30 minute repair
Contains pressures up to 70 Bar
CLOCK SPRING
1. Patented, high-strength, unidirectional split sleeve composite structure. Patented, fast curing, high performance two-part adhesive system. Extremely high compressive strength, proprietary load transferring component. Once installed, the three elements bond together to form extraordinarily strong and durable repair.
2.
3.
Installation Procedure
Step 1 of 8
Locate the hole and plug to reduce/stop any flow. Prepare the pipe surface.
Installation Procedure
Step 2 of 8
Installation Procedure
Step 3 of 8
Using a metal plate, clamp the Metalplastic over the hole and leave to cure for 15-20 minutes.
Installation Procedure
Step 4 of 8
Installation Procedure
Step 5 of 8
Apply filler material over the metal plate and adhesive onto pipe surface.
Installation Procedure
Step 6 of 8
Installation Procedure
Step 7 of 8
Installation Procedure
Step 8 of 8
Tighten and leave to cure (<2 hours). Installation completed within 30 mins.
Leak repaired in support location on an 8 Flare line 2 holes of diameter approx apart.
Test spools with 25mm diameter defect pressure contained was 100 Bar!!!