Bathroom

Work Tiles Breaking and Throwing Plumber Labour work All pipes and conceal material All walls levelling and plaster Door and window granite framing Tiles cost with labour charge (90psqft) Flooring with Labour charge Electric old replacing WC with seat cover Wash Basin Mirror

Status Cost Done for both 6000 Done for 1 11000 Done for 1 12500 Done for 1 9000 Done for both 10500 Partially done 28000 6000 7000 Done for 1 5000 OLD 2500 NA 1000 98500 NA NA NA NA NA NA NA NA 86400 59500 22400 32400 46000 100800 24000 60000 431500 23000 44800 39200 38500 29500 18500 35000 15000 22000 12000 9000 16000 27000 8000 14000 8000

Kitchen & Other

Kitchen Storage Trolley and door TV Unit with glass door Storage (Behind Door) Main & safety Door Hall Wardrobe Wardrobe upper storage Door and panel (4Door)

Hall

Glass and Door with fitting Maala TV Panel

NA

Windows & Others 3 Box Grill DONE*** SLIDING WINDOW 2 Bedroom window granite frame Done Hall window + Duct Done Breaking Lift and throwing Done Broken walls plastering with material Broken wall POP with material Hall & Kitchen Floor breaking & throwingDone Kitchen and duct tile fixing Partially Hall flowwing (sand & Cement) Kitchen flooring (sand & cement) Kitchen Platform (excluding granite) Done Broken wall POP with material

Electric work with material

40000 292500

Actual Expense 12000 11000 12500 9000 21000 28000

5000

98500

38500 18500 35000 15000

9000 16000

14000

244500

Bath 2

6000 11000 12500 9000 10500 28000 6000 7000 5000 2500 1000 0

197000

38500 18500 35000 15000 22000 12000 9000

14000

262500

Kitchen Storage Trolley and door Glass and Door with fitting Maala TV Panel TV Unit with glass door Storage (Behind Door) Main & safety Door Hall Wardrobe Wardrobe upper storage Door and panel (4Door)

86400 59500 23000 44800 39200 22400 32400 46000 100800 24000 60000 538500

3 Box Grill SLIDING WINDOW 2 Bedroom window granite frame Hall window + Duct Breaking Lift and throwing Broken walls plastering with material Broken wall POP with material Hall & Kitchen Floor breaking & throwing Kitchen and duct tile fixing Hall flowwing (sand & Cement) Kitchen flooring (sand & cement) Kitchen Platform (excluding granite) Broken wall POP with material Electric work with material

38500 29500 18500 35000 15000 22000 12000 9000 16000 27000 8000 14000 8000 40000 292500

Tiles Breaking and Throwing Plumber Labour work All pipes and conceal material All walls levelling and plaster Door and window granite framing Tiles cost with labour charge (90psqft) Flooring with Labour charge Electric old replacing WC with seat cover Wash Basin Mirror

6000 11000 12500 9000 10500 28000 6000 7000 5000 2500 1000 98500 86400 59500 22400 32400 46000 100800 24000 60000 431500 23000 44800 39200 38500 29500 18500 35000 15000 22000 12000 9000 16000 27000 8000 14000 8000 40000

197000 52500 35750 15750 26775 23500 91350 17000 20000 33900 23750 6650 5625 22500 9450 7000 40000 148875

Bath 2

Kitchen Storage Trolley and door TV Unit with glass door Storage (Behind Door) Main & safety Door Hall Wardrobe Wardrobe upper storage Door and panel (4Door) Glass and Door with fitting Maala TV Panel 3 Box Grill SLIDING WINDOW 2 Bedroom window granite frame Hall window + Duct Breaking Lift and throwing Broken walls plastering with material Broken wall POP with material Hall & Kitchen Floor breaking & throwing Kitchen and duct tile fixing Hall flowwing (sand & Cement) Kitchen flooring (sand & cement) Kitchen Platform (excluding granite) Broken wall POP with material Electric work with material

292500

6000 11000 12500 9000 10500 28000 6000 7000 5000 2500 1000 0

197000

38500 18500 35000 15000 22000 12000 9000

14000

262500