Professional Documents
Culture Documents
Materials
Trade
Description
Unit
cube.
cube.
S. ft
L. ft
L. ft
kg.
CONCRETE
Cement
bag
CONCRETE
Sand
cube.
CONCRETE
cube.
CONCRETE
Metal 1 "
cube.
CONCRETE
Metal 2 "
cube.
CONCRETE
Water
gal.
S. ft
L. ft
L. ft
L. ft
kg.
ltr
Nr
REINFORCEM
Tor Steel
ENT
REINFORCEM
25mm
ENT
REINFORCEM
20mm
ENT
kg.
kg.
Basic Price
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS &
RUBBLE
CEMENT
BLOCKS &
RUBBLE
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS &
RUBBLE
CEMENT
BLOCKS &
RUBBLE
CEMENT
BLOCKS
BRICK WORK
16mm
kg.
12mm
kg.
10mm
kg.
binding wire
kg.
Mild steel
10mm
kg.
6mm
kg.
Rubble
cube.
cement
bag
sand
cube.
water
gal.
Nr
Nr
Nr
Cement
bag
cube.
gal.
BRICK WORK
WATER
PROOFING
WATER
PROOFING
WATER
PROOFING
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
Nr
Bricks
Cement
bag
Sand
cube.
DPC tar
ltr
L. ft.
L. ft.
s. ft.
Nr
L. ft.
5mm.glaze sheet.
s. ft.
4" Brush
Nr
Sand paper
Nr
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
ROOF
Wood primer
ltr.
Enamel paint
ltr.
pair.
pair.
Nr
Nr
Nr
Nr
Mortice lock
Nr
Hold fast
Nr
casement fastner
Nr
casement stay
Nr
s. ft.
ROOF
s. ft.
ROOF
Class 1 timber
c. ft.
ROOF
Calicut tile
Nr
ROOF
Nr
ROOF
Nr
ROOF
s. ft.
ROOF
l. ft.
ROOF
Wire nails
kg.
ROOF
Colouring powder
kg.
ROOF
Cement
bag
ROOF
Sand
cube
ROOF
Lime
kg.
ROOF
Nr
ROOF
Wood primer
ltr
ROOF
Enamel paint
ltr
ROOF
Wood preservative
ltr
ROOF
S. ft.
ROOF
pair
ROOF
Roofing screws
Nr
ROOF
Nr
FLOOR
Lime
kg.
FLOOR
Cement
cube.
FLOOR
Sand
cube.
FLOOR
water
gall.
FLOOR
Bricks
Nr
FLOOR
Nr
FLOOR
Nr
FLOOR
Nr
FLOOR
Tile grout
kg.
WALL
Cement
bag
WALL
Sand
cube
WALL
Lime
kg.
WALL
water
gal
WALL
Nr
WALL
Nr
WALL
Nr
WALL
Tile grout
kg.
CEILING
Cement
bag
CEILING
Sand
cube
CEILING
Lime
kg.
CEILING
water
gal
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
s. ft.
CEILING
s. ft.
CEILING
Wire nails
kg.
CEILING
Emulsion paint
ltr
PAINTING
Emulsion paint
ltr
PAINTING
Weathersheild paint
ltr
PAINTING
Brush 4"
Nr
PAINTING
Acrylic filler
ltr
PAINTING
Sand paper
Nr
PAINTING
Water
gal
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
PLUMBING
Nr
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Solvent cement
kg.
Labour
Description
Unit
Plant
Basic Price
Skilled
day
Un skilled
day
Skilled Labour
day
Un Skilled Labour
day
Vibrator Operator
day
1,000.00
Concrete Mixer
operator
day
1,000.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled labour
day
700.00
Un skilled labour
day
450.00
Description
1,000.00 Tractor
600.00
Unit
Basic Price
Skilled labour
day
1,000.00
Un skilled labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Painter
day
1,000.00
Carpenter
day
1,000.00
Skilled labour
day
1,000.00
Un skilled labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Basic Prices
MATERIALS
Item
No.
Description
LABOUR
Code
No.
Unit
Price
( Rs.)
Item
No.
Description
PLANT
Price
( Rs.)
Item
No.
Description
Code
No.
Unit
Price
( Rs.)
Acid
M-001
Gal
254.00
Painter
L-001
Day
1,200.00
Hire of Mixer
P-001
Day
1,500.00
M-002
litre
245.00
Plumber
L-002
Day
1,200.00
Hire of Vibrator
P-002
Day
1,000.00
M-003
Sq.ft
26.00
SK Labour
L-003
Day
1,200.00
Vibrating Rammer
P-003
Day
1,000.00
Barrel Bolt
M-004
No
75.00
SK Labour (Vibrator)
L-004
Day
1,200.00
Binding Wire - 16 BW
M-005
Lbs
100.00
Tinker
L-005
Day
1,200.00
Bitumen
M-006
Gal
80.00
Tiler
L-006
Day
1,200.00
Blasting Powder
M-007
Lbs
200.00
U / SK Labourer
L-007
Day
700.00
Blue
M-008
Ozs
10.00
Carpenter
L-008
Day
1,200.00
Boild Lime
M-009
Cwt
300.00
Mason
L-009
Day
1,200.00
10
M-010
No
75.00
10
Glazier
L-010
Day
1,200.00
11
M-011
No
45.00
12
M-012
Lbs
50.00
13
M-013
Doz
1.00
14
M-014
No
2.50
15
M-015
No
3.75
16
M-016
No
1.30
17
M-017
No
1.25
18
M-018
No
7.50
19
Bricks
M-019
No
20
Brush - 3"
M-020
No
210.00
21
Brush - 6"
M-021
No
495.00
22
Brush 2"
M-022
No
165.00
23
Butt Hinges
M-023
No
70.00
24
Casement Fasteners
M-024
No
55.00
25
Casement Stays
M-025
No
55.00
26
Cement
M-026
Bag
660.00
27
M-027
Sq.ft
25.00
28
M-028
No
7.00
29
M-029
No
10.50
30
M-030
No
8.75
31
M-031
No
10.75
32
M-032
No
34.00
33
M-033
Lbs
25.00
34
M-034
No
45.00
35
Coloured Pigment
M-035
Lbs
175.00
36
Colouring Powder
M-036
Lbs
175.00
37
Cotton Waste
M-037
Lbs
12.50
38
D. D. T. Powder
M-038
Lbs
25.00
39
Diesel Fuel
M-039
Ltr
70.00
40
Door Closer
M-040
No
1,850.00
41
Draw Rings
M-041
No
42
M-042
Cube
1,500.00
43
Emulsion Paint
M-043
litre
280.00
44
Enamel Paint
M-044
litre
354.00
45
M-045
No
1.50
46
Fire Wood
M-046
Lbs
250.00
47
Flannel Cloth
M-047
Yards
70.00
48
M-048
Sq.ft
49
Floor Brush
M-049
No
50
Fuel Forge
M-050
Ltr
100.00
51
Fuse wire
M-051
L.ft
10.00
52
M-052
No
2,200.00
53
M-053
Cube
2,000.00
54
Gutter Brackets
M-054
No
55
Gutter joiner
M-055
No
56
M-056
No
5.00
57
M-057
No
30.00
6.00
22.50
15.00
210.00
58
M-058
No
59
M-059
No
60
M-060
Kg.
61
M-061
No
62
Jumper Steel
M-062
Lbs
63
Jute Hessian
M-063
Sq.ft
3.50
64
Metal - 1 "
M-064
Cube
8,000.00
65
M-065
Cube
3,500.00
66
M-066
Cube
9,000.00
67
M-067
No
6.00
68
M-068
Kg.
68.00
69
M-069
litre
80.00
70
M-070
No
960.00
71
Mould Oil
M-071
litre
35.00
72
Nails - 2"
M-072
Lbs
50.00
73
Nails - 3/4"
M-073
Lbs
20.00
74
M-074
No
2,000.00
75
Primer
M-075
litre
180.00
76
M-076
No
15.00
77
M-077
No
14.00
78
M-078
No
79
M-079
No
80
M-080
No
69.00
81
M-081
No
42.00
82
M-082
No
21.00
83
M-083
No
10.50
84
M-084
No
350.00
85
M-085
No
110.00
86
M-086
No
580.00
87
M-087
No
88
M-088
No
89
M-089
No
90
M-090
No
91
M-091
No
92
M-092
L.ft
46.00
93
M-093
L.ft
32.00
94
M-094
L.ft
21.00
95
M-095
L.ft
7.50
96
M-096
L.ft
79.00
97
M-097
L.ft
185.00
98
M-098
L.ft
14.00
99
PVC Shoe
M-099
No
100
M-100
No
101
M-101
No
102
M-102
No
103
M-103
No
104
PVC Straps
M-104
No
105
M-105
No
35.00
106
M-106
Pair
245.00
107
M-107
No
500.00
108
M-108
No
16.00
109
M-109
No
110
M-110
No
111
M-111
Cube
112
Salt
M-112
Lbs
113
Sand
M-113
Cube
114
Sand Papers
M-114
No
3.50
115
Slaked Lime
M-115
Lbs
275.00
116
Soldering Lead
M-116
Lbs
13.75
117
Solvent Cement
M-117
Grms
1.40
118
Spur Stone
M-118
No
15.00
119
Tarnap
M-119
Gal
450.00
27.00
22.00
25.00
0.55
65.00
29.50
19.50
48.00
192.00
3.50
3.50
2,500.00
10.00
3,000.00
120
M-120
No
31.25
121
M-121
No
102.00
122
M-122
No
15.50
123
M-123
No
165.50
124
M-124
No
125
M-125
No
875.00
126
M-126
No
21.50
127
M-127
No
63.50
128
Tee Hinges
M-128
Pair
165.00
129
M-129
No
180.00
130
M-130
No
125.00
131
M-131
No
100.00
132
M-132
No
150.00
133
M-133
L.ft
1.50
134
M-134
L.ft
12.00
135
M-135
Sq.ft
28.00
136
Timber Class I
M-136
Cu.ft
1,200.00
137
M-137
L.ft
45.00
138
M-138
Cu.ft
1,300.00
139
526.00
M-139
Sq.ft
140.00
M-139a
Sq.ft
110.00
140
Timber Class II
M-140
Cu.ft
750.00
141
M-141
Sq.ft
65.00
142
M-142
L.ft
12.00
143
M-143
L.ft
22.00
144
M-144
L.ft
145
M-145
Sq.ft
146
M-146
L.ft
147
M-147
Sq.ft
65.00
148
Timber Purlins
M-148
L.ft
100.00
149
M-149
L.ft
12.00
150
M-150
L.ft
151
Timber Wedges
M-151
No
5.00
152
M-152
Kg.
68.00
153
M-153
No
145.00
154
Varnish
M-154
Ltr
355.00
155
M-155
No
75.00
156
M-156
No
100.00
157
Water
M-157
Gal
0.30
158
Wax Polish
M-158
Lbs
150.00
159
M-159
Lbs
17.50
160
Wire Brush
M-160
No
65.00
161
Wire Nails
M-161
Lbs
50.00
162
M-162
Lbs
25.00
163
M-163
Lbs
25.00
164
Wirecut Bricks
M-164
No
8.75
165
Wood Preservative
M-165
Gal
450.00
166
Yellow Ochre
M-166
Lbs
15.00
65.00
35.00
65.00
5.00
Activity
1
Concrete Work
Formwork
Note
Reinforcement
Block Work
Brick Work
10
Roof
11
12
13
Plastering
14
Tiling
15
Ceiling
16
Painting
Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the
Downs of Concrete Works
Page 23 Of 115
SDS
7/25/2013
Page 24 Of 115
01.B.03
Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
excavated material not exceeding 30' 0"
Analysis for
No
1
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
2.25
Cube
Rate
Amount
700.00
01.B.04
39.38
Total for
Rate for 1
Cube
Cube
1,614.38
1,614.38
Rate(Say)
1Cube
1,614.38
Rate(Say)
1ft3
16.14
Rate(Say)
1m3
570.00
Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
excavated material to distance not exceeding 30' 0"
Analysis for
No
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
3.5
Cube
Rate
Amount
700.00
01.B.05
Total for
Rate for 1
Cube
Cube
2,511.25
2,511.25
Rate(Say)
1Cube
2,511.25
Rate(Say)
1ft3
25.11
Rate(Say)
887.00
1m
Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
excavated material not exceeding 30' 0"
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
Cube
Rate
700.00
01.B.06
2,100.00
Total for
Rate for 1
Cube
Cube
2,100.00
2,100.00
Rate(Say)
1Cube
2,100.00
Rate(Say)
1ft3
21.00
Rate(Say)
1m3
742.00
Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Item Description
U / SK Labourer
SDS
Amount
52.50
Analysis for
No
2,450.00
61.25
Analysis for
No
1,575.00
Item Ref
Unit
Quantity
L-007
Day
2.5
Cube
Rate
700.00
Amount
1,750.00
43.75
7/25/2013
Page 25 Of 115
01.B.07
Total for
Rate for 1
Cube
Cube
1,793.75
Rate(Say)
1Cube
1,793.75
Rate(Say)
1ft
17.94
Rate(Say)
1m3
633.83
Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0"
and depositing excavated material to a distance not exceeding 30' 0"
Analysis for
No
Cube
Unit
Quantity
M-007
Lbs
0.75
200.00
150.00
M-051
L.ft
10
10.00
100.00
M-062
Lbs
65.00
65.00
1.03
Item Description
Item Ref
Blasting Powder
Rate
Amount
63.00
1.04 SK Labour
L-003
Day
1,200.00
1,200.00
1.05 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Cube
Rate for 1
Cube
01.B.08
1.01
Item Description
SK Labour
1Cube
2,978.00
Rate(Say)
1ft
29.78
Rate(Say)
1m3
1,052.00
10
Sq.ft
Item Ref
Unit
Quantity
L-003
Day
1.5
Rate
Amount
1,200.00
1.02 U / SK Labourer
01.B.09
2,978.00
Rate(Say)
Analysis for
1
2,978.00
No
1,800.00
450.00
L-007
Day
0.5
Total for
10
Sq.ft
Rate for 1
Sq.ft
700.00
350.00
2,600.00
260.00
Rate(Say)
1 Sq.ft
260.00
Rate(Say)
2,797.60
1m
No
Item Description
SDS
1,793.75
Cube
Item Ref
Unit
Quantity
Rate
L-003
Day
1,200.00
Amount
3,600.00
90.00
7/25/2013
Page 26 Of 115
SDS
M-050
Ltr
0.25
100.00
25.00
M-007
lbs
0.68
200.00
136.00
M-051
L.ft
3.05
10.00
30.50
M-062
lbs
0.45
46.00
20.70
Total for
Cube
Rate for 1
Cube
3,902.20
3,902.20
Rate(Say)
1Cube
3,902.20
Rate(Say)
1ft3
39.02
Rate(Say)
1,379.00
1m
7/25/2013
Page 27 Of 115
Item Description
Item Ref
Unit
Quantity
L-007
Day
U / SK Labourer
Cube
Rate
Amount
700.00
700.00
17.50
Total for
Rate for 1
Cube
Cube
717.50
717.50
Rate(Say)
1Cube
717.50
Rate(Say)
1 ft
7.18
Rate(Say)
1m3
254.00
Item Description
Earth Delivered at Site
Item Ref
Unit
Quantity
M-042
Cube
Cube
Rate
Amount
1,500.00
02.A.03
No
225.00
L-007
Day
1.25
Total for
Cube
Rate for 1
Cube
700.00
875.00
2,600.00
2,600.00
Rate(Say)
1Cube
2,600.00
Rate(Say)
1 ft
26.00
Rate(Say)
1m3
919.00
Filling under floors including levelling, watering & compacting in 3" layers with available and
selected earth at site
Analysis for
1
Cube
Item Description
1.02 U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
Rate
Amount
700.00
SDS
1,500.00
1,400.00
35.00
Total for
Rate for 1
Cube
Cube
1,435.00
1,435.00
Rate(Say)
1Cube
1,435.00
Rate(Say)
1 ft
14.35
Rate(Say)
1m3
507.00
7/25/2013
Page 28 Of 115
B.
DPC
Sqr
Item Ref
Unit
Quantity
M-038
Lbs
16
25.00
400.00
1.01 Water
M-157
Gal
20
0.30
6.00
1.02 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Sqr
Item Description
D. D. T. Powder
Total for
Rate for 1
Rate
Amount
756.00
Sqr
756.00
Rate(Say)
1Sqr
756.00
Rate(Say)
1ft2
7.56
Rate(Say)
81.35
1m
DPC
03.B.01
3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
2.25
660.00
1,485.00
1.02
Sand
M-113
Cube
0.11
3,000.00
330.00
1.03
Bitumen
M-006
Gal
1.5
80.00
120.00
1.04
Fire W ood
M-046
Lbs
10
250.00
2,500.00
1.05
W ater
M-157
Gal
10
0.30
3.00
1.06
Mason
L-009
Day
1.25
1,200.00
1,500.00
1.07
U / SK Labourer
L-007
Day
2.5
700.00
1,750.00
Sqr
Total for
Rate for 1
Rate(Say)
7,688.00
Sqr
7,688.00
1Sqr
7,688.00
Rate(Say)
1ft
76.88
Rate(Say)
1m2
827.23
Page 29 Of 115
Page 30 Of 115
04.01
No
Item Ref
Unit
Quantity
M-111
Cube
1.3
1.02 Cement
M-026
Bag
1.03 Sand
M-113
Cube
1.04 Water
M-157
1.05 Mason
1.06 U / SK Labourer
04.02
Item Description
Rate
Amount
2,500.00
3,250.00
660.00
3,300.00
0.3
3,000.00
900.00
Gal
100
0.30
30.00
L-009
Day
1,200.00
4,800.00
L-007
Day
700.00
4,200.00
Total for
Cube
Rate for 1
Cube
16,480.00
16,480.00
Rate(Say)
1Cube
16,480.00
Rate(Say)
1ft
164.80
Rate(Say)
1m3
5,823.32
No
Item Description
Analysis for
1
Item Ref Unit Quantity
M-111
Cu
1.3
1.02 Cement
M-026
Bag
1.03 Sand
M-113
Cu
1.04 Water
M-157
1.05 Mason
1.06 U / SK Labourer
1.07
Cube
Cube
Rate
Amount
2,500.00
3,250.00
660.00
3,300.00
0.3
3,000.00
900.00
Gal
100
0.30
30.00
L-009
Day
4.5
1,200.00
5,400.00
L-007
Day
700.00
4,900.00
Total for
Cube
Rate for 1
Cube
309.00
18,089.00
18,089.00
Rate(Say)
1Cube
18,089.00
Rate(Say)
1ft
180.89
Rate(Say)
1m3
6,391.87
Page 31 Of 115
Page 32 Of 115
Mixing Concrete
B.
Screed
C.
Mass Concrete
D.
Column
E.
Beam
F.
Slab
G.
Lintol
Mixing Concrete
05.A.01 Mixing Concrete 1:1-1/2:3(3/4")
Analysis for
No.
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
23
1.02 Sand
M-113
Cube
M-066
Cube
Rate
Amount
660.00
15,180.00
0.42
3,000.00
1,260.00
Cube
0.82
9,000.00
7,380.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
150
0.30
45.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Cube
Rate for 1
Cube
26,164.10
26,164.10
Rate(Say)
1Cube
26,160.00
Rate(Say)
1m3
9,243.82
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
13
1.02 Sand
M-113
Cube
M-065
Cube
Rate
Amount
660.00
8,580.00
0.53
3,000.00
1,590.00
Cube
0.92
3,500.00
3,220.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
110
0.30
33.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Cube
Rate for 1
Cube
Rate(Say)
15,722.10
15,722.10
1Cube
15,720.00
1m3
Rate(Say)
Page 33 Of 115
5,554.77
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
14
660.00
9,240.00
1.02 Sand
M-113
Cube
0.6
3,000.00
1,800.00
M-064
Cube
0.9
8,000.00
7,200.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
100
0.30
30.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Cube
Rate for 1
Cube
20,569.10
20,569.10
Rate(Say)
1Cube
20,570.00
Rate(Say)
1m3
7,268.55
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
18
660.00
11,880.00
1.02 Sand
M-113
Cube
0.5
3,000.00
1,500.00
M-066
Cube
0.88
9,000.00
7,920.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
120
0.30
36.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Cube
Rate for 1
Cube
23,635.10
23,635.10
Rate(Say)
1Cube
23,640.00
Rate(Say)
1m3
8,353.36
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
31
1.02 Sand
M-113
Cube
M-066
P-001
Cube
Rate
Amount
660.00
20,460.00
0.44
3,000.00
1,320.00
Cube
0.96
9,000.00
8,640.00
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
200
1.06 SK Labour
L-003
Day
0.333
1.07 U / SK Labourer
L-007
Day
Total for
Cube
Rate for 1
Cube
Page 34 Of 115
0.30
60.00
1,200.00
399.60
700.00
1,400.00
32,779.10
32,779.10
Rate(Say)
1Cube
32,780.00
Rate(Say)
1m3
11,583.04
Screed Concrete
05.B.01 2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
05.A.02
Cube
0.1667
15,720.00
2,620.52
1.02 SK Labour
L-003
Day
0.125
1,200.00
150.00
1.03 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
Amount
3,120.52
3,120.52
Rate(Say)
1 Sqr
3,120.00
Rate(Say)
1ft
31.20
Rate(Say)
1m2
335.71
05.B.02 3" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
05.A.02
Cube
0.25
15,720.00
3,930.00
1.02 SK Labour
L-003
Day
0.125
1,200.00
150.00
1.03 U / SK Labourer
L-007
Day
0.75
700.00
525.00
Total for
Sqr
Rate for 1
Sqr
Amount
4,605.00
4,605.00
Rate(Say)
1 Sqr
4,610.00
Rate(Say)
1ft2
46.10
Rate(Say)
496.04
1m
Mass Concrete
05.C.01 6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass concrete)
Analysis for
No
Sqr
Item Description
Item Ref
Unit
Quantity
Rate
05.A.03
Cube
0.5
20,570.00
Amount
10,285.00
Page 35 Of 115
1.025 Water
M-157
Gal
200
0.30
60.00
1.03 SK Labour
L-003
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
1.25
700.00
875.00
Total for
Sqr
Rate for 1
Sqr
11,820.00
11,820.00
Rate(Say)
1 Sqr
11,820.00
Rate(Say)
1ft2
118.20
Rate(Say)
1m2
1,271.83
Column Concrete
05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.
Analysis for
No
Item Description
0.51
Cube
Item Ref
Unit
Quantity
Rate
Amount
05.A.01
Cube
0.51
26,160.00
13,341.60
667.08
P-002
Day
0.5
1,000.00
500.00
1.03 Mason
L-009
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
L-004
Day
0.5
1,200.00
600.00
M-063
Sq.ft
45
3.50
157.50
1.07 Water
M-157
Gal
100
0.30
30.00
L-007
Day
0.5
700.00
350.00
Total for
0.51
Cube
Rate for 1
Cube
17,296.18
33,914.08
Rate(Say)
1Cube
33,914.00
Rate(Say)
1m3
11,983.75
1m
11,983.75
1m3
13,182.12
1m
14,500.33
1m3
15,950.37
Page 36 Of 115
06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for
No
Item Description
Sawn timber formwork to 9" x 9" cement concrete
1.01
column in ground floor - Making Mould
0.15
Sq
Item Ref
Unit
Quantity
06.A.02
1 Use
694.00
694.00
M-010
No
0.6
75.00
45.00
M-071
litre
0.5
35.00
17.50
M-144
L.ft
3.5
65.00
227.50
L-008
Day
0.25
1,200.00
300.00
L-007
Day
0.25
700.00
175.00
L-008
Day
0.25
1,200.00
300.00
L-007
Day
0.25
700.00
175.00
Total for
0.15
Sq
Rate for 1
Sq
1.08
Rate
Amount
1,934.00
12,893.33
Rate(Say)
1Sq
12,893.00
Rate(Say)
1ft2
128.93
Rate(Say)
1m
1,387.29
1m2
1,387.29
1m2
1,526.02
1m
1,678.62
1m2
1,846.48
06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for
No
Item Description
Uses
Item Ref
Unit
Quantity
M-141
Sq.ft
18.15
65.00
1,179.75
M-143
L.ft
17.1
22.00
376.20
M-142
L.ft
16.12
12.00
193.44
M-161
Lbs
1.5
50.00
75.00
1.05 Carpenter
L-008
Day
0.5
1,200.00
600.00
1.06 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
Rate
Amount
2,774.39
693.60
1 Use
694.00
Beam
SDS
7/25/2013
Page 37 Of 115
Item Description
Item Ref
Sawn timber formwork for 9" x 12" concrete beams
1.01
06.B.02
in ground floor - Making the mould
0.55
Sq
Unit
Quantity
1 Use
2,607.00
2,607.00
06.B.03
1 Use
1,568.00
1,568.00
L-008
Day
1,200.00
1,200.00
L-007
Day
700.00
1,400.00
M-071
litre
0.5
35.00
17.50
M-161
Lbs
0.5
65.00
32.50
L-008
Day
0.5
1,200.00
600.00
L-007
Day
700.00
1,400.00
Total for
0.55
Sq
Rate for 1
Sq
1.02
1.09
Rate
Amount
156.80
8,981.80
16,330.55
Rate(Say)
1Sq
16,331.00
Rate(Say)
1ft2
163.31
Rate(Say)
1m2
1,757.22
Ground floor
1m2
1,757.22
First Floor
1m2
1,932.94
Second Floor
1m
2,126.23
Third Floor
1m2
2,338.85
06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
No
Item Description
Analysis for
4
Item Ref Unit Quantity
Amount
M-141
Sq.ft
60
65.00
3,900.00
M-142
L.ft
24
12.00
288.00
M-143
L.ft
45
22.00
990.00
M-144
L.ft
30
65.00
1,950.00
M-161
Lbs
50.00
100.00
1.06 Carpenter
L-008
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
SDS
Uses
Rate
10,428.00
2,607.00
1 Use
2,607.00
7/25/2013
Page 38 Of 115
06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
No
Item Description
Analysis for
6
Item Ref Unit Quantity
Uses
Rate
Amount
M-144
L.ft
110
65.00
7,150.00
M-143
L.ft
80
22.00
1,760.00
M-141
Sq.ft
65.00
390.00
M-151
No
22
5.00
110.00
Total for
Uses
Rate for 1
Uses
9,410.00
1,568.33
Rate(Say)
1 Use
1,568.00
Slab
06.C.01 Sawn timber formwork for underside of first floor slab
No
Item Description
Analysis for
2
Item Ref Unit Quantity
Sq
Rate
Amount
06.C.02
1 Use
06.C.03
Sq
L-008
Day
1,200.00
1,200.00
L-007
Day
700.00
2,800.00
M-071
litre
4.54
35.00
158.90
M-161
Lbs
50.00
100.00
L-008
Day
0.5
1,200.00
600.00
L-007
Day
700.00
1,400.00
Total for
Sq
Rate for 1
Sq
1.09
7,016.00
-
7,016.00
1,403.20
8,176.00
-
8,176.00
1,635.20
24,489.30
12,244.65
Rate(Say)
1Sq
12,245.00
Rate(Say)
1ft2
122.45
Rate(Say)
1m2
1,317.56
Ground floor
1m
1,317.56
First Floor
1m2
1,449.32
Second Floor
1m
1,594.25
Third Floor
1m2
1,753.68
06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for
No
SDS
Item Description
Uses
Item Ref
Unit
Quantity
Rate
Amount
M-141
Sq.ft
220
65.00
14,300.00
M-144
L.ft
121
65.00
7,865.00
7/25/2013
Page 39 Of 115
M-161
Lbs
50.00
200.00
1.04 Carpenter
L-008
Day
1,200.00
3,600.00
1.05 U / SK Labourer
L-007
Day
700.00
2,100.00
Total for
Uses
Rate for 1
Uses
28,065.00
7,016.25
Rate(Say)
7,016.00
06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for
No
Item Description
Uses
Item Ref
Unit
Quantity
M-144
L.ft
690
65.00
44,850.00
M-143
L.ft
66
22.00
1,452.00
M-151
No
122
5.00
610.00
M-141
Sq.ft
33
65.00
2,145.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
SDS
Rate
Amount
49,057.00
8,176.17
8,176.00
7/25/2013
Page 40 Of 115
07. Reinforcement
7.01
Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for
1
Cwt.
No
Item Description
Item Ref
Unit
Quantity
M-152
kg
50
M-005
Lbs
1.5
1.05 SK Labour
L-003
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
700.00
700.00
Total for
Cwt.
Rate for 1
Cwt.
7.02
Rate
68.00
-
Amount
3,400.00
510.00
100.00
-
150.00
51.00
6,011.00
6,011.00
Rate(Say)
1Cwt
6,011.00
Rate(Say)
1Kg
120.22
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for
1
Cwt.
No
Item Description
Item Ref
Unit
Quantity
M-068
kg
50
M-005
Lbs
1.5
1.04 SK Labour
L-003
Day
1.05 U / SK Labourer
L-007
Rate
68.00
-
Amount
3,400.00
510.00
100.00
150.00
1,200.00
1,200.00
Day
700.00
700.00
Total for
Cwt.
Rate for 1
Cwt.
5,960.00
5,960.00
Rate(Say)
1Cwt
5,960.00
Rate(Say)
1Kg
119.20
Page 41 Of 115
Page 42 Of 115
8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-057
No
112
1.03 Cement
M-026
Bag
0.75
660.00
495.00
1.04 Sand
M-113
Cube
0.06
3,000.00
180.00
1.05 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
2.5
700.00
1,750.00
Total for
Sqr
Rate for 1
Sqr
08.02
Rate
Amount
30.00
-
3,360.00
168.00
106.50
7,859.50
7,859.50
Rate(Say)
1 Sq
7,860.00
Rate(Say)
1ft2
78.60
Rate(Say)
1m2
845.74
Ground floor
1m
845.74
First Floor
1m2
930.31
Second Floor
1m
1,023.34
3rd floor
1m2
1,125.67
6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-059
No
112
1.03 Cement
M-026
Bag
0.65
660.00
429.00
1.04 Sand
M-113
Cube
0.07
3,000.00
51.00
1.05 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Sqr
Rate for 1
Sqr
Rate
22.00
-
Amount
2,464.00
123.20
96.00
6,363.20
6,363.20
Rate(Say)
1 Sq
6,363.20
Rate(Say)
1ft2
63.63
Rate(Say)
1m2
684.68
1m2
Ground floor
684.68
First Floor
1m
753.15
Second Floor
1m2
828.46
911.31
Third Floor
08.03
Page 43 Of 115
1m
4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-058
No
112
1.03 Cement
M-026
Bag
0.4
660.00
264.00
1.04 Sand
M-113
Cube
0.03
3,000.00
51.00
1.05 Mason
L-009
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Sqr
Rate for 1
Sqr
Rate
Amount
27.00
-
3,024.00
151.20
130.00
6,220.20
6,220.20
Rate(Say)
1 Sq
6,220.20
Rate(Say)
1ft2
62.20
Rate(Say)
1m
669.29
Ground floor
1m2
669.29
First Floor
1m
736.22
Second Floor
1m2
809.85
890.83
Third Floor
1m
Page 44 Of 115
Page 45 Of 115
Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
550
1.03 Cement
M-026
Bag
1.3
660.00
858.00
1.04 Sand
M-113
Cu
0.1
3,000.00
300.00
1.05 Water
M-157
Gal
50
0.30
15.00
1.06 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
09.02
Amount
6.00
-
3,300.00
165.00
160.00
7,998.00
7,998.00
Rate(Say)
1 Sq
7,998.00
Rate(Say)
1ft2
79.98
Rate(Say)
1m
860.58
Ground floor
1m2
860.58
First Floor
1m2
903.61
Second Floor
1m
948.79
Third Floor
1m2
996.23
No
Item Description
Item Ref
Unit
Quantity
M-019
No
1090
1.03 Cement
M-026
Bag
1.04 Sand
M-113
Cu
1.05 Water
M-157
1.06 Mason
1.07 U / SK Labour
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
Rate
Sqr
Rate
Amount
6.00
-
6,540.00
327.00
660.00
1,980.00
0.2
3,000.00
600.00
Gal
115
0.30
34.50
L-009
Day
2.25
1,200.00
2,700.00
L-007
Day
3.75
700.00
2,625.00
Total for
Sqr
Rate for 1
Sqr
159.75
14,966.25
14,966.25
Rate(Say)
1 Sq
14,966.00
Rate(Say)
149.66
1ft
1m2
Rate(Say)
09.03
1,610.34
Ground floor
1m
1,610.34
First Floor
1m2
1,690.86
Second Floor
1m
1,775.40
Third Floor
1m2
1,864.17
No
Item Description
Item Ref
Unit
Quantity
M-019
No
1450
1.03 Cement
M-026
Bag
1.04 Sand
M-113
Cu
1.05 Water
M-157
1.06 Mason
1.07 U / SK Labourer
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
09.04
Page 46 Of 115
Cube
Rate
6.00
-
Amount
8,700.00
435.00
660.00
2,640.00
0.25
3,000.00
750.00
Gal
150
0.30
45.00
L-009
Day
1,200.00
3,600.00
L-007
Day
700.00
2,800.00
Total for
Cube
Rate for 1
Cube
18,970.00
18,970.00
Rate(Say)
1 Cu
18,970.00
Rate(Say)
1ft3
189.70
Rate(Say)
1m3
6,703.18
No
Item Description
Cube
Item Ref
Unit
Quantity
M-019
No
1450
1.03 Cement
M-026
Bag
2.333
660.00
1,539.78
1.04 Sand
M-113
Cu
0.375
3,000.00
1,125.00
1.05 Water
M-157
Gal
150
0.30
45.00
1.06 Mason
L-009
Day
1,200.00
3,600.00
1.07 U / SK Labourer
L-007
Day
700.00
2,800.00
Total for
Cube
Rate for 1
Cube
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
Rate
6.00
-
Amount
8,700.00
435.00
18,244.78
18,244.78
Rate(Say)
1 Cu
18,245.00
Rate(Say)
1ft3
182.45
Rate(Say)
1m3
6,447.00
Page 47 Of 115
09.05
Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
1630
1.03 Cement
M-026
Bag
4.5
660.00
2,970.00
1.04 Sand
M-113
Cu
0.3
3,000.00
900.00
1.05 Water
M-157
Gal
170
0.30
51.00
1.06 Mason
L-009
Day
3.5
1,200.00
4,200.00
1.07 U / SK Labourer
L-007
Day
5.5
700.00
3,850.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for wastage
1.08
09.06
Rate
Amount
6.00
-
9,780.00
489.00
161.00
22,401.00
22,401.00
Rate(Say)
1 Sq
22,401.00
Rate(Say)
1ft2
224.01
Rate(Say)
1m2
2,410.35
Ground floor
1m2
2,410.35
First Floor
1m2
2,651.38
Second Floor
1m
2,916.52
Third Floor
1m2
3,208.17
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
1090
1.03 Cement
M-026
Bag
1.75
660.00
1,155.00
1.04 Sand
M-113
Cu
0.3
3,000.00
900.00
1.05 Water
M-157
Gal
115
0.30
34.50
1.06 Mason
L-009
Day
2.25
1,200.00
2,700.00
1.07 U / SK Labourer
L-007
Day
700.00
2,100.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
Rate
6.00
-
Amount
6,540.00
327.00
144.00
13,900.50
13,900.50
Rate(Say)
1 Sq
13,901.00
Rate(Say)
1ft2
139.01
1m2
Rate(Say)
09.07
Page 48 Of 115
1,495.75
Ground floor
1m
1,495.75
First Floor
1m2
1,645.32
Second Floor
1m
1,809.85
Third Floor
1m2
1,990.84
4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
brickwork measured separately)
Analysis for
1
Sqr
No
Item Description
Item Ref
Unit
Quantity
M-164
No
550
1.03 Cement
M-026
Bag
1.2
660.00
792.00
1.04 Sand
M-113
Cu
0.08
3,000.00
240.00
1.05 Water
M-157
Gal
30
0.30
9.00
1.06 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
Sqr
Rate for 1
Sqr
1.08
09.08
Rate
Amount
8.75
-
4,812.50
96.25
96.00
9,245.75
9,245.75
Rate(Say)
1 Sq
9,246.00
Rate(Say)
1ft2
92.46
Rate(Say)
1m2
994.87
Ground floor
1m
994.87
First Floor
1m2
1,094.36
Second Floor
1m
1,203.79
Third Floor
1m2
1,324.17
9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)
Analysis for
No
Item Description
Sq
Item Ref
Unit
Quantity
M-164
No
1060
1.03 Cement
M-026
Bag
2.5
660.00
1,650.00
1.04 Sand
M-113
Cu
0.18
3,000.00
540.00
1.05 Water
M-157
Gal
100
0.30
30.00
1.06 Mason
L-009
Day
2.25
1,200.00
2,700.00
1.07 U / SK Labourer
L-007
Day
3.75
700.00
2,625.00
Rate
8.75
-
Amount
9,275.00
371.00
1.08
09.10
Page 49 Of 115
Total for
Sq
Rate for 1
Sq
159.75
17,350.75
17,350.75
Rate(Say)
1 Sq
17,351.00
Rate(Say)
1ft2
173.51
Rate(Say)
1m2
1,866.97
Ground floor
1m
1,866.97
First Floor
1m2
2,053.66
Second Floor
1m
2,259.03
Third Floor
1m2
2,484.93
13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
measured separately)
Analysis for
1
Sqr
No
Item Description
Item Ref
Unit
Quantity
M-164
No
1630
1.03 Cement
M-026
Bag
4.5
660.00
2,970.00
1.04 Sand
M-113
Cu
0.3
3,000.00
900.00
1.05 Water
M-157
Gal
50
0.30
15.00
1.06 Mason
L-009
Day
3.75
1,200.00
4,500.00
1.07 U / SK Labourer
L-007
Day
5.5
700.00
3,850.00
Total for
Sqr
Rate for 1
Sqr
1.08
09.11
Rate
Amount
8.75
-
14,262.50
285.25
167.00
26,949.75
26,949.75
Rate(Say)
1 Sq
26,950.00
Rate(Say)
1ft2
269.50
Rate(Say)
1m2
2,899.82
Ground floor
1m
2,899.82
First Floor
1m2
3,189.80
Second Floor
1m2
3,508.78
Third Floor
1m2
3,859.66
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground
floor
Analysis for
1
Sqr
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
0.5
660.00
330.00
1.02 Sand
M-113
Cu
0.01
3,000.00
30.00
Page 50 Of 115
1.03 Acid
M-001
Gal
0.1
254.00
1.04 Water
M-157
Gal
10
0.30
3.00
1.05 Mason
L-009
Day
1,200.00
6,000.00
1.06 U / SK Labourer
L-007
Day
3.5
700.00
2,450.00
Total for
Sqr
Rate for 1
Sqr
09.12
25.40
8,838.40
8,838.40
Rate(Say)
1 Sq
8,838.00
Rate(Say)
1ft2
88.38
Rate(Say)
1m2
950.97
No
Sqr
Item Ref
Unit
Quantity
1.01 Bricks
M-019
No
350
6.00
2,100.00
M-115
Lbs
1.2
275.00
330.00
1.03 Sand
M-113
Cu
0.11
3,000.00
330.00
1.04 Water
M-157
Gal
45
0.30
13.50
1.05 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06 U / SK Labourer
L-007
Day
2.5
700.00
1,750.00
Total for
Sqr
Rate for 1
Sqr
09.13
Item Description
Rate
Amount
6,023.50
6,023.50
Rate(Say)
1 Sq
6,024.00
Rate(Say)
1ft2
60.24
Rate(Say)
1m2
648.18
Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
rendering including necessary excavation.
Analysis for
10
L.ft
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
1.01 Bricks
M-019
No
120
6.00
720.00
1.02 Cement
M-026
Bag
0.5
660.00
330.00
1.03 Sand
M-113
Cu
0.05
3,000.00
150.00
1.04 Water
M-157
Gal
15
0.30
4.50
1.05 Mason
L-009
Day
0.5
1,200.00
600.00
1.06 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
10
L.ft
Rate for 1
L.ft
2,154.50
215.45
Rate(Say)
1 ft
215.45
Rate(Say)
1m
706.68
Page 51 Of 115
09.14
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for
10
L.ft
No
Item Ref
Unit
Quantity
1.01 Bricks
M-019
No
140
6.00
840.00
1.02 Cement
M-026
Bag
0.8
660.00
528.00
1.03 Sand
M-113
Cu
0.05
3,000.00
150.00
1.04 Water
M-157
Gal
20
0.30
6.00
1.05 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06 U / SK Labourer
L-007
Day
1.25
700.00
875.00
Total for
10
L.ft
Rate for 1
L.ft
09.15
Item Description
Rate
Amount
3,899.00
389.90
Rate(Say)
1 ft
389.90
Rate(Say)
1m
1,278.87
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for
No
Item Description
10
L.ft
Item Ref
Unit
Quantity
Rate
Amount
1.01 Bricks
M-019
No
110
6.00
660.00
1.02 Cement
M-026
Bag
0.7
660.00
462.00
1.03 Sand
M-113
Cu
0.04
3,000.00
120.00
1.04 Water
M-157
Gal
15
0.30
4.50
1.05 Mason
L-009
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
1.25
700.00
875.00
Total for
10
L.ft
Rate for 1
L.ft
3,321.50
332.15
Rate(Say)
1 ft
332.15
Rate(Say)
1m
1,089.45
Page 52 Of 115
Page 53 Of 115
B.
Roof Plumbing
Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate
, beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for
6
Sqrs
No
Item Description
Item Ref
Unit
Quantity
M-136
Cu.ft
34
M-149
L.ft
660
396.00
M-163
Lbs
25.00
200.00
M-162
Lbs
25.00
50.00
1.07 Carpenter
L-008
Day
1,200.00
8,400.00
1.08 U / SK Labourer
L-007
Day
700.00
5,600.00
Total for
Sqrs
Rate for 1
Sqrs
Rate
1,200.00
Amount
40,800.00
4,080.00
12.00
7,920.00
67,446.00
11,241.00
Rate(Say)
11,241.00
10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
Analysis for
No
Item Description
Item Ref
Unit
Quantity
1.01 Tiles
M-108
No
750
1.02 Carpenter
L-008
Day
1.03 U / SK Labourer
L-007
Sqrs
Rate
Amount
16.00
12,000.00
1,200.00
3,600.00
Day
700.00
2,100.00
Total for
Sqrs
Rate for 1
Sqrs
17,700.00
2,950.00
Rate(Say)
2,950.00
10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Analysis for
No
Item Description
3.6
Item Ref
Unit
Quantity
M-136
Cu.ft
13.25
L-008
Day
2.5
Sqrs
Rate
1,200.00
1,200.00
Amount
15,900.00
1,590.00
3,000.00
1.04 U / SK Labourer
L-007
Day
Total for
3.6
Sqrs
Rate for 1
Sqrs
700.00
22,590.00
6,275.00
Rate(Say)
10.A.04
Page 54 Of 115
2,100.00
6,275.00
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
separately)
Analysis for
3.6
Sqrs
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
M-003
Sq.ft
420
26.00
10,920.00
M109
No
72
3.50
252.00
1.03 Carpenter
L-008
Day
1,200.00
1,200.00
1.04 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
3.6
Sqrs
Rate for 1
Sqrs
13,772.00
3,825.56
Rate(Say)
3,826.00
10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-056
No
650
1.02 U / SK Labourer
L-007
Day
Total for
Sqr
Rate for 1
Sqr
Sqr
Rate
Amount
5.00
3,250.00
700.00
1,400.00
4,650.00
4,650.00
Rate(Say)
1 Sqr
4,650.00
10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Analysis for
No
Item Description
13.33
L.ft.
Item Ref
Unit
Quantity
M-106
Pair
245.00
980.00
M-110
No
16
3.50
56.00
1.03 Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04 U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
13.33
L.ft.
Rate for 1
L.ft.
Rate(Say)
Rate
Amount
1,511.00
113.35
1 L.ft
10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
113.00
Analysis for
No
Item Description
12
L.ft.
Rate
Page 55 Of 115
Item Ref
Unit
Quantity
Amount
M-105
No
35.00
315.00
1.02 Cement
M-o26
Bag
0.333
660.00
219.78
1.03 Sand
M-113
Cu
0.02
3,000.00
60.00
M-115
Lbs
15
275.00
4,125.00
M-036
Lbs
0.5
175.00
87.50
1.06 Mason
L-009
Day
0.25
1,200.00
300.00
1.07 U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
12
L.ft.
Rate for 1
L.ft.
5,282.28
440.19
Rate(Say)
440.00
10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
Analysis for
No
Item Description
100
Item Ref
Unit
Quantity
M-147
Sq.ft
75
M-015
No
100
1.04 Carpenter
L-008
Day
1.05 U / SK Labourer
L-007
L.ft.
Rate
65.00
-
Amount
4,875.00
243.75
3.75
375.00
1,200.00
3,600.00
Day
700.00
2,100.00
Total for
100
L.ft.
Rate for 1
L.ft.
285.00
11,478.75
114.79
Rate(Say)
115.00
10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Analysis for
No
Item Description
100
L.ft.
Item Ref
Unit
Quantity
M-147
Sq.ft
75
M-015
No
50
3.75
187.50
1.04 Carpenter
L-008
Day
1,200.00
3,600.00
1.05 U / SK Labourer
L-007
Day
700.00
2,100.00
Total for
100
L.ft.
Rate for 1
L.ft.
1.06
Rate(Say)
Rate
65.00
-
Amount
4,875.00
243.75
285.00
11,291.25
112.91
113.00
Page 56 Of 115
Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on
timber members.
Analysis for
15
L.ft.
No
Item Description
Item Ref
Unit
Quantity
M-052
Sheet
M-165
Gal
1.03 Cement
M-026
Rate
Amount
2,200.00
4,400.00
0.25
450.00
112.50
Bag
0.1
660.00
66.00
M-115
Lbs
0.05
275.00
13.75
1.05 Sand
M-113
Cu
0.01
3,000.00
30.00
M-141
Sq.ft
50
65.00
3,250.00
M-072
Lbs
50.00
100.00
1.08 Carpenter
L-008
Day
1,200.00
1,200.00
1.09 U / SK Labourer
L-007
Day
700.00
700.00
1.10 Tinker
L-005
Day
0.5
1,200.00
600.00
1.11 U / SK Labourer
L-007
Day
0.5
700.00
350.00
1.12 Mason
L-009
Day
0.25
1,200.00
300.00
1.13 U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
15
L.ft.
Rate for 1
L.ft.
11,297.25
753.15
Rate(Say)
753.00
18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for
No
Item Description
15
Item Ref
Unit
Quantity
M-052
Sheet
1.02 Cement
M-026
Bag
1.03 Sand
M-113
L.ft.
Rate
Amount
2,200.00
2,200.00
0.05
660.00
33.00
Cu
0.01
3,000.00
30.00
M-116
Lbs
13.75
13.75
1.05 Tinker
L-005
Day
0.5
1,200.00
600.00
1.06 Mason
L-009
Day
0.125
1,200.00
150.00
1.07 U / SK Labourer
L-007
Day
0.75
700.00
525.00
Total for
15
L.ft.
Rate for 1
L.ft.
Rate(Say)
3,551.75
236.78
237.00
Page 57 Of 115
10.B.03
6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
fixed at 18" centres (other specials paid seperately)
Analysis for
24
L.ft.
No
Item Ref
Unit
Quantity
M-088
No
0.00
1.02 Joiner
M-055
No
0.00
M-054
No
17
0.00
M-017
No
34
1.25
42.50
M-117
grms
20
1.40
28.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
1.07 U / SK Labourer
L-007
Day
0.5
700.00
350.00
1.08
Item Description
Rate
Amount
47.50
Total for
24
Rate for 1
L.ft.
L.ft.
1,068.00
44.50
Rate(Say)
1 L.ft.
45.00
No.
Item Ref
Unit
Quantity
M-089
No
0.00
M-055
No
0.00
M-054
No
0.00
M-017
No
1.25
5.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.125
1,200.00
150.00
1.07 U / SK Labourer
L-007
Day
0.125
700.00
87.50
1.08
Item Description
Rate
Amount
11.88
Total for
Rate for 1
No.
No.
271.18
271.18
Rate(Say)
1 No.
271.00
Item Description
No.
Item Ref
Unit
Quantity
Rate
Amount
M-091
No
0.00
M-055
No
0.00
Page 58 Of 115
M-054
No
0.00
M-017
No
1.25
5.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.125
1,200.00
150.00
1.07 U / SK Labourer
L-007
Day
0.125
700.00
87.50
1.08
11.88
Total for
Rate for 1
No.
No.
271.18
271.18
Rate(Say)
1 No.
271.00
No.
Item Ref
Unit
Quantity
M-087
No
0.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
700.00
43.75
1.08
Item Description
Amount
5.94
Total for
Rate for 1
No.
No.
141.49
141.49
Rate(Say)
10.B.07
Rate
1 No.
141.00
3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
specials paid seperately)
Analysis for
24
L.ft.
No
Item Ref
Unit
Quantity
M-078
No
0.00
M-090
No
0.00
M-104
No
0.00
M-014
No
2.50
20.00
M-117
grms
30
1.40
42.00
1.06 Plumber
L-002
Day
0.33
1,200.00
400.00
1.07 U / SK Labourer
L-007
Day
0.33
700.00
233.33
1.08
Item Description
Rate
Amount
31.67
Total for
24
Rate for 1
L.ft.
Rate(Say)
L.ft.
727.00
30.29
1 L.ft.
30.00
Page 59 Of 115
No.
Item Ref
Unit
Quantity
1.01 elbow
M-079
No
0.00
M-117
grms
32
1.40
44.80
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
700.00
43.75
1.08
Item Description
Rate
Amount
5.94
Total for
Rate for 1
No.
No.
169.49
169.49
Rate(Say)
1 No.
169.00
No.
Item Ref
Unit
Quantity
1.01 Shoe
M-099
No
0.00
M-117
grms
15
1.40
21.00
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
700.00
43.75
1.08
Item Description
Rate
Amount
5.94
Total for
Rate for 1
No.
Rate(Say)
No.
145.69
145.69
1 No.
146.00
Page 60 Of 115
Page 61 Of 115
Page 62 Of 115
valance board
barge board
Page 63 Of 115
Page 64 Of 115
B.
Ironmongery
11.A.01
Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3 1/4" X 2 1/4 ft.
timber frame(glazing, ironmongery & painting measured separately)
Analysis for
No
Item Description
22.75
Item Ref
Unit
Quantity
1.01
4"X3" Timber
M-138
Cu.ft
1.5
1.02
Spur Stone
M-118
No
1.03
M-045
1.04
1.05
Sq.ft
Rate
Amount
1,300.00
1,950.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
1.06
1 1/2" Planks
M-139
Sq.ft
14
140.00
1,960.00
1.07
1" Planks
M-139a
Sq.ft
110.00
550.00
1.08
Carpenter
L-008
Day
1,200.00
6,000.00
1.09
U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
Total for
22.75
Sq.ft
Rate for 1
Sq.ft
11,606.00
510.15
Rate(Say)
11.A.02
510.00
Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including 1 1/4" thick
sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)
Analysis for
No
Item Description
28
Item Ref
Unit
Quantity
1.01
4"X3" Timber
M-138
Cu.ft
1.66
1.02
Spur Stone
M-118
No
1.03
M-045
1.04
1.05
Sq.ft
Rate
Amount
1,300.00
2,158.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
1.06
1 1/2" Planks
M-139
Sq.ft
16
140.00
2,240.00
1.07
1" Planks
M-139a
Sq.ft
110.00
770.00
1.08
Carpenter
L-008
Day
1,200.00
7,200.00
1.09
U / SK Labourer
L-007
Total for
Rate for 1
Day
28
Sq.ft
700.00
13,864.00
Sq.ft
495.14
Rate(Say)
11.A.03
Page 65 Of 115
1,400.00
495.00
Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4" thick sash and 3 1/4"
x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)
Analysis for
No
Item Description
21.75
Item Ref
Unit
Quantity
1.01
4"X3" Timber
M-138
Cu.ft
1.8
1.02
Spur Stone
M-118
No
1.03
M-045
1.04
1.05
Sq.ft
Rate
Amount
1,300.00
2,340.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-074
No
2,000.00
2,000.00
1.06
Carpenter
L-008
Day
0.75
1,200.00
900.00
1.07
U / SK Labourer
L-007
Day
0.375
700.00
262.50
1.08
L-009
Day
0.25
1,200.00
300.00
1.09
L-007
Day
0.25
700.00
175.00
Total for
21.75
Sq.ft
Rate for 1
Sq.ft
6,061.50
278.69
Rate(Say)
11.A.04
279.00
Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame having 7/8" thick
tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing, Ironmongory and painting measured
separately)
Analysis for
16.25
Sq.ft
No
Item Description
Item Ref
Unit
Quantity
1.01
4"X3" Timber
M-138
Cu.ft
1.7
1.02
Spur Stone
M-118
No
1.03
M-045
1.04
1.05
Rate
Amount
1,300.00
2,210.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
1.06
1" Planks
M-139a
Sq.ft
21
110.00
2,310.00
1.07
M-015
No
36
3.75
135.00
1.08
Carpenter
L-008
Day
2.25
1,200.00
2,700.00
1.09
U / SK Labourer
L-007
Day
700.00
700.00
1.10
L-009
Day
0.25
1,200.00
300.00
1.11
L-007
Day
0.25
700.00
175.00
Total for
16.25
Rate for 1
Sq.ft
Page 66 Of 115
Sq.ft
8,626.00
530.83
Rate(Say)
11.A.05
531.00
window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable sashes and 3 1/4" x
2 1/4" frame and mullions (Glazing, Ironmongory and painting measured separately)
Analysis for
No
Item Description
28
Item Ref
Unit
Quantity
1.01
4"X3" Timber
M-138
Cu.ft
3.2
1.02
M-018
No
1.03
M-045
1.04
1 1/2" Planks
1.05
Sq.ft
Rate
Amount
1,300.00
4,160.00
7.50
30.00
No
1.50
6.00
M-139
Sq.ft
9.25
140.00
1,295.00
Carpenter
L-008
Day
1,200.00
7,200.00
1.06
U / SK Labourer
L-007
Day
2.5
700.00
1,750.00
1.07
L-009
Day
0.5
1,200.00
600.00
1.08
L-007
Day
0.5
700.00
350.00
28
Sq.ft
Total for
Rate for 1
15,391.00
Sq.ft
549.68
Rate(Say)
11.A.06
550.00
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut and fixed with
timber beadings to doors and windows.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sq.ft
Rate
Amount
1.01
Glass panes
M-027
Sq.ft
25.00
225.00
1.02
M-133
L.ft
30
1.50
45.00
1.03
M-013
Doz
1.00
4.00
1.04
Glazier
L-010
Day
0.5
1,200.00
600.00
1.05
U / SK Labourer
L-007
Day
0.5
700.00
350.00
Sq.ft
Total for
Rate for 1
1,224.00
Sq.ft
136.00
Rate(Say)
136.00
Ironmongery
11.B.01
No
1.01
Item Description
1.5
Item Ref
Unit
Quantity
M-023
No
Pair
Rate
70.00
Amount
210.00
1.25
Page 67 Of 115
1.02
M-017
No
24
1.03
Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04
U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
1.5
Pair
Rate for 1
Pair
715.00
476.67
Rate(Say)
11.B.02
30.00
477.00
No
Item Description
1.5
Item Ref
Unit
Quantity
Pair
Rate
Amount
1.01
Tee Hinges
M-128
Pair
165.00
165.00
1.02
M-061
No
18
0.55
9.90
1.03
Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04
U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
1.5
Pair
Rate for 1
Pair
649.90
433.27
Rate(Say)
11.B.03
433.00
Mortice Lock
Analysis for
No
Item Description
Item Ref
Unit
Quantity
1.01
M-070
No
1.02
Carpenter
L-008
Day
1.03
U / SK Labourer
L-007
Total for
Rate for 1
No
Rate
Amount
960.00
960.00
0.5
1,200.00
600.00
Day
0.5
700.00
350.00
No
1,910.00
No
1,910.00
Rate(Say)
11.B.04
1,910.00
Casement Stays
Analysis for
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
Casement Stays
M-025
No
55.00
220.00
1.02
M-016
No
16
1.30
20.80
1.03
Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04
U / SK Labourer
L-007
Day
0.25
700.00
175.00
No
Total for
Rate for 1
Rate(Say)
No
715.80
178.95
179.00
Page 68 Of 115
11.B.05
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
Door Closer
M-040
No
1,850.00
1,850.00
1.02
M-017
No
1.25
10.00
1.03
Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04
U / SK Labourer
L-007
Day
0.25
700.00
175.00
No
Total for
Rate for 1
2,335.00
No
2,335.00
Rate(Say)
11.B.06
2,335.00
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-153
No
145.00
145.00
1.02
M-016
No
10
1.30
13.00
1.03
Carpenter
L-008
Day
0.063
1,200.00
75.60
1.04
U / SK Labourer
L-007
Day
0.063
700.00
44.10
No
Total for
Rate for 1
277.70
No
277.70
Rate(Say)
11.B.07
278.00
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
Barrel Bolt
M-004
No
75.00
75.00
1.02
M-016
No
1.30
10.40
1.03
Carpenter
L-008
Day
0.063
1,200.00
75.60
1.04
U / SK Labourer
L-007
Day
0.063
700.00
44.10
No
Total for
Rate for 1
205.10
No
205.10
Rate(Say)
11.B.08
205.00
Casement Fasteners
Analysis for
No
1.01
Item Description
Casement Fasteners
Item Ref
Unit
Quantity
M-024
No
No
Rate
55.00
Amount
330.00
Page 69 Of 115
1.02
M-016
No
24
1.30
1.03
Carpenter
L-008
Day
0.5
1,200.00
600.00
1.04
U / SK Labourer
L-007
Day
0.5
700.00
350.00
No
Total for
Rate for 1
1,311.20
No
218.53
Rate(Say)
11.B.09
31.20
219.00
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-011
No
45.00
270.00
1.02
M-016
No
24
1.30
31.20
1.03
Carpenter
L-008
Day
0.5
1,200.00
600.00
1.04
U / SK Labourer
L-007
Day
0.5
700.00
350.00
No
Total for
Rate for 1
1,251.20
No
208.53
Rate(Say)
11.B.10
209.00
Draw Rings
Analysis for
No
Item Description
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
Draw Rings
M-041
No
22.50
135.00
1.02
M-016
No
12
1.30
15.60
1.03
Carpenter
L-008
Day
0.125
1,200.00
150.00
1.04
U / SK Labourer
L-007
Day
0.125
700.00
87.50
No
Total for
Rate for 1
Rate(Say)
No
388.10
64.68
65.00
Page 70 Of 115
Page 71 Of 115
Page 72 Of 115
Page 73 Of 115
1/2 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No
Item Description
10
Item Ref
Unit
Quantity
L.ft
Rate
Amount
1.01
M-095
L.ft
13
7.50
97.50
1.02
M-028
No
7.00
21.00
1.03
Solvent Cement
M-117
Grms
1.40
2.80
1.04
Plumber
L-002
Day
0.125
1,200.00
150.00
1.05
U / SK Labourer
L-007
Day
0.125
700.00
87.50
Total for
10
L.ft
Rate for 1
L.ft
358.80
35.88
Rate(Say)
12.02
1 L.ft
36.00
3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No
Item Description
10
Item Ref
Unit
Quantity
L.ft
Rate
Amount
1.01
M-098
L.ft
13
14.00
182.00
1.02
M-028
No
7.00
21.00
1.03
Solvent Cement
M-117
Grms
1.40
4.20
1.04
Plumber
L-002
Day
0.125
1,200.00
150.00
1.05
U / SK Labourer
L-007
Day
0.125
700.00
87.50
Total for
10
L.ft
Rate for 1
L.ft
444.70
44.47
Rate(Say)
12.03
1 L.ft
44.00
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
Rate
M-094
L.ft
100
105.00
21.00
Amount
1.01
2,100.00
1.02
1.03
M-077
No
14.00
112.00
1.04
Solvent Cement
M-117
Grms
32
1.40
44.80
1.05
M-028
No
35
7.00
245.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
1.07
U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
100
L.ft
Rate for 1
L.ft
3,556.80
35.57
Rate(Say)
12.04
1 L.ft
Page
74 Of 115
36.00
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
Rate
Amount
M-093
L.ft
100
160.00
1.01
32.00
1.02
1.03
M-101
No
19.50
156.00
1.04
Solvent Cement
M-117
Grms
48
1.40
67.20
1.05
M-030
No
35
8.75
306.25
1.06
Plumber
L-002
Day
0.75
1,200.00
900.00
1.07
U / SK Labourer
L-007
Day
0.75
700.00
525.00
Total for
100
L.ft
Rate for 1
L.ft
5,314.45
53.14
Rate(Say)
12.05
3,200.00
1 L.ft
53.00
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
M-092
L.ft
100
230.00
M-100
No
29.50
236.00
1.04
Solvent Cement
M-117
Grms
64
1.40
89.60
1.05
M-029
No
35
10.50
367.50
1.06
Plumber
L-002
Day
0.75
1,200.00
900.00
1.07
U / SK Labourer
L-007
Day
0.75
700.00
525.00
Total for
100
L.ft
Rate for 1
L.ft
1.01
1.02
1.03
Rate
4,600.00
6,948.10
69.48
Rate(Say)
12.06
Amount
46.00
1 L.ft
69.00
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
Rate
M-096
L.ft
100
395.00
79.00
Amount
1.01
7,900.00
1.02
1.03
M-102
No
48.00
384.00
1.04
Solvent Cement
M-117
Grms
112
1.40
156.80
1.05
M-031
No
35
10.75
376.25
1.06
Plumber
L-002
Day
0.75
1,200.00
900.00
1.07
U / SK Labourer
L-007
Day
0.75
Total for
100
L.ft
Rate for 1
L.ft
700.00
106.37
1 L.ft
No
Item Description
100
Item Ref
Unit
Quantity
M-097
L.ft
100
1.01
1.02
1.03
M-103
No
1.04
Solvent Cement
M-117
Grms
1.05
M-032
1.06
Plumber
1.07
U / SK Labourer
Rate
185.00
-
Amount
18,500.00
925.00
1,536.00
200
1.40
280.00
No
35
34.00
1,190.00
L-002
Day
1,200.00
1,200.00
L-007
Day
700.00
700.00
Total for
100
L.ft.
Rate for 1
L.ft.
24,331.00
243.31
1 L.ft
243.00
Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6" Deep, Backfilling
& Compacting
Analysis for
100
L.ft
No
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
2.25
Total for
100
L.ft
Rate for 1
L.ft
Rate
700.00
Amount
1,575.00
1,575.00
15.75
Rate(Say)
12.09
L.ft.
192.00
Rate(Say)
1.01
106.00
3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000
Analysis for
12.08
525.00
10,637.05
Rate(Say)
12.07
Page 75 Of 115
1 L.ft
16.00
Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good average depth 2" (Pipes
and specials paid separately)
Analysis for
100
L.ft
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
1.01
Cement
M-026
Bag
0.1
660.00
66.00
1.02
Sand
M-113
Cu
0.01
3,000.00
30.00
1.06
Mason
L-009
Day
1,200.00
3,600.00
1.07
U / SK Labourer
L-007
Day
700.00
2,100.00
Total for
100
L.ft
Rate for 1
L.ft
Rate(Say)
5,796.00
57.96
1 L.ft
58.00
12.10
Page 76 Of 115
Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and making good.
average depth 3" (Pipes and specials measured paid separately)
Analysis for
100
L.ft
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
1.01
Cement
M-026
Bag
0.2
660.00
132.00
1.02
Sand
M-113
Cu
0.03
3,000.00
90.00
1.06
Mason
L-009
Day
3.5
1,200.00
4,200.00
1.07
U / SK Labourer
L-007
Day
3.5
700.00
2,450.00
Total for
100
L.ft
Rate for 1
L.ft
68.72
Rate(Say)
12.11
6,872.00
1 L.ft
69.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-083
No
10
10.50
105.00
1.02
Solvent Cement
M-117
Grms
20
1.40
28.00
1.06
Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for 1
No
433.00
43.30
Rate(Say)
12.12
No
43.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-076
No
10
15.00
150.00
1.02
Solvent Cement
M-117
Grms
30
1.40
42.00
1.06
Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for 1
No
492.00
49.20
Rate(Say)
12.13
No
49.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-082
No
10
21.00
210.00
1.02
Solvent Cement
M-117
Grms
40
1.40
56.00
1.06
Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for 1
No
566.00
56.60
Rate(Say)
12.14
No
Page
77 Of 115
57.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-081
No
10
42.00
420.00
1.02
Solvent Cement
M-117
Grms
60
1.40
84.00
1.06
Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for 1
No
804.00
80.40
Rate(Say)
12.15
No
80.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-080
No
10
69.00
690.00
1.02
Solvent Cement
M-117
Grms
80
1.40
112.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
1,402.00
140.20
Rate(Say)
12.16
No
140.00
No
Item Description
10
No
Item Ref
Unit
Quantity
1.01
M-085
No
10
Rate
110.00
1,100.00
1.02
Solvent Cement
M-117
Grms
140
1.40
196.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
1,896.00
189.60
Rate(Say)
12.17
Amount
No
190.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-084
No
10
350.00
3,500.00
1.02
Solvent Cement
M-117
Grms
200
1.40
280.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
10
No
Total for
4,380.00
Rate for 1
Page 78 Of 115
No
438.00
Rate(Say)
12.18
No
438.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-086
No
10
580.00
5,800.00
1.02
Solvent Cement
M-117
Grms
240
1.40
336.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
6,736.00
673.60
Rate(Say)
12.19
No
674.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-122
No
10
15.50
155.00
1.02
Solvent Cement
M-117
Grms
30
1.40
42.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
797.00
79.70
Rate(Say)
12.20
No
80.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-126
No
10
21.50
215.00
1.02
Solvent Cement
M-117
Grms
45
1.40
63.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
878.00
87.80
Rate(Say)
12.21
No
88.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-120
No
10
31.25
312.50
1.02
Solvent Cement
M-117
Grms
60
1.40
84.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
Rate for 1
No
Page 79 Of 115
No
996.50
99.65
Rate(Say)
12.22
No
100.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-127
No
10
63.50
635.00
1.02
Solvent Cement
M-117
Grms
90
1.40
126.00
1.06
Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for 1
No
1,361.00
136.10
Rate(Say)
12.23
No
136.00
No
Item Description
10
No
Item Ref
Unit
Quantity
1.01
M-121
No
10
Rate
102.00
1,020.00
1.02
Solvent Cement
M-117
Grms
120
1.40
168.00
1.06
Plumber
L-002
Day
1,200.00
1,200.00
Total for
10
No
Rate for 1
No
2,388.00
238.80
Rate(Say)
12.24
Amount
No
239.00
No
No
Item Ref
Unit
Quantity
M-123
No
10
165.50
1,655.00
1.02
Solvent Cement
M-117
Grms
210
1.40
294.00
1.06
Plumber
L-002
Day
1,200.00
1,200.00
Total for
10
No
Rate for 1
No
1.01
Item Description
10
Rate
3,149.00
314.90
Rate(Say)
12.25
Amount
No
315.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-124
No
10
526.00
5,260.00
1.02
Solvent Cement
M-117
Grms
300
1.40
420.00
1.06
L-002
Plumber
Day
1.5
Total for
10
No
Rate for 1
No
1,200.00
7,480.00
748.00
Rate(Say)
12.26
Page 80 Of 115
1,800.00
No
748.00
No
Item Description
10
Item Ref
Unit
Quantity
No
Rate
Amount
1.01
M-125
No
10
875.00
8,750.00
1.02
Solvent Cement
M-117
Grms
360
1.40
504.00
1.06
Plumber
L-002
Day
1.5
1,200.00
1,800.00
Total for
10
No
Rate for 1
No
Rate(Say)
11,054.00
1,105.40
No
1,105.00
Page 81 Of 115
1/2 "
3/4"
1"
11/4"
11/2"
2"
21/2"
3"
Page 82 Of 115
13. Plastering
A.
Wall Plastering
B.
Rendering
C.
Sofit Plastering
D.
Skirting
Wall Plastering
13.A.01
5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
1.4
660.00
924.00
1.02
Sand
M-113
Cu
0.06
3,000.00
180.00
1.03
W ater
M-157
Gal
10
0.30
3.00
1.04
Mason
L-009
Day
1,200.00
1,200.00
1.05
U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
1.06
Sqr
Total for
Rate for 1
13.A.02
67.50
3,424.50
Sqr
3,424.50
Rate(Say)
1Sq
3,425.00
Rate(Say)
1ft
34.25
Rate(Say)
1m
368.53
5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
0.8
660.00
528.00
1.03
Sand
M-113
Cu
0.07
3,000.00
210.00
1.04
W ater
M-157
Gal
10
0.30
3.00
1.05
Mason
L-009
Day
1,200.00
1,200.00
1.06
U / SK Labourer
L-007
Day
1.25
700.00
875.00
Sqr
Total for
Rate for 1
2,816.00
Sqr
2,816.00
Rate(Say)
1Sq
2,816.00
Rate(Say)
1ft2
28.16
Rate(Say)
1m2
303.00
1m2
303.00
1m2
333.30
13.A.03
1m2
1m2
Page 83 Of 115
366.63
403.30
5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden float.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sq
Rate
Amount
1.01
Cement
M-026
Bag
0.8
660.00
528.00
1.02
Slaked Lime
M-115
Lbs
44
275.00
12,100.00
1.03
Sand
M-113
Cu
0.07
3,000.00
210.00
1.04
W ater
M-157
Gal
10
0.30
3.00
1.05
Mason
L-009
Day
1,200.00
1,200.00
1.06
U / SK Labourer
L-007
Day
1.25
700.00
875.00
1.07
Sqr
Total for
Rate for 1
13.A.04
62.25
14,978.25
Sqr
14,978.25
Rate(Say)
1Sq
14,978.00
Rate(Say)
1ft2
149.78
Rate(Say)
1m2
1,611.63
1m2
1,611.63
1m2
1,772.80
1m2
1,950.08
1m2
2,145.08
5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with lime putty floating.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
0.8
660.00
528.00
1.02
Slaked Lime
M-115
kg
30
275.00
8,250.00
1.03
Sand
M-113
Cu
0.07
3,000.00
210.00
1.04
W ater
M-157
Gal
10
0.30
3.00
1.05
Mason
L-009
Day
1.5
1,200.00
1,800.00
1.06
U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
1.07
Sqr
Total for
Rate for 1
85.50
11,926.50
Sqr
11,926.50
Rate(Say)
1Sq
11,927.00
Rate(Say)
1ft2
119.27
Rate(Say)
1m2
1,283.35
13.A.05
Page 84 Of 115
1m2
1,283.35
1m2
1,411.68
1m2
1,552.85
1m2
1,708.13
5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
1.01
Slaked Lime
M-115
kg
65
1.02
Sand
M-113
Cu
0.07
1.03
W ater
M-157
Gal
1.04
Mason
L-009
1.05
U / SK Labourer
1.06
Sqr
Rate
Amount
275.00
17,875.00
3,000.00
210.00
10
0.30
3.00
Day
1,200.00
1,200.00
L-007
Day
1.75
700.00
1,225.00
Sqr
Total for
Rate for 1
72.75
20,585.75
Sqr
20,585.75
Rate(Say)
1Sq
20,586.00
Rate(Say)
1ft2
205.86
Rate(Say)
1m2
2,215.05
Rendering
13.B.01
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
1.75
660.00
1,155.00
1.02
Sand
M-113
Cu
0.08
3,000.00
240.00
1.03
W ater
M-157
Gal
10
0.30
3.00
1.04
Mason
L-009
Day
1.25
1,200.00
1,500.00
1.05
U / SK Labourer
L-007
Day
700.00
1,400.00
1.06
U / SK Labourer - curing
L-007
Day
0.25
700.00
175.00
Sqr
Total for
Rate for 1
4,473.00
Sqr
4,473.00
Rate(Say)
1Sq
4,473.00
Rate(Say)
1ft2
44.73
Rate(Say)
1m2
481.29
Ground floor
1m2
481.29
First Floor
1m2
529.42
Second Floor
1m2
582.37
Third Floor
1m2
640.60
Page 85 Of 115
13.B.02
No
Item Description
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
1.07
660.00
706.20
1.02
Sand
M-113
Cu
0.05
3,000.00
150.00
1.03
W ater
M-157
Gal
10
0.30
3.00
1.04
Mason
L-009
Day
1,200.00
1,200.00
1.05
U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
Sqr
Total for
Rate for 1
13.B.03
3,109.20
Sqr
3,109.20
Rate(Say)
1Sq
3,109.00
Rate(Say)
1ft2
31.09
Rate(Say)
1m2
334.53
1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for
No
Item Ref
Item Description
Item Ref
Unit
Quantity
Sq
Rate
Amount
1.01
Cement
M-026
Bag
1.5
660.00
990.00
1.02
Sand
M-113
Cu
0.05
3,000.00
150.00
1.03
W ater
M-157
Gal
10
0.30
3.00
1.04
Mason
L-009
Day
1,200.00
1,200.00
1.05
U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
1.06
U / SK Labourer - curing
L-007
Day
0.25
700.00
175.00
Sq
Total for
Rate for 1
13.B.04
3,568.00
Sq
3,568.00
Rate(Say)
1Sq
3,568.00
Rate(Say)
1ft2
35.68
Rate(Say)
1m2
383.92
3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
2.25
660.00
1,485.00
1.02
Sand
M-113
Cu
0.08
3,000.00
240.00
1.03
W ater
M-157
Gal
10
0.30
3.00
1.04
Mason
L-009
Day
1.25
1,200.00
1,500.00
1.05
U / SK Labourer
L-007
Day
700.00
1,400.00
1.06
U / SK Labourer - curing
L-007
Day
0.25
700.00
175.00
Sqr
Total for
4,803.00
Rate for 1
13.B.05
Page 86 Of 115
Sqr
4,803.00
Rate(Say)
1Sq
4,803.00
Rate(Say)
1ft2
48.03
Rate(Say)
1m2
516.80
3/4" thick rendering in cement and sand 1:2 in colored cement floors finished smooth
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
2.25
660.00
1,485.00
1.02
Sand
M-113
Cu
0.08
3,000.00
240.00
1.03
Coloured Pigment
M-035
Lbs
175.00
875.00
1.04
W ater
M-157
Gal
10
0.30
3.00
1.05
Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06
U / SK Labourer
L-007
Day
700.00
1,400.00
1.07
U / SK Labourer - curing
L-007
Day
0.25
700.00
175.00
Sqr
Total for
Rate for 1
5,678.00
Sqr
5,678.00
Rate(Say)
1Sq
5,678.00
Rate(Say)
1ft2
56.78
Rate(Say)
1m2
610.95
Sofit Plastering
13.C.01
3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with Lime putty
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sqr
Rate
Amount
1.01
Cement
M-026
Bag
0.8
660.00
528.00
1.02
Slaked Lime
M-115
kg
275.00
2,200.00
1.03
Sand
M-113
Cu
0.05
3,000.00
150.00
1.04
W ater
M-157
Gal
0.30
1.50
1.05
Mason
L-009
Day
2.5
1,200.00
3,000.00
1.06
U / SK Labourer
L-007
Day
2.5
700.00
1,750.00
1.07
Sqr
Total for
Rate for 1
142.50
7,244.00
Sqr
7,244.00
Rate(Say)
1Sq
7,244.00
Rate(Say)
1ft2
72.44
Rate(Say)
1m2
779.45
Ground floor
1m2
779.45
First Floor
1m2
857.40
13.C.02
Second Floor
1m2
Third Floor
1m2
Page 87 Of 115
943.14
1,037.45
3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including floating with
Lime putty
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Sq
Rate
Amount
1.01
Cement
M-026
Bag
0.8
660.00
528.00
1.02
Slaked Lime
M-115
kg
275.00
2,200.00
1.03
Sand
M-113
Cu
0.05
3,000.00
150.00
1.04
W ater
M-157
Gal
0.30
1.50
1.05
Mason
L-009
Day
1,200.00
2,400.00
1.06
U / SK Labourer
L-007
Day
700.00
1,400.00
1.07
Sqr
Total for
Rate for 1
114.00
6,265.50
Sqr
6,265.50
Rate(Say)
1Sq
6,266.00
Rate(Say)
1ft2
62.66
Rate(Say)
1m2
674.22
Ground floor
1m2
674.22
First Floor
1m2
741.64
Second Floor
1m2
815.81
Third Floor
1m2
897.39
Skirting
13.D.01
1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with floating including
forming groove
Analysis for
No
Item Description
10
Item Ref
Unit
Quantity
1.01
Cement
M-026
Bag
0.1
1.02
Sand
M-113
Cu
1.03
Coloured Pigment
M-035
1.04
Mason
1.05
U / SK Labourer
L.ft
Rate
Amount
660.00
66.00
0.003
3,000.00
9.00
Lbs
0.25
175.00
43.75
L-009
Day
0.375
1,200.00
450.00
L-007
Day
0.312
700.00
218.40
Total for
10
L.ft
Rate for 1
L.ft
787.15
78.72
Rate(Say)
1ft
79.00
Rate(Say)
1m
259.12
Ground floor
1m
259.12
First Floor
1m
285.03
Second Floor
1m
3rd floor
1m
Page 88 Of 115
313.54
344.89
Page 89 Of 115
Page 90 Of 115
Page 91 Of 115
Page 92 Of 115
Page 93 Of 115
Page 94 Of 115
Page 95 Of 115
14. Tilling
A.
Wall Tilling
B.
Floor Tilling
Wall Tilling
14.A.01
No
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground
floor.(Specials measured separately)
Analysis for
1
Sqr
Item Description
Item Ref Unit Quantity
Rate
Amount
M-155
No
400
1.03 Cement
M-026
Bag
2.5
660.00
1,650.00
1.04 Sand
M-113
Cu
0.11
3,000.00
330.00
M-159
Lbs
17.50
17.50
1.06 Mason
L-009
Day
1,200.00
4,800.00
1.07 U / SK Labourer
L-007
Day
700.00
2,800.00
1.08 U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
Sqr
Rate for 1
Sqr
14.A.02
No
75.00
-
30,000.00
3,000.00
42,772.50
42,772.50
Rate(Say)
1Sq
42,773.00
Rate(Say)
1ft2
427.73
Rate(Say)
1m2
4,602.37
Ground floor
1m2
4,602.37
First Floor
1m2
5,062.61
Second Floor
1m2
5,568.87
Third Floor
1m2
6,125.76
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground
floor.(Specials measured separately)
Analysis for
1
Sqr
Item Description
Item Ref Unit Quantity
Rate
Amount
M-156
No
150
1.03 Cement
M-026
Bag
2.5
660.00
1,650.00
1.04 Sand
M-113
Cu
0.11
3,000.00
330.00
M-159
Lbs
17.50
17.50
1.06 Mason
L-009
Day
1,200.00
4,800.00
1.07 U / SK Labourer
L-007
Day
700.00
2,800.00
1.08 U / SK Labourer
L-007
Day
0.25
700.00
175.00
Total for
Sqr
100.00
-
15,000.00
1,500.00
26,272.50
Rate for 1
Page 96 Of 115
Sqr
26,272.50
Rate(Say)
1Sq
26,273.00
Rate(Say)
1ft2
262.73
Rate(Say)
1m2
2,826.97
Ground floor
1m2
2,826.97
First Floor
1m2
3,109.67
Second Floor
1m2
3,420.64
Third Floor
1m2
3,762.70
Floor Tilling
14.B.01
Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
M-132
No
100
1.03 Cement
M-026
Bag
1.25
660.00
825.00
1.04 Sand
M-113
Cu
0.07
3,000.00
210.00
M-035
Lbs
175.00
350.00
M-158
Lbs
0.5
150.00
75.00
M-037
Lbs
12.50
25.00
1.08 Mason
L-009
Day
1,200.00
4,800.00
1.09 U / SK Labourer
L-007
Day
700.00
2,100.00
1.10 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
150.00
Amount
15,000.00
750.00
24,485.00
24,485.00
Rate(Say)
1Sq
24,485.00
Rate(Say)
1ft2
244.85
Rate(Say)
1m2
2,634.59
Ground floor
1m2
2,634.59
First Floor
1m2
2,898.04
Second Floor
1m2
3,187.85
Third Floor
1m2
3,506.63
14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
M-130
No
225
1.03 Cement
M-026
Bag
1.25
660.00
825.00
1.04 Sand
M-113
Cu
0.07
3,000.00
210.00
125.00
Amount
28,125.00
1,406.25
Page 97 Of 115
M-036
Lbs
0.25
175.00
43.75
M-037
Lbs
12.50
25.00
1.07 Mason
L-009
Day
1,200.00
4,800.00
1.08 U / SK Labourer
L-007
Day
700.00
2,800.00
1.09 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
38,585.00
38,585.00
Rate(Say)
1Sq
38,585.00
Rate(Say)
1ft2
385.85
Rate(Say)
1m2
4,151.75
Ground floor
1m2
4,151.75
First Floor
1m2
4,566.92
Second Floor
1m2
5,023.61
Third Floor
1m2
5,525.97
Page 98 Of 115
Page 99 Of 115
15. Ceiling
15.01
Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Analysis for
No
Sqrs
Item Ref
Unit
Quantity
M-136
Cu.ft
1,200.00
9,600.00
M-072
Lbs
50.00
50.00
M-045
No
26
1.50
39.00
1.04 Cement
M-026
Bag
0.23
660.00
151.80
1.05 Sand
M-113
Cu
0.02
3,000.00
60.00
M-022
No
0.25
165.00
41.25
1.07 Tarnap
M-119
Gal
0.333
450.00
149.85
1.08 Carpenter
L-008
Day
2.5
1,200.00
3,000.00
1.09 Mason
L-009
Day
0.5
1,200.00
600.00
1.10 U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
Total for
1.95
Sqrs
Rate for 1
Sqrs
1.11
Item Description
1.95
Rate
139.50
14,881.40
7,631.49
Rate(Say)
15.02
Amount
7,631.00
Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
Analysis for
No
Item Description
1.95
Sqrs
Item Ref
Unit
Quantity
Rate
Amount
M-048
Sq.ft
210
15.00
3,150.00
M-145
Sq.ft
60
35.00
2,100.00
M-134
L.ft
125
12.00
1,500.00
M-033
lbs
0.25
25.00
6.25
M-015
No
96
3.75
360.00
1.06 Carpenter
L-008
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
1.08
L-007
Day
700.00
Total for
1.95
Sqrs
Rate for 1
Sqrs
96.00
10,412.25
5,339.62
Rate(Say)
15.03
1,400.00
5,340.00
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
Analysis for
No
Item Description
1.95
Sqrs
Item Ref
Unit
Quantity
M-146
L.ft
115
65.00
7,475.00
M-135
Sq.ft
215
28.00
6,020.00
1.03 Cement
M-026
Bag
0.027
660.00
17.82
1.04 Sand
M-113
Cu
0.04
3,000.00
120.00
M-012
lbs
50.00
440.53
L-009
Day
1,200.00
1,200.00
L-008
Day
1,200.00
1,200.00
L-007
Day
700.00
2,100.00
L-008
Day
1,200.00
3,600.00
L-007
Day
700.00
2,800.00
Total for
1.95
Sqrs
Rate for 1
Sqrs
1.06
Rate
Amount
327.00
25,300.35
12,974.54
Rate(Say)
15.04
12,975.00
3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
Analysis for
No
Item Description
6" x 3/4" Lunumidella Ceiling
1.01
Planks.
1.8
Item Ref
Unit
Quantity
M-135
Sq.ft
220
Sq
Rate
28.00
Amount
6,160.00
M-150
L.ft
40
5.00
200.00
M-073
Lbs
4.5
20.00
90.00
M-012
Lbs
50.00
440.53
1.05 Carpenter
L-008
Day
1,200.00
3,600.00
1.06 U / SK Labourer
L-007
Day
700.00
4,200.00
Total for
1.8
Sq
Rate for 1
Sq
1.07
Rate(Say)
234.00
14,924.53
8,291.40
8,291.00
16. Painting
A.
Wall
B.
Sofit
C.
Wood
D.
Steel
Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
1.01 Primer
M-075
litre
0.9
180.00
162.00
M-043
litre
1.4
280.00
392.00
1.03 Water
M-157
Gal
0.1
0.30
0.03
M-021
No
0.1
495.00
49.50
M-114
Sheet
3.50
7.00
1.06 Painter
L-001
Day
1.25
1,200.00
1,500.00
Total for
Sqr
Rate for 1
Sqr
45.00
2,155.53
2,155.53
Rate(Say)
1 Sq
2,156.00
Rate(Say)
1ft2
21.56
Rate(Say)
1m2
231.99
Ground floor
1m
231.99
First Floor
1m2
255.18
Second Floor
1m
280.70
Third Floor
1m2
308.77
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
M-043
litre
0.757
280.00
211.96
M-043
litre
0.649
280.00
181.72
M-021
No
0.1
495.00
49.50
1.04 Water
M-157
Gal
0.1
0.30
0.03
1.05 Painter
L-001
Day
0.75
1,200.00
900.00
Total for
Sqr
Rate for 1
Sqr
Rate(Say)
27.00
1,370.21
1,370.21
1 Sq
1,370.00
Rate(Say)
1ft2
Rate(Say)
1m
147.41
Ground floor
1m2
147.41
First Floor
1m
162.15
Second Floor
1m2
178.37
196.21
Third Floor
1m
13.70
Item Description
Analysis for
10
Item Ref Unit Quantity
Sqr
Rate
Amount
M-009
Cwt
0.5
300.00
150.00
1.02 Salt
M-112
Lbs
10.00
20.00
M-166
Lbs
0.5
15.00
7.50
1.04 Blue
M-008
Ozs
10.00
20.00
M-021
No
0.333
495.00
165.83
1.06 Water
M-157
Gal
10
0.30
3.00
1.07 Painter
L-001
Day
2.5
1,200.00
687.50
1.08 U / SK Labourer
L-007
Day
2.5
700.00
500.00
Total for
10
Sqr
Rate for 1
Sqr
35.63
1,589.46
158.95
Rate(Say)
1 Sq
159.00
Rate(Say)
1ft
1.59
Rate(Say)
1m2
17.11
Item Description
Analysis for
10
Item Ref Unit Quantity
Sqr
Rate
Amount
M-009
Cwt
0.5
300.00
150.00
1.02 Salt
M-112
Lbs
10.00
20.00
M-166
Lbs
0.5
15.00
7.50
1.04 Blue
M-008
Ozs
10.00
20.00
M-021
No
0.333
495.00
164.84
1.06 Water
M-157
Gal
10
0.30
3.00
1.07 Painter
L-001
Day
1,200.00
3,600.00
1.08 U / SK Labourer
L-007
Day
700.00
2,100.00
Total for
10
Sqr
Rate for 1
Sqr
171.00
6,236.34
623.63
Rate(Say)
1 Sqr
624.00
Rate(Say)
1ft2
6.24
1m2
Rate(Say)
16.A.05 Cement washing to walls of single storyed building 2 coats
Analysis for
10
No
Item Description
Item Ref Unit Quantity
Sqr
Rate
67.14
Amount
1.01 Cement
M-026
Bag
0.625
660.00
412.50
M-034
No
45.00
45.00
1.03 Water
M-157
Gal
0.30
1.50
1.04 Painter
L-001
Day
1,200.00
2,400.00
1.05 U / SK Labourer
L-007
Day
700.00
1,400.00
Total for
10
Sqr
Rate for 1
Sqr
1.06
114.00
4,373.00
437.30
Rate(Say)
1 Sq
437.00
Rate(Say)
1ft2
4.37
Rate(Say)
1m2
47.02
Ground floor
1m2
47.02
First Floor
1m
51.72
Second Floor
1m2
56.90
62.59
Third Floor
1m
Soffit
16.B.01
No
Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
slabs
Analysis for
1
Sq
Item Description
Item Ref Unit Quantity
Rate
Amount
1.01 Primer
M-075
litre
0.9
180.00
162.00
M-043
litre
1.5
280.00
420.00
1.03 Water
M-157
Gal
0.1
0.30
0.03
M-021
No
0.1
495.00
49.50
1.05 Painter
L-001
Day
1.75
1,200.00
2,100.00
Total for
Sq
Rate for 1
Sq
63.00
2,794.53
2,794.53
Rate(Say)
1 Sq
2,795.00
Rate(Say)
1ft
27.95
Rate(Say)
1m2
300.74
Ground floor
1m
300.74
First Floor
1m2
330.82
363.90
Second Floor
1m
1m2
Third Floor
400.29
Wood
16.C.01
No
Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
ends etc. after fixing.
Analysis for
1
Sqr
Item Description
Item Ref Unit Quantity
Rate
Amount
M-165
Gal
0.605
450.00
272.25
M-020
No
0.1
210.00
21.00
1.03 Painter
L-001
Day
0.75
1,200.00
900.00
1.04 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
1,543.25
1,543.25
Rate(Say)
1 Sq
1,543.00
Rate(Say)
1ft2
15.43
Rate(Say)
1m2
166.03
16.C.02 Painting new timber work with two coats wood preservative
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
M-165
Gal
0.5
450.00
225.00
M-022
No
0.2
165.00
33.00
1.03 Painter
L-001
Day
0.5
1,200.00
600.00
Total for
Sqr
Rate for 1
Sqr
858.00
858.00
Rate(Say)
1 Sq
858.00
Rate(Say)
1ft2
8.58
Rate(Say)
1m2
92.32
16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
1.01 Primer
M-075
litre
0.75
180.00
135.00
M-044
litre
2.5
400.00
354.00
M-022
No
0.1
60.00
165.00
M-114
No
3.50
7.00
1.05 Painter
L-001
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
Rate(Say)
2,811.00
2,811.00
1 Sq
2,810.00
Rate(Say)
1ft2
Rate(Say)
1m2
28.10
302.36
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
1.01 Varnish
M-154
litre
1.8
355.00
639.00
M-020
No
0.33
210.00
70.00
1.03 Painter
L-001
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
0.5
700.00
350.00
Total for
Sqr
Rate for 1
Sqr
1,659.00
1,659.00
Rate(Say)
1 Sq
1,660.00
Rate(Say)
1ft2
16.60
Rate(Say)
1m2
178.62
Item Description
Analysis for
1
Item Ref Unit Quantity
M-158
Lbs
0.75
M-114
Sheet
M-049
No
M-047
1.05 U / SK Labourer
Sqr
Rate
Amount
150.00
112.50
3.50
21.00
0.1
210.00
21.00
Yards
0.5
70.00
35.00
L-007
Day
0.375
700.00
262.50
Total for
Sqr
Rate for 1
Sqr
452.00
452.00
Rate(Say)
1 Sq
450.00
Rate(Say)
1ft2
4.50
Rate(Say)
1m2
48.42
Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for
1
Sqr
No
Item Description
Item Ref Unit Quantity
Rate
Amount
M-002
litre
2.25
245.00
551.25
M-069
litre
0.15
80.00
12.00
M-160
No
65.00
65.00
M-022
No
0.125
165.00
20.63
1.05 Painter
L-001
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
1.5
700.00
1,050.00
16.D.02
No
Total for
Rate for 1
Sqr
Sqr
3,498.88
3,498.88
Rate(Say)
1 Sq
3,500.00
Rate(Say)
1ft2
35.00
Rate(Say)
1m2
376.60
Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
erected steel roof truss.
Analysis for
1
Sqr
Item Description
Item Ref Unit Quantity
Rate
Amount
M-002
litre
0.2
245.00
49.00
M-044
litre
1.33
354.00
470.82
M-069
litre
0.2
80.00
16.00
M-022
No
0.2
165.00
165.00
1.05 Painter
L-001
Day
2.5
1,200.00
687.50
1.06 U / SK Labourer
L-007
Day
700.00
200.00
Total for
Sqr
Rate for 1
Sqr
26.63
1,614.95
1,614.95
Rate(Say)
1 Sq
1,610.00
Rate(Say)
1ft2
16.10
Rate(Say)
1m2
173.24
16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.
No
Item Description
Analysis for
50
Item Ref Unit Quantity
Sq.ft
Rate
Amount
M-002
litre
1.5
245.00
367.50
M-044
litre
0.67
354.00
237.18
M-069
litre
0.2
80.00
16.00
M-160
No
0.5
65.00
32.50
M-022
No
0.2
165.00
33.00
1.06 Painter
L-001
Day
0.5
1,200.00
600.00
1.07 U / SK Labourer
L-007
Day
0.75
700.00
525.00
Total for
50
Sq.ft
Rate for 1
Sq.ft
1,811.18
36.22
Rate(Say)
1 Sq. ft
40.00
Rate(Say)
1ft2
40.00
Rate(Say)
430.40
1m
No
Item Description
Analysis for
1
Item Ref Unit Quantity
Sqr
Rate
Amount
M-002
litre
0.667
245.00
163.42
M-022
No
0.2
165.00
33.00
1.03 Painter
L-001
Day
1.5
1,200.00
1,800.00
Total for
Sqr
Rate for 1
Sqr
1,996.42
1,996.42
Rate(Say)
1 Sqr
2,000.00
Rate(Say)
1ft
20.00
Rate(Say)
1m2
215.20