Project :- Recreation Center Location :- Dammam Main-Contractor :- Azmeel DUCT WORK SCHEDULE FOR RECREATION

sn Description Unit Tag Service Location Weight (KG) Weight G #18 (KG) G #20 Weight (KG) G #22 Weight (KG) G 24 Total Weight(KG) Total Days Required For Duct by Two Group

Total Man Hour

Man Power Employed

FIRST FLOOR

1.0

Supply / Return

AHU-01

First Floor

632.0

468.0

1,100.0

110.0

2.0

Supply / Return

AHU-02

First Floor

590.0

1,230.0

1,820.0

182.0

3.0

Supply / Return

AHU-03

First Floor

444.0

11.0

652.0

1,664.0

2,771.0

277.1 65.5

4.0

Supply / Return

AHU-04

First Floor

856.0

188.0

515.0

2,347.0

3,906.0

390.6

5.0

Supply / Return

AHU-05

First Floor

213.0

677.0

890.0

89.0

6.0

Supply / Return

Tranfer Air Duct

First Floor Total Man Hour @ First Floor

30.0

30.0

3.0

10,487.0

1,048.7

SECOND FLOOR

1.0

Supply / Return

AHU-06 2nd Floor

1,350.0

1,372.0

2,722.0

272.2

2.0

Supply / Return

AHU-07

11.0

762.0

2,098.0

2,871.0

287.1 35.4

3.0

Supply / Return

Tranfer Air Duct

2nd Floor Total Quantity @ 2nd Floor

78.0

78.0

7.8

5,671.0 THIRD FLOOR

567.1

Duct Erector =6 , Welder = 1 , Helper =4 , Foreman = 1 , Lead Man

1.0

Supply / Return

AHU-05 3rd Floor

1,405.0

1,325.0

830.0

2,358.0

5,918.0

591.8

2.0

Supply / Return

AHU-06

1,200.0

1,168.0

2,368.0

236.8 52.3

3.0

Supply / Return

Tranfer Air Duct

3rd Floor Total Quantity@ 3rd Floor

78.0

78.0

7.8

8,364.0

836.4

Duct Erector =6 , Welder = 1 , Helper =4 , Foreman = 1 , Lead Man = 1 , Site Engineer = 1 , QA/QC Engineer =1

RISER ( EXHAUST AND FRESH AIR DUCT in mechanical Room and Pressurization Duct )

1.0

Exhaust

EF-01

258.0

258.0

21.5

2.0

Exhaust

EF-02

147.0

147.0

12.3

3.0

Exhaust

EF-03 Riser All Floor

227.0

227.0

18.9

4.0

Exhaust

EF-04

24.0

24.0

2.0

5.0

Exhaust

EF-05

97.0

130.0

227.0

18.9

6.0

Exhaust

EF-06

452.0

452.0

37.7 14.1

7.0

Fresh Air

FAF-01 Mechanical Room First Floor

63.0

63.0

5.3

8.0

Fresh Air

FAF-02

22.0

22.0

1.8

9.0

Fresh Air

FAF-03

26.0

26.0

2.2

10.0

Pressurization

PF-01 Stair all Floor

319.0

310.0

629.0

52.4

11.0

Pressurization

PF-02

319.0

310.0

629.0

52.4

Total Quantity for Exhaust , Fresh air and Pressurization dut Riser in KG

2,704.0

225.3

Total Working Days Required to Compelete Ducting work Total Month Require to compelete Duct Work only @26 working days
Assumption :1. Two team Consider @10kg Duct can install in one Hour by one team for Supply and Return Duct. 1. Two team Consider @12kg Duct can install in one Hour by one team for Supply and Return Duct.

167.3 6.436378205