
13.37
10.20
140
210
163.00
14.52
11.08
152
210
160.00
14.26
10.88
149
500
365.00
32.52
23.73
341
500
360.00
32.08
23.40
337
500
360.00
32.08
23.40
337
144
144
132
137
148
146
332
328
328
142
142
141
146
143
141
142
335
138
138
138
166
166
164
168
36
36
36
36
16
16
200
197
209
208
169
167
292
145
172
81
81
81
80
210
161.00
19.00
14.17
147
4*
210
161.00
19.00
14.17
147
210
160.00
18.88
14.08
146
210
161.89
16.06
10.96
151
210
159.33
15.96
10.96
148
210
158.00
17.11
13.48
145
210
161.00
18.55
14.86
146
500
360.00
24.88
19.88
340
210
157.00
18.79
13.27
144
4*
210
157.00
18.79
13.27
144
210
157.00
18.51
13.00
144
250
187.00
21.31
18.36
169
7*
250
187.00
21.31
18.36
169
250
186.00
22.08
19.01
167
250
190.00
21.70
18.79
171
61.5
40.80
5.20
2.37
38
2*
61.5
40.80
5.20
2.37
38
3*
61.5
40.80
5.20
2.37
38
4*
61.5
40.80
5.20
2.37
38
60
20.90
5.10
1.90
19
60
20.50
4.95
1.90
19
300
225.32
25.44
25.44
200
300
224.37
27.40
27.40
197
300
224.60
15.81
15.81
209
300
225.05
17.17
17.17
208
250
189.00
20.01
13.96
175
250
188.00
20.51
12.81
175
500
314.00
22.40
20.30
294
500
155.70
10.40
9.70
146
250
189.00
17.00
13.80
175
135
94.70
13.50
10.80
84
135
94.80
13.50
10.80
84
3*
135
94.80
13.50
10.80
84
4
135
93.60
13.50
10.80
83
* Technical Minimum values for the generators, not in operation at the time of field visit, are considered equal to as other units of
identical capacity at same location having same fuel linkage, as approved by Hon. Commission.
Note : 1) Technical Minimum values indicated in column No.8 are adopted for scheduling and SMP calculation
2) In case of JSW Ratnagi SAT are fed from GT LV side & SAT connected only on Unit 1 & 2