13,000 Lane miles of roads to maintain 3,385 miles ha e ADTs of have 400 or less
CIR Solution
3 deep CIR 1.25 minus sizing 2 5% emulsion 2.5% l i 3.0% water Double chip seal or HMA overlay depending on traffic volume
CIR 3 deep
VS.
2 HMA Overlay
Savings =
Mix Designs
The mix design can be as varied as the conditions require, in this instance, the emulsion was 2.5% by weight of RAP Water was added at 3% by weight of RAP Other additives such as slurrys or foamed AC can also be added Various materials can be added to an existing roadway to create a new layer of recycled l d pavement t The Bearcat system is shown to the right.
Tank trailers deliver the asphalt emulsion and d water t to t the th job j b site it
Tankers stay y with the train during work and tank trailers shuttle to the supply point and return with materials. The production of the train is dependent upon the timing of these materials and the careful planning of transport to the supply point. Material can be laid on the surface ahead of this process as well by using a dry material spreader spreader.
RX 900 RX-900
The mill can work in either direction and has 950 HP diesel power power. Front or rear loading, UP or DOWN cutting, widths from 2.2 m to 3.8 m. Shown here is a 3.8 m (126) drum down cutting and rear loading to the RT-500. The RX-900 tows the RT-500 Screening, Mixing and Blending Trailer as well as the emulsion trailer and pushes the additive trailer.
An Asphalt Paving machine will be used d with ith grade d controls t l t to place l th the recycled mixture back onto the roadway in a uniform lift of material.
RT 500 RT-500
Precision machined surfaces provide 100% backing for hammers Two - Moveable Aprons to allow for proper sizing of material Spring Return on Moveable Aprons to eliminate shear bolts for tramp iron relief 1 (25 mm) Thick AR400 Liners on Aprons, (13 mm) AR400 frame or wall liners Hydraulically Lifted Upper Frame - Opens for complete internal access 150 hp (112 kW) electric motor drive. Fully enclosed belt guard
System is capable of spraying paving grade asphalt. Optional foam system can be added.
Discharge to Roadway
The material is mixed in the pugmill and dropped onto the roadway. Roadtec drops the material as close to the milling drum as possible to keep the open areas to a minimum aiding start up and shut down of work each hd day.
Compaction
Compaction of cold materials i d is done diff differently l than h h hot mix i asphalt. Normally N ll a 30 t ton multi-tire lti ti pneumatic roller and two double drum vibratory rollers push the water are used to p content out of the emulsion and consolidate the recycled materials.
The new layer of recycled material will create a barrier to keep the sub sub-base base cracking from coming to the new surface surface.
Summary
A final overlay will be added to the CIR material. CIR is a base material, i l a material i l that h retains i the h ability bili to k keep the h underlying d l i base cracks from migrating to the surface. The water Th t content t t of f the th emulsion l i must t be b eliminated li i t d b by compaction and drying. Often a fog seal is placed on this material shortly after compaction to keep rain from adding moisture to the material before the final paving is completed.