Form # 1: Monthly Energy-Kashmir

MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2001-11
(For Achievement under Triparitite MoU and for progress to SERC)
S.No

Month

April

May

June

July

August

September

October

November

December

Jan-12

Feb-12

Energy Input
Billed and losses

Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %

Hawal

Rainawari

113.81
60.93
53.54
117.67
62.30
52.94

139.35
39.50
72.00
141.82
40.16
72.00

K.K.Moulla

Khanyar

Zakura

Total for
the Division

113.81
60.93
53.54
117.67
62.30
52.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
139.35
39.50
72.00
141.82
40.16
72.00

Mar-12

Input (LU's)

129.18

Billed (LU's)
Losses %

39.83
69.00

129.18
39.83
69.00

Form # 2: Monthly Meters-Kashmir

MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2011-12
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Month

April

May

June

July

August

September

October

November

December

10

11

January

Total consumers
electronic metering
level and % metering at
end of month

Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed

Hawal

Rainawari

10567
6685
63.26
10582
6700
63.32

10363.00
370.00
10481.00
650.00

K.K.Moulla

Khanyar

Zakura

11

12

February

March

% Metering
Total Consumers
Meters Installed
% Metering

10371.00
720.00

E YEAR 2011-12

Total for
the Division

Form # 3: Monthly Revenue-Kashmir

MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2011-12
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Month

Monthly Revenue
Realised, Pure & ED
(Rs. In lacs)

Hawal

Rainawari

Revenue Pure
ED

4.85
1.06

April

Total (Rs. In lacs)


Revenue Pure
ED

5.91
46.47
10.20

May

Total
Revenue Pure
ED

56.67

June

Total
Revenue Pure
ED

July

Total
Revenue Pure
ED

August

September

October

November

December

Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure

10

11

January

57.359
12.59
69.95
60.64

K.K.Moulla

Khanyar

Zakura

Total for
the Division

11

February

12

March

ED
Total
Revenue Pure
ED
Total

13.31
73.95
262.29
57.58
319.87

Form # 4: Monthly Connection-Kashmir

MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2011-12
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Month

April

May

June

July

August

September

October

November

December

10

11

January

Monthly
Connections added
metered and flat rate
(No's)
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered

Hawal

Rainawari
12
0
12
15
0
15

100.00
18.00
118.00
105.00

K.K.Moulla

Khanyar

Zakura

Total for
the Division

11

February

12

March

Flat Rate
Total
Metered
Flat Rate
Total

15.00
120.00
98.00
12.00
110.00

Form # 5: Category Detail-Kashmir

MONTHLY CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2010-11

05.2010 Lac's

Energy Billed as on 31.05.2010

Connections as on 31.05.2010

Description

(For Achievement under Triparitite MoU and for progress reporting to SERC)

Category

Domestic
N.Dom/Commercial
Iri/Aggri.
State / Central
Publ;ic Lighting
LT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Total
Domestic
N.Dom/Commercial
Iri/Aggri.
State / Central
Publ;ic Lighting
LT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Metered
Flat Rate
Total
Domestic
N.Dom/Commercial
Iri/Aggri.
State / Central

Hawal

Rainawari

K.K.Moulla

Khanyar

Zakura

Total for
the Division

Revenue as on 31.05.2010 Lac's

Publ;ic Lighting
LT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Metered
Flat Rate
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Total

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

Losses (LU's)

%age Losses

14.00
16.80
3.06
15.68
10.84
12.10
2.85
15.13
2.23
4.43
5.34
11.35
113.81

7.50
9.00
1.64
8.40
5.80
6.48
1.50
8.12
1.20
2.37
2.85
6.07
60.93

37.50
27.00
4.02
20.58
14.21
15.88
7.50
19.89
6.00
5.81
6.98
14.87
180.24

6.50
7.80
1.42
7.28
5.04
5.62
1.35
7.01
1.03
2.06
2.49
5.28
52.88

46.42857143
46.42857143
46.40522876
46.42857143
46.49446494
46.44628099
47.36842105
46.33179114
46.18834081
46.50112867
46.62921348
46.51982379

Energy Realised
(LU's)

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MAY, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

Losses (LU's)

%age Losses

18.80
16.40
3.04
15.55
11.20
11.80

12.85
7.72
1.43
8.52
6.27
5.55

64.25
23.16
3.50
20.87
15.36
13.60

5.95
8.68
1.61
7.03
4.93
6.25

31.64893617
52.92682927
52.96052632
45.20900322
44.01785714
52.96610169

Energy Realised
(LU's)

7
8
9
10
11
12

Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Total

2.63
14.93
2.24
4.37
5.41
11.53
117.9

1.84
7.03
1.05
2.06
2.55
5.43
62.30

9.20
17.22
5.25
5.05
6.25
13.30
197.02

0.79
7.90
1.19
2.31
2.86
6.10
55.60

30.03802281
52.91359678
53.125
52.8604119
52.8650647
52.90546401

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JULY, 2010

(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

8
9
10
11
12
13
14

Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF OCTUMBER, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

11
12
13
14

Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2011
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Name of Feeder

Feeder-1 Habak

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

2
3
4
5
6
7
8
9
10
11
12
13
14

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2011
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2011
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Feeder-1 Habak
Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
Feeder-8 Khanyar
Feeder-1 Zakura
Total

Energy Pumped

Energy Billed

Losses (LU's)

%age Losses

Form # 6: En. Aud. Ind.

PRIL, 2010

C)

Energy Realised
in Rs (Lac's)

Whether KVAH
Based tariff
implemented

Form # 6: En. Aud. Ind.

MAY, 2010

C)

Energy Realised
in Rs (Lac's)

Whether KVAH
Based tariff
implemented

Form # 6: En. Aud. Ind.

UNE, 2010

C)

ULY, 2010

Whether KVAH
Based tariff
implemented

Yes

Form # 6: En. Aud. Ind.

C)
Whether KVAH
Based tariff
implemented

Yes

Form # 6: En. Aud. Ind.

GUST, 2010

C)
Whether KVAH
Based tariff
implemented

Yes

Form # 6: En. Aud. Ind.

EMBER, 2010

C)

UMBER, 2010

C)

Whether KVAH
Based tariff
implemented

Yes

Whether KVAH
Based tariff
implemented

Yes

EMBER, 2010

C)
Whether KVAH
Based tariff
implemented

Yes

EMBER, 2010

C)
Whether KVAH
Based tariff
implemented

Yes

UARY, 2011

C)
Whether KVAH
Based tariff
implemented

Yes

RUARY, 2011

C)
Whether KVAH
Based tariff
implemented

Yes

RCH, 2011

C)
Whether KVAH
Based tariff
implemented

Yes

Form # 7

MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA &
ABOVE FROM APRIL, 2010 TO JUNE, 2010
Energy/Revenue
Details

No. of Consumers
Energy SuppliedKWH)
Energy Account Energy Billed(KWH)
for the Month of Amount Billed(Lacs)
April, 2010
Revenue Collectted(Lacs)
% of RevenueCollection
Energy SuppliedKWH)
Energy Account Energy Billed(KWH)
for the Month of Amount Billed(Lacs)
May, 2010
Revenue Collectted(Lacs)
% of RevenueCollection
Energy SuppliedKWH)
Energy Account Energy Billed(KWH)
for the Month of Amount Billed(Lacs)
June, 2010
Revenue Collectted(Lacs)
% of RevenueCollection
Energy SuppliedKWH)
Energy Account Energy Billed(KWH)
for the Month of Amount Billed(Lacs)
July, 2010
Revenue Collectted(Lacs)
% of RevenueCollection

Total for
Hawal Rainawari K.K.Moulla Khanyar Zakura the Division

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Format # 8

Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 31-05-2010
(For achievement under Tripartite MoU and for progress reporting to SERC)

KVAR Compensation Details

Connections with load 25


KVA & Above

Hawal

Electric Division-IV, Khanyar.


Rainawari
K.K.Moulla
Khanyar

Zakura

Total for the


Division

No

KVA
Required
(KVAR)
KVAR
Compensation through
Shunt Capacitor

Installed
(KVAR)
Deficiency
(KVAR)
%
Deficiency

Executive Engineer
Electric Division-IV, Khanyar

Form # 9

Monthly detail of Computerised Billed Energy From April, 2010 to June, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Month of
the year
2007-08

Computerized
Billing

Hawal

Total Energy Biled (LU's)


Energy Billed through computer(LU's)

Apr-09

%age computerised Billing

#DIV/0!

Total Energy Biled (LU's)


Energy Billed through computer(LU's)

May-09 %age computerised Billing

#DIV/0!

Total Energy Biled (LU's)


Energy Billed through computer(LU's)

Jun-09

%age computerised Billing

#DIV/0!

Total Energy Biled (LU's)


Energy Billed through computer(LU's)

Jul-09

%age computerised Billing

#DIV/0!

Rainawari

K.K.Moulla

Khanyar

Zakura

Total for
the Division

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Nazir Ah. Zargar

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

17510

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

9386
30 HP

Capacitor Installed: Y/N

N.A

Rating of Capacitor:

N.A

Feeder No:

S.No

LT Indust.

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

20.00

N.A

Type: Metered / Flat Rate:

Flat Rate
Rainawari
F-3

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Opening Balance
G

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

N.A

145010.10

47.30

805.00

10.41

4.73

0.00

0.00

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

867.44

145877.54

0.00

145877.54

Apr-11

N.A

N.A

May-11

N.A

N.A

0.00

N.A

N.A

148061.00

0.00

805.00

0.00

0.00

0.00

0.00

805.00

148866.00

0.00

148866.00

Jun-11

N.A

N.A

80.00

N.A

N.A

151098.99

189.20

805.00

41.62

18.92

0.00

0.00

1054.74

152153.73

0.00

152153.73

Jul-11

N.A

N.A

0.00

N.A

N.A

154436.04

0.00

805.00

0.00

0.00

0.00

0.00

805.00

155241.04

0.00

155241.04

Aug-11

N.A

N.A

Locked

N.A

N.A

157569.66

118.25

805.00

26.02

10.75

0.00

0.00

960.02

158529.67

0.00

158529.67

Sep-11

N.A

N.A

Locked

N.A

N.A

160907.62

7590.00

805.00

1669.80

690.00

0.00

0.00

10754.80

171662.42

0.00

171662.42

Oct-11

N.A

N.A

Locked

N.A

N.A

174237.35

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

188127.35

0.00

188127.35

Nov-11

N.A

N.A

Locked

N.A

N.A

190949.26

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

204839.26

0.00

204839.26

Dec-11

N.A

N.A

Locked

N.A

N.A

207911.85

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

221801.85

0.00

221801.85

10

Jan-12

N.A

N.A

Locked

N.A

N.A

220169.58

0.00

805.00

0.00

0.00

0.00

0.00

805.00

220974.58

0.00

220974.58

11

Feb-12

N.A

N.A

Locked

N.A

N.A

224289.20

0.00

805.00

0.00

0.00

0.00

0.00

805.00

225094.20

0.00

225094.20

12

Mar-12

N.A

N.A

Locked

N.A

N.A

228470.61

0.00

805.00

0.00

0.00

0.00

0.00

805.00

229275.61

0.00

229275.61

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Executive Engineer, UEED

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

18334

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10074
70 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

LT Water Works

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
computed
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Type: Metered / Flat Rate:

Rainawari
F-3

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

1943230.38

Flat Rate

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

16232.05

13797.24

16232.04619

13797.24

0.85

N.A

67468.50

13280.00

14843.07

6133.50

0.00

0.00

101725.07

2044955.5

0.00

2044955.5

May-11

19409.38

16497.98

19409.38289

16497.98

0.85

N.A

2075629.8

80675.10

13280.00

17748.52

7334.10

0.00

0.00

119037.72

2194667.5

0.00

2194667.5

Jun-11

18450.04

15682.54

18450.0421

15682.54

0.85

N.A

2227587.5

76687.60

13280.00

16871.27

6971.60

0.00

0.00

113810.47

2341398.0

0.00

2341398.0

Jul-11

18027.93

15323.74

18027.93215

15323.74

0.85

N.A

2376519.0

74933.10

13280.00

16485.28

6812.10

0.00

0.00

111510.48

2488029.4

0.00

2488029.4

Aug-11

18626.56

15832.58

18626.56081

15832.58

0.85

N.A

2525349.9

77421.30

13280.00

17032.69

7038.30

0.00

0.00

114772.29

2640122.2

0.00

2640122.2

Sep-11

18626.56

15832.58

18626.56081

15832.58

0.85

N.A

2679724.0

77421.30

13280.00

17032.69

7038.30

0.00

0.00

114772.29

2794496.3

544013.00

2250483.3

Oct-11

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2284240.5

95951.79

16600.00

21109.39

8722.89

0.00

0.00

142384.07

2426624.6

0.00

2426624.6

Nov-11

18626.56

15832.58

15832.6

0.85

N.A

2463024.0

95632.35

16600.00

21039.12

8694.00

0.00

0.00

141965.47

2604989.44

533134.00

2071855.4

Dec-11

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2102933.3

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2244950.46

0.00

2244950.5

10

Jan-12

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2278624.7

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2420641.90

0.00

2420641.9

11

Feb-12

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2456951.5

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2598968.71

0.00

2598968.7

12
Note:

Mar-12

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2637953.2

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2779970.42

0.00

2779970.4

18626.56

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Director National Institute of Technology

Category:

Central

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

11KV

Type: Metered / Flat Rate:

Installation No:

46785

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

9943
1200 KW

Capacitor Installed: Y/N

N.A

Rating of Capacitor:

N.A

Feeder No:

KVAH Units KWH Units


supplied
supplied
A
B

S.No

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Flat Rate
Habak
F-1

Opening Balance
G

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P
2725491.0

Arrears
Q=O-P

Apr-11

447058.82

380000.00

447058.8235

380000

0.85

N.A

1394990.63

1306500.00

24000.00

0.00

0.00

0.00

0.00

1330500.00

2725490.6

May-11

447060.00

380001.00

447060

380001

0.85

N.A

0.00

1096875.00

24000.00

0.00

0.00

0.00

0.00

1120875.00

1120875.0

Jun-11

447061.18

380002.00

447061.1765

380002

0.85

N.A

1137688.13

706875.00

24000.00

0.00

0.00

0.00

0.00

730875.00

1868563.1

1851750.0

0.0

Jul-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

0.00

755625.00

24000.00

0.00

0.00

0.00

0.00

779625.00

779625.0

0.0

779625.0

Aug-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

791319.38

667875.00

24000.00

0.00

0.00

0.00

0.00

691875.00

1483194.4

0.0

1483194.4

Sep-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

0.00

823875.00

24000.00

0.00

0.00

0.00

0.00

847875.00

847875.0

0.0

847875.0

Oct-11

256470.59

218000.00

256470.5882

218000

0.85

N.A

847875.00

1254045.00

28800.00

0.00

0.00

0.00

0.00

1282845.00

2130720.0

2130720.0

2130720.0

Nov-11

481176.47

409000.00

481176.4706

409000

0.85

N.A

0.00

2352772.50

28800.00

0.00

0.00

0.00

0.00

2381572.50

2381573.0

2381573.00

2381573.0

Dec-11

383529.41

326000.00

383529.4118

326000

0.85

N.A

0.00

1875315.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

1904115.00

0.0

10

Jan-12

383529.41

326000.00

383529.4118

168000

0.85

N.A

0.00

966420.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

995220.00

908895.0

11

Feb-12

383529.41

326000.00

383529.4118

166000

0.85

N.A

0.0

954915.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

983715.00

0.0

12
Note:

Mar-12

383529.41

326000.00

383529.4118

280000

0.85

N.A

0.0

1610700.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

983715.00

0.0

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

0.0
1120875.0

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Poultary

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

75858A

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10039
53 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

State

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Type: Metered / Flat Rate:

Kathi Darwaza
F-3

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

7303734.5

Flat Rate

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

7971.76

6776.00

7971.764706

6776

0.85

N.A

2667121.00

1060.00

586766.60

242465.54

0.00

0.00

3497413.14

10801147.6

0.0

10801147.6

May-11

7972.94

6777.00

7972.941176

6777

0.85

N.A

10963164.85

2673066.75

1060.00

588074.69

243006.08

0.00

0.00

3505207.52

14468372.4

0.0

14468372.4

Jun-11

7974.12

6778.00

7974.117647

6778

0.85

N.A

14685397.96

2649371.00

1060.00

582861.62

0.00

0.00

3476298.70

18161696.7

0.0

18161696.7

Jul-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

18434122.10

2663187.00

1060.00

585901.14

242107.91

0.00

0.00

3491000.05

21925122.2

0.0

21925122.2

Aug-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

22253998.99

241988.57

0.00

0.00

3492136.71

25746135.7

0.0

25746135.7

Sep-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

26132327.73

160875.00

1060.00

35392.50

14625.00

0.00

0.00

3263171.55

29395499.3

0.0

29395499.3

Oct-11

17352.94

14750.00

17352.94118

14750

0.85

N.A

3989135.00

93334.31

1272.00

20533.55

8484.00

0.00

0.00

206023.50

4195158.5

0.0

4195158.5

Nov-11

18541.18

15760.00

18541.17647

15760

0.85

N.A

4104274.00

99725.34

1272.00

21939.57

9065.00

0.00

0.00

124204.86

4228478.9

0.0

4228478.9

Dec-11

18541.18

15760.00

18541.17647

15760

0.85

N.A

4228478.0

99725.24

1272.00

21939.57

9065.00

0.00

0.00

132001.91

4360479.9

0.0

4360479.9

10

Jan-12

18541.18

15760.00

18541.17647

11000

0.85

N.A

4360479.9

69605.25

1272.00

15313.16

6327.75

0.00

0.00

129264.56

4489744.5

0.0

4489744.5

11

Feb-12

18541.18

15760.00

18541.17647

12000

0.85

N.A

4489744.5

75933.00

1272.00

16705.26

6903.00

0.00

0.00

93093.41

4582837.9

0.0

4582837.9

12
Note:

Mar-12

18541.18

15760.00

18541.17647

7000

0.85

N.A

4582837.9

46546.50

1272.00

10240.23

4231.50

0.00

0.00

98141.76

4680979.6

0.0

4680979.6

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

2661874.25

1060.00

240851.91

585612.3

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. JLNM Hospital

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

14260A

Meter Rated Current:

N.A

Meter Type:

N,.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10043
300 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

State

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Type: Metered / Flat Rate:

Flat Rate
Rainawari
F-1

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

498712.50

6000.00

109716.75

45337.50

0.00

0.00

3792883.5

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

659766.75

4452650.3

0.0

4452650.3

Apr-11

119983.76

101986.20

119983.7604

101986.2

0.85

N.A

May-11

118693.61

100889.57

118693.6124

100889.6

0.85

N.A

4519440.0

493350.00

6000.00

108537.00

44850.00

0.00

0.00

652737.00

5172177.0

0.0

5172177.0

Jun-11

119983.76

101986.20

119983.7604

101986.2

0.85

N.A

5249759.7

498712.50

6000.00

109716.75

45337.50

0.00

0.00

659766.75

5909526.4

0.0

5909526.4

Jul-11

117403.46

99792.94

117403.4645

99792.94

0.85

N.A

5998169.3

487987.50

6000.00

107357.25

44362.50

0.00

0.00

645707.25

6643876.6

0.0

6643876.6

Aug-11

118693.61

100889.57

118693.6124

100889.6

0.85

N.A

6743534.7

493350.00

6000.00

108537.00

44850.00

0.00

0.00

652737.00

7396271.7

0.0

7396271.7

6
7

Sep-11
Oct-11

118693.61
143529.41

100889.57
122000.00

118693.6124
143529.4118

100889.6
122000

0.85
0.85

N.A
N.A

7507215.8
3965135.5

493350.00
771985.50

6000.00
7200.00

108537.00
169836.81

44850.00
70180.50

0.00
0.00

0.00
0.00

652737.00
4914158.00

8159952.8
4914158.0

4148810.0
3530103.0

4011142.8
4914158.0

Nov-11

143529.41

122000.00

143529.4118

122000

0.85

N.A

1384055.0

759330.00

7200.00

167052.60

69030.00

0.00

0.00

2317638.00

2317638.0

0.0

2317638.0

Dec-11

143529.41

122000.00

143529

122000

0.85

N.A

2317638.0

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

3320250.6

0.0

3320250.6

10

Jan-12

143529.41

122000.00

143529

122000

0.85

N.A

3320250.6

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

4322863.2

3749770.0

573093.2

11

Feb-12

143529.41

122000.00

143529

122000

0.85

N.A

573093.2

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

1575705.8

0.0

1575705.8

12

Mar-12

143529.41

122000.00

143529

122000

0.85

N.A

1575705.8

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

2578318.4

0.0

2578318.4

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Horticulture, Hazratbal

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

6162SD

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10049
32 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

State

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Type: Metered / Flat Rate:

Flat Rate
Habak
F-1

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

41184.00

640.00

9060.48

3744.00

0.00

0.00

922056.25

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

54628.48

976684.7

0.0

976684.73

Apr-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

May-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

991335.0

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1045963.5

0.0

1045963.48

Jun-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

1061652.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1116281.4

0.0

1116281.41

Jul-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

1133025.6

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1187654.1

0.0

1187654.11

Aug-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

1205468.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1260097.4

0.0

1260097.41

Sep-11

9908.34

8422.09

9908.336341

8422.086

0.85

N.A

1278998.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1333627.3

0.0

1333627.35

Oct-11

12179.00

10352.15

12178.99675

10352.15

0.85

N.A

1353631.8

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1420760.6

0.0

1420760.60

Nov-11

12179.00

10352.15

12178.99675

10352.15

0.85

N.A

1442072.0

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1509200.8

0.0

1509200.85

Dec-11

12179.00

12178.99675

10352.15

0.85

N.A

1531838.9

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1598967.7

0.0

1598967.70

10

Jan-12

12179.00

10352.15

12178.996

7680

0.85

N.A

1512598.3

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1577256.7

0.0

1577256.74

11

Feb-12

12179.00

7680.00

12178.996

7680

0.85

N.A

1598967.7

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1663626.2

0.0

1663626.19

12
Note:

Mar-12

12179.00

7680.00

12178.996

7680

0.85

N.A

1688580.6

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1753239.1

0.0

1753239.06

10352.15

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Poultary Briolers

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

90SD

Meter Rated Current:

N.A

Meter Type:

LTKWH

Computer Code:
Sanctioned Load:

10040
53 KW

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

State

DiVision:

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
COMPUT
ED
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

N.A

Opening Balance
G

Type: Metered / Flat Rate:

Kathi Darwaza

Feeder No:

F-3

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

1212543.38

Flat

Name of 33/11KV Sub-Stations:

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

15701.10

13345.94

15701.10069

13345.94

0.85

N.A

65261.63

1060.00

14357.56

5932.88

0.00

0.00

86612.06

1299155.44

0.00

1299155.44

May-11

15689.75

13336.28

15689.74705

13336.28

0.85

N.A

1318642.77

65214.43

1060.00

14347.18

5928.59

0.00

0.00

86550.20

1405192.97

0.00

1405192.97

Jun-11

15733.61

13373.57

15733.61241

13373.57

0.85

N.A

1426270.87

65396.76

1060.00

14387.29

5945.16

0.00

0.00

86789.21

1513060.08

0.00

1513060.08

Jul-11

15708.33

13352.08

15708.32583

13352.08

0.85

N.A

1535755.98

65291.66

1060.00

14364.16

5935.61

0.00

0.00

86651.43

1622407.41

0.00

1622407.41

Aug-11

15710.39

13353.83

15710.38961

13353.83

0.85

N.A

1646743.52

65300.23

1060.00

14366.05

5936.39

0.00

0.00

86662.68

1733406.19

0.00

1733406.19

Sep-11

15710.39

13353.83

15710.38961

13353.83

0.85

N.A

1759407.29

65300.23

1060.00

14366.05

5936.39

0.00

0.00

86662.68

1846069.96

300000.00

1546069.96

Oct-11

16858.82

14330.00

16858.82353

14330

0.85

N.A

1569261.01

90676.66

1272.00

19948.87

8243.33

0.00

0.00

120140.86

1689401.87

0.00

1689401.87

Nov-11

18435.29

15670.00

18435.29412

15670

0.85

N.A

1714742.90

99155.84

1272.00

21814.29

9014.17

0.00

0.00

131256.30

1845999.19

0.00

1845999.19

Dec-12

18435.29

15670.00

18435.29412

15670

0.85

N.A

1873689.18

99155.84

1272.00

21814.29

9014.17

0.00

0.00

131256.30

2004945.48

0.00

2004945.48

10

Jan-12

18435.29

15670.00

18435.29412

7000

0.85

N.A

1172412.50

46546.50

1272.00

21814.29

9014.17

0.00

0.00

78646.96

1251059.46

0.00

1251059.46

11

Feb-12

18435.29

15670.00

18435.29412

7000

0.85

N.A

1251059.46

46546.50

1272.00

21814.29

9014.17

0.00

0.00

78646.96

1329706.42

0.00

1329706.42

12
Note:

Mar-12

18435.29

15670.00

18435.29412

10000

0.85

N.A

1329706.42

66495.00

1272.00

21814.29

9014.17

0.00

0.00

98595.46

1428301.88

705000.00

723301.88

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 KVAH and demand readings will be required for load more than 100KW only.
4 In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer LAWDA, Habak

Category:

State

DiVision:

N.A

Supply Type:

LT3Ph

LTKWH

LAWDA2

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10085
200 KW

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

Sub-Division:- Rainawari

CT Ratio:200/5A

Installation No:

KVAH Units KWH Units


supplied
supplied
A
B

Electric Division-IV, Khanyar

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

N.A

Opening Balance
G

Type: Metered / Flat Rate:

Name of 33/11KV Sub-Stations:

Kathi Darwaza

Feeder No:

F-3

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

5277467

Metered

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

9412.94

8001.00

9412.941176

8001

0.85

N.A

123337.50

4000.00

27134.25

11212.50

0.00

0.00

165684.25

5443151.3

0.0

5443151.3

May-11

9414.12

8002.00

9414.117647

8002

0.85

N.A

5524798.52

134062.50

4000.00

29493.75

12187.50

0.00

0.00

179743.75

5704542.3

0.0

5704542.3

Jun-11

9415.29

8003.00

9415.294118

8003

0.85

N.A

5790110.40

139425.00

4000.00

30673.50

12675.00

0.00

0.00

186773.50

5976883.9

0.0

5976883.9

Jul-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6066537.16

150150.00

4000.00

33033.00

13650.00

0.00

0.00

200833.00

6267370.2

0.0

6267370.2

Aug-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6361380.71

0.00

4000.00

0.00

0.00

0.00

0.00

4000.00

6365380.7

0.0

6365380.7

Sep-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6460861.42

246675.00

4000.00

54268.50

22425.00

0.00

0.00

327368.50

6788229.9

0.0

6788229.9

Oct-11

32352.94

27500.00

32352.94118

27500

0.85

N.A

6548885.50

174013.00

4800.00

38282.00

31638.00

0.00

0.00

248733.00

6797618.5

0.0

6797618.5

Nov-11

32352.94

27500.00

32352.94118

27500

0.85

N.A

6763581.00

174013.00

4800.00

38282.00

21638.00

0.00

0.00

238733.00

7002314.0

496125.0

6506189.0

Dec-11

14117.65

12000.00

14117.64706

12000

0.85

N.A

6978277.00

47916.00

4800.00

10541.52

4356.00

0.00

0.00

105657.00

7083934.0

0.0

7083934.0

10

Jan-12

24705.88

21000.00

24705.88235

21000

0.85

N.A

6308644.50

83853.00

47200.00

18447.66

5808.00

0.00

0.00

239161.66

6547806.2

925518.0

5622288.2

11

Feb-12

18823.53

16000.00

18823.52941

16000

0.85

N.A

5622288.16

63888.00

47200.00

14055.36

5808.00

0.00

0.00

194839.36

5817127.5

100000.0

5717127.5

12
Note:

Mar-12

30588.24

26000.00

30588.23529

26000

0.85

N.A

5717127.52

108966.00

47200.00

23972.52

5808.00

0.00

0.00

294912.52

6012040.0

240543.0

5771497.0

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer LWDA, Hazratbal

Category:

State

DiVision:

N.A

Supply Type:

LT3Ph

LTKWH

LAWDA1

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10084
200 KW

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

Sub-Division:- Rainawari

CT Ratio:200/5A

Installation No:

KVAH Units KWH Units


supplied
supplied
A
B

Electric Division-IV, Khanyar

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

N.A

Opening Balance
G

Type: Metered / Flat Rate:

Name of 33/11KV Sub-Stations:

Kathi Darwaza

Feeder No:

F-3

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

774782.3

Metered

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P
870169.05

Apr-11

12942.35

11001.00

12942.35294

11001

0.85

N.A

69712.50

4000.00

15336.75

6337.50

0.00

0.00

95386.75

870169.05

0.0

May-11

12943.53

11002.00

12943.52941

11002

0.85

N.A

883221.59

69712.50

4000.00

15336.75

6337.50

0.00

0.00

95386.75

978608.34

0.00

978608.34

Jun-11

12944.71

11003.00

12944.70588

11003

0.85

N.A

993287.46

85800.00

4000.00

18876.00

7800.00

0.00

0.00

116476.00

1109763.46

0.00

1109763.46

Jul-11

12945.88

11004.00

12945.88235

11004

0.85

N.A

1126409.91

85800.00

4000.00

18876.00

7800.00

0.00

0.00

116476.00

1242885.91

0.00

1242885.91

Aug-11

12945.88

11004.00

12945.88235

11004

0.85

N.A

1261529.20

0.00

4000.00

0.00

0.00

0.00

0.00

4000.00

1265529.20

0.00

1265529.20

6
7

Sep-11
Oct-11

12945.88
17647.06

11004.00
15000.00

12945.88235
17647.05882

11004
15000

0.85
0.85

N.A
N.A

1284512.14
1401209.00

150150.00
94916.00

4000.00
4800.00

33033.00
20881.00

13650.00
4425.00

0.00
0.00

0.00
0.00

200833.00
125022.00

1485345.14
1526231.00

0.00
0.00

1485345.14
1526231.00

Nov-11

17647.06

15000.00

17647.05882

15000

0.85

N.A

1519407.00

94916.00

4800.00

20881.00

4425.00

0.00

0.00

125022.00

1644429.00

0.00

1644429.00

Dec-11

8235.29

7000.00

8235.294118

7000

0.85

N.A

1637605.00

27951.00

4800.00

6149.22

2541.00

0.00

0.00

81300.00

1718905.00

0.00

1744689.00

10

Jan-12

8235.29

7000.00

8235.294118

7000

0.85

N.A

1380887.75

27951.00

4800.00

7027.68

2904.00

0.00

0.00

81300.00

1462187.75

536254.00

925933.75

11

Feb-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

925933.75

31944.00

4800.00

7376.16

3048.00

0.00

0.00

81300.00

1007233.75

86957.00

920276.75

12

Mar-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

920276.75

31944.00

4800.00

7376.16

3048.00

0.00

0.00

81300.00

1001576.75

201571.00

800005.75

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Registrar Kashmir University

Category:

State

DiVision:

N.A

Supply Type:

11KV

HTKWH

222M

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10060

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

Sub-Division:- Rainawari

CT Ratio:60/5A

Installation No:

KVAH Units KWH Units


supplied
supplied
A
B

Electric Division-IV, Khanyar

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

N.A

Opening Balance
G

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

Habak

Feeder No:

F-1

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

2218125.0

40340.0

487987.5

0.00

0.00

0.00

4273098.5

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

2746452.5

7019551

0.0

7019551

Apr-11

574677.65

488476.00

574677.6471

488476

0.85

N.A

May-11

574678.82

488477.00

574678.8235

488477

0.85

N.A

7124844

1852500.0

40340.0

407550.0

0.00

0.00

0.00

2300390.0

9425234

6884551.0

2540683

Jun-11

574680.00

488478.00

574680

488478

0.85

N.A

2578794

1974375.0

40340.0

434362.5

0.00

0.00

0.00

2449077.5

5027871

0.0

5027871

Jul-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

5103289

1998750.0

40340.0

439725.0

0.00

0.00

0.00

2478815.0

7582104

3000000.0

4582104

Aug-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

4650836

1941858.8

40340.0

427208.9

0.00

0.00

0.00

2409407.7

7060243

3884551.0

3175692

Sep-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

3223328

1941858.8

40340.0

427208.9

0.00

0.00

0.00

2409407.7

5632735

0.0

5632735

Oct-11

521176.47

443000.00

521176.4706

443000

0.85

N.A

5717226

2548357.5

65342.5

560638.6

0.00

0.00

0.00

3157404.0

3157404

0.0

3157404

Nov-11

555294.12

472000.00

555294.1176

472000

0.85

N.A

3204765

2715180.0

65342.5

597339.6

0.00

0.00

0.00

6518332.0

6518332

6884551.0

-366219

Dec-11

555294.12

472000.00

555294.1176

472000

0.85

N.A

-371712

2715180.0

65342.5

597339.6

0.00

0.00

0.00

9825259.0

9825259.0

4686977.0

5138282

10

Jan-12

705882.35

600000.00

705882.3529

600000

0.85

N.A

5215356

3451500.0

65342.5

759330.0

0.00

0.00

0.00

4276172.5

9491528.7

0.0

9491529

11

Feb-12

607058.82

516000.00

607058.8235

516000

0.85

N.A

9633902

2968290.0

65342.5

653023.8

0.00

0.00

0.00

3686656.3

13320558.0

0.0

13320558

Mar-12

535294.12

455000.00

535294.1176

455000

0.85

N.A

13520366

2617387.5

65342.5

575825.3

0.00

0.00

0.00

3258555.3

16778921.6

11644000.0

5134922

12
Note:

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. JLNM Hospital

Category:

State

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

14260

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10042
90 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Rainawari
F-1

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

6172863

Flat Rate

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

1109009.98 942658.49

1109009.984

942658.5

0.85

N.A

4609600.00

1800.00

1014112.00

10237.50

0.00

0.00

5635749.50

11808613

1473000.00

10335613

May-11

206327.44

175378.32

206327.439

175378.3

0.85

N.A

10490647

857600.00

1800.00

188672.00

10237.50

0.00

0.00

1058309.50

11548956

0.00

11548956

Jun-11

219222.90

186339.47

219222.9039

186339.5

0.85

N.A

11722191

911200.00

1800.00

200464.00

10237.50

0.00

0.00

1123701.50

12845892

0.00

12845892

Jul-11

216643.81

184147.24

216643.8109

184147.2

0.85

N.A

13038580

900480.00

1800.00

198105.60

10237.50

0.00

0.00

1110623.10

14149204

1946810.00

12202394

Aug-11

209003.97

177653.37

209003.9697

177653.4

0.85

N.A

12385429

868725.00

1800.00

191119.50

78975.00

0.00

0.00

1140619.50

13526049

0.00

13526049

Sep-11

209003.53

177653.00

209003.5294

177653

0.85

N.A

13728940

868725.00

1800.00

191119.50

78975.00

0.00

0.00

1140619.50

14869559

0.00

14869559

Oct-11

23529.41

20000.00

23529.41176

20000

0.85

N.A

10322005

126555.00

2160.00

27842.10

11505.00

0.00

0.00

168062.10

10490067

1254985.00

9235082

Nov-11

17647.06

15000.00

17647.05882

15000

0.85

N.A

9223577

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9350164

0.00

9350164

Dec-11

17647.06

15000.00

17647.05882

0.85

N.A

9350164

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9476750

0.00

9476750

10

Jan-12

17647.06

15000.00

17647.05882

15000

15000

0.85

N.A

9476750

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9603337

291567.00

9311770

11

Feb-12

17647.06

15000.00

17647.05882

15000

0.85

N.A

9311770

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9438356

0.00

9438356

12
Note:

Mar-12

17647.06

15000.00

17647.05882

15000

0.85

N.A

9438356

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9564943

0.00

9564943

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Mental Hospital

Category:

State

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

46827

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10045
51 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Flat Rate

Kathi Darwaza
F-3

Opening Balance
G

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

19352.22

16449.39

19352.21942

16449.39

0.85

N.A

11950800.00

80437.50

1020.00

17696.25

7312.50

0.00

0.00

106466.25

12057266.25

0.00

12057266.25

May-11

19997.29

16997.70

19997.2934

16997.7

0.85

N.A

12238125.24

83118.75

1020.00

18286.13

7556.25

0.00

0.00

109981.13

12348106.37

0.00

12348106.37

Jun-11

16126.85

13707.82

16126.84951

13707.82

0.85

N.A

12533327.96

67031.25

1020.00

14746.88

6093.75

0.00

0.00

88891.88

12622219.84

0.00

12622219.84

Jul-11

15675.30

13324.00

15675.29773

13324

0.85

N.A

12811553.14

65154.38

1020.00

14333.96

5923.13

0.00

0.00

86431.47

12897984.60

700000.00

12197984.60

Aug-11

14836.70

12611.20

14836.70155

12611.2

0.85

N.A

12380954.37

61668.75

1020.00

13567.13

5606.25

0.00

0.00

81862.13

12462816.50

0.00

12462816.50

Sep-11

14836.70

12611.20

14836.70155

12611.2

0.85

N.A

12649758.75

61668.75

1020.00

13567.13

5606.25

0.00

0.00

81862.13

12731620.87

0.00

12731620.87

Oct-11

23164.71

19690.00

23164.70588

19690

0.85

N.A

12882332.00

124593.40

1224.00

27410.55

11326.67

0.00

0.00

164554.62

13046886.62

0.00

13046886.62

Nov-11

24552.94

20870.00

24552.94118

20870

0.85

N.A

13231093.00

132060.14

1224.00

29053.23

12005.47

0.00

0.00

174342.84

13405435.84

0.00

13405435.84

Dec-11

24552.94

20870.00

24552.94118

20870

0.85

N.A

13594332.00

102509.55

1224.00

22552.10

9319.05

0.00

0.00

135604.70

13729936.70

0.00

13729936.70

10

Jan-12

47258.82

40170.00

47258.82353

40170

0.85

N.A

13720618.00

254185.72

1224.00

55920.86

23107.79

0.00

0.00

334438.37

14055056.37

0.00

14055056.37

11

Feb-12

28858.82

24530.00

28858.82353

24530

0.85

N.A

14055056.37

155219.70

1224.00

34148.34

14110.88

0.00

0.00

204702.92

14259759.28

0.00

14259759.28

12

Mar-12

20000.00

17000.00

20000

17000

0.85

N.A

14259759.28

113041.50

1224.00

24869.13

10276.50

0.00

0.00

149411.13

14409170.41

0.00

14409170.41

Note:

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.

3 KVAH and demand readings will be required for load more than 100KW only.

2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85

3 Surcharge on HT consumers for having metering on LT.

5 Please attach circle-wise and Divisional wise Abstracts with each energy account.

Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Central Jail, Kathi Darwaza

Category:

State

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

5531M

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10030
360 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Flat Rate

Kathi Darwaza
F-3

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

718199.60

7200.00

158003.91

16741.25

0.00

0.00

2.27E+07

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

900144.76

23574494.8

0.0

23574494.8

Apr-11

172789.51

146871.08

172789.5104

146871.1

0.85

N.A

May-11

122564.06

104179.45

122564.0563

104179.4

0.85

N.A

23928112.2

509437.50

7200.00

112076.25

11875.00

0.00

0.00

640588.75

24568700.9

0.0

24568700.9

Jun-11

108153.10

91930.14

108153.1036

91930.14

0.85

N.A

24937231.4

449538.38

7200.00

98898.44

10478.75

0.00

0.00

566115.57

25503347.0

0.0

25503347.0

Jul-11

108372.43

92116.56

108372.4287

92116.56

0.85

N.A

25885897.2

450450.00

7200.00

99099.00

10500.00

0.00

0.00

567249.00

26453146.2

0.0

26453146.2

Aug-11

87730.06

74570.55

87730.06135

74570.55

0.85

N.A

26849943.4

364650.00

7200.00

80223.00

8500.00

0.00

0.00

460573.00

27310516.4

600000.0

26710516.4

Sep-11

87704.26

74548.62

87704.25839

74548.62

0.85

N.A

27111174.2

364542.75

7200.00

80199.41

8497.50

0.00

0.00

460439.66

27571613.8

0.0

27571613.8

Oct-11

86270.59

73330.00

86270.58824

73330

0.85

N.A

27985188.0

464013.90

8640.00

102083.06

42183.08

0.00

0.00

616920.04

28602108.1

0.0

28602108.1

Nov-11

188235.29

160000.00

188235.2941

160000

0.85

N.A

29031139.7

1012440.00

8640.00

222736.80

92040.00

0.00

0.00

1335856.80

30366996.5

0.00

30366996.5

Dec-11

188235.29

160000.00

188235.2941

160000

0.85

N.A

30822501.4

1012440.00

8640.00

222736.80

92040.00

0.00

0.00

1335856.80

32158358.2

0.00

32158358.2

10

Jan-12

226023.53

192120.00

226023.5294

192120

0.85

N.A

32640733.6

1215687.38

8640.00

1215687.38

110517.03

0.00

0.00

2550531.79

35191265.4

1000000.00

34191265.4

11

Feb-12

164564.71

139880.00

164564.7059

139880

0.85

N.A

34704134.4

885125.70

8640.00

885125.70

80465.97

0.00

0.00

1859357.37

36563491.7

0.00

36563491.7

12
Note:

Mar-12

120000.00

102000.00

120000

102000

0.85

N.A

37111944.1

678249.00

8640.00

678249.00

61659.00

0.00

0.00

1426797.00

38538741.1

71700.00

38467041.1

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Central Jail

Category:

State

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

5531A

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10031
47.25 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

Opening Balance
G

Flat Rate

Kathi Darwaza
F-3

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

6220.50

960.00

1368.51

565.50

0.00

0.00

1010431.13

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

9114.51

1019545.6

0.00

1019545.6

Apr-11

1496.57

1272.09

1496.571635

1272.086

0.85

N.A

May-11

1935.22

1644.94

1935.221942

1644.939

0.85

N.A

1034838.8

8043.75

960.00

1769.63

731.25

0.00

0.00

11504.63

1046343.4

0.00

1046343.4

Jun-11

1470.77

1250.15

1470.768676

1250.153

0.85

N.A

1062038.6

6113.25

960.00

1344.92

555.75

0.00

0.00

8973.92

1071012.5

0.00

1071012.5

Jul-11

1935.22

1644.94

1935.221942

1644.939

0.85

N.A

1087077.7

8043.75

960.00

1769.63

731.25

0.00

0.00

11504.63

1098582.3

0.00

1098582.3

Aug-11

1586.88

1348.85

1586.881992

1348.85

0.85

N.A

1115061.1

6595.88

960.00

1451.09

599.63

0.00

0.00

9606.60

1124667.7

200000.00

924667.7

Sep-11

1586.88

1348.85

1586.881992

1348.85

0.85

N.A

938537.7

6595.88

960.00

1451.09

599.63

0.00

0.00

9606.60

948144.3

0.00

948144.3

Oct-11

1552.94

1320.00

1552.941176

1320

0.85

N.A

866958.8

8352.63

1152.00

1837.58

759.33

0.00

0.00

11342.00

878300.8

0.00

878300.8

Nov-11

8623.53

7330.00

8623.529412

7330

0.85

N.A

878300.0

46382.41

1152.00

10204.13

4216.58

0.00

0.00

57738.00

936038.0

0.00

936038.0

Dec-11

11764.71

10000.00

11764.70588

10000

0.85

N.A

936038.0

63277.50

1152.00

13921.05

5752.50

0.00

0.00

78350.00

1014388.0

0.00

1014388.0

10

Jan-12

14611.76

12420.00

14611.76471

12420

0.85

N.A

1014390.3

78590.66

1152.00

17289.94

5752.50

0.00

0.00

78350.00

1092740.3

0.00

1092740.3

11

Feb-12

15976.47

13580.00

15976.47059

13580

0.85

N.A

1109131.4

85930.84

1152.00

18904.79

5752.50

0.00

0.00

78350.00

1187481.4

0.00

1187481.4

12

Mar-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

1205293.6

53196.00

1152.00

11703.12

5752.50

0.00

0.00

78350.00

1283643.6

83000.00

1200643.6

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ghulam Mohd. Zaroo

Category:

LT Indust.

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Flat Rate

Installation No:

420SM

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Khanyar

Computer Code:
Sanctioned Load:

8482
26 HP

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

F-8

S.No

Month

KVAH Units KWH Units


supplied
supplied

KVAH Units
recorded /
computed

KWH Units
recorded

AV-Power
Factor

Max. Demand
Recorded KVA

E=D/C

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)

Opening Balance

Energy Charges / F.R


Charges billed
(In Rs.)

Demand
charges billed
(In Rs. )

ED Billed
(In Rs.)

Capacitor
Surcharge
Billed(In Rs.)

4578.64

700.00

1007.30

416.24

0.00

187540.313

Total Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

N=H+I+J+K+L+M

O=G+N

Q=O-P

0.00

6702.18

194242.49

0.00

194242.49

Apr-11

2640.00

2244.00

2640

2244

0.85

N.A

May-11

1980.00

1683.00

1980

1683

0.85

N.A

197156.13

4396.54

700.00

967.24

399.69

0.00

0.00

6463.46

203619.59

0.00

203619.59

Jun-11

1540.00

1309.00

1540

1309

0.85

N.A

206673.89

0.00

700.00

0.00

0.00

0.00

0.00

700.00

207373.89

0.00

207373.89

Jul-11

4982.35

4235.00

4982.352941

4235

0.85

N.A

210484.50

4292.48

700.00

944.34

390.23

0.00

0.00

6327.05

216811.55

0.00

216811.55

Aug-11

2290.59

1947.00

2290.588235

1947

0.85

N.A

220063.72

4682.70

700.00

1030.19

425.70

0.00

0.00

6838.59

226902.31

0.00

226902.31

Sep-11

2290.59

1947.00

2290.588235

1947

0.85

N.A

230305.85

4812.78

700.00

1058.81

437.53

0.00

0.00

7009.12

237314.96

0.00

237314.96

Oct-11

711.76

605.00

711.7647059

605

0.85

N.A

237952.60

1643.79

800.00

361.63

149.44

0.00

0.00

2954.86

240907.46

0.00

240907.46

Nov-11

2329.41

1980.00

2329.411765

1980

0.85

N.A

244369.38

5379.66

800.00

1183.53

489.04

0.00

0.00

7852.23

252221.60

0.00

252221.60

Dec-11

2329.41

1980.00

2329.411765

1980

0.85

N.A

252221.00

5379.66

800.00

1183.53

489.04

0.00

0.00

7852.23

260073.23

0.00

260073.23

10

Jan-12

1164.71

990.00

1164.705882

990

0.85

N.A

256308.55

2689.83

800.00

591.76

489.04

0.00

0.00

4570.63

260879.18

0.00

260879.18

11

Feb-12

517.65

440.00

517.6470588

440

0.85

N.A

260879.18

1195.48

800.00

263.01

489.04

0.00

0.00

2747.53

263626.71

0.00

263626.71

Mar-12

0.00

0.00

0.85

N.A

263626.71

0.00

800.00

0.00

489.04

0.00

0.00

1289.04

264915.75

70000.00

194915.75

12
Note:

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer PHE, Pokhribal

Category:

State

DiVision:

N.A

Supply Type:

11KV
HT
Trivector

100-SD

Meter Rated Current:

N.A

Meter Type:

Computer Code:

10021

Capacitor Installed: Y/N

Rating of Capacitor:

Sanctioned Load:

760kws

Month

Sub-Division:- Rainawari

CT Ratio:

Installation No:

S.No

Electric Division-IV, Khanyar

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH Units
recorded
D

AV-Power
Factor
E=D/C

Max. Demand
Recorded KVA
F

N.A

Opening Balance
G

Type: Metered / Flat Rate:

Flat Rate

Name of 33/11KV Sub-Stations:

Kathi Darwaza

Feeder No:

F-3

Late
Surcharge for payment
metering on surcharge Total Amount Billed
LT side
biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Energy Charges / F.R


Charges billed
(In Rs.)
H

Demand
charges billed
(In Rs. )
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

600600.00

8260.00

132132.00

54600.00

0.00

0.00

4088142

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

795592.0

4883734

0.0

4883734.0

Apr-11

144496.57

122822.09

144496.5716

122822.1

0.85

511.01

May-11

152237.46

129401.84

152237.4594

129401.8

0.85

511.01

4956990.0

632775.00

8260.00

139210.50

57525.00

0.00

0.00

837770.5

5794761

0.0

5794760.5

Jun-11

148367.02

126111.96

148367.0155

126112

0.85

511.01

5881681.9

616687.50

8260.00

135671.25

56062.50

0.00

0.00

816681.3

6698363

0.0

6698363.2

Jul-11

138045.83

117338.96

138045.8318

117339

0.85

511.01

6798838.6

573787.50

8260.00

126233.25

52162.50

0.00

0.00

760443.3

7559282

0.0

7559281.9

Aug-11

145786.72

123918.71

145786.7196

123918.7

0.85

511.01

7672671.1

605962.50

8260.00

133311.75

55087.50

0.00

0.00

802621.8

8475293

0.0

8475292.8

Sep-11

140626.13

119532.21

140626.1278

119532.2

0.85

511.01

8602422.2

584512.50

8260.00

128592.75

53137.50

0.00

0.00

774502.8

9376925

2988757.0

6388168.0

Oct-11

160000.00

136000.00

160000

136000

0.85

511.01

6483990.5

860574.00

9912.00

189326.28

20060.00

0.00

0.00

1059812.3

7543803

0.0

7543802.8

Nov-11

152941.18

130000.00

152941.1765

130000

0.85

511.01

7656959.8

822607.50

9912.00

180973.66

19175.00

0.00

0.00

1013493.1

8670453

1468221.00

7202231.9

Dec-11

122352.94

104000.00

122352.9412

104000

0.85

511.01

7310265.4

658060.00

144773.00

18437.50

0.00

0.00

8113098

0.00

8113098.4

10

Jan-12

165882.35

141000.00

165882.3529

141000

0.85

511.01

8234794.9

892212.75

9912.00

123433.31

81110.25

0.00

0.00

802833.0

9037628

0.00

9037627.9

11

Feb-12

107058.82

91000.00

107058.8235

91000

0.85

511.01

9173192.3

561060.50

9912.00

113938.44

51005.50

0.00

0.00

802833.0

9976025

1911187.00

8064838.3

12
Note:

Mar-12

98823.53

84000.00

98823.52941

84000

0.85

511.01

8185810.9

517902.00

9912.00

166769.45

47082.00

0.00

0.00

802833.0

8988644

698102.00

8290541.9

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2
3
4
5

9912

802833

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Note:
11KV Trivector Meter not commissioned/Tested yet

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar