Professional Documents
Culture Documents
www.doble.no
Overview of presentation
Motivation and background
IEC 60099-5 available diagnostic methods Requirements
measurement on-side
www.doble.no
Why test Metal Oxide Surge Arresters? Utilize the lifetime of the operating MOSAs.
Sealing defects Discharging due to surface contamination Overloading Long term aging during normal service
www.doble.no
Degradation of MOSA One consequence of the degradation of the MOSA is an increase with time of the resistive component of the continuous leakage current Increase in resistive leakage current will cause an increase in power losses and hence increased temperature in ZnO-blocks The resistive current may exceed a critical limit where the accumulated energy in the ZnO-blocks exceeds the energy capability of the arrester. The arrester will then get thermally unstable and fail.
www.doble.no
Degradation of MOSA
An arrester failure may appear in different ways:
Arrester with porcelain housing may explode
The arrester can be causing an earth fault due to internal flashover Aged or overloaded arresters may have reduced protection against overvoltages, i.e. it is not protecting the apparatus it is supposed to protect.
www.doble.no
1. Metal Oxide Surge Arrester - MOSA 2. Separate grounding wire 3. Insulated base for each arrester
www.doble.no
Allows an easy on-line in service condition assessment test of the MOSA. Without insulated base you have to take the arrester out of service for proper condition testing. If a surge counter is present, the clip-on should be placed above the counter to avoid circulating currents from the counter ground loop.
www.doble.no
www.doble.no
Method B2 is ranked to be the best field method for evaluation of ageing and deterioration of MOSA.
www.doble.no
www.doble.no
This capacitive 3rd harmonic component will be added to 3rd harmonic component resistive component and create a measuring error.
the
www.doble.no
is a sensitive indicator of
www.doble.no
It
Ic 200-3000 A U
Ir 10-600A
Ir=It-Ic
www.doble.no
Itot increases with only 1,5% when the resistive vector is doubled This small change in Itot is not measurable at a mAmeter
Ic1= 100
Ic2=100
Usyst
www.doble.no
20 C and U/Ur=0.7
The resistive leakage current values will then be approximately the same independent of the test conditions by taking account of the ambient temperature and operating voltage, measurements performed under different conditions can be directly compared, and the measured values will be a reliable indicator of the arrester condition.
www.doble.no
www.doble.no
www.doble.no
Field Probe Rod delivered in separate transport case. Rod is divided on 3 pieces for 1m each piece.
Cannot be used as a Hot Stick!
www.doble.no
LCD display
www.doble.no
USB, RS232, Ethernet By connecting data cables to one of above ports, the instrument can communicate with a PC using the enclosed Windows based data management software LCMViewer.
www.doble.no
1-Field probe FP500 (antenna): Measures the capacitive current from the electric field surrounding the arrestor.
2
2-Clip-on current transformer CCT500: Measures the total current in the grounding cable of surge arrester.
www.doble.no
www.doble.no
Measurement System Test Teast : verify system Simul. : generate test signals Test Simul. Main
Measurement System Test Connect antenna to probe Start arrester and test signals before start Main
www.doble.no
LCM 500 Measurement System Test Failed CONTACT MANUFACTURER Measured: Ir:205 +/- 8A It:332 +/- 5A
www.doble.no
TROUBLE SHOOTING: - Be sure that all connections between field test cable crocodile clips are fasten properly to Field Probe - Observe that current loop is not in vicinity or not around antenna
www.doble.no
www.doble.no
Define database of your surge arrester and transfer this to the LCM 500, use Add to LCM Queue button. Software automatically will move you to Instrument tab. If you dont know the rated voltage, the software will recommend a proper value based on system voltage and arrester type.
www.doble.no
Use Send Data to LCM button in order send data to LCM 500 instrument.
www.doble.no
1. Choose instrument.
correct
ComPort for LCM 500 2. Use Test button to check status of your connection in Log
area.
www.doble.no
2.During field measurements grounding cable has to be connected to local earth system in the substation.
www.doble.no
www.doble.no
3
4 5 8 9
www.doble.no
www.doble.no
www.doble.no
Leanguage : English Dump mode : OFF Time : 10:30:45 Date : 2011.06.14 Backlight : 40 Baudrate : 57600 Serial # : 205039 Netw. Radio
<
Main
Time: battery backed real-time clock. Backlight: time in sec. the light in the LCD display is turned on. Baudrate:
baudrate defines the data transfer speed during communication with a PC and can be set to 9600 bit/sec. or 57600 bit/sec.
www.doble.no
www.doble.no
<
By pressing the MEAS button in the main menu, the screen presented on the left appears.
When database is transferred from the software, you will get access to it in this menu.
Main
If you press Setup in the above menu, you will enter the measuring set-up mode
www.doble.no
Station/Loc/Arrester: No station chosen No location chosen No arresrer chosen Installation # Run Auto Setup
<
Main
www.doble.no
Mode: In field test 3-phase mode should be set. 1-phase mode is for use in lab tests. Temp: Choose between manual automatically setting of the temperature. or
Meas
Main
Line: The line-to-line operating voltage. Choose between manual or automatic. Manual setting is the most common. Automatic is for connection to a PT combined with an adapter.
Transf: This ratio defines the voltage divider ratio of the voltage transformer that can be connected for automatic voltage measurements. The ratio can be set from 1:1 up to 1:10000 in steps.
www.doble.no
Station/Loc/Arrester: No station chosen No location chosen No arresrer chosen Installation # Run Auto Setup
<
Main
www.doble.no
Auto measurement Start :2011.02.10 < 16:11:25 Interval : 00:00:15 90005 STA A1 PH R Abort Run Main
STA A1 PH R Ir corr. 198A 5A It : 567 A Ir:172A 24 C 68kV AUTO, next measurement 2011.02.10 16:11:40 Abort
Function allows performe long-term monitoring of an surge arrester. The time and date for the first measurements can be set than by press button Run subseqent measurements will begin.
www.doble.no
Station/Loc/Arrester: No station chosen No location chosen No arresrer chosen Installation # Run Auto Setup
<
Main
www.doble.no
159A
0.8% 89 A 68 kV Main
current with standard deviation (corrected value with regard to ambient temperature and line voltage).
In addition the ambient temperature and the line voltage used during the measurement are displayed. To save your measurement, press the Store button
www.doble.no
Measurements
from
the
transfer take place your than only), Surge use all Arrester (Auto
Apply Measurements performed measurement will be add to existing Surge Arrester data.
www.doble.no
Test Conditions
You can observe factor of temperature, voltage and containing of 3th harmonic from taken measurements.
www.doble.no
www.doble.no
www.doble.com
Risk Assessment
www.doble.no
2. If Ir is higher than expected: Temporary heating of the ZnO-blocks inside?? Consider to retest in approximately 1 day to confirm the value.
3. If high reading is stable and confirmed, consider monitoring continuously or proceed with step 4. 4. Contact the arrester manufacturer and consider replacing
www.doble.no
200 %
150 %
100 %
www.doble.no
200 %
150 %
100 %
www.doble.no