PILE & FOUNDATION DEFECT

BY FAILURE ANALYSIS AND SOLUTION (FAS)


Date : 25 JULY 2013 , MR. NARATE MEKSOOK

PT06 PRUKSA TOWN

No.

Project

Number of Tested piles

Beta 0.6-0.79

Beta 0.6 and less

PT01 188&210

0.00

VK

28.57

PK65

40.00

PS30

12

41.67

PT02

42.86

PS29

0.00

PT01

85/179 , 85/185

60.00

PT06

55/30 55/51 55/256

100.00

PK67

100.00

10

PK15

100.00

11

PK72

100.00

12

PT01 85/5

100.00

13

PT06 55/243

100.00

14

THE CONNECT12

15

SUMMATION

86

16

TOTAL COST OF NEW MICRO PILE

26.67

32

3,840,000.00

COST OF PREVENTION BY NEW PILE AT BEGINNING

384,000.00

COST SAVING

3,456,000

COST SAVING

90.00%

55.81