You are on page 1of 2

Kuwait The Ministry of Awqaf and Islamic Affairs Gaza mosques

3 - earthworks

* Notes: 1 - The Contractor shall ensure the adequacy of the bearing capacity of the soil at the required level of incorporation and alarm in writing of any reservation in this regard and shall bear all responsibilities that may arise not to of the validity of the soil. 2 - If increased drilling for attributed required Vtsb the the ordinary concrete k-150 to reach the required attributable to the Contractor's expense without any financial claims or time or otherwise. 3 - drilling carried out in accordance with the dimensions shown in drawings and geometric measurement in earthworks from the reality of elevations, charts, and considering that the vertical aspects of drilling completely, and carries on the categories of the excavation work necessary strengthening. 4 - Prices include drilling in any type of soil types, as well as supplying all the necessary tools and the number and suction pumps and tools if drilling below the water level and the transfer of excess waste from drilling output of unauthorized places of the municipality.

Item No. statement of work unit category JD Fils 1/3 cubic meters: dig up any water table depth and is drilling Manual of the difficulty and sensitivity of the place. M 35 002 2/3 cubic meters: dig up any water table depth and is drilling to the (machinery and equipment). M 35 001 3/3 cubic meters: Manual drilling under any water table depth and category include the necessary pump. M 30 005

3/4 cubic meters: bridge soft Boterbh and clean, free of stones from the drilling and output so as to reach the levels required to be backfill layers no more than the thickness of 30 cm layer and sprinkle with water and heavy tamping mechanically. 1 250 m3 5/3 cubic meters: Supply and bridging Boterbh a soft, clean free from stones supplied to the job site from overseas to reach elevations required category includes transportation and filling layers not exceeding thickness of 30 cm and spraying water heavy and tamping mechanically and according to the specifications. M 32 502 6/3 cubic meters: Supply and bridging Paljach clean skim stones and impurities supplier to the work site from overseas to reach elevations required category include backfilling layers not exceeding thickness of 30 cm and sprayed water necessary WWDC each layer mechanically until they reach the maximum dry density as well as testing the quality of Gach and determine proportion and according to the specifications of ways. M 35 002 7/3 cubic meters: Supply and bridging the soft, clean sand and unwashed, certified category include mattresses, settlement and all necessary. M 37 502 8/3 cubic meters: supply and bridge the broken concrete bricks or broken bricks Jerry clean and good category include the father on the layers and all what it takes. M 30 007 9/3 cubic meters: Supply and bridge fossils Beslbouch crushed. 300 011 10/3 meter flat: Dahl Yards by spraying with water demand to reach the required density of the soil. M 23 500 11/3 flat Surface: Supply and brushes Salbukh naturally rounded (Garmxwor), washed and thickness of the layer of 20 to 30 cm is used for corridors or something like that. M 20 005 12/3 flat Surface: Settlement soil Bmnsop the irregular and converted to land with a regular level. M 23 000 13/3 flat Surface: Settlement soil Bmnsop the irregular and converted to land a regular level with father and good of reach to the maximum dry density and category include an examination ratio . M 25 000 14/3 flat Surface: strengthening aspects of drilling iron or wooden pillars customized to any depth and until the completion of all actions that require a reinforcement to prevent any damage. 200 010

You might also like