You are on page 1of 76

Form # 1: Monthly Energy-Kashmir

MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-113
(For Achievement under Triparitite MoU and for progress to SERC)
S.No Month Energy Input Billed and losses Hawal Rainawari K.K.Moulla Khanyar Zakura Total for the Division

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses % Input (LU's) Billed (LU's) Losses %

121.43 38.28 68.48 110.79 35.71 67.77 93.88 35.65 62.03

121.43 38.28 68.48 110.79 35.71 67.77 93.88 35.65 62.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12

Mar-13

Input (LU's) Billed (LU's) Losses %

0.00 0.00 0.00

Form # 2: Monthly Meters-Kashmir

MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total consumers electronic metering level and % metering at end of month Total for the Division

S.No

Month

Hawal

Rainawari

K.K.Moulla

Khanyar

Zakura

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed % Metering Total Consumers Meters Installed

11460 9921 86.57 11552 10333 89.45 11643 10821 92.94

11460.00 9921.00 86.57 11552.00 10333.00 89.45 11643.00 10821.00 92.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11

Feb-13 % Metering Total Consumers Meters Installed % Metering

12

Mar-13

0.00 0.00 0.00 0.00

Form # 3: Monthly Revenue-Kashmir

MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
S.No Month Monthly Revenue Realised, Pure & ED (Rs. In lacs) Hawal Rainawari K.K.Moulla Khanyar Zakura Total for the Division

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Revenue Pure ED Total (Rs. In lacs) Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED Total Revenue Pure ED

26.82 5.81 32.63 92.23 13.23 105.46 13.84 3.03 16.87

26.82 5.81 32.63 92.23 13.23 105.46 13.84 3.03 16.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11

Feb-13 Total Revenue Pure ED Total

12

Mar-13

0.00 0.00 0.00 0.00

Form # 4: Monthly Connection-Kashmir

MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC) Monthly Connections added metered and flat rate (No's) Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered Flat Rate Total Metered

S.No

Month

Hawal

Rainawari

K.K.Moulla

Khanyar

Zakura

Total for the Division 15 0 15 92 0 92 91 0 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Apr-12

May-12

Jun-12

15 0 15 92 0 92 91 0 91

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

11

Feb-13

12

Mar-13

Flat Rate Total Metered Flat Rate Total

0 0 0 0 0

Form # 5: Category De

Circle-Ist, Srinagar

Division:- Electric Division-IV, Khanyar (For Achievement under Triparitite MoU and for progress reporting to SERC)

CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2012-1

Description

Month
Category April May June July Aug Sept. Oct

Domestic N.Dom/Commercial Irrigation/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten. LT Pub. WW HT Pub. WW Gen. Bulk Temporary Total
Category

Connections

Description

Month
April May June July Aug Sept. Oct

Domestic N.Dom/Commercial Irrigation/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten. LT Pub. WW HT Pub. WW Gen. Bulk Temporary Total Metered Flat Rate Total
Category

Energy Billed

Description

Month
April May June July Aug Sept. Oct

Domestic N.Dom/Commercial Irrigation/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten. LT Pub. WW HT Pub. WW

Revenue

Revenue

Gen. Bulk Temporary Total Metered Flat Rate Total

Form # 5: Category Detail-Kashmir

ectric Division-IV, Khanyar

ENUE FOR THE YEAR 2012-13.

g to SERC)

Month
Nov. Dec Jan Feb Mar

Month
Nov. Dec Jan Feb Mar

Month
Nov. Dec Jan Feb Mar

Executive Engineer Electric Division-IV, Khanyar

Form # 5: Category Detail-Kashmir

MONTHLY CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Description Total for the Division

Category

Hawal

Rainawari

K.K.Moulla

Khanyar

Zakura

Domestic N.Dom/Commercial Iri/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten. LT Pub. WW HT Pub. WW Gen. Bulk Total Domestic N.Dom/Commercial Iri/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten. LT Pub. WW HT Pub. WW Gen. Bulk Total Domestic N.Dom/Commercial Iri/Aggri. State / Central Public Lighting LT Industries HT Industries HT P. Inten.

9317 1675 36 25 0 80 0 0 1 3 0 11137 3322780 861096 4901 3045878 0 24981 0 0 0 205886 0 11796267 8672456.00 2324960.00 9802.00 18884444.00 0.00 52460.00 0.00 0.00

enue as on 31.06.2012 Lac's

9317 1675 36 25 0 80 0 0 1 3 0 11137 3322780 861096 4901 3045878 0 24981 0 0 0 205886 0 11796267 8672456 2324960 9802 18884444 0 52460 0 0

Energy Billed as on 31.06.2012

Connections as on 31.06.2012

Revenue as on

LT Pub. WW HT Pub. WW Gen. Bulk Total

0.00 844134.00 0.00 30788256.00

0 844134 0 30788256

0 0 0 0 0 0

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

9.75 9.43 15.53 4.89 40.40 9.28 8.30 12.73 0.94 10.53 3.98 3.19 8.87 14.38 1.17 153.37

2.88 2.61 2.81 4.62 9.95 2.20 0.89 1.31 0.73 1.54 3.92 0.39 2.51 3.57 1.17 41.11

7.52 6.81 7.34 30.00 25.98 5.75 2.32 3.43 22.33 4.03 10.23 1.02 6.55 9.32 9.39 152.02

6.87 6.82 12.72 0.27 30.45 7.08 7.41 11.42 0.21 8.99 0.06 2.80 6.36 10.81 0.00 112.26

70.45 72.33 81.89 5.62 75.36 76.26 89.29 89.68 22.34 85.34 1.52 87.75 71.71 75.17 0.00 73.19

2.18 0.95 2.12 3.92 14.54 1.63 1.02 1.05 0.52 0.63 0.49 0.18 0.96 1.23 0.00 31.42

5.7 2.47 5.53 25.45 37.94 4.25 2.67 2.74 9.2 1.65 1.28 0.47 2.5 3.22 0 105.07

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MAY, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak

8.61 9.09 14.14

3.10 1.53 2.85

8.10 3.99 7.44

5.51 7.56 11.29

63.96 83.18 79.84

1.13 0.64 1.27

2.94 1.67 3.32

4 5 6 7 8 9 10 11 12 13 14 15

Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

3.49 10.64 9.22 6.50 11.90 0.86 10.31 2.44 1.92 7.91 12.22 1.54 110.79

3.48 9.77 1.96 1.00 1.35 0.84 3.45 1.83 0.21 1.07 1.72 1.54 35.71

27.80 25.49 5.12 2.60 3.53 6.00 9.00 11.00 0.55 2.80 4.50 12.31 130.23

0.01 0.87 7.26 5.50 10.55 0.02 6.86 0.61 1.71 6.84 10.50 0.00 75.08

0.31 8.21 78.72 84.67 88.63 2.42 66.55 24.86 89.02 86.44 85.89 0.00 67.77

0.03 0.84 0.80 1.02 0.25 0.00 0.04 0.00 0.01 0.07 0.17 0.00 6.26

0.23 2.19 2.09 2.67 0.64 0 0.1 0 0.034 0.17 0.45 0 16.50

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari

8.36 7.38 13.73 2.67 8.75 7.40 5.14 10.24 0.79 8.14 2.31 1.48 6.20 10.24

2.89 1.60 3.59 2.52 8.39 1.82 1.99 2.25 0.76 2.74 1.69 0.31 1.62 2.42

7.54 4.17 9.38 20.10 21.90 4.75 5.20 5.88 5.45 7.15 12.10 0.81 4.23 6.32

5.47 5.78 10.14 0.15 0.36 5.58 3.15 7.99 0.03 5.40 0.62 1.17 4.58 7.82

65.44 78.35 73.82 5.66 4.11 75.41 61.24 78.00 3.51 66.35 26.74 79.03 73.86 76.35

2.68 1.51 3.26 6.32 8.85 2.07 1.78 1.81 1.72 1.07 6.26 0.22 1.21 2.09

7 3.94 8.5 50.45 23.1 5.39 4.65 4.72 12.31 2.79 44.75 0.58 3.16 5.46

15

PHE Pokhribal Total

1.05 93.88

1.05 35.65

8.44 123.42

0.00 58.23

0.00 62.02

1.05 41.90

8.44 185.24

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JULY, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Energy Billed in Rs (Lac's)

Losses (LU's) %age Losses

Energy Realised (LU's)

Energy Realised in Rs (Lac's)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 10 11 12 13 14 15

Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF OCTUBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal

0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00

5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Energy Billed in Rs (Lac's) Energy Realised (LU's) Energy Realised in Rs (Lac's)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's) %age Losses

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Feeder-2 Habak Feeder-3 Habak Feeder-5 Habak Feeder-1 Hazratbal Feeder-2 Hazratbal Feeder-3 Hazratbal Feeder-1 Kathidarwaza Feeder-2 Kathidarwaza Feeder-3 Kathidarwaza Feeder-5 Kathidarwaz Feeder-1 Rainawari Feeder-2 Rainawari Feeder-3 Rainawari Feeder-4 Rainawari PHE Pokhribal Total

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Form # 6: En. Au

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH Based tariff implemented

0.00

Form # 6: En. Aud. Ind.

Form # 7

MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FROM APRIL, 2012 TO JUNE, 2012 Energy/Revenue Total for Hawal Rainawari K.K.Moulla Khanyar Zakura Details the Division

No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) April, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) May, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) June, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) July, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) August, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) September, 2012

16 11.18 11.18 84.10 0.00 0.00 16 11.31 11.31 85.93 65.87 76.66 16 9.19 9.19 69.66 0.00 0.00

16 11 11 84 0 0 16 11 11 86 66 77 16 9 9 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Energy Account for the Month of September, Revenue Collected (Lacs) 2012 % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) Octuber, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) November, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) December, 2012 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) January, 2013 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) February, 2013 Revenue Collected (Lacs) % of Revenue Collection No. of Consumers Energy Supplied (LU's) Energy Account Energy Billed (LU's) for the Month of Amount Billed (Lacs) March, 2013 Revenue Collected (Lacs) % of Revenue Collection

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Format # 8

Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 30-06-2012
(For achievement under Tripartite MoU and for progress reporting to SERC)

KVAR Compensation Details No Connections with load 25 KVA & Above KVA Required (KVAR) Installed (KVAR) Deficiency (KVAR) % Deficiency

Hawal

Electric Division-IV, Khanyar. Rainawari K.K.Moulla Khanyar

Zakura

Total for the Division

KVAR Compensation through Shunt Capacitor

Executive Engineer Electric Division-IV, Khanyar

Form # 9

Monthly detail of Computerised Billed Energy From April 2012 to March 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
S.No Month Computerized Billing
Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing Total Energy Biled (LU's)

Hawal

Rainawari

K.K.Moulla

Khanyar

Zakura

Total for the Division

Apr-12

May-12 Energy Billed through computer(LU's)


%age computerised Billing Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

Jun-12

41.11 41.11 100.00 35.17 35.17 100.00 35.65 35.65 100.00

Jul-12

#DIV/0!

Aug-12

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

Sep-12

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

Oct-12

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

Nov-12

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

Dec-12

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

10

Jan-13

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

11

Feb-13

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

12

Mar-13

Total Energy Biled (LU's) Energy Billed through computer(LU's) %age computerised Billing

#DIV/0!

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Nazir Ah. Zargar LT Indust. CT Ratio:
17510 9386 30 HP

DiVision: N.A Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Meter Rated Current: N.A Capacitor Installed: Y/N N.A

S.No

Month

KVAH Units supplied A

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded B 0 0 0 C N.A N.A N.A D 0.00 0.00 0.00 E=D/C N.A N.A N.A

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 0.00 0.00 0.00

G 273158.28 278259.50 284426.00

1 2 3 4 5 6 7 8 9 10 11 12

Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13

N.A N.A N.A

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: EM & RE Circle-Ist, Srinagar DiVision: Electric Division-IV, Khanyar

Name of Installation:Executive Engineer, UEED Category: LT Water Works CT Ratio: Installation No: Computer Code: Sanctioned Load:
18334 10074 70 KW

N.A

Supply Type: Meter Type: Rating of Capacitor:

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed computed

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 104775.00 100584.00 92202.00

A 1 2 3 Apr-12 May-12 Jun-12 29411.76 28235.29 25882.35

B 25000.00 24000.00 22000.00

E=D/C 0.85 0.85 0.85

G 1326242.25 1481022.75 1630309.23

29411.7647 25000.00 28235.2941 24000.00 25882.3529 22000.00

71000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: EM & RE Circle-Ist, Srinagar DiVision: Electric Division-IV, Khanyar

Director National Institute of Technology Central CT Ratio: N.A Supply Type:


46785 9943

Meter Rated Current: N.A Capacitor Installed: Y/N N.A

Meter Type: Rating of Capacitor:

Sanctioned Load:

1200 KW

S.No

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 1517295 1414530 1148550

A 1 2 3 Apr-12 May-12 Jun-12 295294.12 275294.12 223529.41

D 251000 234000 190000

E=D/C 0.85 0.85 0.85

G 1639500.0 3186795.0 1444530

251000.00 295294.118 234000.00 275294.118 190000.00 223529.412

675000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Joint Director Poultary State CT Ratio:
75858A 10039 53 KW

DiVision: N.A Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 59845.5 73144.5 39897

A 1 2 3 Apr-12 May-12 Jun-12 10588.24 12941.18 7058.82

B 9000.00 11000.00 6000.00

C 10588.2353 12941.1765 7058.82353

D 9000 11000 6000

E=D/C 0.85 0.85 0.85

G 4096144.25 4170480.75 4324957.5

26000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar
State

DiVision: N.A Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Supdtt. JLNM Hospital CT Ratio:

14260A 10043 300 KW

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 600801.00 607525.60 793321.00

A 1 2 3 Apr-12 May-12 Jun-12 114003.98 115280.00 150535.29

B 96903.39 97988.00

E=D/C 0.85 0.85 0.85

G 722480 1468965.2 2223721.7

114003.985 96903.387 115280 97988 127955

127955.00 150535.294

322846.39

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Joint Director Floriculture, Hazratbal State CT Ratio: N.A
6162SD 10049 32 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 51068.16 51068.16 51068.16

A 1 2 3 Apr-12 May-12 Jun-12 9035.29 9035.29 9035.29

B 7680.00 7680.00 7680.00

C 9035.29412 9035.29412 9035.29412

D 7680 7680 7680

E=D/C 0.85 0.85 0.85

G 1395814.38 1458917.5 1522020.75

23040

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Joint Director Poultary Briolers State CT Ratio: N.A
90SD 10040 53 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KWH KVAH Units KWH Units Units AV-Power recorded / supplied COMPUTE Factor computed D B 7000.00 10000.00 7000.00 C 8235.29412 11764.7059 8235.29412 D 7000 10000 7000 E=D/C 0.85 0.85 0.85

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 46546.5 66495 46546.5

A 1 2 3 Apr-12 May-12 Jun-12 8235.29 11764.71 8235.29

G 1230524.25 1288636 1391651.13

24000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Ex. Engineer LAWDA, Habak State CT Ratio:200/5A N.A LAWDA2 Meter Rated Current: N.A
10085 200 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA

Opening Balance

Energy Charges / F.R Charges billed (In Rs.)

A 1 2 3 Apr-12 May-12 Jun-12 30588.24 27058.82 31764.71

B 26000.00 23000.00 27000.00

C 30588.2353 27058.8235 31764.7059

D 26000 23000 27000

E=D/C 0.85 0.85 0.85

F N.A N.A N.A

G 5665832.5 5848331 6105723

H 108966 96393 113157

76000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Ex. Engineer LWDA, Hazratbal State CT Ratio:200/5A N.A LAWDA1 Meter Rated Current: N.A
10084 200 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 33528 46101 41910

A 1 2 3 Apr-12 May-12 Jun-12 9411.76 12941.18 11764.71

B 8000.00 11000.00 10000.00

C 9411.76471 12941.1765 11764.7059

D 8000 11000 10000

E=D/C 0.85 0.85 0.85

G 90464.16 105803.219 100690.2

29000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Registrar Kashmir University State CT Ratio:60/5A N.A 222M Meter Rated Current: N.A
10060 2017 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 2436135 2315235 1789320

A 1 2 3 Apr-12 May-12 Jun-12 474117.65 450588.24 348235.29

D 403000 383000 296000

E=D/C 0.85 0.85 0.85

G 7383068 10405578 10780590

403000.00 474117.647 383000.00 450588.235 296000.00 348235.294

1082000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Supdtt. JLNM Hospital State
14260 10042 90 KW

DiVision:

Electric Division-IV, Khanyar

CT Ratio: N.A Meter Rated Current: N.A Capacitor Installed: Y/N N

Supply Type: Meter Type: Rating of Capacitor:

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 167747 170847 164647

A 1 2 3 Apr-12 May-12 Jun-12 31830.55 32418.79 31242.31

B 27055.97 27555.97 26555.97

E=D/C 0.85 0.85 0.85

G 227368 435946.81 656868

31830.5503 27055.968 32418.7856 27555.968 31242.315 26555.968

81167.903

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Supdtt. Mental Hospital State
46827 10045 51 KW

DiVision:

Electric Division-IV, Khanyar

CT Ratio: N.A Meter Rated Current: N.A Capacitor Installed: Y/N N

Supply Type: Meter Type: Rating of Capacitor:

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 113041.5 126340.5 73144.5

A 1 2 3 Apr-12 May-12 Jun-12 20000.00 22352.94 12941.18

B 17000.00 19000.00 11000.00

C 20000 22352.9412 12941.1765

D 17000 19000 11000

E=D/C 0.85 0.85 0.85

G 14361727 14511189.13 13778085

47000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Supdtt. Central Jail, Kathi Darwaza State CT Ratio: N.A 5531M Meter Rated Current: N.A 10030 Capacitor Installed: Y/N N
360 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 731445 777991.5 538609.5

A 1 2 3 Apr-12 May-12 Jun-12 129411.76 137647.06 95294.12

D 110000 117000 81000

E=D/C 0.85 0.85 0.85

G 33148432 30794952 32229398

110000.00 129411.765 117000.00 137647.059 81000.00 95294.1176

308000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Supdtt. Central Jail State CT Ratio: N.A 5531A Meter Rated Current: N.A 10031 Capacitor Installed: Y/N N
47.25 KW

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 73144.5 59845.5 0

A 1 2 3 Apr-12 May-12 Jun-12 12941.18 10588.24 0.00

B 11000.00 9000.00 0.00

C 12941.1765 10588.2353 0

D 11000 9000 0

E=D/C 0.85 0.85 0.85

G 1307170.63 1200510.13 1293843

20000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 KVAH and demand readings will be required for load more than 100KW In case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Ghulam Mohd. Zaroo LT Indust. CT Ratio: N.A 420SM Meter Rated Current: N.A 8482 Capacitor Installed: Y/N N
26 HP

DiVision: Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F N.A N.A N.A

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 7855.925 7855.925 6573.325

A 1 2 3 Apr-12 May-12 Jun-12 3170.59 3170.59 2652.94

B 2695.00 2695.00 2255.00

C 3170.58824 3170.58824 2652.94118

D 2695 2695 2255

E=D/C 0.85 0.85 0.85

G 214162.188 225022.6565 235867

7645

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M


Circle: Name of Installation:Category: Installation No: Computer Code: Sanctioned Load: EM & RE Circle-Ist, Srinagar Ex. Engineer PHE, Pokhribal State CT Ratio:
100-SD 10021 760 KW

DiVision: N.A Supply Type: Meter Type: Rating of Capacitor:

Electric Division-IV, Khanyar

Meter Rated Current: N.A Capacitor Installed: Y/N N

S.No

Month

KVAH Units supplied

KVAH Units KWH KWH Units AV-Power recorded / Units supplied Factor computed recorded

Max. Demand Recorded KVA F 511.01 511.01 511.01

Opening Balance

Energy Charges / F.R Charges billed (In Rs.) H 758043 997766 680295

A 1 2 3 Apr-12 May-12 Jun-12 137647.06 181176.47 123529.41

D 117000 154000 105000

E=D/C 0.85 0.85 0.85

G 9060675 9999662 11399579

117000.00 137647.059 154000.00 181176.471 105000.00 123529.412

376000

Note: 1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT 2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH 3 In KVAH and demand readings will be required for load more than 100KW case trivector meter is not installed for load more than 100KW, pleaseonly. workout the KVAH units by dividing 4 recorded KWH units with power factor = 0.85 5 Please attach circle-wise and Divisional wise Abstracts with each energy account. Note: 1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer Rainawari

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Flat Rate
Rainawari

Sub-Division:- Rainawari

F-3

Demand charges billed (In Rs. ) I 989.00 989.00 989.00

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 0.00 0.00 0.00 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.) P 0.00 0.00 0.00

Arrears

J 0.00 0.00 0.00

N=H+I+J+K+L+M O=G+N 989.00 989.00 989.00 274147.28 279248.50 285415.00

Q=O-P 274147.28 279248.50 285415.00

2967 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar Sub-Division:- Rainawari

LT3Ph N.A N.A

Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No:

Metered
Rainawari

F-3

Demand charges billed (In Rs. ) I 17430.00 17430.00 17430.00

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 9525.00 9144.00 8382.00 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 23050.50 22128.48 20284.44

N=H+I+J+K+L+M O=G+N 154780.50 149286.48 138298.44 1481022.8 1630309.2 1768607.7

P 0.00 0.00 0.00

Q=O-P 1481022.8 1630309.2 1768607.7

442365.42 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar 11KV
N.A

Sub-Division:- Rainawari Metered


Hazratabal

Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No:

N.A

F-2

Demand charges billed (In Rs. ) I 30000 30000 30000

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 0 0 0 L 0 0 0 M 0 0 0

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 0 0 0

N=H+I+J+K+L+M O=G+N 1547295 1444530 1178550 3186795 4631325 2623080

P 0 3186795 0

Q=O-P 3186795.0 1444530.0 2623080.0

4170375 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

3186795

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Kathi Darwaza

Sub-Division:- Rainawari

F-3

Demand charges billed (In Rs. ) I 1325 1325 1325

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 5440.5 6649.5 3627 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 13166.01 16091.79 8777.34

N=H+I+J+K+L+M O=G+N 79777.01 97210.79 56648.84 4175921.3 4267691.5 4381606.3

P 0.0 0.0 0.0

Q=O-P 4175921.3 4267691.5 4381606.3

233636.64 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N,.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Rainawari

Sub-Division:- Rainawari

F-1

Demand charges billed (In Rs. ) I 7500.00 7500.00 7500.00

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 6008.01 6075.26 7933.21 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 132176.22 133655.63 174530.62

N=H+I+J+K+L+M O=G+N 746485.23 754756.49 983284.83 1468965.2 2223721.7 3207006.5

P 0.0 0.0 0.0

Q=O-P 1468965.2 2223721.7 3207006.5

2484526.548 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Habak

Sub-Division:- Rainawari

F-5

Demand charges billed (In Rs. ) I 800 800 800

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 4642.56 4642.56 4642.56 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 11234.995 11234.995 11234.995

N=H+I+J+K+L+M O=G+N 67745.72 67745.72 67745.72 1463560.1 1526663.2 1589766.5

P 0.0 0.0 0.0

Q=O-P 1463560.10 1526663.22 1589766.47

203237.1453 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph Type: Metered / Flat Rate: Metered
Kathi Darwaza

Sub-Division:- Rainawari

LTKWH Name of 33/11KV Sub-Stations: N.A Feeder No:

F-3

Demand charges billed (In Rs. ) I 1325 1325 1325

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 4231.5 6045 4231.5 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 10240.23 14628.9 10240.23

N=H+I+J+K+L+M O=G+N 62343.23 88493.90 62343.23 1292867.48 1377129.90 1453994.36

P 0.00 0.00 0.00

Q=O-P 1292867.48 1377129.90 1453994.36

213180.36 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph Type: Metered / Flat Rate: LTKWH Name of 33/11KV Sub-Stations: N.A Feeder No: Metered
Hazratbal

Sub-Division:- Rainawari

F-2

Demand charges billed (In Rs. )

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

I 49560 49560 49560

J 23972.52 21206.46 24894.54

K 9906 8763 10287

L 0.00 0.00 0.00

M 0.00 0.00 0.00

N=H+I+J+K+L+M O=G+N 192404.52 175922.46 197898.54 5858237.0 6024253.5 6303621.5

P 0.0 0.0 0.0

Q=O-P 5858237.0 6024253.5 6303621.5

566225.52 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph Type: Metered / Flat Rate: LTKWH Name of 33/11KV Sub-Stations: N.A Feeder No: Metered
Hazratbal

Sub-Division:- Rainawari

F-3

Demand charges billed (In Rs. ) I 49560 49560 49560

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 3048 4191 3810 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 7376.16 10142.22 9220.2

N=H+I+J+K+L+M O=G+N 93512.16 109994.22 104500.20 183976.32 215797.44 205190.40

P 0.0 0.00 0.00

Q=O-P 183976.32 215797.44 205190.40

308006.58 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar 11KV Type: Metered / Flat Rate: HTKWH Name of 33/11KV Sub-Stations: N.A Feeder No: Metered
Hazratbal

Sub-Division:- Rainawari

F-1

Demand charges billed (In Rs. ) I 50425 50425 50425

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 0.00 0.00 0.00 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 535949.7 509351.7 393650.4

N=H+I+J+K+L+M O=G+N 3022509.7 2875011.7 2233395.4 10405578 13280590 13013985

P 0.0 2500000.0 0.0

Q=O-P 10405578 10780590 13013985

8130916.8 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

2500000

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar Sub-Division:- Rainawari

LT3Ph N.A N.A

Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No:

Metered
Rainawari

F-1

Demand charges billed (In Rs. ) I 2250 2250 2250

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 1677.47 10237.50 10237.50 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 36904.34 37586.34 36222.34

N=H+I+J+K+L+M O=G+N 208578.8 220920.8 213356.8 435947 656868 870224

P 0.0 0.0 0.0

Q=O-P 435947 656868 870224

642856.49 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar Sub-Division:- Rainawari

LT3Ph N.A N.A

Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No:

Metered
Kathi Darwaza

F-3

Demand charges billed (In Rs. ) I 1275 1275 1275

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 10276.50 11485.50 6649.50 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 24869.13 27794.91 16091.79

N=H+I+J+K+L+M O=G+N 149462.1 166895.9 97160.8 14511189 14678085 13875246

P 0.0 900000.0 0.0

Q=O-P 14511189 13778085 13875246

413518.83 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

900000

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Kathi Darwaza

Sub-Division:- Rainawari

F-3

Demand charges billed (In Rs. ) I 9000 9000 9000

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 66495.00 70726.50 48964.50 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 160917.9 171158.13 118494.09

N=H+I+J+K+L+M O=G+N 967857.9 1028876.1 715068.1 34116290 31823828 32944466

P 0.0 0.0 0.0

Q=O-P 34116290 31823828 32944466

2711802.119 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Kathi Darwaza

Sub-Division:- Rainawari

F-3

Demand charges billed (In Rs. ) I 1200 1200 1200

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 6649.50 5440.50 0.00 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 16091.79 13166.01 0

N=H+I+J+K+L+M O=G+N 97085.8 79652.0 1200.0 1404256 1280162 1295043

P 0.0 0.0 0.0

Q=O-P 1404256 1280162 1295043

177937.8 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar LT3Ph N.A N.A Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No: Metered
Rainawari

Sub-Division:- Rainawari

F-2

Demand charges billed (In Rs. ) I 860 860 860

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 416.24 399.69 657.33 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 1728.3035 1728.3035 1446.1315

N=H+I+J+K+L+M O=G+N 10860.5 10843.9 9536.8 225023 235867 245403

P 0.0 0.0 0.0

Q=O-P 225023 235867 245403

31241.17591 Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

LATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar 11KV
HT Trivector

Sub-Division:- Rainawari Metered


Kathi Darwaza

Type: Metered / Flat Rate: Name of 33/11KV Sub-Stations: Feeder No:

N.A

F-3

Demand charges billed (In Rs. ) I 14175 14175 14175

ED Billed (In Rs.)

Capacitor Late Surcharge Surcharge payment for metering Billed(In surchar on LT side Rs.) ge biled K 68913.00 90706.00 61845.00 L 0.00 0.00 0.00 M 0.00 0.00 0.00

Total Amount Billed (In Rs.)

Total Amount Amount due received (in Rs.) (In Rs.)

Arrears

J 166769.45 219508.52 149664.9

N=H+I+J+K+L+M O=G+N 1007900.5 1322155.5 905979.9 10068575 11321818 12305559

P 0.0 0.0 0.0

Q=O-P 10068575 11321818 12305559

3236035.869

Surcharge shall include following: 1 2 3


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP except for domestic, street lighting and loads where KVAH billing done. Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges. Surcharge on HT consumers for having metering on LT.

ithin due date.

Executive Engineer Electric Division-IV, khanyar

Total For the Year


S.No. Name of Installation Computer Code: Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Apr-12

30 HP 0 2967 70 KW 71000 442365.42 1200 KW 675000 4170375 53 KW 26000 233636.64 300 KW 322846.387 2484526.55 32 KW 23040 203237.145 53 KW 24000 213180.36 200 KW 76000 566225.52 200 KW 29000 308006.58 2017 KW 1082000 8130916.8 90 KW 81167.9032 642856.49 51 KW 47000 413518.83 360 KW 308000 2711802.12 47.25 KW 20000 177937.8 26 HP 7645 31241.1759 760 KW 376000 3236035.87 Total 31.69 239.69
Sanctioned Load (KW/HP) KWH Units supplied (LU's)

0 0 3186795 0 0 0 0 0 0 2500000 0 900000 0 0 0 0 65.87

S.No.

Name of Installation

Computer Code:

Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 May-12

30 HP 70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP)

0.00 989.00 25000.00 154780.50 251000.00 1547295.00 9000.00 79777.01 96903.39 746485.23 7680.00 67745.72 7000.00 62343.23 26000.00 192404.52 8000.00 93512.16 403000.00 3022509.70 27055.97 208578.81 17000.00 149462.13 110000.00 967857.90 11000.00 97085.79 2695.00 10860.47 117000.00 1007900.45 11.18 84.10
KWH Units supplied (LU's)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

S.No.

Name of Installation

Computer Code:

Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

1 2 3 4

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary

9386 10074 9943 10039

30 HP

70 KW 1200 KW 53 KW

0.00 989.00 0.00 24000.00 149286.48 0.00 234000.00 1444530.00 3186795.00 11000.00 97210.79 0.00

5 6 7 8 9 10 11 12 13 14 15 16

Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Jun-12

300 KW 97988.00 754756.49 0.00 32 KW 7680.00 67745.72 0.00 53 KW 10000.00 88493.90 0.00 200 KW 23000.00 175922.46 0.00 200 KW 11000.00 109994.22 0.00 2017 KW 383000.00 2875011.70 2500000.00 90 KW 27555.97 220920.84 0.00 51 KW 19000.00 166895.91 900000.00 360 KW 117000.00 1028876.13 0.00 47.25 KW 9000.00 79652.01 0.00 26 HP 2695.00 10843.92 0.00 760 KW 154000.00 1322155.52 0.00 Total 11.31 85.93 65.87
Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Jul-12

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP)

0.00 989.00 22000.00 138298.44 190000.00 1178550.00 6000.00 56648.84 127955.00 983284.83 7680.00 67745.72 7000.00 62343.23 27000.00 197898.54 10000.00 104500.20 296000.00 2233395.40 26555.97 213356.84 11000.00 97160.79 81000.00 715068.09 0.00 1200.00 2255.00 9536.79 105000.00 905979.90 9.19 69.66
KWH Units supplied (LU's)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

S.No.

Name of Installation

Computer Code:

Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

1 2 3 4 5 6 7 8 9 10 11 12

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW

13 14 15 16

Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

10030 10031 8482 10021 Aug-12

360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Sep-12

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Oct-12

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total

S.No.

Name of Installation

Computer Code:

Sanctioned Load (KW/HP)

KWH Units supplied (LU's)

Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Nov-12

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Dec-12

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital

9386 10074 9943 10039 10043

30 HP

70 KW 1200 KW 53 KW 300 KW

6 7 8 9 10 11 12 13 14 15 16

Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Jan-13

32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021 Feb-13

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW

14 Supdtt. Central Jail 15 Ghulam Mohd. Zaroo 16 Ex. Engineer PHE, Pokhribal

10031 8482 10021 Mar-13

47.25 KW 26 HP 760 KW Total


Sanctioned Load (KW/HP) KWH Units supplied (LU's) Total Amount Amount Billed received (Lac (Lac Rs.) Rs.)

S.No.

Name of Installation

Computer Code:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nazir Ah. Zargar Executive Engineer, UEED Director National Institute of Technology Joint Director Poultary Supdtt. JLNM Hospital Joint Director Floriculture, Hazratbal Joint Director Poultary Briolers Ex. Engineer LAWDA, Habak Ex. Engineer LWDA, Hazratbal Registrar Kashmir University Supdtt. JLNM Hospital Supdtt. Mental Hospital Supdtt. Central Jail, Kathi Darwaza Supdtt. Central Jail Ghulam Mohd. Zaroo Ex. Engineer PHE, Pokhribal

9386 10074 9943 10039 10043 10049 10040 10085 10084 10060 10042 10045 10030 10031 8482 10021

30 HP

70 KW 1200 KW 53 KW 300 KW 32 KW 53 KW 200 KW 200 KW 2017 KW 90 KW 51 KW 360 KW 47.25 KW 26 HP 760 KW Total