Date of Issue COST PLAN Item Description Measured Costs 250.00 11,565.00
Sub-Total
11,815.00
0.00
SUB-TOTAL ADD - PROVISIONAL SUMS PROFESSIONAL FEES Architectural & Interior Design Fees Building Services Design Fees STATUTORY FEES Local Authority Plan Fees Local Authority Inspection Fees
11,815.00 0.00
11,815.00
Page 1 of 4
49 Whitehall
Item
Description
Unit
Quantity
Rate
Measured Costs
Provisional Cost
PRELIMINARIES (Based on Monday - Friday working week) Site Management Site Cleanliness Drop and wait lorries No 1 250.00 INCL
To Summary
250.00
0.00
Page 2 of 4
49 Whitehall
Item
Description
Unit
Quantity
Rate
Measured Costs
Provisional Cost
THE WORKS
Supply and install 1no. Electric heater in each toilet on the main staircase, each heater c/w thermostat and will be time controlled. Include new power supply from the basement plant room. New wiring to heaters contained in surface mounted mini trunking.
item
6,150.00
6,150.00
Mechanical isolation of heating system, including complete drain down of gas supply at the meter. Removal of radiators in each toilet area.
item
1,650.00
1,650.00
To supply and fit a replacement sump pump (assumption is made that the power supply and controls are working correctly)
item
305.00
305.00
Identification labels for boiler/gas decommissioning etc. Builders work to repair floor and re-tile before and after works are completed in the toilet areas. To carry out all of the above works outside of normal working hours
item item
1 1
210.00 1,150.00
210.00 1,150.00
item
2,100.00
2,100.00
11,565.00
0.00
Page 3 of 4
49 Whitehall
Item
Description
CLARIFICATIONS All stated rates, costs, provisional sums and totals are exclusive of VAT. The cost of all Statutory, Planning and Local Authority Fees are excluded. We have assumed that the cost of all power, gas, oil and water consumed during the course of the works will be paid directly by the client. We have only allowed to carry out works as costed and described within this document. TERMS We have based this cost plan on the following payment terms; Payment in full on completion. CONDITIONS We have assumed that a JCT Standard Form of Building Contract will be used on this project. PROGRAMME TBA
Page 4 of 4