You are on page 1of 42

TITAN GRAIN BIN LADDER INSTALLATION MANUAL

341799 MANUAL TITAN LADDER 2005

03-14-08

Page 1

Page 2

Section 1 Part Identification


NOTE: SOME PARTS SHOWN MAY NOT BE NEEDED

Page 3

Page 4

Section 2 Outside Ladder Installation

Page 5

Page 6

A. Exterior Ladders and Safety Cage


1) Both inside and outside wall ladders should be installed as the bin is being raised. 2) All ladders start with a Top 1 Ring Ladder Section and continue down the tank with typical 1 ring ladder sections. (Note: Top ladder section brackets will need field drilled into the top sidewall sheet)

Place vinyl caps over top of top ladder section, and when starting new ladder sections at platforms. The caps are used to prevent moisture from getting into the ladder rails and causing rust. (Note: No caps are needed on top ladder section at eave when right and left hand tubes are being used at eave.)

Page 7

3) Place the L.H. and R.H. tubes on top of the top ladder section as shown below. Field drill holes into the roof ladder rails and roof panel ribs and bolt the tubes to the roof with 5/16 x bin bolts. Tighten all bolts.

Page 8

4) As the tank is being raised, bolt the next ladder section to the sidewall at the horizontal seam and attach the ladder sections together, as shown.

5) All ladders stop one ring above the base of the tank; attach last 1 ring section of ladder to the bottom ladder section as shown.

Page 9

6) Attach standoff brackets to the L.H. and R.H. tubes with 5/16 x 1-1/2 bin bolts

Page 10

7) Begin installation of the safety cage by bolting the hoop sections to the standoff brackets with 5/16 x 3/4 bolts. Attach the cage straps to the hoop sections with 5/16 x 3/4 bolts. Begin bolting the hoops to the ladder sections with the standoff brackets. Proceed down the tank with either 1 or 2 ring cage straps. (For bins with Inspection Platforms see section on Inspection Section installation for cage installation at peak)

Page 11

Page 12

8) Safety cages end 2 rings above the rest platforms, and 3 ring from the base of the tank. Extend the hoop at the bottom of safety cage sections as shown.

Page 13

B. Rest Platform
The rest platform must be located in a position so that when a person steps off the ladder and onto the platform he could climb the next section of ladder. Bolt the (2) platform side toe boards to front toe board with 5/16 x carriage bolts as shown. Use same bolts to attach brace tubes to toe boards. Bolt platform brace to front toe board as shown, with 5/16 x carriage bolts.

Attach grate assembly to front toe board with 3/8 x 1 bolts as shown. Grate can be placed on left or right side of platform.

Page 14

Attach (4) platform post to inside of toe boards with 5/16 x bin bolts. Attach Bolting clip 1 to outside of side toe boards as shown with 5/16 x bin bolts.

Page 15

Attach side rails and front rails to platform post with 5/16 x bin bolts. Attach bolting clip 2 to posts as shown with 5/16 x bin bolts.

Check that platform is square and tighten all bolts.

Page 16

Attach platform brace angle to stiffener at sidewall seam as shown, with 7/16 bin bolts. Platform is always bolted below stiffener splices as shown. Field drill holes into sidewall and attach bolting clips to sidewall.

Page 17

Use bottom ladder sections at the rest platforms as shown. Ladder sections extend one ring past the opening is the rest platform. Continue down with the next section of safety cage at the horizontal seam that the rest platform is bolted to.

Page 18

C. Inspection Platform (Optional)


Inspection Platforms are standard on 9,17, and 25 ring tall exterior ladder packages The inspection platform must be located in a position so that when a person steps off the ladder and onto the platform he could look directly into the tank through the manhole. Bolt the (2) platform side toe boards to front toe board with 5/16 x carriage bolts as shown. Use same bolts to attach brace tubes to toe boards. Bolt platform brace to front toe board as shown, with 5/16 x carriage bolts.

Attach grate assembly to front toe board with 3/8 x 1 bolts as shown. Grate can be placed on left or right side of platform.

Page 19

Attach (4) platform post to inside of toe boards with 5/16 x bin bolts. Attach Bolting clip 1 to outside of side toe boards as shown with 5/16 x bin bolts.

Page 20

Attach side rails and front rails to platform post with 5/16 x bin bolts. Attach bolting clip to posts as shown with 5/16 x bin bolts.

Check that platform is square and tighten all bolts.

Page 21

Attach platform brace to stiffener at sidewall seam as shown, with 7/16 bin bolts. Platform is always bolted below stiffener splices as shown. Field drill holes into sidewall and attach bolting clips to sidewall.

Page 22

Bolt inspection platform post to inside of front rails as shown. Attach post to front toe board with 5/16 x bin bolts. Attach post to front rails with 5/16 u-bolts.

Page 23

Bolt cage straps to inspection platform post and to cage 1/2 ring with 5/16 x 3/4 bolts and nuts.

Page 24

Bolt the cage half rings to the ladder tubes with 5/16 x 1-1/2 bolts.

Page 25

Section 3 Inside Ladder Installation

Inside Ladder Layouts


Rings 4 T S I B 5 T S S I B 6 T S S S I B 7 T S S S S I B 8 T I S S S S I B 9 T I S S S S S I B 10 T I S S S S I S I B 11 T I S S S S I S S I B 12 T I S S S S I S S S I B 13 T I S S S S I S S S S I B 14 T I S S S S I S S S S S I B 15 T I S S S S I S S S S I S I B 16 T I S S S S I S S S S I S S I B 17 T I S S S S I S S S S I S S S I B 18 T I S S S S I S S S S I S S S S I B 19 T I S S S S I S S S S I S S S S S I B 20 T I S S S S I S S S S I S S S S I S I B 21 T I S S S S I S S S S I S S S S I S S I B 22 T I S S S S I S S S S I S S S S I S S S I B 23 T I S S S S I S S S S I S S S S I S S S S I B 24 T I S S S S I S S S S I S S S S I S S S S S I B 25 T I S S S S I S S S S I S S S S I S S S S I S I B 26 T I S S S S I S S S S I S S S S I S S S S I S S I B 27 T I S S S S I S S S S I S S S S I S S S S I S S S I B 28 T I S S S S I S S S S I S S S S I S S S S I S S S S I B 29 T I S S S S I S S S S I S S S S I S S S S I S S S S S I B

T LADDER SECTION 1 RING TOP 42" S LADDER SECTION 1 RING STD 42" I LADDER SECTION 1 RING INS 42" B LADDER SECTION BOTTOM

Page 26

1. Locate inside ladder directly below the manhole opening on the roof. 2. Install the inside ladder as the tank is being raised, all inside ladder start with a top ladder section on the first ring of the bin. Field drill holes into the sidewall to attach the top section of ladder to the sidewall.

Page 27

3. Continue down the bin with either, standard 1 ring or inside 1 ring ladder sections, attach the ladders together as shown and bolt to the sidewall sheet seams as shown with a double nut.

4. All inside ladder end with a bottom ladder section 1 ring above the base of the tank. Attach bottom ladder section to sidewall with bin bolts in sidewall sheet seam.

Page 28

Section 4 Ladder Access Door


After bottom ladder section in attached to bottom of 2nd ring, attach door hinges and latch brackets to outside ladder brackets as shown, with 5/16 x 3/4 bin bolts.

Attach cover to hinges with 5/16 x 3/4 bin bolts.

Page 29

Page 30

Apply Decal to cover of door. Door can be padlock is desired, to prevent unauthorized access to the bin sidewall ladder.

Page 31

Section 5 Sidedraw Access Platform

Page 32

Section 6 Commercial Hopper Tank Base Ladders


Part Identification:

Page 33

Page 34

Base Platform Assembly: Attach posts to platform base with 5/16 X 3/4 bin bolts.

Page 35

Attach hand rails and top braces to posts with 5/16 X 3/4 bin bolts. Field drill hole and attach trap door tie back assembly to post. Tighten all bolts in platform.

Page 36

Attach platform to bottom stiffener as shown with 7/16 bin bolts. Field drill holes and attach platform bolting clips and support tube to bin sidewall.

Page 37

Commercial Hopper Tank Bottom Ladder Layout:

Page 38

Attach ladder supports to hopper legs and ladders to their supports by field drilling holes and using 7/16 bin bolts.

FIELD DRILL HOLES IN SUPPORT LEGS AND LADDER SUPPORT ANGLE. ATTACH ANGLES TO LEGS AND LADDER SECTION TO ANGLE WITH 7/16 BIN BOLTS

Page 39

Page 40

CHIEF INDUSTRIES, INC. Agri/Industrial Division Chief Industries, Inc. 4400 East 39th Kearney, NE

Page 41