SECTION 15420 DRAINAGE AND VENT SYSTEMS 00000000PART 1 - GENERAL 1.1 DESCRIPTION: A.

The Work under this Section consists of furnishing and installing a complete drainage system including soil, waste, drainage, and vent system up to the interface point as indicated on the drawings and as specified herein.

1.2

REFERENCES: A. ASO Saudi Arabian Standards Organization SASO -14 SASO -15 SASO 1177 SASO 1209 SASO 1210 SASO 1395 SASO 1396 SASO 1397 SASO 1398 SASO 1399 B. Pipes for Potable Water of Unplasticized Plastic (UPVC) Method of Testing of Pipes for Potable Water of Unplasticized Plastic (UPVC). Unplasticized polyvinyl chloride (UPVC) pipes Specification & measurement of opacity Unplasticized polyvinyl chloride (UPVC) pipes for soil, waste and venting inside buildings. Methods of testing unplasticized polyvinyl chloride (UPVC) pipes for soil, waste and venting inside buildings. Unplasticized polyvinyl chloride (UPVC) pipes for buried/drains and sewers Methods of testing unplasticized polyvinyl chloride (UPVC) pipes for buried/drains and sewers Unplasticized polyvinyl chloride (UPVC) pipe fittings for buried/drains and sewers Methods of test for unplasticized polyvinyl chloride (UPVC) pipe fittings for buried /drains and sewers. Unplasticized polyvinyl chloride (UPVC) pipe fittings for soil, waste and vent inside buildings.

ASTM - American Society for Testing and Materials ASTM D 1784 Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Hot- and Cold-Water Compounds. Solvent Cement for Polyvinyl Chloride (PVC) Plastic Pipe and Fittings.
15420-1 Drainage & Vent System

ASTM D 2564
ITCC in Riyadh Residential Complex J10-13300

ASTM D 2665 ASTM D 2729 ASTM D 2855 ASTM D 3138

Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings. Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings. Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipes and Fittings. Solvent Cements for Transition Joints Between Acrylonitrile-Butadiene-Styrene (ABS) and Poly(Vinyl Chloride) (PVC) Non-Pressure Piping Components. Primers for Use in Solvent-Cement Joints of Poly (Vinyl Chloride) (PVC) Pipes and Fittings. Drain, Waste, and Vent (DWV) Plastic Fittings Patterns.

ASTM F 656 ASTM D 3311 C.

ANSI - American National Standards Institute ANSI B2.1 ANSI A112.18.1 ANSI A112.18.1M Pipe Threads. Finished and Rough Brass Plumbing Fixture Fittings. Finished and Rough Brass Plumbing Fixture Fittings.

ANSI A112.14.1 Backwater Valves. ANSI A112.21.1M Floor Drains.

ANSI A112.21.2 Roof Drains. D. Trade Association Publications ASPE Data Book, 1983-84 Volume I, Fundamentals of Plumbing Design, Chapter 1 "Sanitary Drainage System"; Chapter 2 "Storm Drainage Systems". Plumbing Dictionary - Standard 1018 0 Performance Requirements for Trap Seal Primer Valves. Copper Brass Bronze Design Handbook "Single-Stack Plumbing System".

ASSE CDA 1.3 SUBMITTALS: A. B. 1.4

Product and Maintenance Data: Submit manufacturer's product and maintenance data for the items specified herein. Coordination Drawings: Prepare and submit coordination drawings for the soil, waste, drainage and vent piping.

QUALITY ASSURANCE: A. Plumbing Code Compliance: Comply with applicable portions of Uniform
15420-2 Drainage & Vent System

ITCC in Riyadh Residential Complex J10-13300

Plumbing Code (UPC) - 1994 Edition, BOCA, National Plumbing Code and the local utility authority. 00PART 2 - PRODUCTS 2.1 PIPES AND FITTINGS: A. Pipes and fittings for soil, waste, drainage and vent lines, inside building, shall be as follows: 1. 2. Pipes: Unplasticized polyvinyl chloride (uPVC) plastic pipes conforming to ASTM D 2665, Schedule 40 or Class IV conforming to SASO. Pipe Fittings: Socket-type unplasticized polyvinyl chloride (uPVC) plastic fittings conforming to ASTM D 2665, Schedule to match that of pipe and made ASTM D 3311 drain, waste and vent (DWV) plastic fittings pattern. Jointing System: a. 2.2 Welded joints using solvent cement conforming to ASTM D 2564 with primer conforming to ASTM D 2564 F 656.

3.

DRAINAGE PIPING SPECIALTIES: A. B. C. Cleanout Plugs: Cast iron with tapered body for caulking, raised head rough lead seal plug. Floor Cleanouts: Cast iron body and frame with round adjustable scoriated secured nickel-bronze top, closure plug; and spigot outlet. Wall Cleanouts: Cast iron body adaptable to pipe with cast bronze or brass cleanout plug, stainless steel cover plate with vandal-proof center screw secured to cleanout plug. Flashing Flanges and Vent Flashing Sleeves: Manufacturer's standard products as approved by the Engineer.

D. 2.3

DRAINS: A. B. C. Floor Drains: Adjustable, cast iron body and flashing collar, with protector top and polished bronze strainer head with secured, vandal-proof square hold grate. Roof Drains: Cast iron body, combined flashing collar and gravel stop, cast iron dome, deep sump body. Planter's Area Drains: Where required, shall be cast iron body and flashing collar with adjustable 300 mm diameter top and bar grate with sediment bucket. Area Drain and Trench Drain Outlets: Shall be of cast iron with hinged grate and perforated sediment bucket. Trench Drain and Grating: Shall be cast iron with hinged grate and perforated sediment bucket. Trench drain grating shall be of cast iron, medium duty; size
15420-3 Drainage & Vent System

D. E.

ITCC in Riyadh Residential Complex J10-13300

shall be as shown on the drawings. F. 2.4 Parking Drain: Shall be cast iron bodied area drain with flashing collar. Parking drain shall be of type as shown on drawing.

AUTOMATIC AIR ADMITTANCE VALVES: A. Automatic air admittance valves shall be of unplasticized polyvinyl chloride (UPVC), schedule 40 or equivalent. Sizes shall be as required.

2.5

GREASE INTERCEPTORS: A. Grease interceptors shall be manufacturer's standard fabricated of steel with black duco coating inside and outside, and shall be complete with flow control fittings and other required accessories to intercept grease and oil-laden waste discharged from fixtures. Capacity shall be as indicated on the drawings or as approved by the Engineer. Integral extensions shall permit a greater dimension from centerline of inlets and outlets to finished floor level to accommodate deeper roughing-in conditions. Grease interceptors shall be of type as indicated on drawings.

2.6

PIPE HANGERS AND SUPPORTS: A. Refer to Section 15140 - HANGERS AND SUPPORTS.

2.7

Pipe Insulations A. All drainage piping shall be insulated. For Insulation refer to Section 15250 Mechanical Insulations.

00PART 3 - EXECUTION 3.1 INSTALLATION (GENERAL): A. B. 3.2 See Section 15050 - BASIC PIPING MATERIALS AND METHODS for general piping installation instructions. Refer to the drawings for further details. All cast iron piping, underground and inside masonry walls, shall be wrapped with DENSO tape.

INTERIOR DRAINAGE SYSTEM: A. B. C. D. E. The entire system shall be carefully inspected for damaged materials. Piping shall run as direct as possible making changes in direction with long sweeps, 1/8 or 1/16 bends. Connections shall be made to horizontal lines with Y's and 1/8 bends. Horizontal lines shall be graded not less than 1% for piping 101 mm and larger, and not less than 2% per for piping 76 mm and smaller. Rough fixture connections and open ends of pipe shall be plugged and capped
15420-4 Drainage & Vent System

ITCC in Riyadh Residential Complex J10-13300

during construction using approved test plugs. F. G. Open ends of pipe shall be plugged when work is stopped. Location of floor drains for equipment furnished are diagrammatic. Equipment size and final location shall be verified prior to installation of roughing for floor drains. Roof leader expansion joints shall be installed on all roof leaders immediately below drain. All drip lines or drain tube shall extend to the nearest floor drain or service sink. This shall include but shall not be limited to the discharge from pressure and temperature relief valves, automatic air vents and vent connections on backflow preventers.

H. I.

3.3

INSTALLATION OF PIPING SPECIALTIES: A. Cleanouts 1. 2. Cleanouts shall be installed allowing sufficient clearance behind cleanout plugs to facilitate use of cleaning tools. Cleanouts shall be located on bases of each soil and waste stacks, change of direction of piping greater than 45 o on all horizontal runs, and intervals on all horizontal runs where required or shown on drawings. Cleanouts shall be full pipe size up to 100 mm diameter. Cleanouts shall be placed in readily accessible locations. Where they occur in floors, cleanouts shall be piped to just below floor level and shall be provided with plug and floor access plate flush with floor. Where they occur in walls, cleanouts shall be provided with plug and wall access plate.

3. 4. 5. 6. B. C. 3.4

Flashing Flanges: Install flashing flange and clamping device with each stack and cleanout passing through waterproof membrane. Vent Flashing Sleeves: Install on stacks passing through roof, secure over stack flashing in accordance with manufacturer's instructions.

INSTALLATION OF DRAINS: A. Floor Drains 1. Install floor drains in locations indicated and in accordance with manufacturer's written instructions. Install floor drains at low points of surface areas to be drained, or as indicated. Set tops of drains flush with finished floor. Trap all drains connected to the sanitary sewer.
15420-5 Drainage & Vent System

2. 3.
ITCC in Riyadh Residential Complex J10-13300

4.

Install drain flashing collar or flange so that no leakage occurs between drain and adjoining flooring. Maintain integrity of waterproof membranes, where penetrated.

B.

Roof Drains 1 2 Install roof drains at low points of roof areas, in accordance with the roof membrane manufacturer's installation instructions. Install drain flashing collar or flange so that no leakage occurs between roof drain and adjoining roofing. Maintain integrity of waterproof membranes, where penetrated.

3.5

FIELD QUALITY CONTROL: A. Inspection: Do not enclose, cover, or put into operation drainage and vent piping system until it has been inspected, tested and approved by the Engineer or the authority having jurisdiction. Notify the Engineer, in writing, at least 24 hours prior to the time such inspection must be made. Perform tests specified below in the presence of the Engineer. Piping System Test 1. Rough-In Plumbing: Test the piping of plumbing drainage and venting systems upon completion of the rough piping installation. Tightly close all openings in the piping system, and fill with water to the point of overflow, but not less than 3048 mm of head. Water level shall not drop during the period from 15 minutes before the inspection starts, through completion of the inspection. Inspect all joints for leaks. 2. Finished Plumbing: After the plumbing fixtures have been set and traps filled with water, test connections and prove they are gastight and watertight. Plug the stack openings on the roof and building drains where they leave building. Introduce air into piping system equal to a pressure of 250 Pa. Use a U-tube or manometer inserted in the trap of water closet to measure this pressure. Air pressure must remain constant without the introduction of additional air throughout the period of inspection. Inspect all plumbing fixture connections for gas and water leaks. 3. Repair all leaks and defects using new materials and retest system or portion thereof until satisfactory results are obtained. Prepare reports for all tests and required corrective action.

B.

3.6

ADJUSTING, CLEANING AND PROTECTION: A. B. Clean interior of piping system. Remove dirt debris as work progresses. Clean drain strainers, domes and traps, and remove dirt and debris. Protect drains during remainder of construction period, to avoid clogging with dirt and debris, and to prevent from traffic and construction work. Place plugs on uncompleted piping at end of day or whenever work stops.

ITCC in Riyadh Residential Complex J10-13300

15420-6

Drainage & Vent System

END OF SECTION

ITCC in Riyadh Residential Complex J10-13300

15420-7

Drainage & Vent System