Certified that I personally checked all the non schedule items incorporated in this Estimate which are essentially required for this work. Market rate of Analysis items have been checked and Verified personally.
Name of work: Construction of Bangladesh Public Service Commission Complex at Sher-e-Banglanagar, Dhaka (2nd phase).
Sub-head:- Super Structure for superior quality building category (Renovation & Modification of ground floor, first floor, second floor, third floor and other floor for accommodation of 3 nos honorable members, 3 nos Deputy Secretary, Scrutinizer & Moderation room, Vault room etc. including other ancillary works i,e false ceiling, wall penelling, marble, granite works etc.).
01. Civil works. Item-1 CE's-04.1 Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer. (Cement: CEM-II/A-M) A) Ground floor For 02 nos ramp (East west side) 0.5 4 25.00 ft x 0.83 ft For 02 nos ramp (East west side) 2 x 9.67 ft x 1.67 ft 2 x 9.67 ft x 1.25 ft 2 x 9.67 ft x 0.83 ft 2 x 0.83 ft x 0.83 ft 2 x 5.92 ft x 0.83 ft 2 x 10.75 ft x 0.83 ft 2 x 6.17 ft x 0.83 ft 2 x 5.67 ft x 0.83 ft Middle stair grid-16 2 x 5.50 ft 2 x 5.50 ft (East west side) 1 x 34.67 ft
x x x x x x x x x
= 145.25 = = = = = = = = = 16.15 12.09 72.23 4.82 34.40 28.20 36.67 33.70 383.50
cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum =
x x x
x x x
@ Item-2 CE's-04.2
Tk 4688.00
Tk 72107.70
Brick works of width one brick or one and a half brick length with first class bricks in cement sand (F.M. 1.2) mortar (1:6) in superstructure including raking out joints, filling the interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) and accepted by the Engineer. (Cement: CEM-II/A-M) In ground floor A) G.F: At level (+) 7'-0". N/S 4 x 0.83 ft 1 x 0.83 ft E/W 1 x 0.83 ft 3 x 0.83 ft
x x x x
x x x x
(A) Tk 182381.79
2 OF 55
Brick Pillar 58 x
0.83 ft
0.83 ft
x @
3.50 ft Tk 5155.00
cft cum =
Tk 20413.70
x @
3.00 ft Tk 5769.00
cft cum =
Tk 26333.79
Item-3 CE's-04.16
125 mm brick works with first class bricks in cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer. (Cement:CEM-II/A-M) A) G.F i) At level (-) 6'-0" 8 Deduct: Door C.gate Door gap -5 -1 x x x 20.00ft 6.00ft 6.00ft x x x x 12.00ft 7.00ft 7.00ft 7.00ft = = = = 1920.00 -210.00 -42.00 84.00 sft sft sft sft
4 x 3.00ft ii) At level (-) 9'-0" New wall (Grid-8 to 11, E) N/S 1 x 68.00ft 3 x 13.00ft New wall (Grid-11 to 13, K) N/S 1 x 30.00ft 4 x 5.00ft E/W 1 x 33.00ft 2 x 19.00ft Deduct: Door -4 x 6.00ft Lift door gap 2 x 5.00ft Duct wall Inside 3 x 6.33ft South west of building Outside 1 x 7.25ft Under & below disible ramp (Grid-16) 4 x 23.58ft 4 x 2.67ft
x x x x x x x x x x x x
10.00ft 10.00ft 10.00ft 10.00ft 10.00ft 10.00ft 7.00ft 9.00ft 10.50ft 14.00ft 2.58ft 1.00ft Total
= = = = = = = = = = = = = =
680.00 390.00 300.00 200.00 330.00 380.00 -168.00 90.00 199.40 101.50 243.35 10.68 4508.92 418.89 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
@ Tk 730.00 B) F.F Duct wall Inside 3 x 6.33ft x 10.50ft South west of building Outside 1 x 7.25ft x 14.00ft Lift door gap 2 x 5.00ft x 9.00ft (i) F.F:3 nos members accomodation, Scrutinize & Moderate room (a):Scrutinize & Moderate room: E/W 2 x 14.24 ft x 10.88 ft 3 x 2.50 ft x 10.88 ft
Tk 305788.93
= = =
= 309.72 = 81.56
sft sft
3 OF 55
2 x 7.50 ft 3 x 2.50 ft 1 x 3.00 ft (b):3 nos members accomodation Grid-7 2 x 20.33 ft Grid-8 3 x 20.33 ft Grid-9 2 x 20.33 ft 1 x 12.25 ft 1 x 14.00 ft Grid-8-9 1 x 12.17 ft 2 x 12.25 ft 1 x 14.08 ft Grid-9-10 2 x 23.33 ft 1 x 13.25 ft 1 x 14.08 ft Grid-11 2 x 20.33 ft 1 x 10.25 ft 1 x 14.08 ft Grid-10-11 2 x 23.33 ft 1 x 13.25 ft North to south Grid-E 1 x 13.17 ft 1 x 10.00 ft Grid-F 2 x 19.50 ft 1 x 12.25 ft 1 x 10.00 ft 3 x 19.50 ft Grid-EF 1 x 13.17 ft 1 x 10.00 ft Grid-FG 3 x 14.08 ft 1 x 15.58 ft 1 x 5.00 ft 2 x 14.75 ft Grid-IJ 1 x 8.00 ft 1 x 13.25 ft 2 x 10.00 ft 1 x 13.25 ft 1 x 11.00 ft 1 x 14.67 ft 2 x 10.00 ft 1 x 19.50 ft Grid-JK 1 x 14.67 ft 2 x 10.00 ft 1 x 10.00 ft Grid-R 2 x 10.00 ft N/S
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft
= 163.13 = 81.56 = 32.63 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 442.18 663.27 442.18 133.22 152.25 132.35 266.44 153.12 507.43 144.09 153.12 442.18 111.47 153.12 507.43 144.09 143.22 108.75 424.13 133.22 108.75 636.19 143.22 108.75 459.36 169.43 54.38 320.81 87.00 144.09 217.50 144.09 119.63 159.54 217.50 212.06 159.54 217.50 108.75 217.50 10422.32
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
(A)
ii) At level (+) 7'-0" to (+) 25'-0" (False slab gap) Grid 13 to 16 D to L and Grid 13 to 16 D & L N/S 2 x 70.00 ft x Grid 13 E/W 2 x 25.00 ft x Grid 16 (D to F & J to L) 2 x 46.00 ft x
(B)
Tk 749.00
Tk 779186.93
4 OF 55
C) 2nd floor: At level (+) 25'-0" (i) 2 nos Deputy Secretary room (new accomodation) Grid 8 to 10 & 10 to 11 E/W 2 x 19.67 ft x 2 x 19.67 ft x 2 x 13.67 ft x N/S 2 x 19.67 ft x 2 x 19.67 ft x 2 x 13.67 ft x Lift door gap 2 x 5.00ft x Deduction Door -2 x 3.33 ft x -2 x 2.50 ft x P.A -2 x 7.00 ft x Window -4 x 6.00 ft x
10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 9.00ft 7.00 ft 7.00 ft 7.00 ft 4.50 ft =
= = = = = =
sft sft sft sft sft sft sft sft sft sft sft sft sqm
= = = = = =
(A)
(ii) Grid 13 to 18 (D to L) (Parapet) Grid 13 to 14, D to H E/W 1 x 146.00 ft Grid 13 E to D & KL E/W 2 x 23.50 ft Grid 13 to 16 D & L N/S 2 x 69.50 ft Grid 16 (D to F & J to L) E/W 2 x 45.00 ft Grid 16 to 18 (F & J) N/S 2 x 43.50 ft Grid 18 E/W 4 x 20.00 ft
x x x x x x
= 511.00 = 164.50 = 486.50 = 315.00 = 304.50 = = = = 280.00 2061.50 191.52 380.00 per sqm
@ D) 3rd floor: At level (+) 36'-0" (i) 2 nos Deputy Secretary room (new accomodation) DS room attached to exam. Controller (cadre) E/W 1 x 21.58 ft x 1 x 8.83 ft x N/S 1 x 14.75 ft x 1 x 12.17 ft x Lift door gap 2 x 5.00ft x DS room attached to exam. Controller (Non-Cadre) E/W 1 x 20.33 ft x 1 x 16.58 ft x N/S 2 x 13.00 ft x 1 x 8.00 ft x Toilet inside 1 x 7.00 ft x
10.50 ft 10.50 ft 10.50 ft 10.50 ft 9.00ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 8.00 ft =
= = = =
sft sft sft sft sft sft sft sft sft sft sft sqm =
= = = = = = =
Tk 787.00
(A) Tk 109124.23
5.00ft
9.00ft
90.00 = 8.36
sft sqm
5 OF 55
Tk 806.00
persqm
Tk 6739.13
5.00ft
x @
9.00ft Tk 825.00
sft sqm =
Tk 6897.99
5.00ft
x @
9.00ft Tk 851.00
sft sqm =
Tk 7115.38
H) At level (+) 80'-0". Grid 9 I to J & grid 11 F to G: (Parapet) E/W 2 x 21.00 ft Grid 9 J to K & grid 11 E to F: 2 x 20.50 ft Grid 9 E to F & grid 11 J to K: E/W 2 x 21.33 ft Grid 9 F to G & grid 11 I to J: E/W 2 x 21.00 ft East & West side N/S 4 x 6.50 ft 4 x 10.00 ft Lift door gap 2 x 5.00ft Lift wall gap N/S 2 x 5.50 ft Two Lift connection N/S 1 x 8.00 ft Electric room side E/W 2 x 5.00 ft Main stair east side N/S 2 x 6.50 ft East & West side s/wall to s/wall N/S 2 x 15.00 ft E/W 4 x 13.00 ft Grid 07 & 13 E to F & grid J to K: E/W 4 x 15.83 ft N/S 8 x 1.50 ft E/W 4 x 28.50 ft Grid 07 & 13 G to I: E/W 2 x 42.50 ft Grid 09 E to s/wall & 11 K to s/wall: E/W 2 x 12.00 ft Stair & lift wall (Wall) Stair Chillakota S-E & N-W N/S 2 2 E/W 2 Deduction for door -1 Main Stair Chillakota E/W 2 2 N/S 2 Deduction
x x x x x x x x x x x x x x x x x x
3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 9.00ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft =
= 126.00 = 123.00 = 127.98 = 126.00 = 78.00 = 120.00 90.00 = 33.00 = 24.00 = 30.00 = 39.00 = 90.00 = 156.00 = 189.96 = 36.00 = 342.00 = 255.00 = 72.00 = 2057.94
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
(A)
x x x x x x x
x x x x x x x
6 OF 55
RCC wall
Door
-2 -2 -1 -1 -2 -2 1 2 2
x x x x x x x x x
x x x x x x x x x
9.00 ft 9.00 ft 9.00 ft 7.00 ft 9.00 ft 9.00 ft 12.00 ft 13.00 ft 13.00 ft Total =A+B
= = = = = = = = = = = =
-54.00 -108.00 -189.00 -21.00 -108.00 -54.00 96.00 130.00 130.00 1932.25 3990.19 370.70 per sqm
sft sft sft sft sft sft sft sft sft sft sft sqm =
@ Item-4 CE's-6.4
Tk 877.00
Marble stone flooring with 18mm thick Italian coloured/ grey marble stone of approved quality, texture and size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumic stone and necessary auxiliary materials and water, electricity and other charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M). In ground floor (+) 7'-0" Level 1 x 42.50 ft x 70.00 ft = = 2975.00 276.38 per sqm sft sqm
@ Tk 7269.00 = Tk 2009037.07 Item-5 Analysis rate Supplying and setting foreign made white / black/ any colour Granite on walls of approved quality, textured and size (large size) on walls over 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the Granite slab/tile setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M) 12 mm thick white / black/ any colour Granite walling. Lift wall 2 x 20.00 ft x 2 x 2 x 9.00 ft x 2 x 1 x 5.00 ft x 2 x 5.00 ft x Deduct: -4 x 5.00 ft x For 8 nos floor = 7 x
= = = = = = = =
420.00 18.00 5.00 5.00 -180.00 268.00 1876.00 174.28 per sqm
Item-6 CE's-06.6.3 Supplying, fitting and fixing glazed wall tiles (local made) with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete all respect accepted by the Engineer.Coloured glazed wall tiles of different sizes (Cement: CEM-II/A-M). Wall tiles more than 250 x 400 mm size Glazed wall tiles@ 2nd floor (i) 2 nos Deputy Secretary room (new accomodation) DS toilet 2 x 7.50ft x 2 x 5.50ft x
8.00ft 8.00ft
= =
120.00 88.00
sft sft
7 OF 55
2 2 2 2 2
x x x x x
x x x x x
= = = = = = = = = =
101.28 37.28 61.28 74.72 3.75 486.31 -35.00 -69.63 381.68 35.46 per sqm
sft sft sft sft sft sft sft sft sft sqm =
-2 -2
x x
2.50ft 6.33ft
x x
@ Tk 1166.00 Glazed wall tiles @ 3rd floor (i) 2 nos Deputy Secretary room (new accomodation) 2 x 2 x 7.00ft x 8.00ft 2 x 2 x 3.50ft x 8.00ft 2 x 1 x 4.58ft x 8.00ft 2 x 1 x 8.00ft x 8.00ft
Tk 41345.12
= = = = = =
@ Tk 1172.00 Tk 29249.91 Item-7 CE's-06.9.3 Supplying, fitting and fixing mirror polished homogeneous floor tiles (local made) with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer.(Cement: CEM-II/A-M)GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles. GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles @ Ground floor (i) G.F: (+) 7'-0" Level 1 x 34.00 ft x 42.50 ft = 1445.00 = 134.24 @ Tk 1809.00 per sqm (ii) F.F: 3 nos members room (new accomodation) Room 3 1 x 22.00ft x 22.08ft = 1457.28 3 1 x 5.50ft x 4.75ft = 78.38 Skirting 3 2 x 22.00ft x 0.50ft = 66.00 3 2 x 22.08ft x 0.50ft = 66.24 3 2 x 5.50ft x 0.50ft = 16.50 3 2 x 4.75ft x 0.50ft = 14.25 = 1698.65 = 157.81 @ Tk 1815.00 per sqm (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation): Grid 13 to 14, D to H E/W 1 x 134.00 ft x 6.00 ft = 804.00 Skirting 2 1 x 146.00ft x 0.50ft = 146.00 Skirting 2 1 x 22.00ft x 0.50ft = 22.00 2 2 x 14.17ft x 0.50ft = 28.34 2 2 x 11.50ft x 0.50ft = 23.00 2 2 x 7.00ft x 0.50ft = 14.00 2 2 x 9.50ft x 0.50ft = 19.00 2 1 x 10.50ft x 0.50ft = 10.50 = 1066.84 = 99.11 @ Tk 1821.00 per sqm
sft sqm = Tk 242846.99 sft sft sft sft sft sft sft Sqm = Tk 286421.47
sft sft sft sft sft sft sft sft sft Sqm = Tk 180482.69
8 OF 55
Item-8 CE's-7.1
Reinforced cement concrete works using wooden shutter, with minimum cement content relates to mix ratio 1:2:4 having minimum f 'cr = 24 Mpa, and satisfying, specified compressive strength f'c=19 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM 1 ( 52.5 N) / ASTM-C 150 Type I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming ASTM C-33 including breaking chips and screening, making, placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hoper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing for 28 days,and removing centering-shuttering after specified time proved; including cost of water, electricity, testing charges of materials and cylinders, other charges etc. all complete approved and accepted by the Engineer.
(Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) (A) CE's-7.1.4 Padestals, column capitals, lift walls and walls :Ground Floor a) At level (+) 25'-0" (In 2nd Floor) i) Concrete Col-C1 2 x 2.00 ft x 3.00 ft Col-C2 3 x 2.00 ft x 3.00 ft Col-C5 5 x 2.00 ft x 3.00 ft Col-C6 2 x 1.67 ft x 3.00 ft Col-C7 7 x 1.67 ft x 3.00 ft Col-C8 2 x 2.00 ft x 3.00 ft Col-C9 2 x 2.00 ft x 3.00 ft Col-C4 10 x (3.14 x 2.08 x 2.08/4) = 163.05 x @ CE's-7.1.4 ii) Form Work (Wooden Shuttet) For Col-C1,C2, C5, C8, C9 14 x 2 x 3.00 ft 14 x 2 x 2.00 ft For Col-C6,C7 9 x 2 x 1.67 ft 9 x 2 x 3.00 ft For Col-C4 10 x (3.14x2.08x2.08/4) 3.50 ft Tk 6780.00
= = = = = = = = = = =
12.00 18.00 30.00 10.02 35.07 12.00 12.00 33.96 163.05 570.68 16.16 per cum
sft sft sft sft sft sft sft sft sft cft cum =
Tk 109563.35
x x x x x
CE's-7.1.4
@ b) In Column: At level (+) 80'-0" (In 7th Floor) i) Concrete Col-C10 2 x 2.00 ft x Col-C11 8 x 2.00 ft x Col-C13 5 x 2.00 ft x Col-C14 19 x 1.67 ft x Col-C15 2 x 1.67 ft x = 195.21 Shear wall 4 x 4 x 6.50 ft 8.00 ft x x 1.17 ft 1.17 ft x x x
Tk 405.00
Tk 43686.88
= = = = = = =
= 136.89 = 168.48
9 OF 55
x x x x
x x x x
@ CE's-7.1.4 ii) Form Work (Wooden Shuttet) For Col-C10,C11, C13 15 x 2 x 15 x 2 x For Col-C14,C15 21 x 2 x 21 x 2 x Shear wall 4 x 2 x 4 x 2 x 4 x 2 x 4 x 2 x Electric wall 2 x 2 x 2 x Lift wall 2 x
Tk 7159.00
Tk 364044.73
3.00 ft 2.17 ft 1.67 ft 3.17 ft 6.50 ft 1.42 ft 8.00 ft 1.42 ft 24.63 ft 12.63 ft 8.50 ft 98.00 ft
x x x x x x x x x x x x
4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft
sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
@ (B) CE's-7.1.5 Tie beam and lintels:Ground Floor i) Concrete (a) G.F: (-) 6'-0" level 8 x 20.00 ft x 0.42 ft At level (-) 9'-0" New wall (Grid-8 to 11, E) 1 x 68.00ft x 0.42 ft 3 x 13.00ft x 0.42 ft New wall (Grid-11 to 13, K) 1 x 30.00ft x 0.42 ft 4 x 5.00ft x 0.42 ft 1 x 33.00ft x 0.42 ft 2 x 19.00ft x 0.42 ft At level (+) 7'-0". N/S 4 x 0.83 ft x 19.50 ft 1 x 0.83 ft x 8.00 ft E/W 1 x 0.83 ft x 10.00 ft 3 x 0.83 ft x 20.33 ft (+) 3'-0" level New wall 3 x 7.00 ft x 0.42 ft 1 x 42.33 ft x 1.42 ft 1 x 42.50 ft x 0.42 ft RCC bend for out side pipeline 3 x 6.33 ft x 0.42 ft
Tk 556.00
Tk 182373.58
0.50 ft
= 33.60
cft
(A)
x x x x x x
= = = = = =
x x x x
x x x x
10 OF 55
7.25 ft
0.42 ft
= = = =
@ CE's-7.1.5 ii) Form Work (Wooden Shuttet) 8 x 1 x 20.00 ft 6 x 1 x 6.00 ft 1 3 1 4 1 2 4 1 1 3 3 1 1 1 2 x x x x x x x x x x x x x x x 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 x x x x x x x x x x x x x x x 68.00ft 13.00ft 30.00ft 5.00ft 33.00ft 19.00ft 19.50 ft 8.00 ft 10.00 ft 20.33 ft 7.00 ft 42.33 ft 42.50 ft 6.33 ft 7.25 ft
Tk 6988.00
(B)
Tk 50584.92
x x x x x x x x x x x x x x x x x
1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.83 ft 1.83 ft 1.83 ft 1.83 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft Total =A+B
@ CE's-7.1.5 i) Concrete (b) F.F: (i) F.F: Scrutinize & Moderate room: 2 x 14.24 ft x 0.42 ft 3 x 2.50 ft x 0.42 ft 2 x 7.50 ft x 0.42 ft 3 x 2.50 ft x 0.42 ft 1 x 3.00 ft x 0.42 ft (ii) F.F: 3 nos members accomodation 2 x 20.33 ft x 0.42 ft 3 x 20.33 ft x 0.42 ft 2 x 20.33 ft x 0.42 ft 1 x 12.25 ft x 0.42 ft 1 x 14.00 ft x 0.42 ft 1 x 12.17 ft x 0.42 ft 2 x 12.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 23.33 ft x 0.42 ft 1 x 13.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 20.33 ft x 0.42 ft 1 x 10.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 23.33 ft x 0.42 ft 1 x 13.25 ft x 0.42 ft North to south 1 x 13.17 ft x 0.42 ft 1 x 10.00 ft x 0.42 ft
Tk 350.00
= 227.20 = 51.12 = 278.32 = 96.56 = 55.38 = 42.60 = 28.40 = 46.86 = 53.96 = 142.74 = 14.64 = 18.30 = 111.61 = 29.82 = 60.11 = 60.35 = 8.99 = 20.59 = 790.91 = 1069.23 = 99.33 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
(A)
(B)
Tk 34766.83
x x x x x x x x x x x x x x x x x x x x x x x
0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft
= = = = = = = = = = = = = = = = = = = = =
5.98 1.58 3.15 1.58 0.63 8.54 12.81 8.54 2.57 2.94 2.56 5.15 2.96 9.80 2.78 2.96 8.54 2.15 2.96 9.80 2.78
cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft
Grid-8-9
Grid-9-10
Grid-11
Grid-10-11
Grid-E
= 2.77 = 2.10
11 OF 55
Grid-F
Grid-EF Grid-FG
Grid-IJ
Grid-JK
Grid-R
2 1 1 3 1 1 3 1 1 2 1 1 2 1 1 1 2 1 1 2 1 2
x x x x x x x x x x x x x x x x x x x x x x
19.50 ft 12.25 ft 10.00 ft 19.50 ft 13.17 ft 10.00 ft 14.08 ft 15.58 ft 5.00 ft 14.75 ft 8.00 ft 13.25 ft 10.00 ft 13.25 ft 11.00 ft 14.67 ft 10.00 ft 19.50 ft 14.67 ft 10.00 ft 10.00 ft 10.00 ft
x x x x x x x x x x x x x x x x x x x x x x
0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft
x x x x x x x x x x x x x x x x x x x x x x
0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft
= = = = = = = = = = = = = = = = = = = = = = =
8.19 2.57 2.10 12.29 2.77 2.10 8.87 3.27 1.05 6.20 1.68 2.78 4.20 2.78 2.31 3.08 4.20 4.10 3.08 4.20 2.10 4.20 193.71
cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum = sft sft sft sqm =
(A) (B)
(ii) F.F: RCC bend for out side pipeline Qty same as GF (B) Total =A+B @ CE's-7.1.5 ii) Form Work (Wooden Shuttet) Rft same as (A) = 922.43 ft Qty same as GF (B) x Tk 7055.00 1.42 ft Total @ CE's-7.1.5 i) Concrete (c) 2nd floor: 2 x 2 x 4 x Tk 375.00
= 222.04 = 415.75 = 11.77 per cum = = = = 1309.85 790.91 2100.76 195.17 per sqm
Tk 83055.71
Tk 73186.99
x x x
x x x
= = = = =
Tk 7122.00
Tk 6119.70
x x x
= = = = =
@ CE's-7.1.5 i) Concrete D) 3rd floor: At level (+) 36'-0" (d) 3rd floor: 1 x 21.58 ft x 1 x 8.83 ft x 1 x 14.75 ft x 1 x 12.17 ft x
Tk 400.00
Tk 7625.05
x x x x
= = = =
12 OF 55
1 1 2 1 1
x x x x x
x x x x x
x x x x x
= = = = = = =
Tk 7189.00
Tk 5781.41
x x x x x x x x x
= = = = = = = = = = =
Tk 395.00
30.64 12.54 20.95 17.28 28.87 23.54 36.92 11.36 9.94 192.04 17.84 per sqm
sft sft sft sft sft sft sft sft sft sft sqm =
Tk 7047.21
4.50 ft
0.42 ft
x @
0.50 ft Tk 7568.00
cft cum =
Tk 1215.08
CE's-7.1.5
x @
1.42 ft Tk 689.00
sft sqm =
Tk 2454.13
(C) CE's-7.1.6
In Tee beam, ELL beam & Rectangular beam i) Concrete : At level (+) 80'-0" (In 7th Floor) Stair-2: 02 nos stair E/W 4 x 12.00 ft x 1.00 ft N/S 2 x 19.54 ft x 1.00 ft 2 x 14.50 ft x 1.00 ft Main stair attached: N/S 2 x 19.00 ft x 1.00 ft E/W 5 x 10.00 ft x 1.00 ft Lift room: South lift, N/S 6 x 5.00 ft x 1.00 ft E/W 4 x 7.50 ft x 1.00 ft
x x x x x x x
= 75.84 = 61.75 = 45.82 = 60.04 = 79.00 = 47.40 = 47.40 = 417.25 = 11.81 per cum
@ CE's-7.1.6 ii) Form Work (Wooden Shuttet) E/W 2 x 2 x 12.00 ft N/S 2 x 1 x 19.54 ft 2 x 1 x 14.50 ft
Tk 7045.00
Tk 83236.61
x x x
13 OF 55
1 1 2 2
x x x x
x x x x
@ (D) CE's-7.1.7 In Floor & Roof slab; a) At level (+) 80'-0" (In 7th Floor) i) Concrete Stair-2: 02 nos stair 2 x 28.67 ft x 19.00 ft Main stair-4: 1 x 49.00 ft x 17.00 ft Lift room: South lift - 02 nos 1 x 49.00 ft x 14.50 ft
Tk 610.00
Tk 62406.20
x x x
Tk 7045.00
Tk 220604.99
x x x x x x x x x
= 1089.46 = 833.00 = 686.00 = = = = = = = = 48.17 31.92 41.16 14.28 82.32 82.32 2908.63 270.22 per sqm
sft sft sft sft sft sft sft sft sft sft sqm =
(E) CE's-7.1.8
@ Tk 638.00 Cornice, railing, drop walls, louver, fins etc. Ground Floor a) In Ground floor (+7'-0" level) i) Concrete Drop wall N/S 2 x 70.00 ft x 2.00 ft 2 x 26.00 ft x 2.00 ft Planter 2 x 26.00 ft x 2.00 ft E/W 2 x 45.00 ft x 2.00 ft = 668.00 x @ 0.29 ft Tk 6836.00 0.33 ft 4.33 ft 4.33 ft 4.33 ft 4.33 ft
Tk 172399.03
280.00 104.00 104.00 180.00 668.00 = 194.83 = 5.52 per cum = = = = = = = 2.64 606.20 225.16 225.16 389.70 1448.86 134.60 per sqm
= = = =
sft sft sft sft sft cft cum = sft sft sft sft sft sft sqm =
Tk 37714.09
CE's-7.1.8
x x x x x
Tk 298.00
Tk 40111.51
14 OF 55
CE's-7.1.8
b) In 2nd floor (+25'-0"+0+36'-0" level) i) Concrete Drop wall Gird 13 north side E/W 1 x 134.00 ft N/S 2 x 5.33 ft = 433.98
x x x @
= 402.00 = 31.98 433.98 = 126.58 = 3.58 per cum = = = = = = = 804.00 83.75 63.96 6.72 66.55 1024.97 95.22 per sqm
sft sft sft cft cum = sft sft sft sft sft sft sqm =
Tk 24982.02
CE's-7.1.8
ii) Form Work (Wooden Shuttet) 1 x 2 x 134.00 ft 1 x 1 x 134.00 ft 2 x 2 x 5.33 ft 2 x 1 x 5.33 ft 1 x 1 x 144.67 ft
x x x x x
@ c) In 3rd Floor (+36'-0"+47'-0") Drop Wall i)Concrete: qnty same as item-D (a)i Railing Qty same as Drop wall @ CE's-7.1.8 ii) Form work Qty same as FF Railing same Drop @ d) In 4th Floor (+47'-0"to+58'-0"level) In Railing i)Concrete: oty same as 2nd Floor Drop @ CE's-7.1.8 ii) Form work (Wooden shutter) Qty same as 2nd Floor @ (F) CE's-7.1.9 Sunshade, false ceiling:Ground Floor a) In 2nd floor i) Concrete False slab Gird 13 north side 2 7.50 ft x 7.50 ft
Tk 348.00
Tk 33137.40
CE's-7.1.8
= 3.56 = 3.56 7.12 per cum = 95.02 = 95.02 190.04 per sqm
Tk 7037.00
Tk 50103.44
Tk 373.00
Tk 70884.92
CE's-7.1.8
Tk 7140.00
cum = sqm =
Tk 25418.40
Tk 398.00
Tk 37817.96
x @
= 28.13 = 0.80 per cum = = = = = 112.50 9.90 9.90 132.30 12.29 per sqm
Tk 6000.90
CE's-7.1.8
x x x
Tk 404.00
Tk 4965.55
7.50 ft
8.83 ft
0.25 ft
= 16.56
cft
15 OF 55
8.83 ft
5.50 ft
0.25 ft
@ CE's-7.1.8 ii) Form Work (Wooden Shuttet) 1 x 1 x 1 x 2 x 1 x 2 x 1 x 1 x 1 x 2 x 1 x 2 x 7.50 ft 7.50 ft 8.83 ft 8.83 ft 8.83 ft 5.50 ft x x x x x x
= 12.14 = 28.70 = 0.81 per cum = = = = = = = = 66.23 4.95 5.83 48.57 5.83 3.63 135.03 12.54 per sqm
cft cft cum = sft sft sft sft sft sft sft sqm =
Tk 5471.34
@ Item-9 CE's-8.1.1
Tk 429.00
Tk 5381.46
3420/400-grade(B420/400DWR) / 400G ribbed or deformed bar with minimum fy (ReH)= 420/400 MPa & tensile strength(fu or Rm) at least 525 Mpa, minimum elongation after fracture and total elongation at maximum force is 16% and 8% respectively. Ground floor cft same as item- 08.B(a)+08.E(a) = 450.47 cft 1.25% of this item = 5.63 = 1251.54 @ Tk 81.00 per kg = 415.75 cft 1.25% of this item = 5.20 = 1155.07 @ Tk 81.32 per kg = 570.68 1.0% of this item = 30.35 1.25% of this item = 126.58 1.0% of this item = 28.13 1.25% of this item cft = 5.71 cft = 0.38 cft = 1.27 cft = 0.35 = 7.70 = 1712.19 per kg cft cft kg = cft cft cft
cft kg =
Tk 101374.45
cft kg =
Tk 93930.22
2nd floor cft same as item- 08.A(a) cft same as item- 08.B(c) cft same as item- 08.E(a) cft same as item- 08.F(a)
@ 3rd floor cft same as item- 08.B(d) cft same as item- 08.E(b) cft same as item- 08.F(b)
Tk 81.64
Tk 139783.44
= 28.40 cft 1.25% of this item = 0.36 = 251.44 cft 1.0% of this item = 2.51 = 28.70 cft 1.50% of this item = 0.43 = 3.30 = 733.44 @ Tk 81.96 per kg = 125.72 cft 1.0% of this item = 1.26 = 279.43 @ Tk 82.28 per kg
Tk 60113.00
cft kg =
Tk 22991.63
16 OF 55
Item-10 CE's-11.1
Supplying and making door and window frames (Chowkat) for all floors with matured natural seasoned wood of required size including painting two coats of coal tar to the surface in contact with wall, fitting and fixing in position etc. complete and accepted by the Engineer. (All sizes of wood are finished).
CE's-11.1.5 Chittagong Teak (i)GF: (-) 6'-0" level 5 5 G.F 3 3 (ii) 1st floor: 35 28 7 (iii) 2nd floor: 2 1 1 (iv) 3rd floor: 6 3 3
2 1 2 1 2 1 1 2 1 1 2 1 1
x x x x x x x x x x x x x
7.00ft 6.00ft 7.00ft 6.00ft 7.00ft 3.33ft 2.50ft 7.00ft 2.50ft 3.33ft 7.00ft 2.50ft 3.33ft
0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft
0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft
= = = =
cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum = Tk 525861.51
= 47.33 = 9.01 = 1.69 = 2.70 = 0.24 = 0.32 = = = = = 8.11 0.72 0.97 86.56 2.45 per cum
Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size having bifurcated ends to door and window frames with rowel plug, necessary screws etc. including cutting groove in Chowkat if necessary etc. complete in all respect accepted by the Engineer. (i) G.F 8 2 x 4 (ii) F.F: 3 nos Members room (new accomodation) & others 35 2 x 4 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 2 x 4 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 2 x 4 @Tk 78.00 = 64.00 = 280.00 = 16.00 = 48.00 = 408.00 each nos nos nos nos nos = Tk 31824.00
Item-12 CE's-12.1
Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide plank) solid wood single leaf door shutter having top rail style of sections 100 mm x 38 mm, lock rail 125 x 38 mm and bottom rail 225 x 38 mm. Closed joints with 25 mm x 12 mm size wooden peg and provided with best quality 4 Nos. 100 mm iron hinges 2 (two) Nos. best quality 12 mm dia 300 mm and 200 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, hinged cleats, buffer blocks and finished by sand papering etc. all complete in all floors and accepted by the Engineer. (All sizes of wood are finished)
CE's-12.1.4 Chittagong Teak (i) F.F: 3 nos Members room (new accomodation) & others 7 1 x 2.17ft x 6.83ft (ii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 x 2.17ft x 6.83ft (iii) 3rd F: 3 nos Deputy Secretary room (new accomodation)
= 103.75 = 29.64
sft sft
17 OF 55
3 3
1 1
x x
3.00ft 2.17ft
x x
6.83ft 6.83ft
= = = =
9836.00
Tk 218690.36
Supplying, fitting and fixing 38 mm thick well matured, natural seasoned (min 10" wide plank) wooden double leaf panel door shutters. Top rail and styles of sections 100 mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail 225mm x 38 mm, paneling 38 mm thick both sides raised, provided with best quality 6 Nos. 100 mm iron hinges, 2 (two) Nos. best quality 12 mm dia 300 mm and 225 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, 1 No. hatchbolt hinged cleats, buffer blocks and finished by sand papering, necessary screws etc. all complete in all floors and accepted by the Engineer. (Double leaf. All sizes of wood are finished)
CE's-12.4.4 Chittagong Teak At level (-) 6'-0" to (-) 9'-0" (i) Store 4 1 x (ii) G.F Vault 3 1 x (iii) Presspart 5 1 x
x x x
12048.00
Tk 542852.05
Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid particle board single leaf flush door for all floors for internal use made of well matured mechanical seasoned Rubber (Malaysian timber) or other approved wooden frame having finished size 35 x 50 mm around upon which 1.2 mm thick veneer (total two Nos. of veneers one of 0.7 mm horizontally made of gorjon and another of 0.5 mm vertically made of Burma Teak or Champa or Chapalish or Garjan wood) with necessary screws are pested on each side by mechanized process and provided with best quality 4 Nos. 100 mm iron hinges, 2 Nos. best quality 12 mm iron dia 300 mm and 225 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks etc. complete and accepted by the Engineer.
CE's-12.7.1 Burma Teak veneered (i)3 nos members accomodation 28 1 x 3.00ft x (ii) 2 nos Deputy Secretary room (new accomodation) 2 1 x 3.00ft x
6.83ft 6.83ft
4156.00
Tk 237336.79
Supplying, fitting and fixing of well matured louver shutter having 75.50mm x 38mm size all around frame and inner horizontal wooden louver blade 65mm x 20mm spaced @ 38mm c/c, fixed with frame in grooves including cost of nails, handle, tower bolt, screws (brass fitting) etc. all complete in all respect as per drawing and direction of the Engineer in charge. 1 1 x x 2.50ft 2.50ft x x 2.25ft 2.25ft = 11.25 = 16.88 sft sft
18 OF 55
@Tk 12417.00 Tk 32444.08 Item-16 CE's-12.15.2 Supplying, fitting and fixing M.S. door shutter made with 1.5 x 1.5 x angle outer frame, inner member 1 x F.I. bar, cladding with 16 BWG M.S. sheet, hinged with 2 x 2 x M.S. angle Chowkat. 4 x 3.50 ft x 7.00 ft = = 98.00 9.10 per sqm sft sqm =
sft sqm =
@ Tk 4797.00 Item-17 CE's-12.21.2 Extra cost for using brass/ SS fittings in place of iron fittings in doors & windows for all floors (super quality local). SS fittings of door Qty same as item no-12, 13, 14 @Tk Item-18 CE's-12.22 223.00 = 124.40 per sqm
Tk 43673.91
sqm =
Tk 27740.78
Supplying, fitting and fixing of made in hydraulic door closer (big size) including all necessary tools and accessories etc. all complete approved and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 18 1 = 18.00 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 = 2.00 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 3 1 = 3.00 = 23.00 @Tk 2014.00 each
Item-19 CE's-12.23.2 Supplying, fitting and fixing Rim/ round door lock approved and accepted by the Engineer. (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 39117.00
@Tk 767.00 Item-20 CE's-13.4.1 Supplying, fitting, fixing window grills of any design made with 25 x 6 mm F.I. bar including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants etc. complete for all floors accepted by the Engineer. (Total weight per sqm should be min 42.88 kg. and add or deduct @ Tk. 35.00 for each kg. excess or less respectively) (i) G.F: (+) 3'-0" 1 1 x 19.50ft x (+) 7'-0" N/S 4 1 x 19.50ft x 1 1 x 8.00ft x E/W 3 1 x 20.33ft x 1 1 x 10.00ft x (ii) F.F: 3 nos members accomodation & others: 3.00ft 7.00ft 7.00ft 7.00ft 7.00ft = 58.50 = = = = 546.00 56.00 426.93 70.00 sft sft sft sft sft
19 OF 55
1 1 x 19.50ft x 3.00ft 2 1 x 21.00ft x 3.00ft 36 1 x 5.00ft x 4.50ft 1 1 x 12.00ft x 9.00ft (iii) 2nd F:2 nos Deputy Secretary room (new accomodation) 2 2 x 6.00ft x 4.50ft (iv) 3rd F: 2 nos Deputy Secretary room (new accomodation) 1 2 x 6.00ft x 4.50ft 1 1 x 13.00ft x 4.50ft 1 1 x 12.17ft x 4.50ft
= = = =
sft sft sft sft sft sft sft sft sft sqm =
2570.00
Tk 605300.18
Supplying fitting and fixing of Aluminium swing door as per the U.S.Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.8 mm thick wall frame size 101.60 mm. 44.45 mm. 83.21 mm). 2.33 mm thick shutter size (54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm. 14.49 mm 0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm 1.2 mm), 106.60 mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm. 12.70 mm 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m) section of all aluminum members will be anodized to aluminium bronze/silver colour with a coat not less than 15 micrones in thickness and density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock, swing door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping provision for fitting 5 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and accepted by the Engineer. (Total weight min 23 kg/m2) Size up to: 2100 mm x 2100 mm. Bronze colour Swing door with fixed partition G.F 1 1 x 40.00ft 2 2 x 6.00ft 2 1 x 4.50ft F.F 1 1 x 22.00ft 1 1 x 4.50ft
14.2.2
x x x x x
= = = = = = =
@Tk Item-22
5296.00
Tk 449451.51
20 OF 55
CE's-14.4
Supplying, fitting and fixing of Aluminium sliding doors as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer top (size 75.50 mm, 26.80 mm, 0.78 kg/m) 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.2 mm shutter bottom (size 60 mm, 24 mm, 0.736 kg/m), 1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.616 kg/m) 1.5 mm thick shutter lock (size 49.20 mm, 26.20 mm, 0.661 kg/m), 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm, 0.665 kg/m), 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) sections all aluminium members (Total weight 14.789 kg) will be anodized to aluminium bronze/silver colour with a coat not less than 15 microns in thickness and density of 4 mg per square cm etc. including all accessories like handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer. Size up to: 2100 mm x 2100 mm. Bronze colour 2 1 x 3.50ft 1 1 x 7.50ft
14.4.2
x x
7.00ft 7.00ft
= = = =
2075.00
Tk 19566.38
Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick sliding side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer. Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg) Bronze colour (i) 3 nos members accomodation 1 2 x 6.00ft x 4.50ft 1 1 x 13.00ft x 4.50ft 1 1 x 12.17ft x 4.50ft 36 1 x 5.00ft x 4.50ft (ii) 2 nos Deputy Secretary room (new accomodation) 2 2 x 6.00ft x 2 1 x 6.33ft x (iii) G.F 3 1 x 9.75ft x 5 1 x 4.50ft x
14.6.1.2
= = = = =
sft sft sft sft sft sft sft sft sft sft sft
(D)
21 OF 55
14.6.2.2
@Tk 2370.00 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg) Bronze colour (i) G.F 2 1 x 6.33ft x 2.50ft 2 1 x 6.33ft x 2.00ft
sqm =
Tk 305556.94
= = = =
3120.00
(E) Tk 16513.04
Supplying fitting and fixing of Aluminium fixed fan light as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification mm, 0.313 kg/m) 1.2 mm thick bottom cover (size 76.2 mm, 38.10 mm, 0.76 kg/m) and 2.5 mm thick grouve cover section (size 57.15mm, 15.80 mm, 0.425 kg/m) and 1.2 thick top and side section (76.20 mm, 16 mm, 38.10 mm, 0.961 kg/m) fixed with above mentioned frames and all aluminium members (Total weight 5.365kg) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nut and bolt etc. complete in all respect as per drawing and accepted by the Engineer. Bronze colour (+) 3'-0" 1 1 x 19.50ft x (+) 7'-0" N/S 4 1 x 19.50ft x 1 1 x 8.00ft x E/W 3 1 x 20.33ft x 1 1 x 10.00ft x (ii) F.F: 3 nos members accomodation & others: 1 1 x 19.50ft x 2 1 x 21.00ft x
14.11.2
= 58.50 = = = = = = = = = = = = = = = = 546.00 56.00 426.93 70.00 58.50 126.00 1341.93 124.67 108.00 157.50 252.00 756.00 196.00 1469.50 136.52 261.19 per sqm
sft sft sft sft sft sft sft sft sqm sft sft sft sft sft sft sqm sqm =
(A)
x x x x x
(B) Tk 823787.65
Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall distortion free glass of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all respect as per drawing and accepted by the Engineer.
CE's-14.14.2 (A) 5mm thick tinted glass (i) 2 nos Deputy Secretary room (new accomodation) Qty same as item no-22 Qty same as item no-23(A+B+D+E) Qty same as item no-21 Qty same as item no-24(A)
= = = = =
22 OF 55
Outside 6 2 2 3 6 2 2 2 1 1 1 2 x x x x x x x x x x x x 4.50 ft 6.33 ft 6.33 ft 9.75 ft 6.83 ft 7.50 ft 2.25 ft 4.17 ft 5.75 ft 5.75 ft 4.00 ft 3.75 ft x x x x x x x x x x x x 4.50 ft 2.50 ft 2.00 ft 4.50 ft 3.50 ft 5.50 ft 5.50 ft 7.00 ft 7.00 ft 2.00 ft 7.00 ft 7.00 ft Total @Tk 1073.00 CE's-14.14.3 (B) 5mm thick frosted glass (i) Scrutinizer & moderation room Qty same as item no-24(B) (ii) 2 nos Deputy Secretary room (new accomodation) Qty same as item no-23(B) = = = = = = = = = = = = = = = 121.50 31.65 25.32 131.63 143.43 82.50 24.75 58.38 40.25 11.50 28.00 52.50 751.41 3266.18 303.44 per sqm sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
Tk 325586.65
@Tk 1152.00 Tk 168829.43 Item-26 Analysis rate Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall tempered reflected glass of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all respect as per drawing and accepted by the Engineer. 6 mm thick tempered reflected glass (+) 7'-0" level 18 x 22.00 ft 18 x 3.00 ft
x x @
= = = =
Item-27 CE's-15.1
Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) having with fresh cement to wall both inner-and outer surface, finishing the corner and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) At level (+) 7'-0" to (+) 25'-0" Sft same as item -3B(B) x 2 = @ At level (+) 25'-0" Sft same as item -3C(B) x 2 Offset 42 x Top of wall Offset 2 42 x = x 0.42 ft 443.00 ft 0.42 ft x x x 3.50 ft 0.50 ft 0.83 ft = @ At level (+)80'-0" Tk 193.00 = 4123.00 = = = = 123.48 221.50 14.64 4482.62 416.45 per sqm sft sft sft sft sft sqm = Tk 184.00 = 1551.00 144.09 per sqm sft sqm = (A) Tk 26512.82
(B) Tk 80374.01
23 OF 55
Sft same as item -H(C) x 2 Offset 78 x 2 x Top of wall = Offset 78 x Stair & lift wall Stair Chillakota S-E & N-W Outside 2 x E/W 2 x Main Stair N/S 2 x E/W 2 x Lift Portion 2 x E/W 2 x 0.42 ft 1330.06 ft 0.42 ft x x x 3.50 ft 0.50 ft 0.83 ft
x x x x x x
(C)
Inside plaster Stair Chillakota S-E & N-W N/S 4 E/W 2 Main Stair N/S 2 E/W 2 Electric room N/S 2 E/W 2
x x x x x x
x x x x x x
= 1071.00 = 262.50 = 262.50 = 430.50 = 136.50 = 273.00 = 2436.00 = 226.31 = 1394.62 per sqm
Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall (1:4) with cement up to 150 mm below ground level with neat cement finishing including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor. 36'-0"Level Open terrece wall side 2 N/s E/W 2 N/s 2 2 2
x x x x x
1 2 2 2 2 2
x x x x x x
= = = = = = = = =
Tk 238.00
8.00 19.16 9.00 166.00 92.00 52.00 346.16 173.08 16.08 per sqm
rft rft rft rft rft rft rft sft sqm = Tk 3826.93
x x x
2 2 6
x x x
= = = =
24 OF 55
18.24 sqm
sqm = Tk 4505.39
Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to wall both inner-and outer surface, finishing the corner and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) A) G.F At level (+) 7'-0" 4 x 2.00 ft 1 x 0.83 ft E/W 1 x 2.00 ft 3 x 2.00 ft
x x x x
x x x x
For 02 nos ramp (East west side) 0.5 4 25.00 ft x 0.83 ft For 02 nos ramp (East west side) 2 x 2 x 9.67 ft 2 x 2 x 9.67 ft 2 x 2 x 9.67 ft 2 x 2 x 0.83 ft 2 x 2 x 5.92 ft 2 x 2 x 10.75 ft 2 x 2 x 6.17 ft 2 x 2 x 5.67 ft Middle stair grid-16 2 x 2 x 5.50 ft 2 x 2 x 5.50 ft (East west side) 1 x 2 x 34.67 ft i) Duct wall 3 1 ii) At level (-) 6'-0" 1 1 x x 6.33 ft 7.25 ft
x x x x x x x x x x x x
3.50 ft 0.50 ft 0.50 ft 4.50 ft 3.50 ft 3.50 ft 1.58 ft 3.58 ft 3.58 ft 3.50 ft 4.00 ft 3.17 ft
= 77.00 = 88.00 = 219.81 = 4120.99 = 189.90 = 101.50 = 291.40 = 9017.84 = 13430.23 = 1247.70 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
x x
10.00 ft 14.00 ft
@ Tk 161.00 B) FF: At level (+) 14'-0" (3 nos members accomodation) i) Duct wall 3 1 x 6.33 ft x 10.00 ft 1 1 x 7.25 ft x 14.00 ft Sft same as item -3B(A) x 2
Tk 200879.48
= = = = = =
Tk 170.00
Tk 333809.66
C) At level (+) 25'-0" Lift door gap 2 2 x 5.00ft x (i) 2 nos Deputy Secretary room (new accomodation) E/W 2 2 x 22.00 ft x 2 2 x 20.00 ft x N/S 2 2 x 11.50 ft x 2 1 x 9.50 ft x
= = = = =
25 OF 55
2 2 Deduct Door
1 2
x x
10.50 ft 3.50 ft
x x
10.00 ft 10.00 ft
= 210.00 = 140.00 = 2860.00 = = = = = = -46.62 -35.00 -49.00 -108.00 2621.38 243.53 per sqm
Window
-2 -2 -2 -4
x x x x
x x x x
Tk 179.00
Tk 43592.25
D) 3rd floor: At level (+) 36'-0" Lift door gap 2 2 x 5.00ft x (i) 2 nos Deputy Secretary room (new accomodation) DS room attached to exam. Controller (cadre) E/W 1 x 21.58 ft x 1 x 8.83 ft x N/S 1 x 14.75 ft x 1 x 12.17 ft x DS room attached to exam. Controller (Non-Cadre) E/W 1 x 20.33 ft x 1 x 16.58 ft x N/S 2 x 13.00 ft x 1 x 8.00 ft x Toilet inside 1 x 7.00 ft x
9.00ft
180.00
sft
= = = = = = = = = = =
226.59 92.72 154.88 127.79 213.47 174.09 273.00 84.00 56.00 1582.52 147.02 persqm
sft sft sft sft sft sft sft sft sft sft sqm =
Tk 188.00
(A) Tk 27639.70
5.00ft
x @
9.00ft Tk 197.00
sft sqm =
Tk 3294.31
5.00ft
x @
9.00ft Tk 206.00
sft sqm =
Tk 3444.82
5.00ft
x @
9.00ft Tk 230.00
sft sqm =
Tk 3846.15
Item-30 CE's-15.5
Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) A) G.F: Sft same as item- 8.B(a-ii)+8.E(a-ii) @ B) F.F: Sft same as item- 8.B(b-ii) = 2100.76 = 195.17 sft sqm (A) Tk 152.00 = 2518.09 = 233.94 per sqm sft sqm = (A) Tk 35558.30
26 OF 55
@ C) 2nd. F:
Tk 161.00
per sqm = 1161.10 84.00 45.09 33.96 1324.15 = 123.02 = 1362.46 = 126.58 = 249.59 per sqm = 2372.66 = 220.43 per sqm = 1022.80 = 95.02 per sqm = = = = = 3530.70 90.00 105.21 3725.91 346.15 = = = =
= sft sft sft sft sft sqm sft sqm sqm = sft sqm = sft sqm = sft sft sft sft sqm
Tk 31421.62
Sft same as item- 8.A(a-ii) Top of column 14 9 10 x x x 3.00 ft x 2.00 ft 1.67 ft x 3.00 ft (3.14 x 2.08 x 2.08/4)
@ D) 3rd. F:
Sft same as item- 8.B(d-ii)+8.C(c-ii)+8.F(b-ii) @ E) 4th. F: Sft same as item- 8.C(d-ii) @ F) 7th. F: 15 21 x x 3.00 ft 1.67 ft Sft same as item- 8.A(b-ii) x 2.00 ft x 3.00 ft Tk 179.00 Tk 179.00
(A) Tk 39456.11
(A) Tk 17008.58
(A)
At level (+)80'-0" Lift 1st roof & 2nd roof bottom: slab, cornice, side Cornice 2 1 x 48.00 ft x N/S 2 1 x 49.00 ft x E/W 2 1 x 11.50 ft x 2 1 x 11.50 ft x side 2 1 x 48.00 ft x 2 1 x 49.00 ft x E/W 2 1 x 13.50 ft x 2 1 x 14.50 ft x Stair Chillakota S-E & N-W: Slab, cornice, side N/S 2 2 x 27.25 ft x E/W 2 2 x 14.50 ft x side 2 2 x 27.25 ft x 2 2 x 14.50 ft x Main Stair Chillakota: Slab, cornice, side N/S 2 1 x 48.00 ft x E/W 2 1 x 14.00 ft x side 2 1 x 48.00 ft x 2 1 x 17.25 ft x Inside Lift room (North part) 1 1 x 9.50 ft x RCC wall
1.00 ft 1.50 ft 1.00 ft 1.50 ft 0.67 ft 0.42 ft 0.67 ft 0.42 ft 1.50 ft 1.50 ft 0.42 ft 0.42 ft 1.50 ft 1.50 ft 0.42 ft 0.42 ft 17.00 ft
= = = = = = = = = = = = = = = =
96.00 147.00 23.00 34.50 64.32 41.16 18.09 12.18 163.50 87.00 45.78 24.36 144.00 42.00 40.32 14.49
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
= 161.50
27 OF 55
N/S 2 1 x 17.00 ft E/W 2 1 x 9.50 ft Beam side 2 1 x 7.50 ft Electric room ceiling 2 1 x 13.50 ft Stair room: Main & S-E & N-W stair 1 1 x 21.00 ft 2 1 x 26.50 ft
x x x x x x
= 263.50 = 147.25 = 22.50 = 175.50 = 283.50 = 715.50 = 2766.95 = 257.06 = 603.20 per sqm
@ Item-31 Analysis rate 75 mm thick cement concrete (C.C) works with 25 mm x 25 mm mesh expanded metal using 1st class brick chips of proportion 1:2:4 with net cement finishing on roof including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other charges and costs of tools and plants etc. as per direction of Engineer-in-charge (A) At level (+) 25'-0" Grid 13 to 16 (D to L) = 1 Grid 16 to 18 = 1 At level (+) 80'-0" Sft as per Architectural plan Deduct: 5" brick wall Stair: Lift: Column: R.C.C wall: Lift wall: = x x x x x x x x x x x x x x x x x x x x x x 355.61 ft 19.00 ft 17.50 ft 9.50 ft 2.00 ft 1.67 ft 19.00 ft 9.50 ft 3.00 ft 2.00 ft 3.00 ft 21.00 ft 11.00 ft 5.00 ft 3.00 ft 8.00 ft 6.50 ft 12.00 ft 15.00 ft 16.00 ft 10.00 ft 5.00 ft 16.00 ft x x x x x x x x x x x x x x x x x x x x x x x 0.42 ft 12.00 ft 12.00 ft 8.50 ft 3.00 ft 3.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.17 ft 1.17 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft = 16320.00 = = = = = = = = = = = 149.36 228.00 420.00 323.00 90.00 105.21 38.00 38.00 12.00 4.00 6.00 sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
Total Tk 216.00
x x
69.50 ft 43.50 ft
x x
180.00 ft 90.00 ft
(A)
(B)
1 2 4 15 21 2 4 4 2 2 1
Main stair wall = 21.00 = = = = = = = = 22.00 10.00 6.00 37.44 30.42 20.16 12.60 13.44 Electric room wall 2 2 2 Shear w 4 4 Brick/W 4 2 2 Main stair attached: 2 2 1
28 OF 55
= = = =
@ Tk 1044.00 Tk 3020175.79 Item-32 CE's-03.5.2 Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other charges and costs of tools and plants etc. all complete and accepted by the Engineer. (Cement: CEM-II/A-M) Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2 At level (+) 25'-0" Ghoondy 2 x 69.50 ft = 139.00 2 x 180.00 ft = 360.00 2 x 43.50 ft = 87.00 2 x 90.00 ft = 180.00 Column Side : 14 x 2 x 3.00 ft = 84.00 14 x 2 x 2.00 ft = 56.00 9 x 2 x 3.00 ft = 54.00 9 x 2 x 1.67 ft = 30.06 10 x 1 x 6.53 ft = 65.30 = 1055.36 0.50 x 1055.36 x 0.42 ft x 0.50 ft = 110.81 At level (+) 80'-0" Ghoondy E/W 4 x 159.17 ft = 636.68 N/S 4 x 47.17 ft = 188.68 8 x 1.50 ft = 12.00 Stair attached: 4 x 14.00 ft = 56.00 Lift attached: 2 x 11.08 ft = 22.16 2 x 46.00 ft = 92.00 = 1007.52 Deduct: Lift core 2 x 19.50 ft = 39.00 = 968.52 0.50 x 968.52 x 0.42 ft x 0.50 ft = 101.69 Column Side : 15 x 2 x 3.83 ft = 114.90 15 x 2 x 2.00 ft = 60.00 21 x 2 x 3.83 ft = 160.86 21 x 2 x 1.67 ft = 70.14 = 405.90 0.50 x 405.90 x 0.42 ft x 0.50 ft = 42.62 Total = (A + B + C) = 255.13 = 7.22 @ Tk 6358.00 per cum
(B)
(A)
rft rft rft rft rft rft rft rft rft rft cft rft rft rft rft rft rft rft rft rft cft rft rft rft rft rft cft cft cum =
(A)
(B)
(B)
(C) Tk 45932.23
Item-33
29 OF 55
CE's-19.1.3 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 3/4" x 3/4" x 1/8" channel placed @ 112 mm c/c vertically and connecting the same with each other by 20 x 3 mm M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different M.S. members to required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position in between 2 (two) Nos. 50 x 50 x 6 mm M.S. Tee rail made by welding 2 Nos. 50 x 6 mm M.S. flat bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required Nos. 150 mm to 225 mm long 38 x 6 mm M.S. flat bar clamps one end welded with the gate member and the other end bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the damages by pouring concrete (1:2:4) into the holes and finishing, etc complete, painting 2 (two) coats with approved best quality synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including greasing, electrodes, curing etc. complete as per drawing and design and accepted by the Engineer.(Rate is excluding the cost of paint). 2 x 8.00 ft x @ Item-34 CE's-16.6 7.00 ft = Tk 4236.00 = 112.00 10.41 per sqm sft sqm =
Tk 44075.81
Manufacturing, supplying, fitting and fixing M.S. tube (angle box) post (bottom end bifurcated) made by thorough welding of two Nos. 38 x 38 x 6 mm M.S. angle and vertically placing the post into C.C. or R.C.C. foundation including cutting angle to required shape and size including covering the top of the post with 6 mm thick M.S. plate etc. all complete as per drawing. (Rate is excluding the cost of C.C./R.C.C. foundation and paint) At level (+) 7'-0" 12 x @ 7.00 ft = Tk 816.00 = 84.00 25.60 per rm rft rm =
Tk 20891.19
Item-35 CE's-16.6
Painting to door and window frames and shutters in two coats with approved best quality and colour of synthetic enamel paint delivered from authorized local agent of the manufacturer in a sealed container, having highly water resistant, high bondibilty, flexible, using specific brand thinner applied by brass/roller/spray over a coat of priming elapsing time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing and polishing with sand paper and necessary tools, scaffolding, testing charges etc. all complete in all floors approved and accepted by the Engineer. 12 6 x x 0.50 ft 3.00 ft sft same as item- 14x1.5 x 7.00 ft x 7.00 ft sft same as item- 20 = @ Tk 150.00 = = = = = 168.00 42.00 126.00 2535.20 2871.20 266.74 per sqm sft sft sft sft sft sqm =
Tk 40011.08
Item-36 CE's-16.8.2 Plastic emulsion paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, applying to wall and ceiling in two coats over lime putty of specified brand applied on primer or sealer elapsing specified time for drying/recoating including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects, sand papering the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floors accepted by the Engineer. Lime putty to be applied as per manufacturer instructions approved and accepted by the Engineer. A) At level (-) 6'-0" Ceiling 1 Wall 2 4
x x
176.00 ft 20.00 ft
x x
69.00 ft 12.00 ft
= 12144.00 = 1920.00
sft sft
30 OF 55
20.00 ft
8.00 ft
B) At level (+) 7'-0" & Porch Grid-13 to 16 Ceiling 1 x Beam N/S 2 21 x Rib 2 7 x E/W 2 32 x Wall 2 1 x Vault room Wall N/S 1 1 x 1 1 x 1 1 x 1 1 x E/W 1 1 x 1 1 x 1 1 x 1 1 x Self 1 2 x Colm 25 1 x Porch Ceiling 1 x Beam N/S 15 2 x 2 1 x 2 1 x E/W 2 1 x 7 2 x Colm 5 1 x
180.00 ft 19.50 ft 19.50 ft 20.00 ft 45.00 ft 13.00 ft 12.75 ft 11.58 ft 11.83 ft 12.17 ft 10.25 ft 11.33 ft 11.75 ft 10.25 ft 10.50 ft 90.00 ft 42.00 ft 42.00 ft 42.00 ft 86.00 ft 86.00 ft 10.50 ft
x x x x x x x x x x x x x x x x x x x x x x
70.00 ft 1.50 ft 1.50 ft 1.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 6.00 ft 17.50 ft 44.00 ft 2.63 ft 3.00 ft 2.92 ft 2.92 ft 2.63 ft 17.67 ft
= 12600.00 = = = = = = = = = = = = = = 1228.50 409.50 1920.00 1575.00 227.50 223.13 202.65 207.03 212.98 179.38 198.28 205.63 123.00 4593.75
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm sqm sqm sqm =
= 3960.00 3313.80 252.00 245.28 502.24 3166.52 927.68 36473.82 = 3388.50 = 370.40 = 3652.00 = 1128.18 = 9905.12 per sqm = = = = = = =
Sqm same as item- 27 (A+D) Sqm same as item- 29 Sqm same as item- 30 (A + B + C(B)+D+E+F(B)) @ Item-37 CE's-16.4 Tk 186.00
Tk 1842352.12
On exterior surface applying as per manufacturer instructions 3 coat of weather coat of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container complete in all respect in all loors and accepted by the Engineer. Sqm same as item-27 (B+C) Sqm same as item-30(C(B)+F(B)) Outside +3'-0" to +25'-0" level East- West side 2 x 2 x 3 x 4 x 3 x 4 x 1 x 2 x = 1584.75 = 469.16 sqm sqm
x x x x x x x x
= = = = = = = =
31 OF 55
Southside
Drop Bott. Southside Ceil Beam Curve wall West & East side Curve line
2 2 2 2 2 2 2 1 12 9 4 1 1 2 4 1
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
12.17 ft 7.75 ft 2.42 ft 9.75 ft 12.25 ft 8.33 ft 4.92 ft 9.33 ft 9.67 ft 9.67 ft 9.75 ft 65.50 ft 65.50 ft 6.00 ft 4.00 ft 65.50 ft 49.00 ft 2.33 ft 49.00 ft 44.50 ft 2.00 ft 1.00 ft 4.50ft 6.33ft 6.33ft 7.50ft 6.25ft 14.33ft 9.67ft 3.00ft 8.00ft 9.75ft 3.00ft 3.00ft 3.00ft
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 2.17 ft 1.00 ft 1.00 ft 3.33 ft 6.00 ft 1.50 ft 1.50 ft 3.00 ft 4.50 ft 0.50 ft 4.00 ft 0.50 ft 0.50 ft 0.50 ft 4.50ft 2.50ft 2.00ft 5.50ft 5.50ft 6.83ft 6.83ft 7.00ft 2.25ft 4.50ft 3.83ft 3.83ft 14.00ft = = = = = = = = = = = = = =
= = = = = = = = = = = = = = = = = = = = = =
535.48 341.00 106.48 429.00 539.00 366.52 216.48 205.26 251.81 87.03 39.00 218.12 393.00 18.00 24.00 196.50 441.00 18.64 392.00 44.50 4.00 1.00
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm =
@ Item-38 CE's-16.7
Total Tk 166.00
-162.00 -63.30 -50.64 -123.75 -68.75 -489.37 -198.14 -21.00 -36.00 -175.50 -22.98 -11.49 -42.00 9401.63 = 873.43 = 2927.35 per sqm
Tk 485940.02
Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local agent of the manufacturer in a sealed container, applying to wall and ceiling in 2 coats over a coat of brand specified primer or sealer elapsing specified time for drying/ recoating matt finish including cleaning and sand papering making the surface free from loose and flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applying the paint by brush/roller and necessary scaffolding etc. all complete in all floors accepted by the Engineer. A) At level (+) 3'-0" Store room south east 2 2 2 2 Ceil. 2 1 Deduction Door -2 -1 -1
x x x x x x
x x x x x x
32 OF 55
Sub-station Ceil. 1 Beam 2 2 Colm 1 1 wall 2 cobla 4 1 Deduction Door wall 2 2 1 Deduction Door
1 4 2 1 1 1 1 1 -1 2 2 2 -4 -4 -4 -1
x x x x x x x x x x x x x x x x
43.00 ft 20.33 ft 19.54 ft 10.50 ft 7.83 ft 44.50 ft 0.42 ft 43.00 ft 19.50 ft 4.50 ft 7.17 ft 24.50 ft 8.00 ft 8.00 ft 5.50 ft 19.25 ft
x x x x x x x x x x x x x x x x @
44.50 ft 1.50 ft 1.50 ft 21.50 ft 21.50 ft 21.00 ft 21.00 ft 21.50 ft 2.17 ft 9.17 ft 9.17 ft 9.17 ft 7.00 ft 2.00 ft 2.00 ft 2.00 ft = Tk 122.00
= = = = = = = = = = = = = = = = =
1913.50 243.96 117.24 225.75 168.35 1869.00 35.28 924.50 -42.32 165.06 263.00 449.33 -224.00 -64.00 -44.00 -38.50 7620.77 707.99 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =
Tk 86374.40
Item-39 CE's-16.14
French polishing to door and window frames and shutters three coats over a coat of priming including putty, cleaning finishing and polishing with sand paper etc. all complete in all floors accepted by the Engineer. At level (-) 6'-0" to (-) 9'-0" (i) Store 4 (ii) G.F Vault 3 (iii) Presspart 5 At ground floor (i) North side hallroom attached officers toilet Door 5 2 4 2 (ii) Porchside Door 2 2 At first floor (i) Sft qnty. Same as ground floor (ii)3 nos members accomodation 28 5 At 2nd floor (i) 2 nos Deputy Secretary room (new accomodation) Door 2 2 2.5 1.25 x x 7.00ft 7.00ft x x 3.33ft 2.50ft = 116.55 = 43.75 sft sft 2.5 2.5 x x 3.00ft 2.17ft x x 6.83ft 6.83ft = 1434.30 = 185.26 = 2297.69 sft sft sft = 678.13 sft 1.25 1.25 x x 3.00ft 2.50ft x x 7.00ft 7.00ft = 52.50 = 43.75 = 678.13 sft sft sft 1.25 1.25 2.5 2.5 x x x x 2.50ft 3.00ft 3.00ft 6.00ft x x x x 7.00ft 7.00ft 7.00ft 7.00ft = 109.38 = 52.50 = 210.00 = 210.00 sft sft sft sft 2.5 x 6.00ft x 6.83ft = 512.25 = 1237.05 sft sft 2.5 x 6.00ft x 7.00ft = 315.00 sft 2.5 x 6.00ft x 6.83ft = 409.80 sft
33 OF 55
Louv.
2.5
2.50ft
2.25ft Total
Tk 230.00
Item-40 CE's-18.2.3 Supplying, fitting and fixing of 9 mm thick perforated gypsum board false ceiling with aluminium T bar frame in natural anodized frame at 600 mm x 600 mm grid suspended from ceiling by 12 SWG double ply G.I. Wire (+) 14'-0" Level: 3 nos members room (new accomodation) Member 3 22.00 ft x 22.08 ft Scrutinize & Moderate room 1 45.00 ft x 40.00 ft (+) 25'-0" Level Commission room 1 42.50 ft x 23.08 ft Meeting room 1 19.00 ft x 21.50 ft Lobby 1 19.00 ft x 20.67 ft Library 1 39.08 ft x 42.83 ft 2 4.75 ft x 5.83 ft 1 6.00 ft x 7.58 ft (+) 36'-0" Level Secretary room 1 15.50 ft x 21.67 ft Rest room 1 8.00 ft x 9.00 ft J.S room 1 20.67 ft x 12.00 ft Rest room 1 5.08 ft x 8.50 ft Exam. Contr. Cadre 1 13.67 ft x 21.17 ft Exam. Contr. Non-Cadre 1 13.83 ft x 21.17 ft D.S room(S-W) 2 13.58 ft x 12.75 ft D.S room(S-E) 2 13.58 ft x 12.75 ft Director room(S-E) 2 13.58 ft x 12.75 ft (+) 47'-0" Level Chairman room 1 25.75 ft x 32.75 ft Rest room 1 12.50 ft x 12.75 ft 1 9.25 ft x 12.33 ft 1 6.83 ft x 8.00 ft Conference 1 23.08 ft x 31.83 ft Member (S-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft (+) 58'-0" Level Member (S-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (S-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft (+) 69'-0" Level = = 1457.28 1800.00 sft sft
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
980.90 408.50 392.73 1673.80 55.39 45.48 335.89 72.00 248.04 43.18 289.39 292.78 346.29 346.29 346.29 843.31 159.38 114.05 54.64 734.64 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
34 OF 55
Member (S-W) 1 24.67 ft Rest room 1 7.58 ft Member (S-E) 1 24.67 ft Rest room 1 7.58 ft Member (N-W) 1 24.67 ft Rest room 1 7.58 ft Member (N-E) 1 24.67 ft Rest room 1 7.58 ft Lift Lobby from G.F to 4th floor 4 19.50 ft 4 8.00 ft 8 4.50 ft 4th Floor to 6th floor 3 19.50 ft 3 8.00 ft 6 4.50 ft 4th Floor to 6th floor 3 x 2 136.50 ft 3 x 2 19.33 ft 3 x 2 14.00 ft
x x x x x x x x x x x x x x x x x
24.83 ft 8.08 ft 24.83 ft 8.08 ft 24.83 ft 8.08 ft 24.83 ft 8.08 ft 46.00 ft 11.50 ft 13.50 ft 46.00 ft 9.50 ft 13.50 ft 7.50 ft 5.00 ft 8.00 ft
= = = = = = = = = = = = = = = = = = =
612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 3588.00 368.00 486.00 2691.00 228.00 364.50 6142.50 579.90 672.00 33571.97 3118.91 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm
@ Tk 1426.00 = Tk 4447568.05 Item-41 CE's-18.3.1 Supplying, fitting and fixing 12 mm thick Burma Teak (BT) Veneered board in walling with best quality and well seasoned Garjan wood frame of section 75 x 38 mm at 600 x 600 mm in grid, fitted and fixed to wall by plugs, nails, screws etc. including treatment of inner surface with termite and damp proofing agent maintaining leveled and finished exposed faces including. making holes in wall and mending good the damages. If any, during execution of the work including. cost and carriage of all materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. including French polishing 3 coats over a coat of priming as per item No. 137 of the schedule etc. all complete as per design, approved sample and accepted by the Engineer. (+) 25'-0" Level 2 2 2 2 2 2 2 1 1 1 2 2 2 2 Commission room 23.08 ft x 42.50 ft x 19.00 ft x 21.50 ft x 19.00 ft x 20.67 ft x 35.50 ft x 59.00 ft x 10.67 ft x 13.17 ft x 3.33 ft x 6.00 ft x 7.00 ft x 3.33 ft x
9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft
= = = = = = = = = = = = = = = = = = =
415.44 765.00 342.00 387.00 342.00 372.06 639.00 531.00 96.03 118.53 59.94 108.00 126.00 59.94 4361.94 168.00 192.50 360.50 4001.44
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
4 5
6.00 ft 5.50 ft
x x
35 OF 55
Chairman room
Conference
2 2 2 2 2 2 2 2 2 2
25.75 ft 25.75 ft 12.50 ft 12.75 ft 9.25 ft 12.33 ft 6.83 ft 8.00 ft 23.08 ft 31.83 ft
x x x x x x x x x x
9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft Sub-Total Total Tk 2784.00
= = = = = = = = = = = =
@ Item-42 CE's-20.4
463.50 463.50 225.00 229.50 166.50 221.94 122.94 144.00 415.44 572.94 3025.26 7026.70 652.80 per sqm
sft sft sft sft sft sft sft sft sft sft sft sft sqm = Tk 1817385.06
Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick 2.5 dia pipe for hand-rail as per drawing supplied by architect or engineer and accepted by the Engineer. (i)G.F: Visible ramp West side Basement to PL 2 2 1 1 1 (ii) G.F to F.F 1 1 1 (iii) F.F to 2nd F.: 1 1 1 6 1 1 1 2 = 32.00ft 22.00ft 24.00ft 10.00ft 934.00ft x @Tk = = = = = 3.25ft = = 5839.00 32.00 22.00 24.00 120.00 934.00 3035.50 282.00 per rm Rft Rft Rft Rft Rft sft sqm = Tk 1646626.21 1 1 1 32.00ft 22.00ft 24.00ft = = = 32.00 22.00 24.00 Rft Rft Rft 2 2 1 1 1 72.50ft 72.50ft 32.00ft 22.00ft 24.00ft = = = = = 290.00 290.00 32.00 22.00 24.00 Rft Rft Rft Rft Rft
Item-43 CE's-22.2
Supplying, fitting and fixing of 20mm dia foreign made aluminium pipe curtain rail for door and window including cutting and fitting fixing as per required measurement and supplying necessary screws, electric drill and rowel plug including charge of electricity etc. complete and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = = = 141.00 50.00 Rft Rft Rft Rft Rm = Tk 36726.61
@Tk Item-44
500.00
36 OF 55
CE's-22.5
Supplying, fitting and fixing of C.T wood strip (62 x 25 x 20 mm) for fixing of aluminium curtain rails as per design and drawing fitted and fixed in position including supply of screws, nails, drilling etc. and two coats of French polishing over a coat of priming etc. all complete and accepted by the Engineer. (Rate is excluding the cost of polishing and painting etc.) (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = = = 141.00 50.00 Rft Rft Rft Rft Rm = Tk 40032.00
545.00
Supplying, fitting and fixing vertical Venetian blinds made with glass fiber fabrics (foreign made) with supply of all materials (foreign made) such as Head rail (Aluminium), end capset, rod till, sigger (stopper) runner, spacer (link), Handling cord, ball chain, link chair, cordweight weight-plate plastic washer, glass fiber fabrics, and head cap-set etc. all complete and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = 241.00sft x @Tk 7.50ft 1126.00 = = = = = = 141.00 50.00 50.00 241.00 1807.50 167.92 per sqm Rft Rft Rft Rft Sft Sqm = Tk 189078.87
Item-46 CE's-12.24
Supplying, fitting and fixing of best quality magnetic door shock absorber including all necessary tools and accessories etc. all complete approved and accepted by the Engineer (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 @Tk 215.00 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 10965.00
Item-47 CE's-12.25
Supplying, fitting and fixing best quality heavy type 19 mm dia and to 300 mm long brass hasp bolt including cutting grooves in door shutter and frames, screws etc. all complete approved and accepted by the Engineer. (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 @Tk 322.00 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 16422.00
37 OF 55
Item-48 CE's-30.18.2 Supplying and placing of coloured engraved cement concrete tiles (250 x 250 mm) in size having minimum thickness 24 mm over 12 mm sand cement mortar (4:1) each at a distance of 6 mm apart and filling the joints with cement sand mortar (1:4) including raking out joints and cutting the tiles to required sizes wherever necessary with high class recessed pointing, cleaning and washing of sand, curing for min 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted by the Engineer. Basement level East and West side 1 x 133.68 ft x @ 36'-0"Level East and West side 2 2 2 x x x 40.00 ft 9.58 ft 8.50 ft x x x 13.00 ft 6.25 ft 38.25 ft = = = = = 1040.00 119.75 1300.50 2460.25 228.56 per sqm sft sft sft sft sqm = Tk 215898.14 133.68 ft Tk 868.00 = = 17870.34 1660.20 per sqm sft sqm = Tk 1441049.54
Tk 944.59
= = = = =
@ Item-49 R's-5(a-i)
Tk 970.12
Dismantling unserviceable/ damaged brick works of thickness 250 mm and above in cement or lime in foundation and superstructure etc. as per direction of the Engineer-incharge. 250 mm brick work 1 0.83 x 6.00 ft x @ 7.00 ft Tk 247.00 = 34.86 = 0.99 per cum cft cum = Tk 243.82
Item-50 R's-5(a-ii)
Dismantling unserviceable/damaged brick works of thickness 75/125 mm in cement or lime in foundation and superstructure etc. as per direction of the Engineer-in-charge. 125 mm brick work 2 2 x x 21.50 ft 6.00 ft x x 10.50 ft 7.50 ft = = = = 451.50 90.00 541.50 50.31 per sqm sft sft sft sqm = Tk 1760.73
@ Item-51 R's-8(d)
Tk 35.00
Cleaning and refilling of worn out joints between glazed tiles in floor or walls etc. as per direction of Engineer-in-charge A) Ground floor North east corner officer's toilet Floor 2 x Wall 2 x North sidet corner officer's toilet 1 x Skirting 2 x
x x x x
38 OF 55
2 4
x x
42.08 ft 10.58 ft 66.00 ft 66.00 ft 44.50 ft 7.50 ft 10.50 ft 21.50 ft 7.25 ft 5.83 ft 8.58 ft 30.17 ft 21.50 ft 9.83 ft 4.00 ft 16.00 ft 3.00 ft 40.00 ft 46.00 ft 40.00 ft 40.00 ft 23.50 ft 5.83 ft 5.83 ft 14.00 ft 12.00 ft 22.75 ft 8.00 ft 8.00 ft 12.00 ft 1.00 ft 11.50 ft 29.00 ft 5.83 ft 5.83 ft 0.50 ft 6.50 ft 44.00 ft 5.83 ft 5.83 ft 12.00 ft 19.50 ft 8.00 ft 4.50 ft 66.00 ft 66.00 ft 44.50 ft 40.00 ft 7.50 ft 9.50 ft 14.33 ft 14.58 ft
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
0.50 ft 0.50 ft 44.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 9.83 ft 1.67 ft 1.67 ft 6.50 ft 8.00 ft 8.00 ft 8.00 ft 8.00 ft 8.00 ft 5.00 ft 13.00 ft 5.25 ft 6.00 ft 0.50 ft 12.00 ft 0.83 ft 0.50 ft 8.33 ft 6.00 ft 11.50 ft 1.00 ft 0.50 ft 6.00 ft 0.50 ft 0.50 ft 0.50 ft 1.00 ft 0.50 ft 0.50 ft 6.50 ft 0.50 ft 1.00 ft 0.50 ft 6.00 ft 46.00 ft 11.50 ft 14.00 ft 44.50 ft 0.50 ft 0.50 ft 13.00 ft 0.50 ft 0.50 ft 9.00 ft 4.33 ft
= 42.08 = 21.16 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 2937.00 66.00 44.50 7.50 5.25 422.69 24.22 9.74 55.77 241.36 688.00 314.56 256.00 384.00 60.00 520.00 241.50 240.00 120.00 846.00 319.37 192.39 466.48 216.00 523.25 320.00 176.00 144.00 10.00 11.50 29.00 110.77 64.13 4.75 84.50 22.00 233.20 128.26 144.00 897.00 92.00 126.00 2937.00 66.00 44.50 520.00 7.50 4.75
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
1 x 2 x 2 x Col 2 x 1 x South west toilet block 2 x 2 x 1 x 1 x Wall 1 x 4 x 4 x 8 x 3 x 4 x 1 x 1 x 1 x 6 x Stair room 3 nos 3 x Tread 66 x Riser 66 x Landing 4 x floor 3 x South side stair room 2 nos 2 x Tread 40 x Riser 44 x Landing 2 x Stepside 20 x 2 x landing side 2 x Main stair Tread 19 x Riser 22 x Stepside 19 x Landing 2 x wall 1 x Free standing stair Tread 40 x Riser 44 x Landing 2 x Lift lobby 1 x Gap 1 x 2 x East side hall room 1 x Skirting 2 x 2 x Ver. 1 x Col 2 x 1 x Toilet 1 x 1 x
= 128.97 = 63.13
39 OF 55
Skirting wall
1 20 4 2 2 2 2
x x x x x x x
x x x x x x x
Total area of F.F = same as G.F Add: FF East west side Ver. 2 x 42.00 ft x 4.50 ft Total Tk 56.00
= = = = = = = = =
sft sft sft sft sft sft sft sft sft sft sft sqm
@ Item-52 R's-22
= Tk 230465.27
Taking out unserviceable wooden Chowkat /door or window frame etc. as per direction of Engineer-in-charge 1 x 6 Nos @ Tk 138.00 = 6.00 each no = Tk 828.00
Item-53 R's-48(b)
Renewing synthetic enamel paint to door-windows frame and shutter etc. as per direction of Engineer-in-charge: 2 coats Window grill 8 0.75 x 2 0.75 x 2 0.75 x 5 0.75 x 4 0.75 x 4 0.75 x 4 0.75 x 3 0.75 x 1 0.75 x 1 1.25 x Ground floor northside hall room Door 13 2.5 x 5 1.25 x 1 1.25 x Ground floor substation Door 2 2 x grill 2 0.75 x 2 0.75 x 1 0.75 x 2 2 x 2 2 x 2 2 x 2 2 x Porch side 4 2.5 x 2 1.25 x 2 1.25 x 4.50 ft 7.50 ft 6.25 ft 14.33 ft 6.33 ft 6.33 ft 1.75 ft 3.00 ft 3.00 ft 7.00 ft 2.50 ft 3.00 ft 2.50 ft 8.00 ft 8.00 ft 5.50 ft 96.00 ft 20.83 ft 20.00 ft 21.00 ft 11.25 ft 2.50 ft 3.00 ft 2.50 ft x x x x x x x x x x x x x x x x x x x x x x x x 4.50 ft 5.50 ft 5.50 ft 6.83 ft 2.50 ft 2.00 ft 4.50 ft 3.83 ft 14.00 ft 3.00 ft 7.00 ft 7.00 ft 7.00 ft 7.00 ft 2.00 ft 2.00 ft 11.83 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 7.00 ft 7.00 ft 7.00 ft = = = = = = = = = = 121.50 61.88 51.56 367.03 47.48 37.98 23.63 25.85 31.50 26.25 sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm = Tk 28336.98
= 568.75 = 131.25 = 21.88 = = = = = = = = = = = = = 224.00 24.00 16.50 851.76 41.66 40.00 42.00 22.50 175.00 52.50 43.75 3050.19 283.37 per sqm
@ Item-54 R's-51(b)
Tk 100.00
Renewing acrylic emulsion paint to walls and ceiling etc. as per direction of Engineer-incharge: 2 coats A) Ground floor
40 OF 55
Northside hall room: Ceiling 1 x Beamside E/W 5 2 x Stair beam 1 2 x N/S 8 2 x Col. 4 1 x wall N/S 1 2 x E/W 1 2 x Deduction Door -1 x -2 x -6 x Window -1 x Store room wall 2 x Beamside E/W 2 2 x Deduction fanlight -1 x Col,cobla 10 1 x Deduction Door -2 x Off. Toilet Ceiling 2 x wall 1 1 x Receiption hall 1 Ceiling 1 x Beamside E/W 2 2 x 2 2 x N/S 2 3 x wall N/S 2 1 x E/W 2 1 x Col. 2 1 x 2 1 x Deduction Door -4 x Thai wall -2 x South-west corner toilet block
106.75 ft 20.00 ft 20.00 ft 19.50 ft 10.58 ft 42.08 ft 106.75 ft 2.50 ft 3.33 ft 6.00 ft 4.50 ft 42.08 ft 20.00 ft 20.00 ft 10.00 ft 3.33 ft 6.00 ft 25.00 ft 66.00 ft 20.25 ft 20.58 ft 19.50 ft 66.00 ft 44.50 ft 7.50 ft 10.50 ft 3.00 ft 19.00 ft
x x x x x x x x x x x x x x x x x x x x x x x x x x x x
42.08 ft 1.50 ft 1.00 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 7.00 ft 7.00 ft 4.50 ft 10.00 ft 10.00 ft 1.00 ft 0.50 ft 7.00 ft 6.50 ft 2.50 ft 44.50 ft 1.50 ft 1.50 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 9.00 ft
= = = = = = = = = = =
4492.04 300.00 40.00 468.00 423.20 841.60 2135.00 -17.50 -46.62 -252.00 -20.25
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
= 841.60 = 800.00 = -20.00 = 50.00 = -46.62 = 78.00 = 62.50 = = = = = = = = 2937.00 121.50 123.48 175.50 1320.00 890.00 150.00 210.00
= -84.00 = -342.00
41 OF 55
1 2 2 1 2
4 1 1 1 1 1 1 -2 1 1 1
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
21.50 ft 40.00 ft 46.00 ft 3.00 ft 19.50 ft 50.00 ft 16.00 ft 6.00 ft 2.00 ft 19.50 ft 46.00 ft 19.00 ft 4.42 ft 1.00 ft 5.00 ft 11.50 ft 11.50 ft 19.50 ft 46.00 ft 14.00 ft 14.00 ft 4.50 ft 4.00 ft 3.00 ft 12.00 ft 6.50 ft 12.33 ft 3.00 ft 19.00 ft 12.00 ft 8.50 ft 9.00 ft 6.00 ft 66.50 ft
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
9.83 ft 13.00 ft 5.25 ft 1.50 ft 1.50 ft 1.50 ft 10.00 ft 7.00 ft 10.00 ft 10.00 ft 10.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 10.00 ft 8.00 ft 2.58 ft 19.50 ft 4.50 ft 10.00 ft 10.00 ft 8.00 ft 7.00 ft 10.00 ft 10.00 ft 6.50 ft 7.00 ft 10.00 ft 10.00 ft 6.33 ft 6.58 ft 6.00 ft 44.33 ft
= = = = = = =
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
1 2 2
= -84.00 = 20.00 = 390.00 = 920.00 = = = = = = = = -171.00 -79.56 -9.00 -90.00 230.00 92.00 100.62 897.00
Deduction -1 -2 -1 -2 Two Lift middle gap 2 1 Ceil. 1 1 Beam 2 1 Ceil. 1 1 Main stair side Ceil. 2 1 wall 4 1 2 1 Deduction Door -2 -2 Electric room wall 2 2 2 2 Ceil. 2 1 Deduction Door -2 Main stair room 1 1 2 1 Fl. 2 1 1 1 Landing 2 1 Eastside hall room Ceil. 1 1
= 126.00 = 560.00 = 90.00 = -64.00 = -42.00 = 480.00 = 260.00 = 160.29 = -42.00 = = = = = 190.00 240.00 107.61 59.22 72.00
= 2947.95
42 OF 55
6 4 8 2 1 2
1 1 1 1 1 1 -2 -1 -4 1 -2 -2 1 2 1
x x x x x x x x x x x x x x x
19.50 ft 19.00 ft 20.33 ft 7.50 ft 9.50 ft 42.67 ft 3.00 ft 6.00 ft 6.00 ft 66.50 ft 19.00 ft 4.00 ft 40.00 ft 19.00 ft 50.00 ft
x x x x x x x x x x x x x x x x x x
1.50 ft 1.50 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 7.00 ft 7.00 ft 10.00 ft 9.00 ft 8.00 ft 13.00 ft 1.50 ft 1.50 ft 5.00 ft 10.00 ft 7.00 ft
= = = = = = = = = = = =
175.50 114.00 243.96 150.00 95.00 853.40 -42.00 -42.00 -168.00 1330.00 -342.00 -64.00
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft
Wall
1 2 1
1 1 x 46.00 ft wall 2 1 x 16.00 ft Deduction Door -2 x 2.50 ft North East corner general toilet block East block Ceil. 1 1 x 14.33 ft wall 2 1 x 3.67 ft 2 1 x 14.33 ft West block Ceil. 1 1 x 14.58 ft wall 2 1 x 14.58 ft 2 1 x 4.33 ft Urinals
x x x x x x
43 OF 55
Ceil. 1 1 x North west corner toilet block Ceil. 1 1 x 1 1 x North East corner toilet block Ceil. 1 1 x 1 1 x For stair room For 01 no stair wall 2 2 Deduction Thai door Stair fl. 2 Ceil. 2 wall 2 2
x x x x x
(A)
1 1 -1 1 1 1 1 =
x x x x x x x
x x x x x x x x x x x x x x x x x x x x x x x
10.00 ft 10.00 ft 7.00 ft 6.00 ft 11.75 ft 10.00 ft 10.00 ft 1469.61 ft 21.75 ft 1.50 ft 14.00 ft 8.50 ft 10.00 ft 7.00 ft 10.50 ft 7.00 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 1.50 ft 1.00 ft 1.00 ft
sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm sqm
For 03 nos toilet South side stair room Ceil. 1 1 Beamside 2 1 Landing 1 1 Fl. 2 1 wall E/W 1 1 Deduction Door -1 wall N/S 2 1 Deduction Door -1 wall 1 1 1 1 1 1 1 1 Landing 2 1 Fl. 1 1 2 1 For 02 nos stair
(B)
x x x x x x x x x x x x x x x =
11.50 ft 21.75 ft 8.33 ft 10.50 ft 21.75 ft 6.00 ft 24.00 ft 6.00 ft 5.50 ft 11.50 ft 8.00 ft 6.50 ft 21.75 ft 12.25 ft 10.50 ft 2
= -42.00 = 504.00 = = = = = = = = = = = = = = -42.00 57.75 120.75 84.00 68.25 65.25 12.25 21.00 1677.25 3354.49 37812.40 3512.86 3512.86 7025.72 per sqm
= Tk 653391.56
44 OF 55
Item-55 CE's-23.2.1 Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. complete. 1 x = 22000.00sft 66000.00cft x @Tk 3.00 ft 3600 405.00 = 66000.00 cft = 18.33 Hr per hour Total Civil Cost =
= Tk 7425.00 Tk 34158291.88
45 OF 55
02
Item No-1 CES- 26.67.3
Supplying, fitting and fixing special coloured & special type glazed porcelain Combi closet-p or s trap (RAK, Model: Orient) with seat & seat cover, flushing tank and flushing unit including preparing the base with cement concrete and with wire mesh or rods if necessary, in all floors including making holes wherever required and mending good the damages and fitting, fixing, finishing etc. complete with all necessary fittings and connection approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 10047.00 nos nos nos nos nos nos nos each
= Tk 452115.00
Supplying, fitting and fixing special coloured & special type glazed porcelain W/H Basin (RAK, Model: Orient) including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 3479.00 nos nos nos nos nos nos nos each
= Tk 156555.00
Supplying, fitting and fixing special coloured & special type glazed porcelain Pedestal, (RAK, Model: Orient) with rowel plug and screws etc. all complete approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 1997.00 nos nos nos nos nos nos nos each
= Tk 89865.00
Supplying uPVC waste pipe 315 mm dia with wall thickness 7.7 mm - 9.7 mm for underground laying including fitting, fixing etc. all complete approved and accepted by the Engineer. = 820.00 = 249.92 Tk. 2581.00 rft nos each
= Tk 645053.34
46 OF 55
Construction of masonry inspection pits up to a depth of 700 mm with 250 mm thick brick work in cement mortar (1:4) including 100 mm thick R.C.C. top slab (1:2:4) with 1% reinforcement, manhole cover with locking arrangement including necessary earth work, side filling and one brick flat soling. 75 mm thick (1:3:6) base concrete for making invert channel and 12 mm thick (1:2) cement plaster with neat finishing etc. all complete approved and accepted by the Engineer. Clear 600 x 600 mm and depth 750 to 900 mm, average 825 mm for single 300 mm dia R.C.C. pipes and 375 mm and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover. Total= 64.00 @ Tk. 8164.00 nos each = Tk 522496.00
Supplying, fitting and fixing of 450 x 600 mm size and 5 mm thick unframed super quality mirror with hard boards at the back with all necessary fitting including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. (Made in Japan or equivalent) i) Ground Floor ii) 1st Floor iii) 2nd Floor iv) 3rd Floor 1x 6= 1x 12 = 1x 4 = 1x 6 = Total= @ Tk. 6.00 12.00 4.00 6.00 28.00 539.00 nos nos nos nos nos each
= Tk 15092.00
Item-8 CE's-26.20
Supplying, fitting and fixing super quality 600 x 125 mm coloured glass (plate) shelf having 5 mm thickness with fancy C.P. brackets, screws and frames including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 25.00 @ Tk. 978.00 nos each
= Tk 24450.00
Item-9 CE's-26.22
Supplying, fitting and fixing super quality C.P. Towel rail of 600 mm long and 20 mm in dia with C.P. holder including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 15.00 @ Tk. 491.00 nos each = Tk 7365.00
Item-10 CE's-26.25.1
Supplying, fitting and fixing of special coloured toilet paper holder Size (150 mm x 150 mm x 126 mm) including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 15.00 @ Tk. 571.00 nos each = Tk 8565.00
Supplying, fitting and fixing standard size soap tray including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Porcelain soap tray: colored Total= 15.00 nos @ Tk. 261.00 each = Tk 3915.00 Supplying, fitting and fixing stainless steel grating with hinged cover size 150 x 150 mm in traps or in drains including making holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 45.00 nos
47 OF 55
Tk. 139.00
each
= Tk 6255.00
Supplying 100 mm inside dia best quality uPVC soil, waste and ventilation pipe having specific gravity 1.35-1.45, wall thickness 3.4- 4.0 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating bands, sockets etc. approved and accepted by the Engineer (length: 6000 mm each).
4 5
80.00ft 95.00ft
@
Item-14 CE's-26.38.
= = = = Tk. 605.00
rm = Tk 146594.03
Supplying, fitting and fixing G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good the damages etc. all complete in all respects approved and accepted by the Engineer. A.12.5 mm dia G.I pipe 5
30.00ft @
rm = Tk 10926.55
40.00ft @
rm = Tk 18835.72
Item-15 CE's-26.40.5
Supplying different inside dia best quality CPVC pressure pipe for water supply having specific gravity 1.35 - 1.45, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer. (length: 6000 mm each) A. 37 mm dia wall thickness 3.7 mm - 4.3 mm
10.00ft @
= = Tk. 525.00
rm = Tk 8000.61
Supplying, fitting and fixing G.I. Union with approved and accepted by the Engineer. i) 20 mm dia G.I. Union i)1st Floor 1x5 = ii) 2nd Floor 1x4 = iii) 3rd Floor 1x6= Total= @ Tk.
= Tk 2100.00
Supplying, fitting and fixing best quality G.I. gate valve with sealant etc. complete approved and accepted by the Engineer. i) 20 mm brass gate valve i)1st Floor ii) 2nd Floor iii) 3rd Floor 1x4= 1x2 = 1x3= Total= @ Tk. 5.00 2.00 3.00 10.00 329.00 nos nos nos nos each
= Tk 3290.00
48 OF 55
Supplying different inside dia best quality uPVC pressure waste pipe having specific gravity 1.35 -1.45, wall thickness 2.7 mm - 3.4 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards, fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating bands, sockets etc. complete approved and accepted by the Engineer100 mm dia uPVC P or S trap 100 mm dia Total= 20.00 @ Tk. 478.00 nos each = Tk 9560.00
Supplying, fitting and fixing 12 mm dia, 600 mm long Plastic flexible lead (connection) pipe approved and accepted by the Engineer. Total= 65.00 @ Tk. 80.00 nos each = Tk 5200.00
Supplying, fitting and fixing medium best quality CP pillar cock etc. complete approved and accepted by the Engineer.12 mm CP special heavy duty pillar cock Total= 30.00 @ Tk. 930.00 nos each
= Tk 27900.00
Supplying, fitting and fixing medium best quality CP pillar cock etc. complete approved and accepted by the Engineer.12 mm CP special heavy duty pillar cock Total= 20.00 @ Tk. 831.00 nos each
= Tk 16620.00
Supplying, fitting and fixing Special/Fancy quality C.P. concealed/ surface stop cock with all necessary hardware and consumables approved and accepted by the Engineer. Stop cock concealed (heavy) Total= 35.00 @ Tk. 1018.00 nos each = Tk 35630.00
Supply and fitting-fixing hand / push shower for ablution including holder Moving type hand shower Moving type push shower Total= 45.00 @ Tk. 878.00 nos each = Tk 39510.00
49 OF 55
Groove cutting in brick work, R.C.C floor, including cost for concealing of G.I. pipe work (12 mm and 20 mm dia) in brick wall by cutting groove in wall, lintel, beam etc. by any means carefully without damaging the structure and filling the grooves with C.C (4:2:1) after laying of pipe including cost of scaffolding, finishing, curing etc. all complete approved and accepted by the Engineer. A. Groove size: 40 x 40 mm (for laying 12 to 20 mm dia pipe). 5 65.00ft = = 325.00 rft 99.06 rm
Tk. 40.00
per rm
= Tk 3962.21
= Tk 2655295.45
50 OF 55
Cost of Materials:Brick chips Sand (F.M. 1.2) Sand (F.M. 2.5) Cement 25mm X 25mm mesh 6 Wire brass 7 Extra cement for finishing 25 5.5 5.5 4.5 100 5 0.5 cft. cft. cft. bags sft. Nos. bags @ @ @ @ @ @ @
Tk. Tk. Tk. Tk. Tk. Tk. Tk. 80.00 14.00 25.00 405.75 20.00 40.00 405.75
Per cft. Per cft. Per cft. Per bag Per sft. each Per bag Sub-total
= = = = = = = = = = = =
Tk. 6,443.25
B
1. 2.
Labour Cost:Head mason 1/2 Mason 1 3 Extra Mason for finishing 1/4 4 Skilled labour 1 1/2 5 Ordinary labour for surface cleaning, curing, sand washing, materials lifting etc. 3 6 Curing for 7 days No. No. No. No. @ @ @ @
Tk. Tk. Tk. Tk.
Nos. @
Tk.
200.00
each
L.S.
Profit Overhead Add VAT with adjustment factor 1.0582 Grand total Rate per sft. Rate per sqm. Say, Tk.
Tk. Tk.
600.00 83.33
Tk. 1,044.29
Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|
Item No.- 05
12 mm thick foreign made white / black/colour Granite on walls
Considering 100 sft. of work A. Cost of materials 1. 12 mm thick Granite 2. Grey cement 3. Sand (F.M. 1.2) 4. Sand (F.M. 2.2) 5. White cement B. Cost for cutting, shaping, tools and 1. Hire charge of cutting and shapingmachine in/c cutting disc. 2. Foreman 3. Machine operator 4. Helper C. 1. 2. 3. Labour cost for laying Mason Helper Scaffolding 100 1.7 2.08 2.08 4 sft. bag cft. cft. kg @ Tk 750.00 @ Tk 375.00 @ Tk 1400.00 @ Tk 2500.00 @ Tk 28.00 Per sft. = Tk 75000.00 Per bag = Tk 637.50 Per % cft. = Tk 29.12 Per % cft. = Tk 52.00 Per kg = Tk 112.00 Sub-total = Tk 75830.62 1 1 1 1 day No. No. No. @ Tk 1660.00 @ Tk 428.57 @ Tk 333.00 @ Tk 240.00 Per day = Tk 1660.00 each each each Sub-total each each Per sft. Sub-total = = = = = = = = Tk 428.57 Tk 333.00 Tk 240.00 Tk 2661.57 Tk 1683.00 Tk 480.00 Tk 600.00 Tk 2763.00
5.5 2 100
D. Polishing 1. Hire charge of marble polishing machine in/c polishing stone 2. Machine operator 3. Helper
Per day = Tk 1327.50 = = = = = = = = = = Tk 832.50 Tk 600.00 Tk 2760.00 Tk 83916.76 Tk 8391.68 Tk 2937.09 Tk 95245.52 Tk 5543.38 Tk 100788.91 Tk 1007.89 Tk 10848.92
each each Sub-total Total (A+B+C+D) Profit 10.00% Overhead 3.50% 1.0582 5.50% Grand total Rate per sft. Rate per sqm
Sa y,
Tk.
Item No.- 26
Supplying, fitting and fixing of 6 mm thick tempered reflecting glass in aluminium curtain wall. Considering 5'-0" x 4'-0"= 20 sft. of work (A) Materials: (i) 6 mm thick Tempered reflecting (ii) glass Wastage 5% 20 1 sft. sft. @ Tk. @ Tk. 280.00 280.00 Per sft. Per sft. = Tk 5600.00 = Tk 280.00
(iii) Neoprene / rubber gasket (iv) Local carriage (B) Labour charges:
20
sft.
@ Tk.
1.60
= Tk 32.00 = Tk 40.00
Labour cost for fitting and fixing in position of 6 mm thick Tempered reflecting glass in aluminium curtain wall 20 sft. @ Tk. 8.00 Per sft. = Tk 160.00 Total (A+B) = Tk 6112.00 Profit 10.00% = Tk 611.20 Overhead 3.50% = Tk 213.92 = Tk 6937.12 Add VAT with adjustment factor 1.0582 5.50% = Tk 403.75 Grand total = Tk 7340.87 Rate per sft. = Tk 367.04 Rate per sqm. = Tk 3950.85 Say Tk. 3,951 .00 per sqm.
Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|
ANALYSIS
Item No.- 2
Supplying, fitting and fixing special coloured & special type glazed porcelain Combi closetp trap (RAK, Model: Orient ) with seat & seat cover, flushing tank and flushing unit including preparing the base with cement concrete and with wire mesh or rods if necessary, in all floors including making holes wherever required and mending good the damages and fitting, fixing, finishing etc. complete with all necessary fittings and connection approved and accepted by the Engineer.
(RAK, Model: Orient) Considering 1 No. of fixture Special type combicloset Flushing equipment Fitting fixing materials: Cement mortar (1:4) Cement Sand (F.M. 1.2) Nuts with washer Labour: Plumber Skilled labour Ordinary labour
1 1
No. No.
@ @
each = each =
5870.00 1950.00
@ @ @ @ @ @
Tk. 375.00 Tk. 1,400.00 Tk. 16.00 Tk. Tk. Tk. 347.00 250.00 200.00
Per bag = Per % = cft. = each each each each Total 10.00% 3.50%
37.50 7.00 64.00 86.75 250.00 100.00 8365.25 836.53 292.78 9494.56 552.59 10047.15 10047.00
= = = = Profit = Overhead = = 1.0582 5.50% = Grand total = Rate per No. = 10,047 .00 each
Item No.- 3
Say ,
Tk.
Supplying, fitting and fixing special coloured & special type glazed porcelain W/H Basin (RAK, Model: Orient) including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer.
(RAK, Model: Orient) 1. 2. (a) (b) (c) 3. (a) (i) (ii) (b) 4. Considering 1 No. of fixture Special coloured wash-basin Accessories: 32 mm dia PVC waste pipe Grating with brass coupling CP chain with rubber plug Fitting fixing materials: Cement mortar (1:4) Cement Sand (F.M. 1.2) CI brakets Labour: 1 No. 1 No. 1 No. 1 No. @ @ @ @ 2250 each 75 each 250 each 50 each = = = = 2250.00 75.00 250.00 50.00
@ @ @
54 OF 55
@ @ @
347 each 250 each 200 each Total Profit 10.00% Overhead 3.50% 1.0582 Grand total Rate per No.
= = = = = = = 5.50% = = =
52.05 50.00 80.00 2896.50 289.65 101.38 3287.53 191.34 3478.86 3479.00
Item No.5
Say ,
Supplying, fitting and fixing special coloured & special type glazed porcelain Pedestal, (RAK, Model: Orient) with rowel plug and screws etc. all complete approved and accepted by the Engineer.
(RAK, Model: Orient) Considering 1 No. of fixture (a) Special coloured pedestal: (b) Fitting fixing materials: (i) (c) (i) (ii) 75 mm Rowel plug with screw Labour: Plumber Skilled labour 0.1 0.25 No. No. @ @ Tk. Tk. 300.00 250.00 Profit Overhead Add VAT with adjustment factor each = each = Total = 10.00% = 3.50% = = 1.0582 5.50% = Grand total = Rate per No. = Say , Tk. 1,997 .00 each 30.00 62.50 1662.50 166.25 58.19 1886.94 109.82 1996.76 1997.00 2 Nos. @ Tk. 10.00 each = 20.00 1 No. @ Tk. 1,550.00 each = 1550.00
Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|