You are on page 1of 1

EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-124 6 May 2013 5 May 2013 8.00-12.00


21.00 22.00 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 C 9.00 C 10.00 C Symbols Yesterday = 11.00 R 12.00 R Cloudy (C), Rainy (R) Today Normal Time man hours Over Time man hours Total M/D Total MH No. Description MANPOWER REPORT 13.00 14.00 15.00 16.00 17.00 18.00

Working Date Working Time


19.00 20.00

24.00

Sunshine (S),

No.

Description

Normal Time man hours

Over Time man hours

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Modify Grating For 02E003A Install Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 66" Install New Foundation Support Pipe Fabrication & Welding Pipe 304H 28" Area 02 03A 03A 03B 03B 03B 05 Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Joint Set Joint Q'ty 6 12 9 Q'ty 1 1 1 1 1 1 3 1 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 Note : Rainy Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Modify Grating For 02E003A Install Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform & Stair For 03D020 Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 28" Area 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 1 3 1 No. 1 2 3 4 5 6 7 8 9 10 Activities (Tomorrow) Modify Grating For 02E003A Install Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform & Stair For 03D020 Fit-up and welding Pipe 304H 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Fabrication Pipe 304H 28" Area 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 1 3 1 3 3 8 3 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 8 20 12 4 2 9 4 28 32 80 48 16 8 36 16 12 12 32 12 4 7 8 20 12 4 2 9 4 3 3 8 3 1 102 28 32 80 48 16 8 36 16 12 12 32 12 4 408 Description 2 2 2 4 Indirect 1 1 4 1 1 4 4 16 4 4 8 8 8 16 1 1 4 1 1 2 2 2 4 4 4 16 4 4 8 8 8 16 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 3 1 No. 7 8 9 Crane 50T. Crane 130T. Trailer Description 3 3 8 3 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 8 22 10 4 2 13 3 28 32 88 40 16 8 52 12 12 12 32 12 4 7 8 22 10 4 2 13 3 3 3 8 3 1 103 Unit ea ea ea 28 32 88 40 16 8 52 12 12 12 32 12 4 412 Q'ty 1 2 2 1 4 4 1 1 Indirect 1 4 16 4 4 8 8 4 16 1 4 1 1 2 2 1 4 4 16 4 4 8 8 4 16

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1