PROJECT::

LOCATION:
APPROPRIATION:
SOURCE OF FUND:
SCOPE OF WORK:

CONSTRUCTION OF HOME ECONOMICS BUILDING OF SIBALOM CENTRAL ELEM


SIBALOM CENTRAL ELEMENTARY SCHOOL, SIBALOM, ANTIQUE

I. Column/Footing & Stifpener Column V=7.03 cu.m.


70
8
4
65
85
10

bags
cu.m.
cu.m.
pcs.
pcs.
kilos

Cement
Graded Gravel
Sand
16 mm RSB
10 mm RSB
#16 Tying Wire

II. Wall footing/Roof Beam & Lintel Beam


65
7
4
50
20
80
15
III. CHB Walling
85
2210
10
5
150
15

V=6.43 cu.m.

bags
cu.m.
cu.m.
pcs.
pcs.
pcs.
kilos

Cement
Graded Gravel
Sand
16 mm RSB
12 mm RSB
10 mm RSB
# 16 Tying Wire

bags
pcs.
cu.m.
cu.m.
pcs.
kilos

Cement
4" CHB
Graded Gravel
Sand
10 mm RSB
# 16 Tying Wire

169 sq. m.

IV. Flooring/Filling Materials V = 6.50 cu.m.


65
7
4
55
4
15

bags
cu.m.
cu.m.
pcs.
kilos
cu.m.

Cement
Graded Gravel
Sand
10 mm RSB
# 16 Tying Wire
Mixed Sand & Gravel

V. Tile Works
500
250
90
60
3
10
15

pcs.
pcs.
pcs.
bags
cu.m.
packs
pcs.

.40 x .40 Ceramics Floor Tiles


.20 x .20 Ceramics Wall Tiles
.20 x .20 Ceramics Floor Tiles
Cement
Fine Sand
Tile Grout
Tile Trim

pcs.
pcs.
kilos
kilos
kilos
pcs.
kilos
kilos
pcs.

1/4 x 4' x 8' Marine Plywood


2 x 2 x 12 Good Lumber
4" CW Nail
2" CW Nail
1 1/4" Finishing Nails
3" x 10 Cornice
4" Concrete Nail
1/8 Exe Mesh Wire
1' x 1' x 10' Would Moulding

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
kilos
pcs.
pcs.
pcs.
gals.
gals.
pcs.
pcs.
pcs.
pcs.
liters

G.A. 20 Bended Pre-painted G.I.Fascia


.4 mm x 2.40 Pre Painted Spanish Gutter
.4 mm x 2.40 Pre Painted Valley Gutter
.3 mm x 2.40 Pre Painted Ridge Roll
1/4 x 1 1/2 x 1 1/2 Angle Bar
3/16 x 1 1/2 x 1 1/2 Angle Bar
.4 mm Rib Type Pre Painted Long Span
Welding Rod
Blind Rivets
Tex Screw
1.2 mm 2" x 3" x 6.00 C-Purlins
Metal Primer
Paint Thiner
3" Paint Brush
Hacksaw Blade (Heavy Duty)
2" PVC Pipes
2" PVC Elbow
Vulca Seal

VI. Ceiling
75
160
20
10
5
30
5
6
25
VII. Roof Framing & Roofing
22
22
5
18
55
40
1
60
500
1000
58
6
4
8
10
30
40
2
VIII. Electrical

2
20
30
30
12
12
5
4
7
8
2
2
1
1
50
3
5

boxes
m
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
rolls
sets
sets
set
unit
pcs.
units
kilos

3.5 sq.mm. TireHHN Stranded Wire


# 8 Stranded Wire
Junction Box
Utility Box
4" x 4" Receptacle
2 Watts 3-V Capsule Bulb
1 gang Switch w/ Casing
2 gang Switch w/ Casing
3 gang Convenience Outlet w/ Casing
Electrical Tape
15 A Circuit Breaker
20 A Circuit Breaker
60 A Circuit Breaker
Panel Board 6 Branches
1/2 PVC Electrical Pipe
Ceiling Fan w/ Switch
#16 Tying Wire

IX. Plumbing Works & Septic Tank


1
4
2
5
10
15
10
20
10
4
2
1
4
5
200
15
20
3
2

set
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
liter
pcs.
pcs.
pcs.
bags
pcs.
kilos
pcs.

Flush Type Toilet Bowl w/ Complete Accessories


4" PVC Pipe
4" PVC Tee
4" x 2 PVC Tee
2" PVC Pipe
1/2" PVC Blue Pipe
1/2" PVC Tee
1/2" PVC Elbow
1/2" PVC Adaptor for Faucet
Stainless Ball Valve Faucet
1/2" Gate Ball Valve
Solvent
4" PVC Elbow
4 x 4 Stainless Floor Drain
4" CHB
Cement
10 mm RSB
#16 Tying Wire
4" PVC Clean Out

X. Doors, Window & Window Grills


2

sets

.90 x 2.10 Panel Door w/ 1.80 x 2.10 Wood Jamb

1
1
1
5
9
40
12
10
2
1
5
10

set
set
set
sets
sets
pcs.
pcs.
kilos
gals.
gal.
pcs.
pcs.

.90 x 2.10 Panel Door w/ Wood Jamb


.80 x 2.10 Panel Door w/ Wood Jamb
.60 x 2.10 PVC Door
Door Knob Heavy Duty
4 x 4 Hinges Heavy Duty
10 mm Square bar
1/4 x 1 x 1 Angle Bar
Welding Rod
Metal Primer
Paint Thiner
Paint Brush
1/4" x 1/2" x 1/2" Flat

gals.
gal
liters
gals.
gals.
Liters
sets
pcs.
kilos
gals.

Flat Wall Latex Paint White


Semi Gloss Latex Paint White
Latex Color Tinting (Beige)
Flat Wall Enamel Paint White
Semi Gloss Enamel Paint White
Enamel Color Tinting
9" Roller Brush w/ Pan
3" Paint Brush
Patching Compound
Paint Thinner

XI. Paintings
15
10
5
7
5
2
6
8
10
4

XII. Plastering of Walls/Counter Window Jams/Main Entrance


8
85
2

cu.m.
bags
m

Fine Sand
Cement
1/8" Exe Mesh Wire

XIII. Forms/Scaffoldings & Hardwares


10
50
15
5
5
6
1
5

pcs.
pcs.
kilos
kilos
kilos
pcs.
roll
pcs.

1/4 x 4 x 8 Ordinary Plywood


2 x 2 x 12 Coco Lumber
4" CW Nail
3" CW Nail
2" CW Nail
PVC Pail (Big)
2 mm Nylon
Hack Saw Blade (Heavy Duty)

Total Cost of Ma

Total Cost of P

BALOM CENTRAL ELEMENTARY SCHOOL

275.00
350.00
350.00
410.00
174.00
75.00

275.00
350.00
350.00
410.00
249.00
174.00
75.00

275.00
10.50
350.00
350.00
174.00
75.00

275.00
350.00
350.00
174.00
75.00
250.00

19,250.00
2,800.00
1,400.00
26,650.00
14,790.00
750.00
65,640.00
17,875.00
2,450.00
1,400.00
20,500.00
4,980.00
13,920.00
1,125.00
62,250.00
23,375.00
23,205.00
3,500.00
1,750.00
26,100.00
1,125.00
79,055.00
17,875.00
2,450.00
1,400.00
9,570.00
300.00
3,750.00
35,345.00

54.00
38.00
38.00
275.00
350.00
138.00
65.00

420.00
154.00
70.00
80.00
110.00
380.00
156.00
108.00
280.00

520.00
380.00
380.00
380.00
780.00
624.00
300.00
120.00
1.00
2.00
696.00
460.00
336.00
84.00
95.00
470.00
75.00
280.00

27,000.00
9,500.00
3,420.00
16,500.00
1,050.00
1,380.00
975.00
59,825.00
31,500.00
24,640.00
1,400.00
800.00
550.00
11,400.00
780.00
648.00
7,000.00
78,718.00
11,440.00
8,360.00
1,900.00
6,840.00
42,900.00
24,960.00
300.00
7,200.00
500.00
2,000.00
40,368.00
2,760.00
1,344.00
672.00
950.00
14,100.00
3,000.00
560.00
170,154.00
-

3,750.00
89.00
38.00
38.00
38.00
290.00
125.00
125.00
140.00
55.00
280.00
280.00
350.00
1,700.00
95.00
2,500.00
75.00

4,700.00
1,130.00
120.00
120.00
75.00
95.00
32.00
32.00
32.00
350.00
280.00
460.00
120.00
195.00
10.50
175.00
174.00
70.00
120.00

8,300.00

7,500.00
1,780.00
1,140.00
1,140.00
456.00
3,480.00
625.00
500.00
980.00
440.00
560.00
560.00
350.00
1,700.00
4,750.00
7,500.00
375.00
33,836.00
4,700.00
4,520.00
240.00
600.00
750.00
1,425.00
320.00
640.00
320.00
1,400.00
560.00
460.00
480.00
975.00
2,100.00
2,625.00
3,480.00
210.00
240.00
26,045.00
16,600.00

7,800.00
6,500.00
2,140.00
450.00
65.00
375.00
575.00
120.00
460.00
336.00
84.00
465.00

580.00
620.00
350.00
715.00
740.00
420.00
175.00
84.00
65.00
336.00

350.00
275.00
108.00

330.00
115.00
70.00
70.00
80.00
75.00
310.00
95.00

7,800.00
6,500.00
2,140.00
2,250.00
585.00
15,000.00
6,900.00
1,200.00
920.00
336.00
420.00
4,650.00
65,301.00
8,700.00
6,200.00
1,750.00
5,005.00
3,700.00
840.00
1,050.00
672.00
650.00
1,344.00
29,911.00
2,800.00
23,375.00
216.00
26,391.00
3,300.00
5,750.00
1,050.00
350.00
400.00
450.00
310.00
475.00
12,085.00

Total Cost of Materials


Labors Cost
Total Cost of Project

744,556.00
223,366.80
967,922.80