SECTION 02060 DEMOLITION 00000000PART 1 - GENERAL 1.1 SECTION INCLUDES A.

Demolition, removal and disposal of existing buildings, foundations, underground structures, utilities, landscape items, pavements and other items as indicated on Drawings and specified herein.

1.2 0GENERAL REQUIREMENTS A. Work includes demolition of building superstructures, foundations, underground structures, utilities, landscape items, pavements and other items as required and directed by the Engineer. Removal of rubbish and debris from site on daily basis to avoid accumulation of debris on site, unless otherwise directed by the Engineer. Store materials that cannot be removed daily in areas specified by Engineer. Removal and disposal of materials off site as specified and as directed by the Engineer. In the interest of conservation, salvage shall be pursued to the maximum extent possible; salvaged items and materials shall be handed over owner. Demolition and removal work shall not interfere with existing utilities and traffic on roads, nor shall it interfere with the continuity of access or use of adjoining areas, except as approved. When interference with existing utilities and traffic or continuity of use of any area is required, a detailed work plan shall be furnished specified herein.

B. C. D. E. F.

1.3 SUBMITTALS A. B. Detailed drawings of temporary works, if required, and detailed sequence of operations to ensure uninterrupted progress works on site. Work Plan: Work plan shall include procedures proposed for the accomplishment of the work. The procedures shall provide for safe conduct of the work, including procedures and methods to provide necessary supports, lateral bracing and shoring when required, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection and diversion of existing utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations. The work plan shall be furnished for the Engineer's review and approval not less than twenty five (25) working days before starting the work.
02060 -1 Demolition

ITCC in Riyadh Residential Complex J10-13300

C.

When required, the necessary permits shall be completed by Contractor and submitted for review and approval by the Engineer. When approved, schedule Work to create the least interference and inconvenience to adjoining areas and public. At all times public safety shall be protected. No work shall proceed until the above submittals have been approved by the Engineer.

D.

1.4 DUST CONTROL A. The amount of dust resulting from demolition shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PROTECTION A. Before beginning any demolition work, survey site carefully and examine Drawings and Specifications to determine the extent of Work. Investigate the presence of foundations and other underground structures as well as utilities required to be demolished. Demolition and removal work shall be performed in a manner to prevent damage to the remaining and adjoining structures, facilities and utilities without jeopardizing their use or occupancy. Damage to adjoining structures, facilities and utilities shall be repaired as approved by the Engineer. During the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the demolition site. No structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area. Structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, may be allowed to remain standing without additional bracing, shoring, of lateral support until demolished. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Provide temporary barricades and other forms of protection to protect personnel and general public from injury due to demolition work as well as keeping nonauthorized public traffic off site during the project duration.
02060 -2 Demolition

B.

C.

D.

ITCC in Riyadh Residential Complex J10-13300

E.

Protection of Existing Property: Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The Contractor shall take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the User; any damaged items shall be repaired or replaced as approved by the Engineer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Protect from damage existing finish work that is to remain in place and become exposed during demolition operations. Protect floors with suitable coverings when necessary. Remove protection at completion of work.

F.

G. 3.2

TRAFFIC A. B. C. Conduct demolition and debris removal to ensure minimum interference with adjacent occupied or used facilities. Do not close, block or otherwise obstruct areas or used facilities without a written authorization from Owner. Provide alternate routes around closed or obstructed traffic ways if required by Engineer.

3.3

UTILITY SERVICES A. Maintain existing utilities indicated to remain in service and protect them against damage during demolition operations. Do not interrupt utilities serving occupied or used facilities, except when authorized in writing by Owner. Provide temporary services during interruptions to existing utilities, as acceptable to Owner. Maintain fire protection services during demolition operations. Locate, identify and disconnect utility services that are not indicated to remain and provide bypass connections to maintain continuity of services to occupied areas of building.

B.

3.4

DEMOLITION A. B. C. Perform demolition work in a systematic manner. Use methods acceptable to Engineer to complete the required demolition, and in accordance with approved demolition schedule and governing regulations. Items to be removed, demolished or relocated shall as shown on drawings and as approved by the Engineer.
02060 -3 Demolition

ITCC in Riyadh Residential Complex J10-13300

3.5

DISPOSAL A. Concrete, masonry, and other noncombustible materials, except concrete permitted to remain in place, shall be disposed of in legal manner in the designated disposal areas, off site. Combustible materials shall also be disposed off site in a legal manner. Debris and rubbish shall be removed from site. Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. Local regulations regarding hauling and disposal shall apply.

B. C.

3.6

DUST CONTROL A. Amount of dust resulting from demolition shall be controlled to prevent spread of dust to other portions of construction site and to avoid the creation of nuisance in the surrounding area(s). Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.

3.7

BURNING A. Use of burning at Project site for disposal of refuse and debris will not be permitted.

3.8

USE OF EXPLOSIVES A. Use of explosives will not be permitted.

3.9

CLEANUP AND REPAIR A. B. Upon completion of demolition work, remove tools, equipment, and demolished materials from site and leave site in a clean condition. Repair demolition performed in excess of that required. Return elements of construction and surfaces to remain to condition existing prior to start operations. END OF SECTION

ITCC in Riyadh Residential Complex J10-13300

02060 -4

Demolition