Professional Documents
Culture Documents
Draft / outline of Standard Operating Procedures to integrate the system into the QS system
Area:
5S Area
Sort Out Clutter
Very Good
4 5
Comments
All areas are clear of non-essential product. There is no unneeded equipment. There are no unnecessary tools. A Red Tag session has been held. Information boards are current & tidy. SUBTOTAL Equipment locations and storage marked. Locations individually identified. Max/Min quantities are clearly marked. Walkways etc. clearly marked Jigs / fixtures properly arranged for use. SUBTOTAL Floors are clear of waste, water and oil. Machines cleaned and free of chips and oil. All abnormalities recorded after cleaning. Cleaning is assigned and scheduled. Schedule is carried out. SUBTOTAL Issues and Ideas sheet is being used. Improvements are acted on in timely manner. Standard procedures written clear and used. 5S training material up to date and reviewed. Low scores and discrepancies are being addressed.
Set In Order
SUBTOTAL
21 22
Everyone is trained to the current 5Sstandard. Independent audits are carried out per plan.
5S
23 24 25
Internal audits are carried out per plan. Procedures are up to date and regularly reviewed. Activity boards are up to date and reviewed. SUBTOTAL