You are on page 1of 2

Objective 1:

7.5.2

This lab involves configuring RIPv2 on all the routers and VLSM is used as default for subnetting. In this lab only we are going to examine automatic summarization and examine the routing tables. We are going to configure and propagate a static default route. All the names of the routers and switches has to be given same as in the visio diagram.All passwords must be cisco and set the clock rate to 64000.Configure ans secure router VTY and console line using 15 min timeout.
10.2.0.0/24 and 172.17.1.224/28 subnets.

Objective 2: 9.6.1 In this lab EIGRP will be configured and the operation will be tested over discontinuous subnets by disabling automatic route summarization. All the names of the routers and switches has to be given same as in the Visio diagram. All passwords must be cisco and set the clock rate to 64000.Configure and secure router VTY and console line using 15 min timeout.

Objective 3: In this lab also we are configuring EIGRP routing on all the routers but we are configuring a static default route on all the routers by disabling automatic summarization and routing updates. All the names of the routers and switches has to be given same as in the Visio diagram. All passwords must be cisco and set the clock rate to 64000.Configure and secure router VTY and console line using 15 min timeout. Objective 4: In this lab also we are configuring EIGRP routing on all the routers but we are configuring a static default route on all the routers and the operation will be tested over discontinuous subnets. All the names of the routers and switches has to be given same as in the Visio diagram. All passwords must be cisco and set the clock rate to 64000.Configure and secure router VTY and console line using 15 min timeout. Objective 5: In this lab we are going to configure OSPF on all the routers with process ID of 1 as a parameter. We are going to configure network statement for the LAN Network to be included in the OSPF updates that are sent out from each router.

All the names of the routers and switches has to be given same as in the Visio diagram. All passwords must be cisco and set the clock rate to 64000.Configure and secure router VTY and console line using 15 min timeout.

Objective 6: In this lab we are going to configure OSPF on all the routers with process ID of 1 as a parameter. We are going to configure OSPF router IDs and static default route and to propagate default route to OSPF neighbors and also configuring Hello and Dead timers. All the names of the routers and switches has to be given same as in the Visio diagram. All passwords must be cisco and set the clock rate to 64000.Configure and secure router VTY and console line using 15 min timeout.

You might also like