Electricity Growth Generation Capacity Total Consumers Transmission Lines Distribution Lines Per Capita Generation Access to Electricity
: 10 % in FY-2010 (Av. 7 % since 1990) : 6984 MW (16 August, 2011) : 12.5 Million : 8,600 km : 2,75,000 km : 251 kWh (incl. Captive) : 50 %
Generation on Jan 6, 2009: 3268 MW (Capacity- 4931 MW) Generation: 5000 5300 MW (Capacity- 6984 MW) Highest so far: 5244 MW ( August 29, 2011) Gas shortage causes 400 - 600 MW less Power Generation Peak Demand: 6000 MW (with DSM) Load shedding up to 800 MW during hot summer days (with DSM) Shortage and unreliable power supply has constrained economic growth
3
Commissi oned
TOTAL (MW)
582 1319
1040 1134
1270 1053
450 1900
1500 1300
Total
775
2450
Public Sector : 6204 MW (comm: 360 MW, u/c: 1629 MW, Tender: 1425 MW); (42%) Private Sector : 8569 MW (comm:1463 MW, u/c: 1667 MW, Tender: 2639 MW); (58%)
January, 2011
4 4
Gen Addition Jan 10 Dec 10 : 775 MW Gen Addition Jan 11 Aug 11 : 1048 MW Total Gen. Addition (Jan 09 Aug 11): 2179 MW
5 5
Sl. Descript No. ion 01. 02. Private Sector Public Sector
No. of Contract 25 17
No. of Plant 27 17
Total
42
44
4754
1458
No. of Projects 5 23 28
01. 02.
Renewable Energy Policy envisions 5% of total power, i.e. at least 800 MW from renewable sources by 2015. Solar energy is the most proven source till date Private sector is the engine of growth in power sector development of Bangladesh Solar Park is the concept through which utility scale solar power project is to be developed through private sector
8
Policy, Incentives and Security Mechanism for Investment in Private Power Projects
10
Exemption from corporate income tax for a period of 10 years. Plant and equipment (full value) and spare parts (10% of original plant cost) without payment of customs duties, VAT and any other surcharges. Repatriation of equity along with dividends.
Cont
11
Tax exemption and repatriation facilities on royalties, technical know how and technical assistance fees Avoidance of double taxation on the basis of bilateral agreements The Bangladeshi currency, Taka is freely convertible for FDI Duty Exemption for Solar Panel
12
Payment Guarantee
Implementation Agreement (IA) and PPA will ensure fair and reasonable risk allocation, and payment by the Purchaser is guaranteed by GOB Payments under the PPA will continue in the event of dispatch failure Payment under the PPA will be ensured by Letter of Credit Payment to Escrow Account ensures lenders re - payment
13
Solar Park Solar Park Demonstration Projects will be in nonagricultural lands Two types of Land will be used: - Government owned land - Railway owned Land. Power generated will be directly fed into the Grid on commercial basis Primarily 8 potential sites have been identified Estimated Development Target: 135 MW
15
2. 3. 4.
Implementation
To be implemented on BOO basis Contract period shall be 15-20 years IPP Operator will be selected through Competitive Bidding Power Purchase Agreement (PPA) between BPDB and IPP Operator Land Lease Agreement with IPP Operator
18
BPDB
Selects
15 Yrs PPA
BPDB
Tariff
Guarantee Fee
PRG
PCG
19
BPDB
Selects
15 Yrs LLA
RAILWAY
15 Yrs PPA
BPDB
Tariff
Loan Repayment
20
Sl. No.
Types
1 2
115 20
546 95 641
Sub-total 135 MW
21
Site Details
22
Rajabarihat, Rajshahi
Land available
.
: 52 Acres
Land Status: - Land is under Ministry of Fisheries and Livestock - Land uncultivated since 1988 - Land available in a single plot - High Land and ready to use - Land transfer under process
23
25
Spot: 1
Spot: 2
Spot: 3
Spot: 4
26
27
Chak Asharia
28
Char Mazerdiar
Chak Asharia
29
East Side of Banghabondhu Bridge (Towards North) : about 30 acres - Prospective location for 10 MW East side of Banghabondhu Bridge (Towards South) : about 10 acres - Prospective location for 3MW West Side of Banghabondhu Bridge (Towards North) besides Ecopark : about 50 acres - Prospective location for 15 MW Sirajgonj embankment adjacent area (paikpara) : about 20 acres - Prospective location for 7MW Area adjacent to NWZPGCL Grid sub-station: 25-30 acres Prospective location for 10 MW Total area available: 150 Acres (Approx.)
30
31
West Side
East Side
Paikpara
Near NWPGCL
32
Technical Assistance : Comprehensive Feasibility Study Project Design Preparation of Standard Procurement Documents Capacity Building
FinancialSupport Support Financial
Low Interest Credit Support Partial Risk Guarantee Partial Credit Guarantee
33
Thank you
34