Name of the Work: Construction of PWD Training Academy& Testing Laboratory (Revised) Sub Head: Lot : 2-Supplying, Installation,Commissioning

of Furniture for PWD Training Academy

Analysis of Furniture per unit


S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Furniture Type Executive Table Swivel Chair Visitors Chair What Nut File Cabinet (3 Drayer) Executive Table Swivel Chair Visitors Chair What Nut Steel File Cabinet (3 Drayer) Small Table Small Chair Table Chair Visitor Chair What Nut Steel File Cabinet Table Chair Visitor Chair Computer Table Computer Chair Libraroy Table Big Size Libraroy Table Medium Chair ZvlK gmvix evwjk I Kvfvi eWwmU Market 10% 3.50% SubTotal Price Con.Profit Overhead 17250 1,725 604 19,579 10580 1,058 370 12,008 3460 346 121 3,927 6860 686 240 7,786 10820 1,082 379 12,281 14820 1,482 519 16,821 4270 427 149 4,846 3460 346 121 3,927 6860 686 240 7,786 10820 1,082 379 12,281 3540 354 124 4,018 3460 346 121 3,927 4640 464 162 5,266 3460 346 121 3,927 3460 346 121 3,927 6860 686 240 7,786 10820 1,082 379 12,281 4640 464 162 5,266 3460 346 121 3,927 3460 346 121 3,927 3010 301 105 3,416 3460 346 121 3,927 47900 4,790 1,677 54,367 21970 2,197 769 24,936 3460 346 121 3,927 1000 100 35 1,135 500 50 18 568 500 50 18 568 500 50 18 568 VAT 2.25% 440.52 270.19 88.36 175.19 276.32 378.47 109.05 88.36 175.19 276.32 90.40 88.36 118.49 88.36 88.36 175.19 276.32 118.49 88.36 88.36 76.87 88.36 1,223.25 561.06 88.36 25.54 12.77 12.77 12.77 G.Total 20,019 12,278 4,015 7,961 12,557 17,199 4,955 4,015 7,961 12,557 4,108 4,015 5,385 4,015 4,015 7,961 12,557 5,385 4,015 4,015 3,493 4,015 55,590 25,497 4,015 1,161 580 580 580

Certified that I personally checked all the non schedule items incorporated in this Estimate which are essentially required for this work. Market rate of Analysis items have been checked and Verified personally.

Sub-Assistant Enginner PWD Resource Sub-Division Allenbari, Tejgaon, Dhaka.

Sub-Divisional Engineer PWD Resource Sub-Division Allenbari, Tejgaon, Dhaka.

Sub-Assistant Enginner PWD Resource Division Allenbari, Tejgaon, Dhaka.

Executive Engineer PWD Resource Division Allenbari, Tejgaon, Dhaka.

Name of work: Construction of Bangladesh Public Service Commission Complex at Sher-e-Banglanagar, Dhaka (2nd phase).
Sub-head:- Super Structure for superior quality building category (Renovation & Modification of ground floor, first floor, second floor, third floor and other floor for accommodation of 3 nos honorable members, 3 nos Deputy Secretary, Scrutinizer & Moderation room, Vault room etc. including other ancillary works i,e false ceiling, wall penelling, marble, granite works etc.).
01. Civil works. Item-1 CE's-04.1 Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer. (Cement: CEM-II/A-M) A) Ground floor For 02 nos ramp (East west side) 0.5 4 25.00 ft x 0.83 ft For 02 nos ramp (East west side) 2 x 9.67 ft x 1.67 ft 2 x 9.67 ft x 1.25 ft 2 x 9.67 ft x 0.83 ft 2 x 0.83 ft x 0.83 ft 2 x 5.92 ft x 0.83 ft 2 x 10.75 ft x 0.83 ft 2 x 6.17 ft x 0.83 ft 2 x 5.67 ft x 0.83 ft Middle stair grid-16 2 x 5.50 ft 2 x 5.50 ft (East west side) 1 x 34.67 ft

x x x x x x x x x

3.50 ft 0.50 ft 0.50 ft 4.50 ft 3.50 ft 3.50 ft 1.58 ft 3.58 ft 3.58 ft

= 145.25 = = = = = = = = = 16.15 12.09 72.23 4.82 34.40 28.20 36.67 33.70 383.50

cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum =

x x x

0.83 ft 0.83 ft 0.83 ft

x x x

3.50 ft 4.00 ft 3.17 ft

= 31.96 = 36.52 = 91.22 = 543.19 = 15.38 per cum

@ Item-2 CE's-04.2

Tk 4688.00

Tk 72107.70

Brick works of width one brick or one and a half brick length with first class bricks in cement sand (F.M. 1.2) mortar (1:6) in superstructure including raking out joints, filling the interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) and accepted by the Engineer. (Cement: CEM-II/A-M) In ground floor A) G.F: At level (+) 7'-0". N/S 4 x 0.83 ft 1 x 0.83 ft E/W 1 x 0.83 ft 3 x 0.83 ft

x x x x

19.50 ft 8.00 ft 10.00 ft 20.33 ft

x x x x

10.00 ft 10.00 ft 10.00 ft 10.00 ft

= 647.40 = 66.40 = = = = 83.00 506.22 1303.02 36.90 per cum

cft cft cft cft cft cum =

(A) Tk 182381.79

@ Tk 4943.00 B) F.F: At level (+) 25'-0", grid 13 to 18 (D to L) (Parapet)

2 OF 55

Brick Pillar 58 x

0.83 ft

0.83 ft

x @

3.50 ft Tk 5155.00

= 139.85 = 3.96 per cum

cft cum =

Tk 20413.70

C) 7th floor: At level (+) 80'-0".(Parapet) Brick Pillar 78 x 0.83 ft x 0.83 ft

x @

3.00 ft Tk 5769.00

= 161.20 = 4.56 per cum

cft cum =

Tk 26333.79

Item-3 CE's-04.16

125 mm brick works with first class bricks in cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer. (Cement:CEM-II/A-M) A) G.F i) At level (-) 6'-0" 8 Deduct: Door C.gate Door gap -5 -1 x x x 20.00ft 6.00ft 6.00ft x x x x 12.00ft 7.00ft 7.00ft 7.00ft = = = = 1920.00 -210.00 -42.00 84.00 sft sft sft sft

4 x 3.00ft ii) At level (-) 9'-0" New wall (Grid-8 to 11, E) N/S 1 x 68.00ft 3 x 13.00ft New wall (Grid-11 to 13, K) N/S 1 x 30.00ft 4 x 5.00ft E/W 1 x 33.00ft 2 x 19.00ft Deduct: Door -4 x 6.00ft Lift door gap 2 x 5.00ft Duct wall Inside 3 x 6.33ft South west of building Outside 1 x 7.25ft Under & below disible ramp (Grid-16) 4 x 23.58ft 4 x 2.67ft

x x x x x x x x x x x x

10.00ft 10.00ft 10.00ft 10.00ft 10.00ft 10.00ft 7.00ft 9.00ft 10.50ft 14.00ft 2.58ft 1.00ft Total

= = = = = = = = = = = = = =

680.00 390.00 300.00 200.00 330.00 380.00 -168.00 90.00 199.40 101.50 243.35 10.68 4508.92 418.89 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

@ Tk 730.00 B) F.F Duct wall Inside 3 x 6.33ft x 10.50ft South west of building Outside 1 x 7.25ft x 14.00ft Lift door gap 2 x 5.00ft x 9.00ft (i) F.F:3 nos members accomodation, Scrutinize & Moderate room (a):Scrutinize & Moderate room: E/W 2 x 14.24 ft x 10.88 ft 3 x 2.50 ft x 10.88 ft

Tk 305788.93

= = =

199.40 101.50 90.00

sft sft sft

= 309.72 = 81.56

sft sft

3 OF 55

2 x 7.50 ft 3 x 2.50 ft 1 x 3.00 ft (b):3 nos members accomodation Grid-7 2 x 20.33 ft Grid-8 3 x 20.33 ft Grid-9 2 x 20.33 ft 1 x 12.25 ft 1 x 14.00 ft Grid-8-9 1 x 12.17 ft 2 x 12.25 ft 1 x 14.08 ft Grid-9-10 2 x 23.33 ft 1 x 13.25 ft 1 x 14.08 ft Grid-11 2 x 20.33 ft 1 x 10.25 ft 1 x 14.08 ft Grid-10-11 2 x 23.33 ft 1 x 13.25 ft North to south Grid-E 1 x 13.17 ft 1 x 10.00 ft Grid-F 2 x 19.50 ft 1 x 12.25 ft 1 x 10.00 ft 3 x 19.50 ft Grid-EF 1 x 13.17 ft 1 x 10.00 ft Grid-FG 3 x 14.08 ft 1 x 15.58 ft 1 x 5.00 ft 2 x 14.75 ft Grid-IJ 1 x 8.00 ft 1 x 13.25 ft 2 x 10.00 ft 1 x 13.25 ft 1 x 11.00 ft 1 x 14.67 ft 2 x 10.00 ft 1 x 19.50 ft Grid-JK 1 x 14.67 ft 2 x 10.00 ft 1 x 10.00 ft Grid-R 2 x 10.00 ft N/S

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft 10.88 ft

= 163.13 = 81.56 = 32.63 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 442.18 663.27 442.18 133.22 152.25 132.35 266.44 153.12 507.43 144.09 153.12 442.18 111.47 153.12 507.43 144.09 143.22 108.75 424.13 133.22 108.75 636.19 143.22 108.75 459.36 169.43 54.38 320.81 87.00 144.09 217.50 144.09 119.63 159.54 217.50 212.06 159.54 217.50 108.75 217.50 10422.32

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

(A)

ii) At level (+) 7'-0" to (+) 25'-0" (False slab gap) Grid 13 to 16 D to L and Grid 13 to 16 D & L N/S 2 x 70.00 ft x Grid 13 E/W 2 x 25.00 ft x Grid 16 (D to F & J to L) 2 x 46.00 ft x

2.75 ft 2.75 ft 2.75 ft Total = A+B

= 385.00 = 137.50 = = = = 253.00 775.50 11197.82 1040.30 per sqm

sft sft sft sft sft sqm =

(B)

Tk 749.00

Tk 779186.93

4 OF 55

C) 2nd floor: At level (+) 25'-0" (i) 2 nos Deputy Secretary room (new accomodation) Grid 8 to 10 & 10 to 11 E/W 2 x 19.67 ft x 2 x 19.67 ft x 2 x 13.67 ft x N/S 2 x 19.67 ft x 2 x 19.67 ft x 2 x 13.67 ft x Lift door gap 2 x 5.00ft x Deduction Door -2 x 3.33 ft x -2 x 2.50 ft x P.A -2 x 7.00 ft x Window -4 x 6.00 ft x

10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 9.00ft 7.00 ft 7.00 ft 7.00 ft 4.50 ft =

= = = = = =

413.07 413.07 287.07 413.07 413.07 287.07 90.00

sft sft sft sft sft sft sft sft sft sft sft sft sqm

= = = = = =

-46.62 -35.00 -98.00 -108.00 2028.80 188.48

(A)

(ii) Grid 13 to 18 (D to L) (Parapet) Grid 13 to 14, D to H E/W 1 x 146.00 ft Grid 13 E to D & KL E/W 2 x 23.50 ft Grid 13 to 16 D & L N/S 2 x 69.50 ft Grid 16 (D to F & J to L) E/W 2 x 45.00 ft Grid 16 to 18 (F & J) N/S 2 x 43.50 ft Grid 18 E/W 4 x 20.00 ft

x x x x x x

3.50 ft 3.50 ft 3.50 ft 3.50 ft 3.50 ft 3.50 ft

= 511.00 = 164.50 = 486.50 = 315.00 = 304.50 = = = = 280.00 2061.50 191.52 380.00 per sqm

sft sft sft sft sft sft sft sqm sqm =

@ D) 3rd floor: At level (+) 36'-0" (i) 2 nos Deputy Secretary room (new accomodation) DS room attached to exam. Controller (cadre) E/W 1 x 21.58 ft x 1 x 8.83 ft x N/S 1 x 14.75 ft x 1 x 12.17 ft x Lift door gap 2 x 5.00ft x DS room attached to exam. Controller (Non-Cadre) E/W 1 x 20.33 ft x 1 x 16.58 ft x N/S 2 x 13.00 ft x 1 x 8.00 ft x Toilet inside 1 x 7.00 ft x

Total =A+B Tk 768.00

(B) (C) Tk 291838.57

10.50 ft 10.50 ft 10.50 ft 10.50 ft 9.00ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 8.00 ft =

= = = =

226.59 92.72 154.88 127.79 90.00

sft sft sft sft sft sft sft sft sft sft sft sqm =

= = = = = = =

@ E) 4th floor: At level (+) 47'-0" Lift door gap 2 x

Tk 787.00

213.47 174.09 273.00 84.00 56.00 1492.52 138.66 persqm

(A) Tk 109124.23

5.00ft

9.00ft

90.00 = 8.36

sft sqm

5 OF 55

@ F) 5th floor: At level (+) 58'-0" Lift door gap 2 x

Tk 806.00

persqm

Tk 6739.13

5.00ft

x @

9.00ft Tk 825.00

90.00 = 8.36 persqm

sft sqm =

Tk 6897.99

G) 6th floor: At level (+) 69'-0" Lift door gap 2 x

5.00ft

x @

9.00ft Tk 851.00

90.00 = 8.36 persqm

sft sqm =

Tk 7115.38

H) At level (+) 80'-0". Grid 9 I to J & grid 11 F to G: (Parapet) E/W 2 x 21.00 ft Grid 9 J to K & grid 11 E to F: 2 x 20.50 ft Grid 9 E to F & grid 11 J to K: E/W 2 x 21.33 ft Grid 9 F to G & grid 11 I to J: E/W 2 x 21.00 ft East & West side N/S 4 x 6.50 ft 4 x 10.00 ft Lift door gap 2 x 5.00ft Lift wall gap N/S 2 x 5.50 ft Two Lift connection N/S 1 x 8.00 ft Electric room side E/W 2 x 5.00 ft Main stair east side N/S 2 x 6.50 ft East & West side s/wall to s/wall N/S 2 x 15.00 ft E/W 4 x 13.00 ft Grid 07 & 13 E to F & grid J to K: E/W 4 x 15.83 ft N/S 8 x 1.50 ft E/W 4 x 28.50 ft Grid 07 & 13 G to I: E/W 2 x 42.50 ft Grid 09 E to s/wall & 11 K to s/wall: E/W 2 x 12.00 ft Stair & lift wall (Wall) Stair Chillakota S-E & N-W N/S 2 2 E/W 2 Deduction for door -1 Main Stair Chillakota E/W 2 2 N/S 2 Deduction

x x x x x x x x x x x x x x x x x x

3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 9.00ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft =

= 126.00 = 123.00 = 127.98 = 126.00 = 78.00 = 120.00 90.00 = 33.00 = 24.00 = 30.00 = 39.00 = 90.00 = 156.00 = 189.96 = 36.00 = 342.00 = 255.00 = 72.00 = 2057.94

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

(A)

x x x x x x x

14.50 ft 19.50 ft 12.00 ft 3.00 ft 14.00 ft 12.00 ft 46.00 ft

x x x x x x x

9.25 ft 9.00 ft 9.00 ft 7.00 ft 9.00 ft 9.00 ft 9.00 ft

= 268.25 = 351.00 = 216.00 = -21.00 = 252.00 = 216.00 = 828.00

sft sft sft sft sft sft sft

6 OF 55

RCC wall

Door

-2 -2 -1 -1 -2 -2 1 2 2

x x x x x x x x x

3.00 ft 6.00 ft 21.00 ft 3.00 ft 6.00 ft 3.00 ft 8.00 ft 5.00 ft 5.00 ft

x x x x x x x x x

9.00 ft 9.00 ft 9.00 ft 7.00 ft 9.00 ft 9.00 ft 12.00 ft 13.00 ft 13.00 ft Total =A+B

= = = = = = = = = = = =

-54.00 -108.00 -189.00 -21.00 -108.00 -54.00 96.00 130.00 130.00 1932.25 3990.19 370.70 per sqm

sft sft sft sft sft sft sft sft sft sft sft sqm =

Lift Portion N/S East side

(B) (C) Tk 325101.88

@ Item-4 CE's-6.4

Tk 877.00

Marble stone flooring with 18mm thick Italian coloured/ grey marble stone of approved quality, texture and size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting in position in proper level filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumic stone and necessary auxiliary materials and water, electricity and other charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M). In ground floor (+) 7'-0" Level 1 x 42.50 ft x 70.00 ft = = 2975.00 276.38 per sqm sft sqm

@ Tk 7269.00 = Tk 2009037.07 Item-5 Analysis rate Supplying and setting foreign made white / black/ any colour Granite on walls of approved quality, textured and size (large size) on walls over 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the Granite slab/tile setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M) 12 mm thick white / black/ any colour Granite walling. Lift wall 2 x 20.00 ft x 2 x 2 x 9.00 ft x 2 x 1 x 5.00 ft x 2 x 5.00 ft x Deduct: -4 x 5.00 ft x For 8 nos floor = 7 x

10.50 ft 0.50 ft 0.50 ft 0.50 ft 9.00 ft 268.00 ft

= = = = = = = =

@ Tk 10849.00 (Rate same for all floor)

420.00 18.00 5.00 5.00 -180.00 268.00 1876.00 174.28 per sqm

sft sft sft sft sft sft sft sqm = Tk 1890814.20

Item-6 CE's-06.6.3 Supplying, fitting and fixing glazed wall tiles (local made) with on 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and other charges complete all respect accepted by the Engineer.Coloured glazed wall tiles of different sizes (Cement: CEM-II/A-M). Wall tiles more than 250 x 400 mm size Glazed wall tiles@ 2nd floor (i) 2 nos Deputy Secretary room (new accomodation) DS toilet 2 x 7.50ft x 2 x 5.50ft x

8.00ft 8.00ft

= =

120.00 88.00

sft sft

7 OF 55

Door sill Deduct: Door Window

2 2 2 2 2

x x x x x

6.33ft 2.33ft 3.83ft 4.67ft 2.50ft

x x x x x

8.00ft 8.00ft 8.00ft 8.00ft 0.75ft

= = = = = = = = = =

101.28 37.28 61.28 74.72 3.75 486.31 -35.00 -69.63 381.68 35.46 per sqm

sft sft sft sft sft sft sft sft sft sqm =

-2 -2

x x

2.50ft 6.33ft

x x

7.00ft 5.50ft Total

@ Tk 1166.00 Glazed wall tiles @ 3rd floor (i) 2 nos Deputy Secretary room (new accomodation) 2 x 2 x 7.00ft x 8.00ft 2 x 2 x 3.50ft x 8.00ft 2 x 1 x 4.58ft x 8.00ft 2 x 1 x 8.00ft x 8.00ft

Tk 41345.12

= = = = = =

@ Tk 1172.00 Tk 29249.91 Item-7 CE's-06.9.3 Supplying, fitting and fixing mirror polished homogeneous floor tiles (local made) with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer.(Cement: CEM-II/A-M)GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles. GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles @ Ground floor (i) G.F: (+) 7'-0" Level 1 x 34.00 ft x 42.50 ft = 1445.00 = 134.24 @ Tk 1809.00 per sqm (ii) F.F: 3 nos members room (new accomodation) Room 3 1 x 22.00ft x 22.08ft = 1457.28 3 1 x 5.50ft x 4.75ft = 78.38 Skirting 3 2 x 22.00ft x 0.50ft = 66.00 3 2 x 22.08ft x 0.50ft = 66.24 3 2 x 5.50ft x 0.50ft = 16.50 3 2 x 4.75ft x 0.50ft = 14.25 = 1698.65 = 157.81 @ Tk 1815.00 per sqm (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation): Grid 13 to 14, D to H E/W 1 x 134.00 ft x 6.00 ft = 804.00 Skirting 2 1 x 146.00ft x 0.50ft = 146.00 Skirting 2 1 x 22.00ft x 0.50ft = 22.00 2 2 x 14.17ft x 0.50ft = 28.34 2 2 x 11.50ft x 0.50ft = 23.00 2 2 x 7.00ft x 0.50ft = 14.00 2 2 x 9.50ft x 0.50ft = 19.00 2 1 x 10.50ft x 0.50ft = 10.50 = 1066.84 = 99.11 @ Tk 1821.00 per sqm

112.00 56.00 36.64 64.00 268.64 24.96 per sqm

sft sft sft sft sft sqm =

sft sqm = Tk 242846.99 sft sft sft sft sft sft sft Sqm = Tk 286421.47

sft sft sft sft sft sft sft sft sft Sqm = Tk 180482.69

8 OF 55

Item-8 CE's-7.1

Reinforced cement concrete works using wooden shutter, with minimum cement content relates to mix ratio 1:2:4 having minimum f 'cr = 24 Mpa, and satisfying, specified compressive strength f'c=19 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM 1 ( 52.5 N) / ASTM-C 150 Type I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming ASTM C-33 including breaking chips and screening, making, placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hoper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing for 28 days,and removing centering-shuttering after specified time proved; including cost of water, electricity, testing charges of materials and cylinders, other charges etc. all complete approved and accepted by the Engineer.

(Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) (A) CE's-7.1.4 Padestals, column capitals, lift walls and walls :Ground Floor a) At level (+) 25'-0" (In 2nd Floor) i) Concrete Col-C1 2 x 2.00 ft x 3.00 ft Col-C2 3 x 2.00 ft x 3.00 ft Col-C5 5 x 2.00 ft x 3.00 ft Col-C6 2 x 1.67 ft x 3.00 ft Col-C7 7 x 1.67 ft x 3.00 ft Col-C8 2 x 2.00 ft x 3.00 ft Col-C9 2 x 2.00 ft x 3.00 ft Col-C4 10 x (3.14 x 2.08 x 2.08/4) = 163.05 x @ CE's-7.1.4 ii) Form Work (Wooden Shuttet) For Col-C1,C2, C5, C8, C9 14 x 2 x 3.00 ft 14 x 2 x 2.00 ft For Col-C6,C7 9 x 2 x 1.67 ft 9 x 2 x 3.00 ft For Col-C4 10 x (3.14x2.08x2.08/4) 3.50 ft Tk 6780.00

= = = = = = = = = = =

12.00 18.00 30.00 10.02 35.07 12.00 12.00 33.96 163.05 570.68 16.16 per cum

sft sft sft sft sft sft sft sft sft cft cum =

Tk 109563.35

x x x x x

4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft

= 378.00 = 252.00 = 135.27 = 243.00 = 152.83 = 1161.10 = 107.87 per sqm

sft sft sft sft sft sft sqm =

CE's-7.1.4

@ b) In Column: At level (+) 80'-0" (In 7th Floor) i) Concrete Col-C10 2 x 2.00 ft x Col-C11 8 x 2.00 ft x Col-C13 5 x 2.00 ft x Col-C14 19 x 1.67 ft x Col-C15 2 x 1.67 ft x = 195.21 Shear wall 4 x 4 x 6.50 ft 8.00 ft x x 1.17 ft 1.17 ft x x x

Tk 405.00

Tk 43686.88

3.00 ft 3.00 ft 3.00 ft 3.00 ft 3.00 ft 4.50 ft 4.50 ft 4.50 ft

= = = = = = =

12.00 48.00 30.00 95.19 10.02 195.21 878.45

sft sft sft sft sft sft cft cft cft

= 136.89 = 168.48

9 OF 55

Electric wall 2 x 2 x 2 x Lift wall 2 x

11.00 ft 5.00 ft 1.00 ft 49.00 ft

x x x x

1.00 ft 1.00 ft 3.00 ft 1.00 ft

x x x x

4.50 ft 4.50 ft 4.50 ft 4.50 ft

= 99.00 = 45.00 = 27.00 = 441.00 = 1795.82 = 50.85 per cum

cft cft cft cft cft cum =

@ CE's-7.1.4 ii) Form Work (Wooden Shuttet) For Col-C10,C11, C13 15 x 2 x 15 x 2 x For Col-C14,C15 21 x 2 x 21 x 2 x Shear wall 4 x 2 x 4 x 2 x 4 x 2 x 4 x 2 x Electric wall 2 x 2 x 2 x Lift wall 2 x

Tk 7159.00

Tk 364044.73

3.00 ft 2.17 ft 1.67 ft 3.17 ft 6.50 ft 1.42 ft 8.00 ft 1.42 ft 24.63 ft 12.63 ft 8.50 ft 98.00 ft

x x x x x x x x x x x x

4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft 4.50 ft

= 405.00 = 292.95 = 315.63 = 599.13 = = = = 234.00 51.12 288.00 51.12

sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

= 221.63 = 113.63 = 76.50 = 882.00 = 3530.70 = 328.01 per sqm

@ (B) CE's-7.1.5 Tie beam and lintels:Ground Floor i) Concrete (a) G.F: (-) 6'-0" level 8 x 20.00 ft x 0.42 ft At level (-) 9'-0" New wall (Grid-8 to 11, E) 1 x 68.00ft x 0.42 ft 3 x 13.00ft x 0.42 ft New wall (Grid-11 to 13, K) 1 x 30.00ft x 0.42 ft 4 x 5.00ft x 0.42 ft 1 x 33.00ft x 0.42 ft 2 x 19.00ft x 0.42 ft At level (+) 7'-0". N/S 4 x 0.83 ft x 19.50 ft 1 x 0.83 ft x 8.00 ft E/W 1 x 0.83 ft x 10.00 ft 3 x 0.83 ft x 20.33 ft (+) 3'-0" level New wall 3 x 7.00 ft x 0.42 ft 1 x 42.33 ft x 1.42 ft 1 x 42.50 ft x 0.42 ft RCC bend for out side pipeline 3 x 6.33 ft x 0.42 ft

Tk 556.00

Tk 182373.58

0.50 ft

= 33.60

cft

(A)

x x x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft

= = = = = =

14.28 8.19 6.30 4.20 6.93 7.98

cft cft cft cft cft cft

x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft

= 32.37 = 3.32 = 4.15 = 25.31

cft cft cft cft

x x x x

0.50 ft 1.50 ft 0.50 ft 0.50 ft

= 4.41 = 90.16 = 8.93 = 3.99

cft cft cft cft

10 OF 55

7.25 ft

0.42 ft

0.50 ft Total =A+B

= = = =

@ CE's-7.1.5 ii) Form Work (Wooden Shuttet) 8 x 1 x 20.00 ft 6 x 1 x 6.00 ft 1 3 1 4 1 2 4 1 1 3 3 1 1 1 2 x x x x x x x x x x x x x x x 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 x x x x x x x x x x x x x x x 68.00ft 13.00ft 30.00ft 5.00ft 33.00ft 19.00ft 19.50 ft 8.00 ft 10.00 ft 20.33 ft 7.00 ft 42.33 ft 42.50 ft 6.33 ft 7.25 ft

Tk 6988.00

1.52 222.04 255.64 7.24 per cum

cft cft cft cum =

(B)

Tk 50584.92

x x x x x x x x x x x x x x x x x

1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.83 ft 1.83 ft 1.83 ft 1.83 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft Total =A+B

@ CE's-7.1.5 i) Concrete (b) F.F: (i) F.F: Scrutinize & Moderate room: 2 x 14.24 ft x 0.42 ft 3 x 2.50 ft x 0.42 ft 2 x 7.50 ft x 0.42 ft 3 x 2.50 ft x 0.42 ft 1 x 3.00 ft x 0.42 ft (ii) F.F: 3 nos members accomodation 2 x 20.33 ft x 0.42 ft 3 x 20.33 ft x 0.42 ft 2 x 20.33 ft x 0.42 ft 1 x 12.25 ft x 0.42 ft 1 x 14.00 ft x 0.42 ft 1 x 12.17 ft x 0.42 ft 2 x 12.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 23.33 ft x 0.42 ft 1 x 13.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 20.33 ft x 0.42 ft 1 x 10.25 ft x 0.42 ft 1 x 14.08 ft x 0.42 ft 2 x 23.33 ft x 0.42 ft 1 x 13.25 ft x 0.42 ft North to south 1 x 13.17 ft x 0.42 ft 1 x 10.00 ft x 0.42 ft

Tk 350.00

= 227.20 = 51.12 = 278.32 = 96.56 = 55.38 = 42.60 = 28.40 = 46.86 = 53.96 = 142.74 = 14.64 = 18.30 = 111.61 = 29.82 = 60.11 = 60.35 = 8.99 = 20.59 = 790.91 = 1069.23 = 99.33 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

(A)

(B)

Tk 34766.83

x x x x x x x x x x x x x x x x x x x x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft

= = = = = = = = = = = = = = = = = = = = =

5.98 1.58 3.15 1.58 0.63 8.54 12.81 8.54 2.57 2.94 2.56 5.15 2.96 9.80 2.78 2.96 8.54 2.15 2.96 9.80 2.78

cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft

Grid-7 Grid-8 Grid-9

Grid-8-9

Grid-9-10

Grid-11

Grid-10-11

Grid-E

= 2.77 = 2.10

11 OF 55

Grid-F

Grid-EF Grid-FG

Grid-IJ

Grid-JK

Grid-R

2 1 1 3 1 1 3 1 1 2 1 1 2 1 1 1 2 1 1 2 1 2

x x x x x x x x x x x x x x x x x x x x x x

19.50 ft 12.25 ft 10.00 ft 19.50 ft 13.17 ft 10.00 ft 14.08 ft 15.58 ft 5.00 ft 14.75 ft 8.00 ft 13.25 ft 10.00 ft 13.25 ft 11.00 ft 14.67 ft 10.00 ft 19.50 ft 14.67 ft 10.00 ft 10.00 ft 10.00 ft

x x x x x x x x x x x x x x x x x x x x x x

0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft

x x x x x x x x x x x x x x x x x x x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft

= = = = = = = = = = = = = = = = = = = = = = =

8.19 2.57 2.10 12.29 2.77 2.10 8.87 3.27 1.05 6.20 1.68 2.78 4.20 2.78 2.31 3.08 4.20 4.10 3.08 4.20 2.10 4.20 193.71

cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum = sft sft sft sqm =

(A) (B)

(ii) F.F: RCC bend for out side pipeline Qty same as GF (B) Total =A+B @ CE's-7.1.5 ii) Form Work (Wooden Shuttet) Rft same as (A) = 922.43 ft Qty same as GF (B) x Tk 7055.00 1.42 ft Total @ CE's-7.1.5 i) Concrete (c) 2nd floor: 2 x 2 x 4 x Tk 375.00

= 222.04 = 415.75 = 11.77 per cum = = = = 1309.85 790.91 2100.76 195.17 per sqm

Tk 83055.71

Tk 73186.99

17.75 ft 10.50 ft 22.00 ft

x x x

0.42 ft 0.42 ft 0.42 ft

x x x

0.50 ft 0.50 ft 0.50 ft

= = = = =

@ CE's-7.1.5 ii) Form Work (Wooden Shuttet) 2 x 1 x 17.75 ft 2 x 1 x 10.50 ft 4 x 1 x 22.00 ft

Tk 7122.00

7.46 4.41 18.48 30.35 0.86 per cum

cft cft cft cft cum =

Tk 6119.70

x x x

1.42 ft 1.42 ft 1.42 ft

= = = = =

@ CE's-7.1.5 i) Concrete D) 3rd floor: At level (+) 36'-0" (d) 3rd floor: 1 x 21.58 ft x 1 x 8.83 ft x 1 x 14.75 ft x 1 x 12.17 ft x

Tk 400.00

50.41 29.82 124.96 205.19 19.06 per sqm

sft sft sft sft sqm =

Tk 7625.05

0.42 ft 0.42 ft 0.42 ft 0.42 ft

x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft

= = = =

4.53 1.85 3.10 2.56

cft cft cft cft

12 OF 55

1 1 2 1 1

x x x x x

20.33 ft 16.58 ft 13.00 ft 8.00 ft 7.00 ft

x x x x x

0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft

x x x x x

0.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft

= = = = = = =

@ CE's-7.1.5 ii) Form Work (Wooden Shuttet) 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 1 x 2 x 1 x 1 x 1 x 1 x 1 x

Tk 7189.00

4.27 3.48 5.46 1.68 1.47 28.40 0.80 per cum

cft cft cft cft cft cft cum =

Tk 5781.41

21.58 ft 8.83 ft 14.75 ft 12.17 ft 20.33 ft 16.58 ft 13.00 ft 8.00 ft 7.00 ft

x x x x x x x x x

1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft 1.42 ft

= = = = = = = = = = =

@ CE's-7.1.5 i) Concrete (e) 7th floor: 6 x

Tk 395.00

30.64 12.54 20.95 17.28 28.87 23.54 36.92 11.36 9.94 192.04 17.84 per sqm

sft sft sft sft sft sft sft sft sft sft sqm =

Tk 7047.21

4.50 ft

0.42 ft

x @

0.50 ft Tk 7568.00

= 5.67 = 0.16 per cum

cft cum =

Tk 1215.08

CE's-7.1.5

ii) Form Work (Wooden Shuttet) 6 x 1 x 4.50 ft

x @

1.42 ft Tk 689.00

= 38.34 = 3.56 per sqm

sft sqm =

Tk 2454.13

(C) CE's-7.1.6

In Tee beam, ELL beam & Rectangular beam i) Concrete : At level (+) 80'-0" (In 7th Floor) Stair-2: 02 nos stair E/W 4 x 12.00 ft x 1.00 ft N/S 2 x 19.54 ft x 1.00 ft 2 x 14.50 ft x 1.00 ft Main stair attached: N/S 2 x 19.00 ft x 1.00 ft E/W 5 x 10.00 ft x 1.00 ft Lift room: South lift, N/S 6 x 5.00 ft x 1.00 ft E/W 4 x 7.50 ft x 1.00 ft

x x x x x x x

1.58 ft 1.58 ft 1.58 ft 1.58 ft 1.58 ft 1.58 ft 1.58 ft

= 75.84 = 61.75 = 45.82 = 60.04 = 79.00 = 47.40 = 47.40 = 417.25 = 11.81 per cum

cft cft cft cft cft cft cft cft cum =

@ CE's-7.1.6 ii) Form Work (Wooden Shuttet) E/W 2 x 2 x 12.00 ft N/S 2 x 1 x 19.54 ft 2 x 1 x 14.50 ft

Tk 7045.00

Tk 83236.61

x x x

4.17 ft 4.17 ft 4.17 ft

= 200.16 = 162.96 = 120.93

sft sft sft

13 OF 55

2 x 5 x Lift Room: N/S 3 x E/W 2 x

1 1 2 2

x x x x

19.00 ft 10.00 ft 5.00 ft 7.50 ft

x x x x

4.17 ft 4.17 ft 4.17 ft 4.17 ft

= 158.46 = 208.50 = 125.10 = 125.10 = 1101.21 = 102.31 per sqm

sft sft sft sft sft sqm =

@ (D) CE's-7.1.7 In Floor & Roof slab; a) At level (+) 80'-0" (In 7th Floor) i) Concrete Stair-2: 02 nos stair 2 x 28.67 ft x 19.00 ft Main stair-4: 1 x 49.00 ft x 17.00 ft Lift room: South lift - 02 nos 1 x 49.00 ft x 14.50 ft

Tk 610.00

Tk 62406.20

x x x

0.42 ft 0.42 ft 0.42 ft

= 457.57 = 349.86 = 298.41 = 1105.84 = 31.31 per cum

cft cft cft cft cum =

@ CE's-7.1.7 ii) Form Work (Wooden Shuttet) Bottom 2 x 1 x 1 x Side 2 x 2 x 2 x 2 x 1 x 2 x 1 x 2 x 2 x 2 x 2 x 2 x

Tk 7045.00

Tk 220604.99

28.67 ft 49.00 ft 49.00 ft 28.67 ft 19.00 ft 49.00 ft 17.00 ft 49.00 ft 49.00 ft

x x x x x x x x x

19.00 ft 17.00 ft 14.00 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft

= 1089.46 = 833.00 = 686.00 = = = = = = = = 48.17 31.92 41.16 14.28 82.32 82.32 2908.63 270.22 per sqm

sft sft sft sft sft sft sft sft sft sft sqm =

(E) CE's-7.1.8

@ Tk 638.00 Cornice, railing, drop walls, louver, fins etc. Ground Floor a) In Ground floor (+7'-0" level) i) Concrete Drop wall N/S 2 x 70.00 ft x 2.00 ft 2 x 26.00 ft x 2.00 ft Planter 2 x 26.00 ft x 2.00 ft E/W 2 x 45.00 ft x 2.00 ft = 668.00 x @ 0.29 ft Tk 6836.00 0.33 ft 4.33 ft 4.33 ft 4.33 ft 4.33 ft

Tk 172399.03

280.00 104.00 104.00 180.00 668.00 = 194.83 = 5.52 per cum = = = = = = = 2.64 606.20 225.16 225.16 389.70 1448.86 134.60 per sqm

= = = =

sft sft sft sft sft cft cum = sft sft sft sft sft sft sqm =

Tk 37714.09

CE's-7.1.8

ii) Form Work (Wooden Shuttet) 2 x 2 x 1 x 2 x 1 x 2 x 1 x 2 x 1 x 2 x

2.00 ft 70.00 ft 26.00 ft 26.00 ft 45.00 ft

x x x x x

Tk 298.00

Tk 40111.51

14 OF 55

CE's-7.1.8

b) In 2nd floor (+25'-0"+0+36'-0" level) i) Concrete Drop wall Gird 13 north side E/W 1 x 134.00 ft N/S 2 x 5.33 ft = 433.98

x x x @

3.00 ft 3.00 ft 0.29 ft Tk 6970.00 3.00 ft 0.63 ft 3.00 ft 0.63 ft 0.46 ft

= 402.00 = 31.98 433.98 = 126.58 = 3.58 per cum = = = = = = = 804.00 83.75 63.96 6.72 66.55 1024.97 95.22 per sqm

sft sft sft cft cum = sft sft sft sft sft sft sqm =

Tk 24982.02

CE's-7.1.8

ii) Form Work (Wooden Shuttet) 1 x 2 x 134.00 ft 1 x 1 x 134.00 ft 2 x 2 x 5.33 ft 2 x 1 x 5.33 ft 1 x 1 x 144.67 ft

x x x x x

@ c) In 3rd Floor (+36'-0"+47'-0") Drop Wall i)Concrete: qnty same as item-D (a)i Railing Qty same as Drop wall @ CE's-7.1.8 ii) Form work Qty same as FF Railing same Drop @ d) In 4th Floor (+47'-0"to+58'-0"level) In Railing i)Concrete: oty same as 2nd Floor Drop @ CE's-7.1.8 ii) Form work (Wooden shutter) Qty same as 2nd Floor @ (F) CE's-7.1.9 Sunshade, false ceiling:Ground Floor a) In 2nd floor i) Concrete False slab Gird 13 north side 2 7.50 ft x 7.50 ft

Tk 348.00

Tk 33137.40

CE's-7.1.8

= 3.56 = 3.56 7.12 per cum = 95.02 = 95.02 190.04 per sqm

cum cum cum = sqm sqm sqm =

Tk 7037.00

Tk 50103.44

Tk 373.00

Tk 70884.92

CE's-7.1.8

Tk 7140.00

= 3.56 per cum = 95.02 per sqm

cum = sqm =

Tk 25418.40

Tk 398.00

Tk 37817.96

x @

0.25 ft Tk 7535.00 7.50 ft 0.33 ft 0.33 ft

= 28.13 = 0.80 per cum = = = = = 112.50 9.90 9.90 132.30 12.29 per sqm

cft cum = sft sft sft sft sqm =

Tk 6000.90

CE's-7.1.8

ii) Form Work (Wooden Shuttet) 2 x 1 x 7.50 ft 2 x 2 x 7.50 ft 2 x 2 x 7.50 ft

x x x

@ CE's-7.1.9 b) In 3rd floor i) Concrete False slab 1

Tk 404.00

Tk 4965.55

7.50 ft

8.83 ft

0.25 ft

= 16.56

cft

15 OF 55

8.83 ft

5.50 ft

0.25 ft

@ CE's-7.1.8 ii) Form Work (Wooden Shuttet) 1 x 1 x 1 x 2 x 1 x 2 x 1 x 1 x 1 x 2 x 1 x 2 x 7.50 ft 7.50 ft 8.83 ft 8.83 ft 8.83 ft 5.50 ft x x x x x x

Tk 6733.00 8.83 ft 0.33 ft 0.33 ft 5.50 ft 0.33 ft 0.33 ft

= 12.14 = 28.70 = 0.81 per cum = = = = = = = = 66.23 4.95 5.83 48.57 5.83 3.63 135.03 12.54 per sqm

cft cft cum = sft sft sft sft sft sft sft sqm =

Tk 5471.34

@ Item-9 CE's-8.1.1

Tk 429.00

Tk 5381.46

3420/400-grade(B420/400DWR) / 400G ribbed or deformed bar with minimum fy (ReH)= 420/400 MPa & tensile strength(fu or Rm) at least 525 Mpa, minimum elongation after fracture and total elongation at maximum force is 16% and 8% respectively. Ground floor cft same as item- 08.B(a)+08.E(a) = 450.47 cft 1.25% of this item = 5.63 = 1251.54 @ Tk 81.00 per kg = 415.75 cft 1.25% of this item = 5.20 = 1155.07 @ Tk 81.32 per kg = 570.68 1.0% of this item = 30.35 1.25% of this item = 126.58 1.0% of this item = 28.13 1.25% of this item cft = 5.71 cft = 0.38 cft = 1.27 cft = 0.35 = 7.70 = 1712.19 per kg cft cft kg = cft cft cft

cft kg =

Tk 101374.45

1st floor cft same as item- 08.B(b)

cft kg =

Tk 93930.22

2nd floor cft same as item- 08.A(a) cft same as item- 08.B(c) cft same as item- 08.E(a) cft same as item- 08.F(a)

@ 3rd floor cft same as item- 08.B(d) cft same as item- 08.E(b) cft same as item- 08.F(b)

Tk 81.64

Tk 139783.44

= 28.40 cft 1.25% of this item = 0.36 = 251.44 cft 1.0% of this item = 2.51 = 28.70 cft 1.50% of this item = 0.43 = 3.30 = 733.44 @ Tk 81.96 per kg = 125.72 cft 1.0% of this item = 1.26 = 279.43 @ Tk 82.28 per kg

cft cft cft cft kg =

Tk 60113.00

4th floor cft same as item- 08.E(c)

cft kg =

Tk 22991.63

16 OF 55

Item-10 CE's-11.1

Supplying and making door and window frames (Chowkat) for all floors with matured natural seasoned wood of required size including painting two coats of coal tar to the surface in contact with wall, fitting and fixing in position etc. complete and accepted by the Engineer. (All sizes of wood are finished).

CE's-11.1.5 Chittagong Teak (i)GF: (-) 6'-0" level 5 5 G.F 3 3 (ii) 1st floor: 35 28 7 (iii) 2nd floor: 2 1 1 (iv) 3rd floor: 6 3 3

2 1 2 1 2 1 1 2 1 1 2 1 1

x x x x x x x x x x x x x

7.00ft 6.00ft 7.00ft 6.00ft 7.00ft 3.33ft 2.50ft 7.00ft 2.50ft 3.33ft 7.00ft 2.50ft 3.33ft

0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft 0.46ft

0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft 0.21ft

= = = =

6.76 2.90 4.06 1.74

cft cft cft cft cft cft cft cft cft cft cft cft cft cft cum = Tk 525861.51

= 47.33 = 9.01 = 1.69 = 2.70 = 0.24 = 0.32 = = = = = 8.11 0.72 0.97 86.56 2.45 per cum

@ Tk 214544.00 Item-11 CE's-11.3

Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size having bifurcated ends to door and window frames with rowel plug, necessary screws etc. including cutting groove in Chowkat if necessary etc. complete in all respect accepted by the Engineer. (i) G.F 8 2 x 4 (ii) F.F: 3 nos Members room (new accomodation) & others 35 2 x 4 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 2 x 4 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 2 x 4 @Tk 78.00 = 64.00 = 280.00 = 16.00 = 48.00 = 408.00 each nos nos nos nos nos = Tk 31824.00

Item-12 CE's-12.1

Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide plank) solid wood single leaf door shutter having top rail style of sections 100 mm x 38 mm, lock rail 125 x 38 mm and bottom rail 225 x 38 mm. Closed joints with 25 mm x 12 mm size wooden peg and provided with best quality 4 Nos. 100 mm iron hinges 2 (two) Nos. best quality 12 mm dia 300 mm and 200 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, hinged cleats, buffer blocks and finished by sand papering etc. all complete in all floors and accepted by the Engineer. (All sizes of wood are finished)

CE's-12.1.4 Chittagong Teak (i) F.F: 3 nos Members room (new accomodation) & others 7 1 x 2.17ft x 6.83ft (ii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 x 2.17ft x 6.83ft (iii) 3rd F: 3 nos Deputy Secretary room (new accomodation)

= 103.75 = 29.64

sft sft

17 OF 55

3 3

1 1

x x

3.00ft 2.17ft

x x

6.83ft 6.83ft

= = = =

@Tk Item-13 CE's-12.4

9836.00

61.47 44.46 239.32 22.23 per sqm

sft sft sft sqm =

Tk 218690.36

Supplying, fitting and fixing 38 mm thick well matured, natural seasoned (min 10" wide plank) wooden double leaf panel door shutters. Top rail and styles of sections 100 mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail 225mm x 38 mm, paneling 38 mm thick both sides raised, provided with best quality 6 Nos. 100 mm iron hinges, 2 (two) Nos. best quality 12 mm dia 300 mm and 225 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, 1 No. hatchbolt hinged cleats, buffer blocks and finished by sand papering, necessary screws etc. all complete in all floors and accepted by the Engineer. (Double leaf. All sizes of wood are finished)

CE's-12.4.4 Chittagong Teak At level (-) 6'-0" to (-) 9'-0" (i) Store 4 1 x (ii) G.F Vault 3 1 x (iii) Presspart 5 1 x

6.00ft 5.67ft 6.00ft

x x x

6.83ft 6.83ft 6.83ft

= 163.92 = 116.18 = 204.90 = 485.00 = 45.06 per sqm

sft sft sft sft sqm =

@Tk Item-14 CE's-12.7

12048.00

Tk 542852.05

Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid particle board single leaf flush door for all floors for internal use made of well matured mechanical seasoned Rubber (Malaysian timber) or other approved wooden frame having finished size 35 x 50 mm around upon which 1.2 mm thick veneer (total two Nos. of veneers one of 0.7 mm horizontally made of gorjon and another of 0.5 mm vertically made of Burma Teak or Champa or Chapalish or Garjan wood) with necessary screws are pested on each side by mechanized process and provided with best quality 4 Nos. 100 mm iron hinges, 2 Nos. best quality 12 mm iron dia 300 mm and 225 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks etc. complete and accepted by the Engineer.

CE's-12.7.1 Burma Teak veneered (i)3 nos members accomodation 28 1 x 3.00ft x (ii) 2 nos Deputy Secretary room (new accomodation) 2 1 x 3.00ft x

6.83ft 6.83ft

= 573.72 = 40.98 = 614.70 = 57.11 per sqm

sft sft sft sqm =

@Tk Item-15 CE's-12.19

4156.00

Tk 237336.79

Supplying, fitting and fixing of well matured louver shutter having 75.50mm x 38mm size all around frame and inner horizontal wooden louver blade 65mm x 20mm spaced @ 38mm c/c, fixed with frame in grooves including cost of nails, handle, tower bolt, screws (brass fitting) etc. all complete in all respect as per drawing and direction of the Engineer in charge. 1 1 x x 2.50ft 2.50ft x x 2.25ft 2.25ft = 11.25 = 16.88 sft sft

CE's-12.7.1 False slab top 2nd floor 2 3rd floor 3

18 OF 55

@Tk 12417.00 Tk 32444.08 Item-16 CE's-12.15.2 Supplying, fitting and fixing M.S. door shutter made with 1.5 x 1.5 x angle outer frame, inner member 1 x F.I. bar, cladding with 16 BWG M.S. sheet, hinged with 2 x 2 x M.S. angle Chowkat. 4 x 3.50 ft x 7.00 ft = = 98.00 9.10 per sqm sft sqm =

= 28.13 = 2.61 per sqm

sft sqm =

@ Tk 4797.00 Item-17 CE's-12.21.2 Extra cost for using brass/ SS fittings in place of iron fittings in doors & windows for all floors (super quality local). SS fittings of door Qty same as item no-12, 13, 14 @Tk Item-18 CE's-12.22 223.00 = 124.40 per sqm

Tk 43673.91

sqm =

Tk 27740.78

Supplying, fitting and fixing of made in hydraulic door closer (big size) including all necessary tools and accessories etc. all complete approved and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 18 1 = 18.00 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 = 2.00 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 3 1 = 3.00 = 23.00 @Tk 2014.00 each

nos nos nos nos = Tk 46322.00

Item-19 CE's-12.23.2 Supplying, fitting and fixing Rim/ round door lock approved and accepted by the Engineer. (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 39117.00

@Tk 767.00 Item-20 CE's-13.4.1 Supplying, fitting, fixing window grills of any design made with 25 x 6 mm F.I. bar including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending good the damages, tools and plants etc. complete for all floors accepted by the Engineer. (Total weight per sqm should be min 42.88 kg. and add or deduct @ Tk. 35.00 for each kg. excess or less respectively) (i) G.F: (+) 3'-0" 1 1 x 19.50ft x (+) 7'-0" N/S 4 1 x 19.50ft x 1 1 x 8.00ft x E/W 3 1 x 20.33ft x 1 1 x 10.00ft x (ii) F.F: 3 nos members accomodation & others: 3.00ft 7.00ft 7.00ft 7.00ft 7.00ft = 58.50 = = = = 546.00 56.00 426.93 70.00 sft sft sft sft sft

19 OF 55

1 1 x 19.50ft x 3.00ft 2 1 x 21.00ft x 3.00ft 36 1 x 5.00ft x 4.50ft 1 1 x 12.00ft x 9.00ft (iii) 2nd F:2 nos Deputy Secretary room (new accomodation) 2 2 x 6.00ft x 4.50ft (iv) 3rd F: 2 nos Deputy Secretary room (new accomodation) 1 2 x 6.00ft x 4.50ft 1 1 x 13.00ft x 4.50ft 1 1 x 12.17ft x 4.50ft

= = = =

58.50 126.00 810.00 108.00

sft sft sft sft sft sft sft sft sft sqm =

= 108.00 = = = = = 54.00 58.50 54.77 2535.20 235.53 per sqm

@Tk Item-21 CE's-14.2

2570.00

Tk 605300.18

Supplying fitting and fixing of Aluminium swing door as per the U.S.Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.8 mm thick wall frame size 101.60 mm. 44.45 mm. 83.21 mm). 2.33 mm thick shutter size (54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm. 14.49 mm 0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm 1.2 mm), 106.60 mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm. 12.70 mm 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m) section of all aluminum members will be anodized to aluminium bronze/silver colour with a coat not less than 15 micrones in thickness and density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock, swing door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping provision for fitting 5 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and accepted by the Engineer. (Total weight min 23 kg/m2) Size up to: 2100 mm x 2100 mm. Bronze colour Swing door with fixed partition G.F 1 1 x 40.00ft 2 2 x 6.00ft 2 1 x 4.50ft F.F 1 1 x 22.00ft 1 1 x 4.50ft

14.2.2

x x x x x

10.50ft 7.00ft 7.00ft 10.50ft 7.00ft

= = = = = = =

@Tk Item-22

5296.00

420.00 168.00 63.00 231.00 31.50 913.50 84.87 per sqm

sft sft sft sft sft sft sqm =

Tk 449451.51

20 OF 55

CE's-14.4

Supplying, fitting and fixing of Aluminium sliding doors as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer top (size 75.50 mm, 26.80 mm, 0.78 kg/m) 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.2 mm shutter bottom (size 60 mm, 24 mm, 0.736 kg/m), 1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.616 kg/m) 1.5 mm thick shutter lock (size 49.20 mm, 26.20 mm, 0.661 kg/m), 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm, 0.665 kg/m), 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) sections all aluminium members (Total weight 14.789 kg) will be anodized to aluminium bronze/silver colour with a coat not less than 15 microns in thickness and density of 4 mg per square cm etc. including all accessories like handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer. Size up to: 2100 mm x 2100 mm. Bronze colour 2 1 x 3.50ft 1 1 x 7.50ft

14.4.2

x x

7.00ft 7.00ft

= = = =

@Tk Item-23 CE's-14.6

2075.00

49.00 52.50 101.50 9.43 per sqm

sft sft sft sqm =

Tk 19566.38

Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick sliding side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the Engineer. Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg) Bronze colour (i) 3 nos members accomodation 1 2 x 6.00ft x 4.50ft 1 1 x 13.00ft x 4.50ft 1 1 x 12.17ft x 4.50ft 36 1 x 5.00ft x 4.50ft (ii) 2 nos Deputy Secretary room (new accomodation) 2 2 x 6.00ft x 2 1 x 6.33ft x (iii) G.F 3 1 x 9.75ft x 5 1 x 4.50ft x

14.6.1.2

= = = = =

54.00 58.50 54.77 810.00 977.27

sft sft sft sft sft sft sft sft sft sft sft

(A) (B) (C)

4.50ft 5.50ft 4.50ft 4.50ft Total

= 108.00 = 69.63 = = = = 131.63 101.25 232.88 1387.77

(D)

21 OF 55

14.6.2.2

@Tk 2370.00 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg) Bronze colour (i) G.F 2 1 x 6.33ft x 2.50ft 2 1 x 6.33ft x 2.00ft

= 128.93 per sqm

sqm =

Tk 305556.94

= = = =

@Tk Item-24 CE's-14.11

3120.00

31.65 25.32 56.97 5.29 per sqm

sft sft sft sqm =

(E) Tk 16513.04

Supplying fitting and fixing of Aluminium fixed fan light as per the U.S. Architectural Aluminium Manufacturers Association (AAMA) standard specification mm, 0.313 kg/m) 1.2 mm thick bottom cover (size 76.2 mm, 38.10 mm, 0.76 kg/m) and 2.5 mm thick grouve cover section (size 57.15mm, 15.80 mm, 0.425 kg/m) and 1.2 thick top and side section (76.20 mm, 16 mm, 38.10 mm, 0.961 kg/m) fixed with above mentioned frames and all aluminium members (Total weight 5.365kg) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nut and bolt etc. complete in all respect as per drawing and accepted by the Engineer. Bronze colour (+) 3'-0" 1 1 x 19.50ft x (+) 7'-0" N/S 4 1 x 19.50ft x 1 1 x 8.00ft x E/W 3 1 x 20.33ft x 1 1 x 10.00ft x (ii) F.F: 3 nos members accomodation & others: 1 1 x 19.50ft x 2 1 x 21.00ft x

14.11.2

3.00ft 7.00ft 7.00ft 7.00ft 7.00ft 3.00ft 3.00ft

= 58.50 = = = = = = = = = = = = = = = = 546.00 56.00 426.93 70.00 58.50 126.00 1341.93 124.67 108.00 157.50 252.00 756.00 196.00 1469.50 136.52 261.19 per sqm

sft sft sft sft sft sft sft sft sqm sft sft sft sft sft sft sqm sqm =

(A)

Scrutinizer & moderation room 1 1 x 1 2 x 1 2 x 3 6 x 2 1 x

12.00ft 7.50ft 12.00ft 6.00ft 14.00ft

x x x x x

9.00ft 10.50ft 10.50ft 7.00ft 7.00ft

(B) Tk 823787.65

Total= A+B @Tk 3154.00 Item-25 CE's-14.14

Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall distortion free glass of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all respect as per drawing and accepted by the Engineer.

CE's-14.14.2 (A) 5mm thick tinted glass (i) 2 nos Deputy Secretary room (new accomodation) Qty same as item no-22 Qty same as item no-23(A+B+D+E) Qty same as item no-21 Qty same as item no-24(A)

= = = = =

101.50 1375.11 1476.61 913.50 124.67

sft sft sft sft sft

22 OF 55

Outside 6 2 2 3 6 2 2 2 1 1 1 2 x x x x x x x x x x x x 4.50 ft 6.33 ft 6.33 ft 9.75 ft 6.83 ft 7.50 ft 2.25 ft 4.17 ft 5.75 ft 5.75 ft 4.00 ft 3.75 ft x x x x x x x x x x x x 4.50 ft 2.50 ft 2.00 ft 4.50 ft 3.50 ft 5.50 ft 5.50 ft 7.00 ft 7.00 ft 2.00 ft 7.00 ft 7.00 ft Total @Tk 1073.00 CE's-14.14.3 (B) 5mm thick frosted glass (i) Scrutinizer & moderation room Qty same as item no-24(B) (ii) 2 nos Deputy Secretary room (new accomodation) Qty same as item no-23(B) = = = = = = = = = = = = = = = 121.50 31.65 25.32 131.63 143.43 82.50 24.75 58.38 40.25 11.50 28.00 52.50 751.41 3266.18 303.44 per sqm sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

Tk 325586.65

= 1469.50 = 108.00 = 1577.50 = 146.55 per sqm

sft sft sft sqm =

@Tk 1152.00 Tk 168829.43 Item-26 Analysis rate Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall tempered reflected glass of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all respect as per drawing and accepted by the Engineer. 6 mm thick tempered reflected glass (+) 7'-0" level 18 x 22.00 ft 18 x 3.00 ft

x x @

14.50 ft 14.50 ft Tk 3951.00

= = = =

5742.00 783.00 6525.00 606.19 per sqm

sft sft sft sqm = Tk 2395045.99

Item-27 CE's-15.1

Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) having with fresh cement to wall both inner-and outer surface, finishing the corner and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) At level (+) 7'-0" to (+) 25'-0" Sft same as item -3B(B) x 2 = @ At level (+) 25'-0" Sft same as item -3C(B) x 2 Offset 42 x Top of wall Offset 2 42 x = x 0.42 ft 443.00 ft 0.42 ft x x x 3.50 ft 0.50 ft 0.83 ft = @ At level (+)80'-0" Tk 193.00 = 4123.00 = = = = 123.48 221.50 14.64 4482.62 416.45 per sqm sft sft sft sft sft sqm = Tk 184.00 = 1551.00 144.09 per sqm sft sqm = (A) Tk 26512.82

(B) Tk 80374.01

23 OF 55

Sft same as item -H(C) x 2 Offset 78 x 2 x Top of wall = Offset 78 x Stair & lift wall Stair Chillakota S-E & N-W Outside 2 x E/W 2 x Main Stair N/S 2 x E/W 2 x Lift Portion 2 x E/W 2 x 0.42 ft 1330.06 ft 0.42 ft x x x 3.50 ft 0.50 ft 0.83 ft

= 7980.38 = 229.32 = 665.03 = 27.19

sft sft sft sft

28.92 ft 14.83 ft 46.00 ft 14.00 ft 46.00 ft 11.50 ft

x x x x x x

10.50 ft 10.50 ft 10.50 ft 10.50 ft 13.00 ft 13.00 ft

= 607.32 = 311.43 = 966.00 = 294.00 = 1196.00 = 299.00 = 12575.67 = 1168.31

sft sft sft sft sft sft sft sqm

(C)

Inside plaster Stair Chillakota S-E & N-W N/S 4 E/W 2 Main Stair N/S 2 E/W 2 Electric room N/S 2 E/W 2

x x x x x x

25.50 ft 12.50 ft 12.50 ft 20.50 ft 6.50 ft 13.00 ft

x x x x x x

10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft

= 1071.00 = 262.50 = 262.50 = 430.50 = 136.50 = 273.00 = 2436.00 = 226.31 = 1394.62 per sqm

sft sft sft sft sft sft sft sqm sqm =

Total = (C+D) @ Tk 262.00 Item-28 CE's-15.2

(D) (E) Tk 365390.02

Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall (1:4) with cement up to 150 mm below ground level with neat cement finishing including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor. 36'-0"Level Open terrece wall side 2 N/s E/W 2 N/s 2 2 2

x x x x x

1 2 2 2 2 2

x x x x x x

4.00 ft 9.58 ft 2.25 ft 41.50 ft 23.00 ft 13.00 ft

= = = = = = = = =

@ 47'-0"Level Open terrace Skirting 2 2 Oftset 2 x 2 (+47'-0"to+58'-0"level)

Tk 238.00

8.00 19.16 9.00 166.00 92.00 52.00 346.16 173.08 16.08 per sqm

rft rft rft rft rft rft rft sft sqm = Tk 3826.93

x x x

2 2 6

x x x

48.33 ft 39.82 ft 1.67 ft

= = = =

193.32 159.28 40.08 392.68 196.34

rft rft rft rft sft

24 OF 55

= @ Item-29 CE's-15.4 Tk 247.00

18.24 sqm

sqm = Tk 4505.39

Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to wall both inner-and outer surface, finishing the corner and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) A) G.F At level (+) 7'-0" 4 x 2.00 ft 1 x 0.83 ft E/W 1 x 2.00 ft 3 x 2.00 ft

x x x x

19.50 ft 8.00 ft 10.00 ft 20.33 ft

x x x x

10.00 ft 10.00 ft 10.00 ft 10.00 ft

= 1560.00 = 66.40 = 200.00 = 1219.80

sft sft sft sft sft

For 02 nos ramp (East west side) 0.5 4 25.00 ft x 0.83 ft For 02 nos ramp (East west side) 2 x 2 x 9.67 ft 2 x 2 x 9.67 ft 2 x 2 x 9.67 ft 2 x 2 x 0.83 ft 2 x 2 x 5.92 ft 2 x 2 x 10.75 ft 2 x 2 x 6.17 ft 2 x 2 x 5.67 ft Middle stair grid-16 2 x 2 x 5.50 ft 2 x 2 x 5.50 ft (East west side) 1 x 2 x 34.67 ft i) Duct wall 3 1 ii) At level (-) 6'-0" 1 1 x x 6.33 ft 7.25 ft

x x x x x x x x x x x x

3.50 ft 0.50 ft 0.50 ft 4.50 ft 3.50 ft 3.50 ft 1.58 ft 3.58 ft 3.58 ft 3.50 ft 4.00 ft 3.17 ft

= 145.25 = = = = = = = = 19.34 19.34 174.06 11.62 82.88 67.94 88.35 81.19

= 77.00 = 88.00 = 219.81 = 4120.99 = 189.90 = 101.50 = 291.40 = 9017.84 = 13430.23 = 1247.70 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

x x

10.00 ft 14.00 ft

Sft same as item -3(A) x 2

@ Tk 161.00 B) FF: At level (+) 14'-0" (3 nos members accomodation) i) Duct wall 3 1 x 6.33 ft x 10.00 ft 1 1 x 7.25 ft x 14.00 ft Sft same as item -3B(A) x 2

Tk 200879.48

= = = = = =

Tk 170.00

189.90 101.50 291.40 20844.64 21136.04 1963.59 per sqm

sft sft sft sft sft sqm =

Tk 333809.66

C) At level (+) 25'-0" Lift door gap 2 2 x 5.00ft x (i) 2 nos Deputy Secretary room (new accomodation) E/W 2 2 x 22.00 ft x 2 2 x 20.00 ft x N/S 2 2 x 11.50 ft x 2 1 x 9.50 ft x

9.00ft 10.00 ft 10.00 ft 10.00 ft 10.00 ft

= = = = =

180.00 880.00 800.00 460.00 190.00

sft sft sft sft sft

25 OF 55

2 2 Deduct Door

1 2

x x

10.50 ft 3.50 ft

x x

10.00 ft 10.00 ft

= 210.00 = 140.00 = 2860.00 = = = = = = -46.62 -35.00 -49.00 -108.00 2621.38 243.53 per sqm

sft sft sft sft sft sft sft sft sqm =

Window

-2 -2 -2 -4

x x x x

3.33 ft 2.50 ft 3.50 ft 6.00 ft

x x x x

7.00 ft 7.00 ft 7.00 ft 4.50 ft

Tk 179.00

Tk 43592.25

D) 3rd floor: At level (+) 36'-0" Lift door gap 2 2 x 5.00ft x (i) 2 nos Deputy Secretary room (new accomodation) DS room attached to exam. Controller (cadre) E/W 1 x 21.58 ft x 1 x 8.83 ft x N/S 1 x 14.75 ft x 1 x 12.17 ft x DS room attached to exam. Controller (Non-Cadre) E/W 1 x 20.33 ft x 1 x 16.58 ft x N/S 2 x 13.00 ft x 1 x 8.00 ft x Toilet inside 1 x 7.00 ft x

9.00ft

180.00

sft

10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 8.00 ft

= = = = = = = = = = =

226.59 92.72 154.88 127.79 213.47 174.09 273.00 84.00 56.00 1582.52 147.02 persqm

sft sft sft sft sft sft sft sft sft sft sqm =

@ E) 4th floor: At level (+) 47'-0" Lift door gap 2 2 x

Tk 188.00

(A) Tk 27639.70

5.00ft

x @

9.00ft Tk 197.00

180.00 = 16.72 persqm

sft sqm =

Tk 3294.31

F) 5th floor: At level (+) 58'-0" Lift door gap 2 2 x

5.00ft

x @

9.00ft Tk 206.00

180.00 = 16.72 persqm

sft sqm =

Tk 3444.82

G) 6th floor: At level (+) 69'-0" Lift door gap 2 2 x

5.00ft

x @

9.00ft Tk 230.00

180.00 = 16.72 persqm

sft sqm =

Tk 3846.15

Item-30 CE's-15.5

Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer. (Cement: CEM-II/A-M) A) G.F: Sft same as item- 8.B(a-ii)+8.E(a-ii) @ B) F.F: Sft same as item- 8.B(b-ii) = 2100.76 = 195.17 sft sqm (A) Tk 152.00 = 2518.09 = 233.94 per sqm sft sqm = (A) Tk 35558.30

26 OF 55

@ C) 2nd. F:

Tk 161.00

per sqm = 1161.10 84.00 45.09 33.96 1324.15 = 123.02 = 1362.46 = 126.58 = 249.59 per sqm = 2372.66 = 220.43 per sqm = 1022.80 = 95.02 per sqm = = = = = 3530.70 90.00 105.21 3725.91 346.15 = = = =

= sft sft sft sft sft sqm sft sqm sqm = sft sqm = sft sqm = sft sft sft sft sqm

Tk 31421.62

Sft same as item- 8.A(a-ii) Top of column 14 9 10 x x x 3.00 ft x 2.00 ft 1.67 ft x 3.00 ft (3.14 x 2.08 x 2.08/4)

(A) (B) (C) Tk 42430.77

Sft same as item- 8.B(b-ii)+8.C(b-ii)+8.F(a-ii) Total Tk 170.00

@ D) 3rd. F:

Sft same as item- 8.B(d-ii)+8.C(c-ii)+8.F(b-ii) @ E) 4th. F: Sft same as item- 8.C(d-ii) @ F) 7th. F: 15 21 x x 3.00 ft 1.67 ft Sft same as item- 8.A(b-ii) x 2.00 ft x 3.00 ft Tk 179.00 Tk 179.00

(A) Tk 39456.11

(A) Tk 17008.58

(A)

At level (+)80'-0" Lift 1st roof & 2nd roof bottom: slab, cornice, side Cornice 2 1 x 48.00 ft x N/S 2 1 x 49.00 ft x E/W 2 1 x 11.50 ft x 2 1 x 11.50 ft x side 2 1 x 48.00 ft x 2 1 x 49.00 ft x E/W 2 1 x 13.50 ft x 2 1 x 14.50 ft x Stair Chillakota S-E & N-W: Slab, cornice, side N/S 2 2 x 27.25 ft x E/W 2 2 x 14.50 ft x side 2 2 x 27.25 ft x 2 2 x 14.50 ft x Main Stair Chillakota: Slab, cornice, side N/S 2 1 x 48.00 ft x E/W 2 1 x 14.00 ft x side 2 1 x 48.00 ft x 2 1 x 17.25 ft x Inside Lift room (North part) 1 1 x 9.50 ft x RCC wall

1.00 ft 1.50 ft 1.00 ft 1.50 ft 0.67 ft 0.42 ft 0.67 ft 0.42 ft 1.50 ft 1.50 ft 0.42 ft 0.42 ft 1.50 ft 1.50 ft 0.42 ft 0.42 ft 17.00 ft

= = = = = = = = = = = = = = = =

96.00 147.00 23.00 34.50 64.32 41.16 18.09 12.18 163.50 87.00 45.78 24.36 144.00 42.00 40.32 14.49

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

= 161.50

27 OF 55

N/S 2 1 x 17.00 ft E/W 2 1 x 9.50 ft Beam side 2 1 x 7.50 ft Electric room ceiling 2 1 x 13.50 ft Stair room: Main & S-E & N-W stair 1 1 x 21.00 ft 2 1 x 26.50 ft

x x x x x x

7.75 ft 7.75 ft 1.50 ft 6.50 ft 13.50 ft 13.50 ft

= 263.50 = 147.25 = 22.50 = 175.50 = 283.50 = 715.50 = 2766.95 = 257.06 = 603.20 per sqm

sft sft sft sft sft sft sft sqm sqm =

@ Item-31 Analysis rate 75 mm thick cement concrete (C.C) works with 25 mm x 25 mm mesh expanded metal using 1st class brick chips of proportion 1:2:4 with net cement finishing on roof including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other charges and costs of tools and plants etc. as per direction of Engineer-in-charge (A) At level (+) 25'-0" Grid 13 to 16 (D to L) = 1 Grid 16 to 18 = 1 At level (+) 80'-0" Sft as per Architectural plan Deduct: 5" brick wall Stair: Lift: Column: R.C.C wall: Lift wall: = x x x x x x x x x x x x x x x x x x x x x x 355.61 ft 19.00 ft 17.50 ft 9.50 ft 2.00 ft 1.67 ft 19.00 ft 9.50 ft 3.00 ft 2.00 ft 3.00 ft 21.00 ft 11.00 ft 5.00 ft 3.00 ft 8.00 ft 6.50 ft 12.00 ft 15.00 ft 16.00 ft 10.00 ft 5.00 ft 16.00 ft x x x x x x x x x x x x x x x x x x x x x x x 0.42 ft 12.00 ft 12.00 ft 8.50 ft 3.00 ft 3.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.00 ft 1.17 ft 1.17 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft 0.42 ft = 16320.00 = = = = = = = = = = = 149.36 228.00 420.00 323.00 90.00 105.21 38.00 38.00 12.00 4.00 6.00 sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

Total Tk 216.00

(B) (C) Tk 130291.51

x x

69.50 ft 43.50 ft

x x

180.00 ft 90.00 ft

= 12510.00 = 3915.00 = 16425.00

sft sft sft

(A)

(B)

1 2 4 15 21 2 4 4 2 2 1

Main stair wall = 21.00 = = = = = = = = 22.00 10.00 6.00 37.44 30.42 20.16 12.60 13.44 Electric room wall 2 2 2 Shear w 4 4 Brick/W 4 2 2 Main stair attached: 2 2 1

= 8.40 = 4.20 = 6.72

28 OF 55

(-) Total = (A+B)

= = = =

@ Tk 1044.00 Tk 3020175.79 Item-32 CE's-03.5.2 Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other charges and costs of tools and plants etc. all complete and accepted by the Engineer. (Cement: CEM-II/A-M) Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2 At level (+) 25'-0" Ghoondy 2 x 69.50 ft = 139.00 2 x 180.00 ft = 360.00 2 x 43.50 ft = 87.00 2 x 90.00 ft = 180.00 Column Side : 14 x 2 x 3.00 ft = 84.00 14 x 2 x 2.00 ft = 56.00 9 x 2 x 3.00 ft = 54.00 9 x 2 x 1.67 ft = 30.06 10 x 1 x 6.53 ft = 65.30 = 1055.36 0.50 x 1055.36 x 0.42 ft x 0.50 ft = 110.81 At level (+) 80'-0" Ghoondy E/W 4 x 159.17 ft = 636.68 N/S 4 x 47.17 ft = 188.68 8 x 1.50 ft = 12.00 Stair attached: 4 x 14.00 ft = 56.00 Lift attached: 2 x 11.08 ft = 22.16 2 x 46.00 ft = 92.00 = 1007.52 Deduct: Lift core 2 x 19.50 ft = 39.00 = 968.52 0.50 x 968.52 x 0.42 ft x 0.50 ft = 101.69 Column Side : 15 x 2 x 3.83 ft = 114.90 15 x 2 x 2.00 ft = 60.00 21 x 2 x 3.83 ft = 160.86 21 x 2 x 1.67 ft = 70.14 = 405.90 0.50 x 405.90 x 0.42 ft x 0.50 ft = 42.62 Total = (A + B + C) = 255.13 = 7.22 @ Tk 6358.00 per cum

1605.95 14714.05 31139.05 2892.89 per sqm

sft sft sft sqm =

(B)

(A)

rft rft rft rft rft rft rft rft rft rft cft rft rft rft rft rft rft rft rft rft cft rft rft rft rft rft cft cft cum =

(A)

(B)

(B)

(C) Tk 45932.23

Item-33

29 OF 55

CE's-19.1.3 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 3/4" x 3/4" x 1/8" channel placed @ 112 mm c/c vertically and connecting the same with each other by 20 x 3 mm M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different M.S. members to required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position in between 2 (two) Nos. 50 x 50 x 6 mm M.S. Tee rail made by welding 2 Nos. 50 x 6 mm M.S. flat bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required Nos. 150 mm to 225 mm long 38 x 6 mm M.S. flat bar clamps one end welded with the gate member and the other end bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the damages by pouring concrete (1:2:4) into the holes and finishing, etc complete, painting 2 (two) coats with approved best quality synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including greasing, electrodes, curing etc. complete as per drawing and design and accepted by the Engineer.(Rate is excluding the cost of paint). 2 x 8.00 ft x @ Item-34 CE's-16.6 7.00 ft = Tk 4236.00 = 112.00 10.41 per sqm sft sqm =

Tk 44075.81

Manufacturing, supplying, fitting and fixing M.S. tube (angle box) post (bottom end bifurcated) made by thorough welding of two Nos. 38 x 38 x 6 mm M.S. angle and vertically placing the post into C.C. or R.C.C. foundation including cutting angle to required shape and size including covering the top of the post with 6 mm thick M.S. plate etc. all complete as per drawing. (Rate is excluding the cost of C.C./R.C.C. foundation and paint) At level (+) 7'-0" 12 x @ 7.00 ft = Tk 816.00 = 84.00 25.60 per rm rft rm =

Tk 20891.19

Item-35 CE's-16.6

Painting to door and window frames and shutters in two coats with approved best quality and colour of synthetic enamel paint delivered from authorized local agent of the manufacturer in a sealed container, having highly water resistant, high bondibilty, flexible, using specific brand thinner applied by brass/roller/spray over a coat of priming elapsing time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing and polishing with sand paper and necessary tools, scaffolding, testing charges etc. all complete in all floors approved and accepted by the Engineer. 12 6 x x 0.50 ft 3.00 ft sft same as item- 14x1.5 x 7.00 ft x 7.00 ft sft same as item- 20 = @ Tk 150.00 = = = = = 168.00 42.00 126.00 2535.20 2871.20 266.74 per sqm sft sft sft sft sft sqm =

Chillakota Member & DS

Tk 40011.08

Item-36 CE's-16.8.2 Plastic emulsion paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, applying to wall and ceiling in two coats over lime putty of specified brand applied on primer or sealer elapsing specified time for drying/recoating including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects, sand papering the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floors accepted by the Engineer. Lime putty to be applied as per manufacturer instructions approved and accepted by the Engineer. A) At level (-) 6'-0" Ceiling 1 Wall 2 4

x x

176.00 ft 20.00 ft

x x

69.00 ft 12.00 ft

= 12144.00 = 1920.00

sft sft

30 OF 55

20.00 ft

8.00 ft

= 640.00 = 14704.00 = 1366.03

sft sft sqm

B) At level (+) 7'-0" & Porch Grid-13 to 16 Ceiling 1 x Beam N/S 2 21 x Rib 2 7 x E/W 2 32 x Wall 2 1 x Vault room Wall N/S 1 1 x 1 1 x 1 1 x 1 1 x E/W 1 1 x 1 1 x 1 1 x 1 1 x Self 1 2 x Colm 25 1 x Porch Ceiling 1 x Beam N/S 15 2 x 2 1 x 2 1 x E/W 2 1 x 7 2 x Colm 5 1 x

180.00 ft 19.50 ft 19.50 ft 20.00 ft 45.00 ft 13.00 ft 12.75 ft 11.58 ft 11.83 ft 12.17 ft 10.25 ft 11.33 ft 11.75 ft 10.25 ft 10.50 ft 90.00 ft 42.00 ft 42.00 ft 42.00 ft 86.00 ft 86.00 ft 10.50 ft

x x x x x x x x x x x x x x x x x x x x x x

70.00 ft 1.50 ft 1.50 ft 1.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 17.50 ft 6.00 ft 17.50 ft 44.00 ft 2.63 ft 3.00 ft 2.92 ft 2.92 ft 2.63 ft 17.67 ft

= 12600.00 = = = = = = = = = = = = = = 1228.50 409.50 1920.00 1575.00 227.50 223.13 202.65 207.03 212.98 179.38 198.28 205.63 123.00 4593.75

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm sqm sqm sqm =

= 3960.00 3313.80 252.00 245.28 502.24 3166.52 927.68 36473.82 = 3388.50 = 370.40 = 3652.00 = 1128.18 = 9905.12 per sqm = = = = = = =

Sqm same as item- 27 (A+D) Sqm same as item- 29 Sqm same as item- 30 (A + B + C(B)+D+E+F(B)) @ Item-37 CE's-16.4 Tk 186.00

Tk 1842352.12

On exterior surface applying as per manufacturer instructions 3 coat of weather coat of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container complete in all respect in all loors and accepted by the Engineer. Sqm same as item-27 (B+C) Sqm same as item-30(C(B)+F(B)) Outside +3'-0" to +25'-0" level East- West side 2 x 2 x 3 x 4 x 3 x 4 x 1 x 2 x = 1584.75 = 469.16 sqm sqm

9.17 ft 13.42 ft 32.00 ft 6.17 ft 9.33 ft 3.33 ft 30.50 ft 17.50 ft

x x x x x x x x

22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft

= = = = = = = =

403.48 590.48 2112.00 542.96 615.78 293.04 671.00 770.00

sft sft sft sft sft sft sft sft

31 OF 55

Southside

Grid-7H col Beam E/W

Drop Bott. Southside Ceil Beam Curve wall West & East side Curve line

2 2 2 2 2 2 2 1 12 9 4 1 1 2 4 1

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

12.17 ft 7.75 ft 2.42 ft 9.75 ft 12.25 ft 8.33 ft 4.92 ft 9.33 ft 9.67 ft 9.67 ft 9.75 ft 65.50 ft 65.50 ft 6.00 ft 4.00 ft 65.50 ft 49.00 ft 2.33 ft 49.00 ft 44.50 ft 2.00 ft 1.00 ft 4.50ft 6.33ft 6.33ft 7.50ft 6.25ft 14.33ft 9.67ft 3.00ft 8.00ft 9.75ft 3.00ft 3.00ft 3.00ft

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 22.00 ft 2.17 ft 1.00 ft 1.00 ft 3.33 ft 6.00 ft 1.50 ft 1.50 ft 3.00 ft 4.50 ft 0.50 ft 4.00 ft 0.50 ft 0.50 ft 0.50 ft 4.50ft 2.50ft 2.00ft 5.50ft 5.50ft 6.83ft 6.83ft 7.00ft 2.25ft 4.50ft 3.83ft 3.83ft 14.00ft = = = = = = = = = = = = = =

= = = = = = = = = = = = = = = = = = = = = =

535.48 341.00 106.48 429.00 539.00 366.52 216.48 205.26 251.81 87.03 39.00 218.12 393.00 18.00 24.00 196.50 441.00 18.64 392.00 44.50 4.00 1.00

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm =

2 16 2 2 4 2 Deduct: Door/ Window E & W side -8 -4 -4 -3 -2 -5 -3 -1 -2 -4 -2 -1 -1

@ Item-38 CE's-16.7

Total Tk 166.00

-162.00 -63.30 -50.64 -123.75 -68.75 -489.37 -198.14 -21.00 -36.00 -175.50 -22.98 -11.49 -42.00 9401.63 = 873.43 = 2927.35 per sqm

Tk 485940.02

Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local agent of the manufacturer in a sealed container, applying to wall and ceiling in 2 coats over a coat of brand specified primer or sealer elapsing specified time for drying/ recoating matt finish including cleaning and sand papering making the surface free from loose and flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applying the paint by brush/roller and necessary scaffolding etc. all complete in all floors accepted by the Engineer. A) At level (+) 3'-0" Store room south east 2 2 2 2 Ceil. 2 1 Deduction Door -2 -1 -1

x x x x x x

21.00 ft 11.25 ft 21.00 ft 3.00 ft 9.75 ft 4.00 ft

x x x x x x

10.00 ft 10.00 ft 11.25 ft 7.00 ft 4.50 ft 4.50 ft

= 840.00 = 450.00 = 472.50 = -42.00 = -43.88 = -18.00

sft sft sft sft sft sft

32 OF 55

Sub-station Ceil. 1 Beam 2 2 Colm 1 1 wall 2 cobla 4 1 Deduction Door wall 2 2 1 Deduction Door

1 4 2 1 1 1 1 1 -1 2 2 2 -4 -4 -4 -1

x x x x x x x x x x x x x x x x

43.00 ft 20.33 ft 19.54 ft 10.50 ft 7.83 ft 44.50 ft 0.42 ft 43.00 ft 19.50 ft 4.50 ft 7.17 ft 24.50 ft 8.00 ft 8.00 ft 5.50 ft 19.25 ft

x x x x x x x x x x x x x x x x @

44.50 ft 1.50 ft 1.50 ft 21.50 ft 21.50 ft 21.00 ft 21.00 ft 21.50 ft 2.17 ft 9.17 ft 9.17 ft 9.17 ft 7.00 ft 2.00 ft 2.00 ft 2.00 ft = Tk 122.00

= = = = = = = = = = = = = = = = =

1913.50 243.96 117.24 225.75 168.35 1869.00 35.28 924.50 -42.32 165.06 263.00 449.33 -224.00 -64.00 -44.00 -38.50 7620.77 707.99 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm =

Tk 86374.40

Item-39 CE's-16.14

French polishing to door and window frames and shutters three coats over a coat of priming including putty, cleaning finishing and polishing with sand paper etc. all complete in all floors accepted by the Engineer. At level (-) 6'-0" to (-) 9'-0" (i) Store 4 (ii) G.F Vault 3 (iii) Presspart 5 At ground floor (i) North side hallroom attached officers toilet Door 5 2 4 2 (ii) Porchside Door 2 2 At first floor (i) Sft qnty. Same as ground floor (ii)3 nos members accomodation 28 5 At 2nd floor (i) 2 nos Deputy Secretary room (new accomodation) Door 2 2 2.5 1.25 x x 7.00ft 7.00ft x x 3.33ft 2.50ft = 116.55 = 43.75 sft sft 2.5 2.5 x x 3.00ft 2.17ft x x 6.83ft 6.83ft = 1434.30 = 185.26 = 2297.69 sft sft sft = 678.13 sft 1.25 1.25 x x 3.00ft 2.50ft x x 7.00ft 7.00ft = 52.50 = 43.75 = 678.13 sft sft sft 1.25 1.25 2.5 2.5 x x x x 2.50ft 3.00ft 3.00ft 6.00ft x x x x 7.00ft 7.00ft 7.00ft 7.00ft = 109.38 = 52.50 = 210.00 = 210.00 sft sft sft sft 2.5 x 6.00ft x 6.83ft = 512.25 = 1237.05 sft sft 2.5 x 6.00ft x 7.00ft = 315.00 sft 2.5 x 6.00ft x 6.83ft = 409.80 sft

33 OF 55

Louv.

2.5

2.50ft

2.25ft Total

= 28.13 = 188.43 = 4401.29 = 408.89 per sqm

sft sft sft sqm = Tk 94044.63

Tk 230.00

Item-40 CE's-18.2.3 Supplying, fitting and fixing of 9 mm thick perforated gypsum board false ceiling with aluminium T bar frame in natural anodized frame at 600 mm x 600 mm grid suspended from ceiling by 12 SWG double ply G.I. Wire (+) 14'-0" Level: 3 nos members room (new accomodation) Member 3 22.00 ft x 22.08 ft Scrutinize & Moderate room 1 45.00 ft x 40.00 ft (+) 25'-0" Level Commission room 1 42.50 ft x 23.08 ft Meeting room 1 19.00 ft x 21.50 ft Lobby 1 19.00 ft x 20.67 ft Library 1 39.08 ft x 42.83 ft 2 4.75 ft x 5.83 ft 1 6.00 ft x 7.58 ft (+) 36'-0" Level Secretary room 1 15.50 ft x 21.67 ft Rest room 1 8.00 ft x 9.00 ft J.S room 1 20.67 ft x 12.00 ft Rest room 1 5.08 ft x 8.50 ft Exam. Contr. Cadre 1 13.67 ft x 21.17 ft Exam. Contr. Non-Cadre 1 13.83 ft x 21.17 ft D.S room(S-W) 2 13.58 ft x 12.75 ft D.S room(S-E) 2 13.58 ft x 12.75 ft Director room(S-E) 2 13.58 ft x 12.75 ft (+) 47'-0" Level Chairman room 1 25.75 ft x 32.75 ft Rest room 1 12.50 ft x 12.75 ft 1 9.25 ft x 12.33 ft 1 6.83 ft x 8.00 ft Conference 1 23.08 ft x 31.83 ft Member (S-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft (+) 58'-0" Level Member (S-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (S-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-W) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft Member (N-E) 1 24.67 ft x 24.83 ft Rest room 1 7.58 ft x 8.08 ft (+) 69'-0" Level = = 1457.28 1800.00 sft sft

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

980.90 408.50 392.73 1673.80 55.39 45.48 335.89 72.00 248.04 43.18 289.39 292.78 346.29 346.29 346.29 843.31 159.38 114.05 54.64 734.64 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

34 OF 55

Member (S-W) 1 24.67 ft Rest room 1 7.58 ft Member (S-E) 1 24.67 ft Rest room 1 7.58 ft Member (N-W) 1 24.67 ft Rest room 1 7.58 ft Member (N-E) 1 24.67 ft Rest room 1 7.58 ft Lift Lobby from G.F to 4th floor 4 19.50 ft 4 8.00 ft 8 4.50 ft 4th Floor to 6th floor 3 19.50 ft 3 8.00 ft 6 4.50 ft 4th Floor to 6th floor 3 x 2 136.50 ft 3 x 2 19.33 ft 3 x 2 14.00 ft

x x x x x x x x x x x x x x x x x

24.83 ft 8.08 ft 24.83 ft 8.08 ft 24.83 ft 8.08 ft 24.83 ft 8.08 ft 46.00 ft 11.50 ft 13.50 ft 46.00 ft 9.50 ft 13.50 ft 7.50 ft 5.00 ft 8.00 ft

= = = = = = = = = = = = = = = = = = =

612.56 61.25 612.56 61.25 612.56 61.25 612.56 61.25 3588.00 368.00 486.00 2691.00 228.00 364.50 6142.50 579.90 672.00 33571.97 3118.91 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm

@ Tk 1426.00 = Tk 4447568.05 Item-41 CE's-18.3.1 Supplying, fitting and fixing 12 mm thick Burma Teak (BT) Veneered board in walling with best quality and well seasoned Garjan wood frame of section 75 x 38 mm at 600 x 600 mm in grid, fitted and fixed to wall by plugs, nails, screws etc. including treatment of inner surface with termite and damp proofing agent maintaining leveled and finished exposed faces including. making holes in wall and mending good the damages. If any, during execution of the work including. cost and carriage of all materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. including French polishing 3 coats over a coat of priming as per item No. 137 of the schedule etc. all complete as per design, approved sample and accepted by the Engineer. (+) 25'-0" Level 2 2 2 2 2 2 2 1 1 1 2 2 2 2 Commission room 23.08 ft x 42.50 ft x 19.00 ft x 21.50 ft x 19.00 ft x 20.67 ft x 35.50 ft x 59.00 ft x 10.67 ft x 13.17 ft x 3.33 ft x 6.00 ft x 7.00 ft x 3.33 ft x

Meeting room Lobby Library

9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft

= = = = = = = = = = = = = = = = = = =

415.44 765.00 342.00 387.00 342.00 372.06 639.00 531.00 96.03 118.53 59.94 108.00 126.00 59.94 4361.94 168.00 192.50 360.50 4001.44

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

Deduct: Door Library gap

4 5

6.00 ft 5.50 ft

x x

7.00 ft 7.00 ft Sub-Total

(+) 47'-0" Level

35 OF 55

Chairman room

Conference

2 2 2 2 2 2 2 2 2 2

25.75 ft 25.75 ft 12.50 ft 12.75 ft 9.25 ft 12.33 ft 6.83 ft 8.00 ft 23.08 ft 31.83 ft

x x x x x x x x x x

9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft Sub-Total Total Tk 2784.00

= = = = = = = = = = = =

@ Item-42 CE's-20.4

463.50 463.50 225.00 229.50 166.50 221.94 122.94 144.00 415.44 572.94 3025.26 7026.70 652.80 per sqm

sft sft sft sft sft sft sft sft sft sft sft sft sqm = Tk 1817385.06

Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick 2.5 dia pipe for hand-rail as per drawing supplied by architect or engineer and accepted by the Engineer. (i)G.F: Visible ramp West side Basement to PL 2 2 1 1 1 (ii) G.F to F.F 1 1 1 (iii) F.F to 2nd F.: 1 1 1 6 1 1 1 2 = 32.00ft 22.00ft 24.00ft 10.00ft 934.00ft x @Tk = = = = = 3.25ft = = 5839.00 32.00 22.00 24.00 120.00 934.00 3035.50 282.00 per rm Rft Rft Rft Rft Rft sft sqm = Tk 1646626.21 1 1 1 32.00ft 22.00ft 24.00ft = = = 32.00 22.00 24.00 Rft Rft Rft 2 2 1 1 1 72.50ft 72.50ft 32.00ft 22.00ft 24.00ft = = = = = 290.00 290.00 32.00 22.00 24.00 Rft Rft Rft Rft Rft

Main stair side

Item-43 CE's-22.2

Supplying, fitting and fixing of 20mm dia foreign made aluminium pipe curtain rail for door and window including cutting and fitting fixing as per required measurement and supplying necessary screws, electric drill and rowel plug including charge of electricity etc. complete and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = = = 141.00 50.00 Rft Rft Rft Rft Rm = Tk 36726.61

@Tk Item-44

500.00

50.00 = 241.00 = 73.45 per rm

36 OF 55

CE's-22.5

Supplying, fitting and fixing of C.T wood strip (62 x 25 x 20 mm) for fixing of aluminium curtain rails as per design and drawing fitted and fixed in position including supply of screws, nails, drilling etc. and two coats of French polishing over a coat of priming etc. all complete and accepted by the Engineer. (Rate is excluding the cost of polishing and painting etc.) (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = = = 141.00 50.00 Rft Rft Rft Rft Rm = Tk 40032.00

@Tk Item-45 CE's-22.6

545.00

50.00 = 241.00 = 73.45 per rm

Supplying, fitting and fixing vertical Venetian blinds made with glass fiber fabrics (foreign made) with supply of all materials (foreign made) such as Head rail (Aluminium), end capset, rod till, sigger (stopper) runner, spacer (link), Handling cord, ball chain, link chair, cordweight weight-plate plastic washer, glass fiber fabrics, and head cap-set etc. all complete and accepted by the Engineer. (ii) F.F: 3 nos Members room (new accomodation) & others 1 1 141.00ft (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 25.00ft (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 2 1 25.00ft = 241.00sft x @Tk 7.50ft 1126.00 = = = = = = 141.00 50.00 50.00 241.00 1807.50 167.92 per sqm Rft Rft Rft Rft Sft Sqm = Tk 189078.87

Item-46 CE's-12.24

Supplying, fitting and fixing of best quality magnetic door shock absorber including all necessary tools and accessories etc. all complete approved and accepted by the Engineer (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 @Tk 215.00 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 10965.00

Item-47 CE's-12.25

Supplying, fitting and fixing best quality heavy type 19 mm dia and to 300 mm long brass hasp bolt including cutting grooves in door shutter and frames, screws etc. all complete approved and accepted by the Engineer. (i) G.F 8 1 (ii) F.F: 3 nos Members room (new accomodation) & others 35 1 (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation) 2 1 (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation) 6 1 @Tk 322.00 = 8.00 = 35.00 = 2.00 = 6.00 = 51.00 each nos nos nos nos nos = Tk 16422.00

37 OF 55

Item-48 CE's-30.18.2 Supplying and placing of coloured engraved cement concrete tiles (250 x 250 mm) in size having minimum thickness 24 mm over 12 mm sand cement mortar (4:1) each at a distance of 6 mm apart and filling the joints with cement sand mortar (1:4) including raking out joints and cutting the tiles to required sizes wherever necessary with high class recessed pointing, cleaning and washing of sand, curing for min 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted by the Engineer. Basement level East and West side 1 x 133.68 ft x @ 36'-0"Level East and West side 2 2 2 x x x 40.00 ft 9.58 ft 8.50 ft x x x 13.00 ft 6.25 ft 38.25 ft = = = = = 1040.00 119.75 1300.50 2460.25 228.56 per sqm sft sft sft sft sqm = Tk 215898.14 133.68 ft Tk 868.00 = = 17870.34 1660.20 per sqm sft sqm = Tk 1441049.54

@ 47'-0"Level East and West side 2 2 x x 2 4 2 x x x 39.82 ft 10.00 ft 5.00 ft x x x

Tk 944.59

48.33 ft 1.67 ft 1.67 ft

= = = = =

@ Item-49 R's-5(a-i)

Tk 970.12

3849.00 133.60 33.40 4016.00 373.10 per sqm

sft sft sft sft sqm = Tk 361947.52

Dismantling unserviceable/ damaged brick works of thickness 250 mm and above in cement or lime in foundation and superstructure etc. as per direction of the Engineer-incharge. 250 mm brick work 1 0.83 x 6.00 ft x @ 7.00 ft Tk 247.00 = 34.86 = 0.99 per cum cft cum = Tk 243.82

Item-50 R's-5(a-ii)

Dismantling unserviceable/damaged brick works of thickness 75/125 mm in cement or lime in foundation and superstructure etc. as per direction of the Engineer-in-charge. 125 mm brick work 2 2 x x 21.50 ft 6.00 ft x x 10.50 ft 7.50 ft = = = = 451.50 90.00 541.50 50.31 per sqm sft sft sft sqm = Tk 1760.73

@ Item-51 R's-8(d)

Tk 35.00

Cleaning and refilling of worn out joints between glazed tiles in floor or walls etc. as per direction of Engineer-in-charge A) Ground floor North east corner officer's toilet Floor 2 x Wall 2 x North sidet corner officer's toilet 1 x Skirting 2 x

6.00 ft 25.00 ft 106.75 ft 106.75 ft

x x x x

6.00 ft 8.00 ft 42.08 ft 0.50 ft

= 72.00 = 400.00 = 4492.04 = 106.75

sft sft sft sft

38 OF 55

Col Receiption hall Skirting

2 4

x x

42.08 ft 10.58 ft 66.00 ft 66.00 ft 44.50 ft 7.50 ft 10.50 ft 21.50 ft 7.25 ft 5.83 ft 8.58 ft 30.17 ft 21.50 ft 9.83 ft 4.00 ft 16.00 ft 3.00 ft 40.00 ft 46.00 ft 40.00 ft 40.00 ft 23.50 ft 5.83 ft 5.83 ft 14.00 ft 12.00 ft 22.75 ft 8.00 ft 8.00 ft 12.00 ft 1.00 ft 11.50 ft 29.00 ft 5.83 ft 5.83 ft 0.50 ft 6.50 ft 44.00 ft 5.83 ft 5.83 ft 12.00 ft 19.50 ft 8.00 ft 4.50 ft 66.00 ft 66.00 ft 44.50 ft 40.00 ft 7.50 ft 9.50 ft 14.33 ft 14.58 ft

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

0.50 ft 0.50 ft 44.50 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 9.83 ft 1.67 ft 1.67 ft 6.50 ft 8.00 ft 8.00 ft 8.00 ft 8.00 ft 8.00 ft 5.00 ft 13.00 ft 5.25 ft 6.00 ft 0.50 ft 12.00 ft 0.83 ft 0.50 ft 8.33 ft 6.00 ft 11.50 ft 1.00 ft 0.50 ft 6.00 ft 0.50 ft 0.50 ft 0.50 ft 1.00 ft 0.50 ft 0.50 ft 6.50 ft 0.50 ft 1.00 ft 0.50 ft 6.00 ft 46.00 ft 11.50 ft 14.00 ft 44.50 ft 0.50 ft 0.50 ft 13.00 ft 0.50 ft 0.50 ft 9.00 ft 4.33 ft

= 42.08 = 21.16 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 2937.00 66.00 44.50 7.50 5.25 422.69 24.22 9.74 55.77 241.36 688.00 314.56 256.00 384.00 60.00 520.00 241.50 240.00 120.00 846.00 319.37 192.39 466.48 216.00 523.25 320.00 176.00 144.00 10.00 11.50 29.00 110.77 64.13 4.75 84.50 22.00 233.20 128.26 144.00 897.00 92.00 126.00 2937.00 66.00 44.50 520.00 7.50 4.75

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

1 x 2 x 2 x Col 2 x 1 x South west toilet block 2 x 2 x 1 x 1 x Wall 1 x 4 x 4 x 8 x 3 x 4 x 1 x 1 x 1 x 6 x Stair room 3 nos 3 x Tread 66 x Riser 66 x Landing 4 x floor 3 x South side stair room 2 nos 2 x Tread 40 x Riser 44 x Landing 2 x Stepside 20 x 2 x landing side 2 x Main stair Tread 19 x Riser 22 x Stepside 19 x Landing 2 x wall 1 x Free standing stair Tread 40 x Riser 44 x Landing 2 x Lift lobby 1 x Gap 1 x 2 x East side hall room 1 x Skirting 2 x 2 x Ver. 1 x Col 2 x 1 x Toilet 1 x 1 x

= 128.97 = 63.13

39 OF 55

Skirting wall

1 20 4 2 2 2 2

x x x x x x x

13.83 ft 4.00 ft 3.00 ft 14.58 ft 4.33 ft 14.33 ft 9.00 ft

x x x x x x x

11.83 ft 8.00 ft 5.00 ft 0.50 ft 0.50 ft 8.00 ft 8.00 ft

Total area of F.F = same as G.F Add: FF East west side Ver. 2 x 42.00 ft x 4.50 ft Total Tk 56.00

= = = = = = = = =

163.61 640.00 60.00 14.58 4.33 229.28 144.00 21960.36 21960.36

sft sft sft sft sft sft sft sft sft sft sft sqm

@ Item-52 R's-22

= 378.00 = 44298.72 = 4115.45 per sqm

= Tk 230465.27

Taking out unserviceable wooden Chowkat /door or window frame etc. as per direction of Engineer-in-charge 1 x 6 Nos @ Tk 138.00 = 6.00 each no = Tk 828.00

Item-53 R's-48(b)

Renewing synthetic enamel paint to door-windows frame and shutter etc. as per direction of Engineer-in-charge: 2 coats Window grill 8 0.75 x 2 0.75 x 2 0.75 x 5 0.75 x 4 0.75 x 4 0.75 x 4 0.75 x 3 0.75 x 1 0.75 x 1 1.25 x Ground floor northside hall room Door 13 2.5 x 5 1.25 x 1 1.25 x Ground floor substation Door 2 2 x grill 2 0.75 x 2 0.75 x 1 0.75 x 2 2 x 2 2 x 2 2 x 2 2 x Porch side 4 2.5 x 2 1.25 x 2 1.25 x 4.50 ft 7.50 ft 6.25 ft 14.33 ft 6.33 ft 6.33 ft 1.75 ft 3.00 ft 3.00 ft 7.00 ft 2.50 ft 3.00 ft 2.50 ft 8.00 ft 8.00 ft 5.50 ft 96.00 ft 20.83 ft 20.00 ft 21.00 ft 11.25 ft 2.50 ft 3.00 ft 2.50 ft x x x x x x x x x x x x x x x x x x x x x x x x 4.50 ft 5.50 ft 5.50 ft 6.83 ft 2.50 ft 2.00 ft 4.50 ft 3.83 ft 14.00 ft 3.00 ft 7.00 ft 7.00 ft 7.00 ft 7.00 ft 2.00 ft 2.00 ft 11.83 ft 0.50 ft 0.50 ft 0.50 ft 0.50 ft 7.00 ft 7.00 ft 7.00 ft = = = = = = = = = = 121.50 61.88 51.56 367.03 47.48 37.98 23.63 25.85 31.50 26.25 sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm = Tk 28336.98

= 568.75 = 131.25 = 21.88 = = = = = = = = = = = = = 224.00 24.00 16.50 851.76 41.66 40.00 42.00 22.50 175.00 52.50 43.75 3050.19 283.37 per sqm

@ Item-54 R's-51(b)

Tk 100.00

Renewing acrylic emulsion paint to walls and ceiling etc. as per direction of Engineer-incharge: 2 coats A) Ground floor

40 OF 55

Northside hall room: Ceiling 1 x Beamside E/W 5 2 x Stair beam 1 2 x N/S 8 2 x Col. 4 1 x wall N/S 1 2 x E/W 1 2 x Deduction Door -1 x -2 x -6 x Window -1 x Store room wall 2 x Beamside E/W 2 2 x Deduction fanlight -1 x Col,cobla 10 1 x Deduction Door -2 x Off. Toilet Ceiling 2 x wall 1 1 x Receiption hall 1 Ceiling 1 x Beamside E/W 2 2 x 2 2 x N/S 2 3 x wall N/S 2 1 x E/W 2 1 x Col. 2 1 x 2 1 x Deduction Door -4 x Thai wall -2 x South-west corner toilet block

106.75 ft 20.00 ft 20.00 ft 19.50 ft 10.58 ft 42.08 ft 106.75 ft 2.50 ft 3.33 ft 6.00 ft 4.50 ft 42.08 ft 20.00 ft 20.00 ft 10.00 ft 3.33 ft 6.00 ft 25.00 ft 66.00 ft 20.25 ft 20.58 ft 19.50 ft 66.00 ft 44.50 ft 7.50 ft 10.50 ft 3.00 ft 19.00 ft

x x x x x x x x x x x x x x x x x x x x x x x x x x x x

42.08 ft 1.50 ft 1.00 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 7.00 ft 7.00 ft 4.50 ft 10.00 ft 10.00 ft 1.00 ft 0.50 ft 7.00 ft 6.50 ft 2.50 ft 44.50 ft 1.50 ft 1.50 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 9.00 ft

= = = = = = = = = = =

4492.04 300.00 40.00 468.00 423.20 841.60 2135.00 -17.50 -46.62 -252.00 -20.25

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

= 841.60 = 800.00 = -20.00 = 50.00 = -46.62 = 78.00 = 62.50 = = = = = = = = 2937.00 121.50 123.48 175.50 1320.00 890.00 150.00 210.00

= -84.00 = -342.00

41 OF 55

Ceiling Receiption front Beamside

1 2 2 1 2

wall Deduction Door Col. Lift lobby

4 1 1 1 1 1 1 -2 1 1 1

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

21.50 ft 40.00 ft 46.00 ft 3.00 ft 19.50 ft 50.00 ft 16.00 ft 6.00 ft 2.00 ft 19.50 ft 46.00 ft 19.00 ft 4.42 ft 1.00 ft 5.00 ft 11.50 ft 11.50 ft 19.50 ft 46.00 ft 14.00 ft 14.00 ft 4.50 ft 4.00 ft 3.00 ft 12.00 ft 6.50 ft 12.33 ft 3.00 ft 19.00 ft 12.00 ft 8.50 ft 9.00 ft 6.00 ft 66.50 ft

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

9.83 ft 13.00 ft 5.25 ft 1.50 ft 1.50 ft 1.50 ft 10.00 ft 7.00 ft 10.00 ft 10.00 ft 10.00 ft 9.00 ft 9.00 ft 9.00 ft 9.00 ft 10.00 ft 8.00 ft 2.58 ft 19.50 ft 4.50 ft 10.00 ft 10.00 ft 8.00 ft 7.00 ft 10.00 ft 10.00 ft 6.50 ft 7.00 ft 10.00 ft 10.00 ft 6.33 ft 6.58 ft 6.00 ft 44.33 ft

= = = = = = =

845.38 520.00 241.50 9.00 58.50 75.00 320.00

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

1 2 2

= -84.00 = 20.00 = 390.00 = 920.00 = = = = = = = = -171.00 -79.56 -9.00 -90.00 230.00 92.00 100.62 897.00

Deduction -1 -2 -1 -2 Two Lift middle gap 2 1 Ceil. 1 1 Beam 2 1 Ceil. 1 1 Main stair side Ceil. 2 1 wall 4 1 2 1 Deduction Door -2 -2 Electric room wall 2 2 2 2 Ceil. 2 1 Deduction Door -2 Main stair room 1 1 2 1 Fl. 2 1 1 1 Landing 2 1 Eastside hall room Ceil. 1 1

= 126.00 = 560.00 = 90.00 = -64.00 = -42.00 = 480.00 = 260.00 = 160.29 = -42.00 = = = = = 190.00 240.00 107.61 59.22 72.00

= 2947.95

42 OF 55

Beamside Northside E/W Col. wall E/W Deduction Door

6 4 8 2 1 2

1 1 1 1 1 1 -2 -1 -4 1 -2 -2 1 2 1

x x x x x x x x x x x x x x x

19.50 ft 19.00 ft 20.33 ft 7.50 ft 9.50 ft 42.67 ft 3.00 ft 6.00 ft 6.00 ft 66.50 ft 19.00 ft 4.00 ft 40.00 ft 19.00 ft 50.00 ft

x x x x x x x x x x x x x x x x x x

1.50 ft 1.50 ft 1.50 ft 10.00 ft 10.00 ft 10.00 ft 7.00 ft 7.00 ft 7.00 ft 10.00 ft 9.00 ft 8.00 ft 13.00 ft 1.50 ft 1.50 ft 5.00 ft 10.00 ft 7.00 ft

= = = = = = = = = = = =

175.50 114.00 243.96 150.00 95.00 853.40 -42.00 -42.00 -168.00 1330.00 -342.00 -64.00

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft

Wall

East. Ver. Ceil. Beam Curve slab

1 2 1

= 520.00 = 114.00 = 75.00 = 230.00 = 320.00 = -35.00

1 1 x 46.00 ft wall 2 1 x 16.00 ft Deduction Door -2 x 2.50 ft North East corner general toilet block East block Ceil. 1 1 x 14.33 ft wall 2 1 x 3.67 ft 2 1 x 14.33 ft West block Ceil. 1 1 x 14.58 ft wall 2 1 x 14.58 ft 2 1 x 4.33 ft Urinals

x x x x x x

9.00 ft 2.50 ft 2.50 ft 4.33 ft 10.00 ft 10.00 ft

= 128.97 = 18.35 = 71.65 = 63.13 = 291.60 = 86.60

sft sft sft sft sft sft

43 OF 55

Ceil. 1 1 x North west corner toilet block Ceil. 1 1 x 1 1 x North East corner toilet block Ceil. 1 1 x 1 1 x For stair room For 01 no stair wall 2 2 Deduction Thai door Stair fl. 2 Ceil. 2 wall 2 2

13.83 ft 9.50 ft 21.83 ft 12.75 ft 21.33 ft

x x x x x

11.83 ft 5.50 ft 7.83 ft 13.17 ft 11.50 ft

= 163.61 = 52.25 = 170.93 = 167.92 = 245.30 = 30049.10

sft sft sft sft sft sft

(A)

1 1 -1 1 1 1 1 =

x x x x x x x

23.50 ft 11.75 ft 6.00 ft 12.00 ft 9.83 ft 9.83 ft 11.75 ft 3

x x x x x x x x x x x x x x x x x x x x x x x

10.00 ft 10.00 ft 7.00 ft 6.00 ft 11.75 ft 10.00 ft 10.00 ft 1469.61 ft 21.75 ft 1.50 ft 14.00 ft 8.50 ft 10.00 ft 7.00 ft 10.50 ft 7.00 ft 10.50 ft 10.50 ft 10.50 ft 10.50 ft 1.50 ft 1.00 ft 1.00 ft

= 470.00 = 235.00 = = = = = = = -42.00 144.00 231.01 196.60 235.00 1469.61 4408.82

sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sft sqm sqm sqm

For 03 nos toilet South side stair room Ceil. 1 1 Beamside 2 1 Landing 1 1 Fl. 2 1 wall E/W 1 1 Deduction Door -1 wall N/S 2 1 Deduction Door -1 wall 1 1 1 1 1 1 1 1 Landing 2 1 Fl. 1 1 2 1 For 02 nos stair

(B)

x x x x x x x x x x x x x x x =

11.50 ft 21.75 ft 8.33 ft 10.50 ft 21.75 ft 6.00 ft 24.00 ft 6.00 ft 5.50 ft 11.50 ft 8.00 ft 6.50 ft 21.75 ft 12.25 ft 10.50 ft 2

= 250.13 = = = = 65.25 116.62 178.50 217.50

= -42.00 = 504.00 = = = = = = = = = = = = = = -42.00 57.75 120.75 84.00 68.25 65.25 12.25 21.00 1677.25 3354.49 37812.40 3512.86 3512.86 7025.72 per sqm

x 1677.25 ft Total area of G.F = (A+B+C)

Total area of F.F = same as G.F Total area @ Tk 93.00

= Tk 653391.56

44 OF 55

Item-55 CE's-23.2.1 Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. complete. 1 x = 22000.00sft 66000.00cft x @Tk 3.00 ft 3600 405.00 = 66000.00 cft = 18.33 Hr per hour Total Civil Cost =

= Tk 7425.00 Tk 34158291.88

gv: kwdKzj Bmjvg Dc-mnKvix cKkjx1,

Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx,

gvt Avyj Iqv`y` Dc-mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

gvt Gbvgyj nK Lvb mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

mi`vi gCbyj Bmjvg wbevnx cKkjx, MYc~Z m` wefvM, XvKv|

45 OF 55

02
Item No-1 CES- 26.67.3

Internal Sanitary and water supply


Supplying, fitting fixing of food grade plastic overhead water reservoir tank including all necessary fittings, hardware and consumables etc. all complete approved and accepted by the Engineer. Water tank 1x16 = 16.00 @ Tk. 24715.00 nos each = Tk 395440.00

Item No-2 Analysis Rate

Supplying, fitting and fixing special coloured & special type glazed porcelain Combi closet-p or s trap (RAK, Model: Orient) with seat & seat cover, flushing tank and flushing unit including preparing the base with cement concrete and with wire mesh or rods if necessary, in all floors including making holes wherever required and mending good the damages and fitting, fixing, finishing etc. complete with all necessary fittings and connection approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 10047.00 nos nos nos nos nos nos nos each

= Tk 452115.00

Item No-3 Analysis Rate

Supplying, fitting and fixing special coloured & special type glazed porcelain W/H Basin (RAK, Model: Orient) including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 3479.00 nos nos nos nos nos nos nos each

= Tk 156555.00

Item No-4 Analysis Rate

Supplying, fitting and fixing special coloured & special type glazed porcelain Pedestal, (RAK, Model: Orient) with rowel plug and screws etc. all complete approved and accepted by the Engineer. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 1x 5 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= 1x 8 Nos= Total= @ Tk. 5.00 8.00 8.00 8.00 8.00 8.00 45.00 1997.00 nos nos nos nos nos nos nos each

= Tk 89865.00

Item No-5 CES-26.46.5

Supplying uPVC waste pipe 315 mm dia with wall thickness 7.7 mm - 9.7 mm for underground laying including fitting, fixing etc. all complete approved and accepted by the Engineer. = 820.00 = 249.92 Tk. 2581.00 rft nos each

= Tk 645053.34

46 OF 55

Item No-6 CES-26.78.3

Construction of masonry inspection pits up to a depth of 700 mm with 250 mm thick brick work in cement mortar (1:4) including 100 mm thick R.C.C. top slab (1:2:4) with 1% reinforcement, manhole cover with locking arrangement including necessary earth work, side filling and one brick flat soling. 75 mm thick (1:3:6) base concrete for making invert channel and 12 mm thick (1:2) cement plaster with neat finishing etc. all complete approved and accepted by the Engineer. Clear 600 x 600 mm and depth 750 to 900 mm, average 825 mm for single 300 mm dia R.C.C. pipes and 375 mm and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover. Total= 64.00 @ Tk. 8164.00 nos each = Tk 522496.00

Item No-7 CE's- 26.18

Supplying, fitting and fixing of 450 x 600 mm size and 5 mm thick unframed super quality mirror with hard boards at the back with all necessary fitting including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. (Made in Japan or equivalent) i) Ground Floor ii) 1st Floor iii) 2nd Floor iv) 3rd Floor 1x 6= 1x 12 = 1x 4 = 1x 6 = Total= @ Tk. 6.00 12.00 4.00 6.00 28.00 539.00 nos nos nos nos nos each

= Tk 15092.00

Item-8 CE's-26.20

Supplying, fitting and fixing super quality 600 x 125 mm coloured glass (plate) shelf having 5 mm thickness with fancy C.P. brackets, screws and frames including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 25.00 @ Tk. 978.00 nos each

= Tk 24450.00

Item-9 CE's-26.22

Supplying, fitting and fixing super quality C.P. Towel rail of 600 mm long and 20 mm in dia with C.P. holder including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 15.00 @ Tk. 491.00 nos each = Tk 7365.00

Item-10 CE's-26.25.1

Supplying, fitting and fixing of special coloured toilet paper holder Size (150 mm x 150 mm x 126 mm) including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 15.00 @ Tk. 571.00 nos each = Tk 8565.00

Item No-11 CES-26.26.3

Supplying, fitting and fixing standard size soap tray including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Porcelain soap tray: colored Total= 15.00 nos @ Tk. 261.00 each = Tk 3915.00 Supplying, fitting and fixing stainless steel grating with hinged cover size 150 x 150 mm in traps or in drains including making holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. Total= 45.00 nos

Item No-12 CES-26.27

47 OF 55

@ Item No-13 CES-26.36

Tk. 139.00

each

= Tk 6255.00

Supplying 100 mm inside dia best quality uPVC soil, waste and ventilation pipe having specific gravity 1.35-1.45, wall thickness 3.4- 4.0 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating bands, sockets etc. approved and accepted by the Engineer (length: 6000 mm each).

4 5

80.00ft 95.00ft

@
Item-14 CE's-26.38.

= = = = Tk. 605.00

320.00 rft 475.00 rft 795.00 rft 242.30 per rm

rm = Tk 146594.03

Supplying, fitting and fixing G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good the damages etc. all complete in all respects approved and accepted by the Engineer. A.12.5 mm dia G.I pipe 5

30.00ft @

= = Tk. 239.00 = = Tk. 309.00

150.00 rft 45.72 per rm 200.00 rft 60.96 per rm

rm = Tk 10926.55

A. 20 mm dia G.I pipe 5

40.00ft @

rm = Tk 18835.72

Item-15 CE's-26.40.5

Supplying different inside dia best quality CPVC pressure pipe for water supply having specific gravity 1.35 - 1.45, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer. (length: 6000 mm each) A. 37 mm dia wall thickness 3.7 mm - 4.3 mm

10.00ft @

= = Tk. 525.00

50.00 rft 15.24 per rm

rm = Tk 8000.61

Item No-16 CES- 26.47.2

Supplying, fitting and fixing G.I. Union with approved and accepted by the Engineer. i) 20 mm dia G.I. Union i)1st Floor 1x5 = ii) 2nd Floor 1x4 = iii) 3rd Floor 1x6= Total= @ Tk.

sealant etc. complete in all respects

5.00 4.00 6.00 15.00 140.00

nos nos nos nos each

= Tk 2100.00

Item No-17 CES-26.48.2

Supplying, fitting and fixing best quality G.I. gate valve with sealant etc. complete approved and accepted by the Engineer. i) 20 mm brass gate valve i)1st Floor ii) 2nd Floor iii) 3rd Floor 1x4= 1x2 = 1x3= Total= @ Tk. 5.00 2.00 3.00 10.00 329.00 nos nos nos nos each

= Tk 3290.00

48 OF 55

Item No-18 CES-26.53.2

Supplying different inside dia best quality uPVC pressure waste pipe having specific gravity 1.35 -1.45, wall thickness 2.7 mm - 3.4 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards, fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating bands, sockets etc. complete approved and accepted by the Engineer100 mm dia uPVC P or S trap 100 mm dia Total= 20.00 @ Tk. 478.00 nos each = Tk 9560.00

Item No-19 CES-26.72

Supplying, fitting and fixing 12 mm dia, 600 mm long Plastic flexible lead (connection) pipe approved and accepted by the Engineer. Total= 65.00 @ Tk. 80.00 nos each = Tk 5200.00

Item No-20 CES-26.54.2

Supplying, fitting and fixing medium best quality CP pillar cock etc. complete approved and accepted by the Engineer.12 mm CP special heavy duty pillar cock Total= 30.00 @ Tk. 930.00 nos each

= Tk 27900.00

Item No-21 CES-26.55.2

Supplying, fitting and fixing medium best quality CP pillar cock etc. complete approved and accepted by the Engineer.12 mm CP special heavy duty pillar cock Total= 20.00 @ Tk. 831.00 nos each

= Tk 16620.00

Item No-22 CES- 26.62.6

Supplying, fitting and fixing Special/Fancy quality C.P. concealed/ surface stop cock with all necessary hardware and consumables approved and accepted by the Engineer. Stop cock concealed (heavy) Total= 35.00 @ Tk. 1018.00 nos each = Tk 35630.00

Item No-23 CES- 26.66.2

Supply and fitting-fixing hand / push shower for ablution including holder Moving type hand shower Moving type push shower Total= 45.00 @ Tk. 878.00 nos each = Tk 39510.00

49 OF 55

Item No-24 CES- 26.64.1

Groove cutting in brick work, R.C.C floor, including cost for concealing of G.I. pipe work (12 mm and 20 mm dia) in brick wall by cutting groove in wall, lintel, beam etc. by any means carefully without damaging the structure and filling the grooves with C.C (4:2:1) after laying of pipe including cost of scaffolding, finishing, curing etc. all complete approved and accepted by the Engineer. A. Groove size: 40 x 40 mm (for laying 12 to 20 mm dia pipe). 5 65.00ft = = 325.00 rft 99.06 rm

Tk. 40.00

per rm

= Tk 3962.21
= Tk 2655295.45

gv: kwdKzj Bmjvg Dc-mnKvix cKkjx-1, MYc~Z m` Dc-wefvM, XvKv|

Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM,

gvt Avyj Iqv`y` Dc-mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

gvt Gbvgyj nK Lvb mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

mi`vi gCbyj Bmjvg wbevnx cKkjx, MYc~Z m` wefvM, XvKv|

50 OF 55

Analysis of Rates of item-31


75 mm thick cement concrete (C.C) works with 25 mm x 25 mm mesh expanded metal using 1st class brick chips of proportion 1:2:4 with net cement finishing on roof including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other charges and costs of tools and plants etc. as per direction of Engineer-in-charge Considering 100 sft. of work. A
1. 2. 3. 4. 5.

Cost of Materials:Brick chips Sand (F.M. 1.2) Sand (F.M. 2.5) Cement 25mm X 25mm mesh 6 Wire brass 7 Extra cement for finishing 25 5.5 5.5 4.5 100 5 0.5 cft. cft. cft. bags sft. Nos. bags @ @ @ @ @ @ @
Tk. Tk. Tk. Tk. Tk. Tk. Tk. 80.00 14.00 25.00 405.75 20.00 40.00 405.75

Per cft. Per cft. Per cft. Per bag Per sft. each Per bag Sub-total

= = = = = = = = = = = =

Tk. 2,000.00 Tk. Tk. 77.00 137.50

Tk. 1,825.88 Tk. 2,000.00 Tk. Tk. 200.00 202.88

Tk. 6,443.25

B
1. 2.

Labour Cost:Head mason 1/2 Mason 1 3 Extra Mason for finishing 1/4 4 Skilled labour 1 1/2 5 Ordinary labour for surface cleaning, curing, sand washing, materials lifting etc. 3 6 Curing for 7 days No. No. No. No. @ @ @ @
Tk. Tk. Tk. Tk.

each each 306.00 each 250.00 each


387.00 306.00

Tk. Tk. Tk. Tk.

193.50 306.00 76.50 375.00

Nos. @

Tk.

200.00

each

L.S.

Profit Overhead Add VAT with adjustment factor 1.0582 Grand total Rate per sft. Rate per sqm. Say, Tk.

= = Sub-total = Total = 10.00% = 3.50% = 5.50% = = = =

Tk. Tk.

600.00 83.33

Tk. 1,634.33 Tk. 8,077.58 Tk. Tk. 807.76 282.72

Tk. 9,168.06 Tk. 533.59

Tk. 9,701.65 Tk. 97.02

Tk. 1,044.29

1,044 .00 Per sqm.

gv: kwdKzj Bmjvg Dc-mnKvix cKkjx-1, MYc~Z m` Dc-wefvM, XvKv|

Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|

gvt Avyj Iqv`y` Dc-mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

gvt Gbvgyj nK Lvb mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

mi`vi gCbyj Bmjvg wbevnx cKkjx, MYc~Z m` wefvM, XvKv|

Item No.- 05
12 mm thick foreign made white / black/colour Granite on walls
Considering 100 sft. of work A. Cost of materials 1. 12 mm thick Granite 2. Grey cement 3. Sand (F.M. 1.2) 4. Sand (F.M. 2.2) 5. White cement B. Cost for cutting, shaping, tools and 1. Hire charge of cutting and shapingmachine in/c cutting disc. 2. Foreman 3. Machine operator 4. Helper C. 1. 2. 3. Labour cost for laying Mason Helper Scaffolding 100 1.7 2.08 2.08 4 sft. bag cft. cft. kg @ Tk 750.00 @ Tk 375.00 @ Tk 1400.00 @ Tk 2500.00 @ Tk 28.00 Per sft. = Tk 75000.00 Per bag = Tk 637.50 Per % cft. = Tk 29.12 Per % cft. = Tk 52.00 Per kg = Tk 112.00 Sub-total = Tk 75830.62 1 1 1 1 day No. No. No. @ Tk 1660.00 @ Tk 428.57 @ Tk 333.00 @ Tk 240.00 Per day = Tk 1660.00 each each each Sub-total each each Per sft. Sub-total = = = = = = = = Tk 428.57 Tk 333.00 Tk 240.00 Tk 2661.57 Tk 1683.00 Tk 480.00 Tk 600.00 Tk 2763.00

5.5 2 100

Nos. @ Tk 306.00 Nos. @ Tk 240.00 sft. @ Tk 6.00

D. Polishing 1. Hire charge of marble polishing machine in/c polishing stone 2. Machine operator 3. Helper

2.5 2.5 2.5

days @ Tk 531.00 Nos. @ Tk 333.00 Nos. @ Tk 240.00

Per day = Tk 1327.50 = = = = = = = = = = Tk 832.50 Tk 600.00 Tk 2760.00 Tk 83916.76 Tk 8391.68 Tk 2937.09 Tk 95245.52 Tk 5543.38 Tk 100788.91 Tk 1007.89 Tk 10848.92

each each Sub-total Total (A+B+C+D) Profit 10.00% Overhead 3.50% 1.0582 5.50% Grand total Rate per sft. Rate per sqm

Add VAT with adjustment factor

Sa y,

Tk.

10,849 .00 Per sqm.

Item No.- 26
Supplying, fitting and fixing of 6 mm thick tempered reflecting glass in aluminium curtain wall. Considering 5'-0" x 4'-0"= 20 sft. of work (A) Materials: (i) 6 mm thick Tempered reflecting (ii) glass Wastage 5% 20 1 sft. sft. @ Tk. @ Tk. 280.00 280.00 Per sft. Per sft. = Tk 5600.00 = Tk 280.00

(iii) Neoprene / rubber gasket (iv) Local carriage (B) Labour charges:

20

sft.

@ Tk.

1.60

Per sft. L.S.

= Tk 32.00 = Tk 40.00

Labour cost for fitting and fixing in position of 6 mm thick Tempered reflecting glass in aluminium curtain wall 20 sft. @ Tk. 8.00 Per sft. = Tk 160.00 Total (A+B) = Tk 6112.00 Profit 10.00% = Tk 611.20 Overhead 3.50% = Tk 213.92 = Tk 6937.12 Add VAT with adjustment factor 1.0582 5.50% = Tk 403.75 Grand total = Tk 7340.87 Rate per sft. = Tk 367.04 Rate per sqm. = Tk 3950.85 Say Tk. 3,951 .00 per sqm.

gv: kwdKzj Bmjvg Dc-mnKvix cKkjx-1, MYc~Z m` Dc-wefvM, XvKv|

Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|

gvt Avyj Iqv`y` Dc-mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

gvt Gbvgyj nK Lvb mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

mi`vi gCbyj Bmjvg wbevnx cKkjx, MYc~Z m` wefvM, XvKv|

ANALYSIS
Item No.- 2

Supplying, fitting and fixing special coloured & special type glazed porcelain Combi closetp trap (RAK, Model: Orient ) with seat & seat cover, flushing tank and flushing unit including preparing the base with cement concrete and with wire mesh or rods if necessary, in all floors including making holes wherever required and mending good the damages and fitting, fixing, finishing etc. complete with all necessary fittings and connection approved and accepted by the Engineer.
(RAK, Model: Orient) Considering 1 No. of fixture Special type combicloset Flushing equipment Fitting fixing materials: Cement mortar (1:4) Cement Sand (F.M. 1.2) Nuts with washer Labour: Plumber Skilled labour Ordinary labour

1. 2 3. (a) (i) (ii) (b) 4. (a) (b) (c)

1 1

No. No.

@ @

Tk. 5,870.00 Tk. 1,950.00

each = each =

5870.00 1950.00

0.1 0.5 4 0.25 1 0.5

bag. cft. Nos. No. No. No.

@ @ @ @ @ @

Tk. 375.00 Tk. 1,400.00 Tk. 16.00 Tk. Tk. Tk. 347.00 250.00 200.00

Per bag = Per % = cft. = each each each each Total 10.00% 3.50%

37.50 7.00 64.00 86.75 250.00 100.00 8365.25 836.53 292.78 9494.56 552.59 10047.15 10047.00

Add VAT with adjustment factor

= = = = Profit = Overhead = = 1.0582 5.50% = Grand total = Rate per No. = 10,047 .00 each

Item No.- 3

Say ,

Tk.

Supplying, fitting and fixing special coloured & special type glazed porcelain W/H Basin (RAK, Model: Orient) including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer.
(RAK, Model: Orient) 1. 2. (a) (b) (c) 3. (a) (i) (ii) (b) 4. Considering 1 No. of fixture Special coloured wash-basin Accessories: 32 mm dia PVC waste pipe Grating with brass coupling CP chain with rubber plug Fitting fixing materials: Cement mortar (1:4) Cement Sand (F.M. 1.2) CI brakets Labour: 1 No. 1 No. 1 No. 1 No. @ @ @ @ 2250 each 75 each 250 each 50 each = = = = 2250.00 75.00 250.00 50.00

0.01 bag. 0.05 cft. 1 Pair

@ @ @

375 Per bag = 1400 Per % = cft. pair = 85 Per

3.75 0.70 85.00

54 OF 55

(a) (b) (c)

Plumber Skilled labour Ordinary labour

0.15 No. 0.2 No. 0.4 No.

@ @ @

347 each 250 each 200 each Total Profit 10.00% Overhead 3.50% 1.0582 Grand total Rate per No.

Add VAT with adjustment factor

= = = = = = = 5.50% = = =

52.05 50.00 80.00 2896.50 289.65 101.38 3287.53 191.34 3478.86 3479.00

Item No.5

Say ,

3479.00 .00 each

Supplying, fitting and fixing special coloured & special type glazed porcelain Pedestal, (RAK, Model: Orient) with rowel plug and screws etc. all complete approved and accepted by the Engineer.
(RAK, Model: Orient) Considering 1 No. of fixture (a) Special coloured pedestal: (b) Fitting fixing materials: (i) (c) (i) (ii) 75 mm Rowel plug with screw Labour: Plumber Skilled labour 0.1 0.25 No. No. @ @ Tk. Tk. 300.00 250.00 Profit Overhead Add VAT with adjustment factor each = each = Total = 10.00% = 3.50% = = 1.0582 5.50% = Grand total = Rate per No. = Say , Tk. 1,997 .00 each 30.00 62.50 1662.50 166.25 58.19 1886.94 109.82 1996.76 1997.00 2 Nos. @ Tk. 10.00 each = 20.00 1 No. @ Tk. 1,550.00 each = 1550.00

gv: kwdKzj Bmjvg Dc-mnKvix cKkjx-1, MYc~Z m` Dc-wefvM, XvKv|

Avey Rvdi gynv` kwdDj nvbvb Dc-wefvMxq cKkjx, MYc~Z m` Dc-wefvM, XvKv|

gvt Avyj Iqv`y` Dc-mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

gvt Gbvgyj nK Lvb mnKvix cKkjx, MYc~Z m` wefvM, XvKv|

mi`vi gCbyj Bmjvg wbevnx cKkjx, MYc~Z m` wefvM, XvKv|