Project : ITCC -COMMERCIAL CENTER Subject : BMS Input / Output List - Plumbing & Fire Protection Item Qty.

Point Description
Plumbing and Fire Protection Equipments Water Meters Incoming Water Flow [Water Meter] Total per Unit Total for all Units Total Water Meters Points Grey Water Tanks 1 2 3 4 5 6 1 Tank Low Level Tank High Level Potable Make-up Incoming Water Flow Influent Dirt Interceptor SHOCKED Alarm Tank water volume reading Tank Level (%) Monitor Total per Unit Total for all Units Total Grey Water Tanks Points Sump Pumps-SP1 TO SP-5 [1-Duty & 1-Lag] - 5 Lift Sta. 1 2 3 4 5 Pump on/off Status Pump Trip Status 10 Pressure in the Common Discharge Header Pump Auto / Manual Status Sump High & Low Level Total per Unit Total for all Units Total Sump Pumps Points 1 5 1 1 1 3 3 1 1 1 1

AI

Note: Fire Protection Control with Fire Alarm Panel BACnet Required Points Software Network OPC Client DI AO DO Thermostat Integration

Remarks

1 1

Flow Meter 0 0 1 0 0 0 0

1 1 1

From Tank Float Switch From Tank Float Switch Solenoid valve Float Switch Relay Output From BMS (4-20)mA from the Level Indicator

3 3 6

0 0

0 0

2 1 1 2 6 60 65 0 0 0 0

From Pump Control Panel From Pump Control Panel Liquid Pressure Sensor From Pump Control Panel From Tank Float Switch

Odor Control Unit, Chlorination Unit & Coloring Dye Unit of Grey Water Treatment Plant (1 unit each plant x 1no. plant) 1 2 3 4 5 6 7 3 Dosing Pump On/Off Status Chemical flow status Dosing Pump Trip Alarm Dosing Pump Auto / Manual Status Dosing Pump Start/stop command Chemical Tank Level Chemical Tank Low Level Alarm TOTAL Total Odor Control, Chlorination, Coloring Dye Units Points 0 0 1 1 6 18 0 0 1 3 1 1 1 1 1 From Grey Water Treatment Plant Panel Flow switch From Grey Water Treatment Plant Panel From Grey Water Treatment Plant Panel Relay Output From BMS From Grey Water Treatment Plant Panel From Grey Water Treatment Plant Panel

1 of 3

Project : ITCC -COMMERCIAL CENTER Subject : BMS Input / Output List - Plumbing & Fire Protection Item Qty. Point Description
Total Odor, Chlorination, Coloring Dye Units Points Air Purification Unit (Aerator) - 1no. each Grey Water Treatment Plant 1 1 Aerator On/Off /Fault Status TOTAL Total Aerator Unit Points Total Aerator Unit Points Non-Potable water pumps [2-Duty&1-Standby]- 1set 1 2 3 4 5 6 7 8 3 Pump On/Off Status Water flow status Pump Trip Alarm Pump Auto / Manual Status Pump Start/stop command Discharge header pressure switch Discharge header pressure Pump motor temperature high TOTAL Total Non-Potable Water Pumps Points Total Non-Potable Water Pumps Points Filter Pumps for Grey Water Treatment Plant, [2-pumps x 1-set] 1 2 3 4 5 6 7 2 Pump On/Off Status Water flow status Pump Trip Alarm Pump Auto / Manual Status Pump Start/stop command Discharge header pressure switch Pump motor temperature high TOTAL Total Filter Pumps for Potable Water -Points Total Filter Pumps for Potable Water -Points 1 1 2 1 1 2 6 0 0

AI

Note: Fire Protection Control with Fire Alarm Panel BACnet Required Points Software Network OPC Client DI AO DO Thermostat Integration
21

Remarks

3 3 3 3 0 0 0 0

From Grey Water Treatment Plant Panel

1 1 1 1 1 1

VFC From Pump Control Panel Flow switch VFC From Pump Control Panel VFC From Pump Control Panel Relay Output From BMS Liquid pressure switch Liquid pressure sensor From Pump Control Panel

5 15 24

0 0

1 3

1 1 1 1 1 1 5 10 14 0 0 1 2

From Pump Control Panel Flow switch From Pump Control Panel From Pump Control Panel Relay Output From BMS Liquid pressure switch From Pump Control Panel

Sand Filters & Activated Carbon Filters for Grey Water Treatment Plant [1 nos. Sand Filters x 1 nos.plant + 1 nos. Activated C.Filters x 1 plant] High D P of Sand Filters 1 TOTAL 1 2 0 0 0 0 0 0

DP Differential Pressure Switch from Grey Water Treatment Plant Panel

Total Sand Filter & Carbon Filters for Grey Water Treatment Plant -Points

2 of 3

Project : ITCC -COMMERCIAL CENTER Subject : BMS Input / Output List - Plumbing & Fire Protection Item Qty. Point Description AI

Note: Fire Protection Control with Fire Alarm Panel BACnet Required Points Software Network OPC Client DI AO DO Thermostat Integration
2

Remarks

Total Sand Filter & Carbon Filters for Grey Water Treatment Plant -Points Electric Water Heaters [EWH] 1 16 EWH On/Off Status TOTAL Total Electric Water Heaters -Points Total Electric Water Heaters -Points 0 0 1 1 16

From Building Local Control Panel 0 0 16 0 0

3 of 3