MINISTRY OF PUBLIC WORKS

REHABILITATION OF CHAGHCHARAN CITY ROAD SECTION B AND C3 (Lot - 2)

Bill of Quantities
CONTRACT ID: MPW/JPN/NRAP/WEST/GOR/001/C2/002 Location: Ghor Province Road Category: Secondary Road Length : 2750 m Item Unit rate Total Cost Work description Unit Quantity No. in USD. in USD. BILL NO. 1 : PRIMARILY AND GENERAL REQUIREMENT Mobilization at site is for the cost of establishing security, plant, equipment, facilities and personnel upon the site. 12/1 Lump sum 1.00 Provision and installation of two (2) subproject sign boards as directed by the Engineer. Demobilization from site shall be compensation in full for the costs of 12/3 Lump sum removing plant, equipment, facilities, personnel, and restoration of site. Setting out the horizontal alignment and elevation levels, placement of ranging rods and profile boards to determine the 15/1 exact alignment of the road. All the structure will be as per design level & alignment provided by the UNOPS.

1.00

2,750.00

Sub-Total for Bill No. : 1


Bill No. 2 : CLEARING AND EARTH WORKS Roadway excavation to spoil materials: Cutting & Filling of the embankments as specified and directed by 24/1 the engineer. Material surplus or considered unsuitable for the works shall be transported from site and Cum 367.20 a) Excavation for structure foundation b) Excavation in hilly area or along the road: excavation shall consist of excavating or re-excavating hilly area Cum 1,100.00 beside the road or along the road and to be used for filling as required on the road within the project, reserve all as shown on the Drawings Embankment backfilling behind the structure with layer by layer compaction. 25/5 Thickness of each layer will not be more than 200 mm.

Cum

214.00

Road way embankment (as per field required) consist of the construction of embankment (each layer 200 mm 27/1 compacted), including pre-loaded embankment, and berms and furnishing, placing, compacting and shaping material obtained from approved sources, to the Sub-grade preparation will consist of the preparation of the top of the existing road surface (95% compaction) to 28/1 accommodate the placement of the pavement structure, shoulder and other cross section futures in accordance with these specifications and in

Cum

6,900.00

Sqm

52,250.00

Sub-Total for Bill No. : 2


BILL NO. 3 : SOIL AGGREGATE PAVEMENTS Sub base (natural river gravel & graded) measured in the final position after compaction to the specified density and 32/1 Cum the quantity shall be calculated as the product of the nominal depth as per drawing. 33/1 Crushed stone base course (Grade -B) Measured in final position after compaction. Material is to be approved by the Lab. test (Min CBR 80% and L. A.<30) for the Contract. The Contractor must provide a compactor of at least 10 tonne static mass. A profile camber board is to be used on site du

9,350.00

Cum

7,425.00

Sub-Total for Bill No. : 3


BILL NO. 4 : BITUMINOUS PAVEMENT WORKS Bituminous Prime coat ( 0.8 to 1.2 43/1 Sqm liter/sqm) 44/3 Asphalt Wearing Course 40 mm Sqm Bituminous Tack coat (0.15 to 0.50 43/2 Sqm liter/sqm) 44/4 Asphalt Binder Course 50 mm Sqm BILL NO. 5 : MISCELLANEOUS WORKS 46,750.00 46,750.00 38,500.00 38,500.00

Sub-Total for Bill No. : 4

100 mm thick grouted stone pitching in culvert floor and apron, the furnishing of materials and construction of a protective 51/2 covering in stone pitching-Grouted (a) pitching. The spaces between the stones shall be filled with cement mortar composed of one part Stone masonry walls constructed with stones set in cement mortar (1:4) as indicated on the drawings, specified or 51/6 ordered. The minimum mass of stone shall be 10 Kg. The rate shall include full compensation for furnishing all materials, trimming of areas, Concrete Kerb Type- A including casting 52/3 and placing as per specification drawing and direction of engineer in charge Concrete Kerb Type - B including casting 52/4 and placing as per specification drawing and direction of the engineer in charge

Sqm

22.00

Cum

775.00

Lin M

5,500.00

Lin M

2,750.00

Sub-Total for Bill No. : 5


BILL NO.7 : CONCRETE WORKS Furnish and place mild steel deformed reinforcing Bars 40 grade and having minimum yield strength not less than 275 72/1 Mpa including cutting, bending and binding with wire, placement as per design etc. all complete.

Tonne

86.00

Blinding concrete 15 Mpa (Mix. ratio 75/9 min. 1:2:4) for side drain, culvert. Cum 273.00 (a) Retaining wall and top of Stone masonry wall. Construction of reinforced cement concrete excluding the reinforcing steel bars Concrete in Culverts/Side drain /Apron 75/10 slab, etc. (25 Mpa or mix ratio 1:1.5:3) as Cum 2,046.00 per drawings.

Sub-Total for Bill No. : 7

MINISTRY OF PUBLIC WORKS

REHABILITATION OF CHAGHCHARAN CITY ROAD SECTION B AND C3

Summary of Bill of Quantities


CONTRACT ID: MPW/JPN/NRAP/WEST/GOR/001/C2/002 Location: Ghor Province Length : 2750 m Road Category: Secondary Road

Bill No. 1 2 3 4 5 7 A

Descriptions
PRELIMINARY AND GENERAL REQUIREMENT CLEARING AND EARTH WORKS SOIL AGGREGATE PAVEMENTS BITUMINOUS PAVEMENT WORKS MISCELLANEOUS WORKS CONCRETE WORKS

Amount in USD

TOTAL BID AMOUNT =

Tender Sum in Words:

Signature of Contractor and Date:.