PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : SANITARY FITTINGS BILL OF QUANTITIES DRAWINGS

REF: 379-PH-300-301 (REV B) ITEM DESCRIPTION GENERAL NOTES All rates to include supply, delivery to site, offloading, installation, testing and commissioning to full working condition and complete with all fixing and connecting accessories, to the satisfaction of the employers representative All items to be read in conjunction with the schedules, General specifications and drawings. GROUND LEVEL - INCLUDING CONFERENCE HALL The Contractor shall supply, install, connect to existing and make ready for use including clamps and fittings and making good builder's works the following as per drawings A B WC suite complete as specified PWD suite complete with with grab rails, seat and hinged arm support and as specified Wall mounted Wash basin as as to ARMITAGE SHANKS or equal Wall mounted w/basin for PWD toilets as to ARMITAGE SHANKS or approved equivalent Wall mounted toilet roll holder as specified Mirrors as specified Bowel urinal for one user complete as specified Cleaners sink complete as specified Flexible connectors CP point of use isolating valve 15mm Landing valve complete with 2x30m x65mm dia. Canvas hose with nozzle and shut-off valve Undersink 10lits unvented water heater as specified Stainless steel kitchen sink as specified kitchen sink type 2 as specified No. No. 6 2 939.60 1,125.60 5,637.60 2,251.20 UNIT QTY RATE FBW Uganda AMOUNT

C D

No. No.

6 2

206.40 352.80

1,238.40 705.60

E F G H I J K

No. No No. No. No. No No

8 3 3 2 17 17 1

132.00 36.00 686.40 960.00 7.20 7.20 1,059.60

1,056.00 108.00 2,059.20 1,920.00 122.40 122.40 1,059.60

M F F

No. No. No.

2 1 1

1,214.40 475.20 475.20

2,428.80 475.20 475.20

SP-01 TOTAL TO COLLECTION

19,659.60

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : SANITARY FITTINGS BILL OF QUANTITIES DRAWINGS REF: 379-PH-300-301 (REV B) ITEM DESCRIPTION LEVEL TWO SANITARY FITTINGS The Contractor shall supply, install, connect to existing and make ready for use including clamps and fittings and making good builder's works the following as per drawings A B WC suite complete as specified PWD suite complete with with grab rails, seat and hinged arm support and as specified Wall mounted w/basin basin as to ARMITAGE SHANKS or equal Wall mounted w/basin for PWD toilets as to ARMITAGE SHANKS or approved equivalent Cleaners sink complete as specified Stainless steel kitchen sink as specified Undersink 10lits unvented water heater as specified Bowel urinal for one user complete as specified Wall mounted toilet roll holder as specified Mirror as specified Flexible connectors CP point of use isolating valve 15mm Fire barriers in service ducts size 1900x600mm deep as concrete to the Structural engineer's details No. No. 2 1 939.60 1,125.60 1,879.20 1,125.60 UNIT QTY RATE FBW Uganda AMOUNT

C D

No. No.

1 1

206.40 352.80

206.40 352.80

E F K L M N S T X

No. No. No. No. No. No. No. No No.

1 1 1 1 2 1 5 5 0

960.00 475.20 1,214.40 686.40 132.00 36.00 7.20 7.20 -

960.00 475.20 1,214.40 686.40 264.00 36.00 36.00 36.00 -

SP-02 TOTAL TO COLLECTION

7,272.00

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : SANITARY FITTINGS BILL OF QUANTITIES DRAWINGS REF: 379-PH-300-301 (REV B) ITEM DESCRIPTION UNIT QTY RATE FBW Uganda AMOUNT

From SP - 01 From SP - 02

19,659.60 7,272.00

SP-03 COLLECTION PAGE FOR SANITARY FITTINGS

26,931.60

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : PLUMBING AND FIRE FIGHTING BILL OF QUANTITIES DRAWINGS REF: 379/PH/400 - 401 (REV B) & 500 - 501 (REV A) ITEM DESCRIPTION GENERAL NOTES All rates to include supply, delivery to site, offloading, installation, testing and commissioning to full working condition and complete with all fixing and connecting accessories, to the satisfaction of the employers representative All items to be read in conjunction with the schedules, Specifications and drawings. WATER STORAGE AND DISTRIBUTION Allow for applying to NWSC paying the relevant fees, and cost of materials required for installing a water connection of 80mm diameter to site. Water Meter, metal body, 80mm Dia Water Meter, metal body, 20mm Dia UNIT QTY RATE FBW Uganda AMOUNT

Item

1,200.00

1,200.00

B C

No. No.

1 1

900.00 120.00

900.00 120.00

Stop valve, and valve chamber in concrete surround with cover 100 dia

No

648.00

648.00

Sectional GRP twin compartment, external flanged cold water No. storage tank, Capacity: 5,000 litres, size 2x2x1.5m high complete with cover, inlet, outlet, overflow, washout, one outlet, cover, float, a level indicator, 600x 600mm access panels and external ladder . To be located on roof floor Allow for Concrete plinth for the 5,000litre tanks to Structural Engineer's/manufacturer's details 100mm distribution MDPE pipe complete with all necessary fittings, clamps and including all digging and backfilling plus builders works for mains Cold water supply Ditto but 32mm Ditto but 25mm Ditto but 20mm Control valves size 32mm as per drawings Control valves size 25mm as per drawings Control valves size 20mm as per drawings Stand Taps 15mm complete with metallic stand pipe as per drawings Pillar fire hydrant with 2.5 inch outlet connection c/w steel cage containing 23m Hose reel No

5,400.00

5,400.00 1 1,200.00 1,201.00

m m m m No. No. No.

56 40 60 130 4 1 5

36.00 9.60 8.40 7.20 37.20 22.80 14.40

2,016.00 384.00 504.00 936.00 148.80 22.80 72.00

H I J K L M

No.

60.00

120.00

No.

1,800.00

1,800.00 15,472.60

PP-01 To Collection Page

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : PLUMBING AND FIRE FIGHTING BILL OF QUANTITIES DRAWINGS REF: 379/PH/400 - 401 (REV B) & 500 - 501 (REV A) ITEM DESCRIPTION UNIT QTY RATE FBW Uganda AMOUNT

LEVEL ONE INCLUDING CONFERENCE HALL AREA WATER SUPPLY AND DISTRIBUTION The Contractor shall supply, install and connect up the following pipes A 32 mm PPR pipes in wall chase, voids and below work benches complete with all necessary fittings and clamps and including builders works Ditto but 25mm Ditto but 20mm Ditto but 15mm Control valves size 32mm as per drawings Ditto but 25mm Ditto but 20mm Ditto but 15mm

m m m m No. No. No. No.

0 15 38 12 0 2 5 23

9.60 6.00 6.00 22.80 14.40 12.00

144.00 228.00 72.00 45.60 72.00 276.00

B C D E F G H

Fire Extinguishers A B C Carbondioxide fire extinguisher 2kg Chemical extinguisher 1kg Automatic FE36 fire extinguisher 2kg No. No. No. 5 2 0 144.00 72.00 720.00 144.00 -

PP-02 To Collection Page

1,701.60

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : PLUMBING AND FIRE FIGHTING BILL OF QUANTITIES DRAWINGS REF: 379/PH/400 - 401 (REV B) & 500 - 501 (REV A) ITEM DESCRIPTION LEVEL TWO WATER SUPPLY AND DISTRIBUTION The Contractor shall supply, install and connect up the following pipes A 32 mm PPR pipes in wall chase, voids and below work benches complete with all necessary fittings and clamps and including builders works Ditto but 25mm Ditto but 20mm Ditto but 15mm Control valves size 32mm as per drawings Ditto but 25mm Ditto but 20mm Ditto but 15mm UNIT QTY RATE FBW Uganda AMOUNT

m m m m No. No. No. No.

0 5 10 5 0 0 3 9

9.60 6.00 6.00 14.40 12.00

48.00 60.00 30.00 43.20 108.00

B C D E F G H

Fire Extinguishers A B C Carbondioxide fire extinguisher 2kg Chemical extinguisher 1kg Automatic FE36 fire extinguisher 2kg No. No. No. 2 1 3 144.00 72.00 420.00 288.00 72.00 1,260.00

PP-03 To collection page

1,909.20

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : PLUMBING AND FIRE FIGHTING BILL OF QUANTITIES DRAWINGS REF: 379/PH/400 - 401 (REV B) & 500 - 501 (REV A) ITEM DESCRIPTION COLLECTION PAGE Collection from PP - 01 Collection from PP - 02 Collection from PP - 03 15,472.60 1,701.60 1,909.20 UNIT QTY RATE FBW Uganda AMOUNT

PP-04 COLLECTION PAGE

19,083.40

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : ABOVE GROUND DRAINAGE BILL OF QUANTITIES DRAWINGS REF: 379-PH-300 - 301 REV B & 800-801 REV B ITEM DESCRIPTION UNIT QTY RATE
FBW Uganda

AMOUNT

GENERAL NOTES
Rates for all materials to include supply, delivery to site, offloading installation to full working condition, testing and commissioning. Including all connecting, clamping and fixing accessories. Expansion joints to be allowed evey 4 meters Cast iron pipes in place of Upvc pipes in the kitchen areas DRAINAGE SYSTEM - PIPES AND FITTINGS All pipes and fittings are to Terrain manufacture unless otherwise specified. The pipes and fittings are to be fitted complete with all necessary fittings and accessories including clamps and all builders work uPVC drain pipes 110mm diameter laid with sand bed or else where and also burried. A B C D E Ditto 110mm but laid in ducts as soil and vent pipes Ditto but 110mm laid in ducts as waste vent pipes Access pipe ,110 mm as no. 138.4 Vent coul as 150.4 Weathering slate m m No. No. No. 48 12 18 7 7 13.20 13.20 4.80 2.40 12.00 633.60 158.40 86.40 16.80 84.00

DP-01

To Collection Page

979.20

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : ABOVE GROUND DRAINAGE BILL OF QUANTITIES DRAWINGS REF: 379-PH-300 - 301 REV B & 800-801 REV B ITEM DESCRIPTION LEVEL ONE All pipes and fittings are to Terrain manufacture unless otherwise specified. The pipes and fittings are to be fitted complete with all necessary fittings and accessories including clamps and all builders work uPVC drain pipe 110mm diam as no. 100.4.40 below floor slab Ditto but 75mm diam as no. Ditto but 50mm diam as no. 200.2.40 Ditto but 40mm diam as no. 200.15.40 Ditto but 32mm diam as no. 200.15.40 Sweep bend 110mm as no. 101.4.92 Sweep bend 75mm as no. Sweep bend 50mm as no. 201.2.91 Sweep bend 40mm as no. 201.15.91 Sweep bend 32mm as no. 201.125.91 Corner branch 110 as to 106.490.22 Single branch 110mm as no. 104.4.92 double branch 110 as 106.4.92 Sweep tee 50mm as no. 204.2.91 Sweep tee 40mm as no. 204.15.91 Trapped floor gully Automatic Air vent ( for stab stacks) see drawings Allow for any other necessary items to complete the installation including reducers, water closet connectors and endcaps. List any other items and give price breakdown. UNIT QTY RATE
FBW Uganda

AMOUNT

25

13.20

330.00

B B C D E F F G H I J J2 K L N N O

m m m m No. No. No. No. No. No. No. No. No. No. No. No.

13 12 14 4 8 9 3 4 9 1 31 5 16 11 9 5

13.20 4.80 3.60 3.60 7.20 7.20 2.40 1.20 1.20 18.00 9.60 14.40 2.40 1.20 24.00 72.00

171.60 57.60 50.40 14.40 57.60 64.80 7.20 4.80 10.80 18.00 297.60 72.00 38.40 13.20 216.00 360.00

item

300.00

300.00

DP-02 To collection page

2,084.40

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH INSTALLATION : ABOVE GROUND DRAINAGE BILL OF QUANTITIES DRAWINGS REF: 379-PH-300 - 301 REV B & 800-801 REV B ITEM DESCRIPTION COLLECTION PAGE Collection from DP - 01 Collection from DP - 02 979.20 2,084.40 UNIT QTY RATE
FBW Uganda

AMOUNT

DP-03 COLLECTION PAGE

3,063.60

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA MECHANICAL INSTALLATION - BILLS OF QUANTITIES DRAWINGS REF: 379/MECH/100-101 REV A & 200-201 REV B ITEM DESCRIPTION GENERAL NOTES FBW Uganda UNIT QTY RATE (USD) AMOUNT

All rates to include supply, delivery to site, offloading, installation, testing and commissioning to full working condition and complete with all connecting and fixing accessories to the satisfaction of the employers representative All items shall be as per "General" and "Particular" Specification and Drawings. In case of contradictions, drawings take precedence Contractor to append priced list of missing items from drawings if any, before tender price submission GENERAL Allow for complying with all Special Preliminary and General Conditions of contract and labour requirements for attending all inspections; and site meetings and for providing all works and services for which no specific items are listed in the Schedule of Quantities. COMMISSIONING AND TESTING Supply all test equipment and labour for testing, commissioning and adjustments of the final installation, as well as, being in attendance and giving assistance for any inspections and tests that the Supply Authority may call for. GUARANTEE Allow for a guarantee period of 12 months against defects in equipment, material and workmanship, but excluding abusem wear and tear and normal maintenance. DRAWINGS / MANUALS Allow for marking-up 3 full sets of "as-built" drawings to show the exact positions of sleeves, ducts etc, Operating and Maintenance Manuals, to be handed to the employers representative on completion of the contract. Allow for builder's works

Item

780.00

780.00

item

906.00

906.00

item

450.00

450.00

Item Item

1 1

1,020.00 1,182.00

1,020.00 1,182.00

MP-01 To collection page

4,338.00

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA MECHANICAL INSTALLATION - BILLS OF QUANTITIES DRAWINGS REF: 379/MECH/100-101 REV A & 200-201 REV B ITEM DESCRIPTION LEVEL ONE AND TWO & THREE A B Crosstalk Attenuators of size 1000x500mm as per schedules 300 x 300 mm 125 l/s, <40Pa Supply Grilles as to Eggcrate, all as per schedules c/w all fixing accessories 250mm Dia Spigot connection Volume Control Dampers with casing leakage conforming to DW142 class A Galvanised Iron sheet ducts, size 0.6mm thick D Circular ducts 250mm Dia Elbows E 250mm Dia Shoe F 250mm Dia to 250mm Dia 3 phase 430V 50Hz, 5kW High Static duct Fan coil units complete with outdoor unit and all fixing accessories as per Mech schedules No. 8 114.00 912.00 No. 6 114.00 684.00 m 60 114.00 6,840.00 No. 12 1,020.00 12,240.00 FBW Uganda UNIT QTY RATE (USD) AMOUNT

No No.

8 8

108.00 180.00

864.00 1,440.00

No.

3,720.00

7,440.00

Split Unit I 1 phase 220-240V 50Hz , 2.5 kW cooling load Indoor door units c/w with outdoor unit as per drawings and schedules and also complete with mounting plinth and fixing accessories. No. Extract fans J All fans shall be manufactured by Flaktwoods, Vent-Axia, Systemair or equal and approved. Fans shall be complete with integrated controller. Extract fan, as per schedules and drawings MP-02 To collection page COLLECTION PAGE Collection from MP - 01 Collection from MP - 02 MP-02 MAIN COLLECTION PAGE 4,338.00 55,800.00 60,138.00 No. 5 4,776.00 23,880.00 55,800.00

1,500.00

1,500.00

PROPOSED GIZ OFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA PUBLIC HEALTH- BILLS OF QUANTITIES DRAWINGS REF: 379 PUBLIC HEALTH DRAWINGS ITEM DESCRIPTION GENERAL NOTES All rates to include supply, delivery to site, offloading, installation, testing and commissioning to full working condition and complete with all connecting and fixing accessories to the satisfaction of the employers representative All items shall be as per "General" and "Particular" Specification and Drawings. In case of contradictions, drawings take precedence Contractor to append priced list of missing items from drawings if any, before tender price submission GENERAL Allow for complying with all Special Preliminary and General Conditions of contract and labour requirements for attending all inspections; and site meetings and for providing all works and services for which no specific items are listed in the Schedule of Quantities. COMMISSIONING AND TESTING Supply all test equipment and labour for testing, commissioning and adjustments of the final installation, as well as, being in attendance and giving assistance for any inspections and tests that the Supply Authority may call for. GUARANTEE Allow for a guarantee period of 12 months against defects in equipment, material and workmanship, but excluding abusem wear and tear and normal maintenance. DRAWINGS / MANUALS Allow for marking-up 3 full sets of "as-built" drawings to show the exact positions of sleeves, ducts etc., Operating and Maintenance Manuals, to be handed to the employers representative on completion of the contract. Allow for builder's works
FBW Uganda

UNIT QTY RATE

Amount(USD)

Item

1,250.00

1,250.00

item

1,250.00

1,250.00

item

3,125.00

3,125.00

Item Item

1 1

1,250.00 312.50

1,250.00 312.50

PH-01

To collection page

7,187.50

PROPOSED GIZ OFFFICE ON PLOT 23 NAKASERO ROAD, KAMPALA BILL OF QUANTITIES COLLECTION PAGE ITEM DESCRIPTION
FBW Uganda

Amount(USD)

SANITARY FITTINGS PLUMBING AND FIRE FIGHTING DRAINAGE VENTILATION AND COMFORT COOLING GENERAL

26,931.60 19,083.40 3,063.60 60,138.00 7,187.50

MP-01 COLLECTION

116,404.10