Photovoltaic plants ABB References


ABB Group May 10, 2012 | Slide 1

Totana PV Solar Plant


Customer need

Maximize the performance and reliability of the solar plant Get the plant in operation in less than 6 months

ABB response

ABB delivers the complete solar plant in consortium with a mechanical partner ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Commissioning

Totana PV Plant (Spain) Size: 1.045 MWp, fix instalaltion Customer: global capital finance ABB Scope: EPC Year of commissioning: EPC: 2008 Status: Connected to grid

Turn key installation, ground & civil works: Inverters, trackers, PV modules, d l t transformers f and d switchgears, it h cabinets, bi t h housing, i system t optimization, control, SCADA, security system, cabling, etc

Partner scope: PV modules.

Customer benefit

Reliable and efficient PV solar plant. Performance Ratio (PR) > 80% (normally PR 75%) Optimized O ti i d operation, ti control t l and d maintenance i t of f PV solar l plant l t( (sun t tracking, ki system optimization, control and protection, etc.) Totana produces 2.2 GWh per year displaces 2200 tons of greenhouse gas emissions e ss o s a annually ua y Client kept the deadline and qualified for Spanish feed-in tariff for solar plant

ABB Group May 10, 2012 | Slide 2

La Robla PV Solar Plant


Customer need

Maximize the performance and reliability of the solar plant Get the plant in operation in 3 months

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and Commissioning SCADA.

La Robla PV Plant (Spain) La Robla PV Plant (Spain) Size: 13.3 MWp, 11-axis Axis tracker Size: 20.2 MWp, tracking Customer: GA Solar Customer: GA Solar ABB Scope: EPC ABB Scope: EPC Year of commissioning: Year of commissioning: EPC: EPC: 2010 2010 Status: Connected to grid

Turn key installation, ground & civil works: Inverters, trackers, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Partner scope: PV modules.

Customer benefit

Reliable and efficient PV solar plant. Performance Ratio (PR) > 80% Optimized p operation, p , control and maintenance of PV solar p plant ( (sun tracking, g, system optimization, control and protection, etc.) La Robla produces 22.6 GWh per year displaces 11,500 tons of greenhouse gas emissions annually Client kept the deadline and qualified for Spanish feed-in tariff for solar plant

ABB Group May 10, 2012 | Slide 3

Golf PV Solar Plant


Customer need

Maximize the performance and reliability of the solar plant Get the plant in operation in 3 months

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and Commissioning SCADA.

Golf PV Plant La Robla PV (Spain) Plant (Spain) Size: 5.5 MWp, 1 Axis tracker Size: 20.2 MWp, 1-axis tracking Customer: GA Solar Customer: GA Solar ABB Scope: BOS ABB Scope: EPC Year of commissioning: Year of commissioning: EPC: EPC: 2010 2010 Status: Connected to grid

Turn key installation, ground & civil works: Inverters, trackers, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Partner scope: PV modules.

Customer benefit

Reliable and efficient PV solar plant. Performance Ratio (PR) > 80% Optimized p operation, p , control and maintenance of PV solar p plant ( (sun tracking, g, system optimization, control and protection, etc.) Client kept the deadline and qualified for Spanish feed-in tariff for solar plant

ABB Group May 10, 2012 | Slide 4

Aprilia 1 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete electrical solution to the EPC contractor ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line. Installation: inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Aprilia 1 PV Plant (Italy) Size: 9.7 MWp, fix installation Customer: Kinexia ABB Scope: eBoP Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 5

Sapeu PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Sapeu PV Plant (Italy) Size: 3.9 MWp, fix installation Customer: GA Solar ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 6

Monreale PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Monreale PV Plant (Italy) Size: 3.27 MWp, fix installation Customer: GA Solar ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 7

Francofonte PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Francofonte PV Plant (Italy) Size: 2.5 MWp, fix installation Customer: GA Solar ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 8

Duccotto PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability Fix and 2 axis Plant Polycrystalline, Monocrystalline & Thin Film panels.

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Duccotto PV Plant (Italy) Size: 7,7 MWp, Fix installation & 2 axis trackers Customer: GA Solar ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid
ABB Group May 10, 2012 | Slide 9

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, , transformers and switchgears, g , cabinets, , housing, g, system y optimization, control, SCADA, security system, cabling, etc

Macchia Rotonda 1 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Macchia Rotonda 1 PV Plant (Italy) Size: 3,3 MWp, p fix installation Customer: BYOM ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid
ABB Group May 10, 2012 | Slide 10

Macchia Rotonda 2 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Macchia Rotonda 2 PV Plant (Italy) Size: 3,3 MWp, p fix installation Customer: BYOM ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid
ABB Group May 10, 2012 | Slide 11

Schinosa PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Panels Panels, structure structure, inverter centers, centers DC & AC cabinets cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Schinosa PV Plant (Italy) Size: 1 MWp, fix installation Customer: Actelios ABB Scope: EPC Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 12

Armiento PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Armiento PV Plant (Italy) Size: 2 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 13

Inicorbaf PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Inicorbaf PV Plant (Italy) Size: 3 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 14

Iacovangelo PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Iacovangelo PV Plant (Italy) Size: 3,5 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 15

Furcas PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Furcas PV Plant (Italy) Size: 2,54 MWp Greenhouse roof top installation Customer: Amplio Group ABB Scope: eBoP Year of commissioning: EPC: 2010 Status: Connected to grid
ABB Group May 10, 2012 | Slide 16

Pinna PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete EBOP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Structure, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Structure Structure, inverter centers, centers DC & AC cabinets cabinets, transformers transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection

Pinna PV Plant (Italy) Size: 1,8 MWp Greenhouse roof top installation Customer: Amplio Group ABB Scope: eBoP Year of commissioning: EPC: 2010 Status: Connected to grid
ABB Group May 10, 2012 | Slide 17

Cardonita PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Cardonita PV Plant (Italy) Size: 3,8 MWp, fix installation Customer: Actelios ABB Scope: EPC Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 18

Spinasanta PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Spinasanta PV Plant (Italy) Size: 6 MWp, fix installation Customer: Actelios ABB Scope: EPC Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 19

Sugherotorto PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Sugherotorto PV Plant (Italy) Size: 3,2 MWp, fix installation Customer: Actelios ABB Scope: EPC Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 20

Borgo Montello PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers a complete BOS solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line Installation: Inverter centers, DC & AC cabinets, transformers, switchgears cabling switchgears, cabling, equipment housing housing, protection equipment equipment, MV connection line, PV modules electrical connection

Borgo Montello PV Plant (Italy) Size: 3,5 MWp, fix installation Customer: Geosol ABB Scope: eBoP Year of commissioning: EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 21

Sirkovce PV Solar Plant


Customer need

First class electrical systems Maximize plant performance and reliability ABB Supplies all the electrical equipment and its engineering. ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

ABB response

Supply: inverters inverters, DC & AC cabinets cabinets, transformers transformers, switchgears switchgears, cabling cabling, equipment housing. Installation: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing.

Sirkovce PV Plant (Slovakia) Size: 1 MWp, fix installation Customer: Enertec ABB Scope: Supplier Year of commissioning EPC: 2010 Status: Connected to grid

ABB Group May 10, 2012 | Slide 22

Canino PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation 150kV, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Canino PV Plant (Italy) Size: 24,2 MWp, 1 axis tracker Customer: Medenergy ABB Scope: EPC Year of commissioning: EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 23

Cairo Montenotte PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete solar plant in consortium with a solar manufacturer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Roof structure, DC cabinets, AC cabinets, inverters, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc.

Cairo Montenotte PV Plant (Italy) Size: 1 MWp, Roof top Customer: Peter ABB Scope: EPC Year of commissioning: EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 24

De Nittis 1 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete Balance of system of the solar PV Plant ( panels are supplied by customer ) ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

De Nittis 1 PV Plant(Italy) Size: 12,7 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 25

De Nittis 2 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete Balance of system of the solar PV Plant ( panels are supplied by customer ) ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

De Nittis 2 PV Plant (Italy) Size: 11,8 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 26

De Nittis 3 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete Balance of system of the solar PV Plant ( panels are supplied by customer ) ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

De Nittis 3 PV Plant (Italy) Size: 14,47 MWp, fix installation Customer: BYOM ABB Scope: BOS Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 27

Helios ITA 3.1 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete Balance of system of the solar PV Plant ( panels are supplied by customer ) ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Helios ITA 3.1 PV Plant (Italy) Size: 5,0 MWp, fix installation Customer: Etrion Corp. Corp ABB Scope: BOS Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 28

Helios ITA 3.2 PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete Balance of system of the solar PV Plant ( panels are supplied by customer ) ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Helios ITA 3.2 PV Plant (Italy) Size: 5,0 MWp, fix installation Customer: Etrion Corp. Corp ABB Scope: BOS Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 29

Tetbury PV Solar Plant


Customer needs

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB applied an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Substation, DC cabinets, AC cabinets, unit transformers, switchgears, i h equipment i h housing, i

Tetbury PV Plant (UK) Size: 1 MWp, fix installation Customer: Soostoom ABB Scope: eBoP Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 30

Malmesbury PV Solar Plant


Customer need

First class electrical systems Maximize plant performance and reliability

ABB response

ABB Supplies all the electrical equipment and its engineering. ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing.

Installation: inverters, DC & AC cabinets, transformers, switchgears, g, equipment q p housing. g cabling,

Malmesbury PV Plant (UK) Size: 5,2 MWp, fix installation Customer: SunStroom ABB Scope: Supplier Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 31

Prunu PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB Supplies all the equipment and engineering. ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, system optimization, control, SCADA

Installation: inverters, DC & AC cabinets, transformers, switchgears, g, equipment q p housing, g, system y optimization, p , control, , SCADA, , etc cabling,

Prunu PV (Corsica, France) Size: 4,4 MWp, fix installation Customer: Meeco ABB Scope: Supplier Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 32

Mezos PV Solar Plant


Customer need

PV facility on a fish farm roof (Wood structure) Architectural integration allows higher feed feed-in in tariff Optimal solution due to tight surface limitations

ABB response

ABB delivers the complete EBOP, panels and structures are supplied by the customer ABB applies an efficiency improvement system to maximize the overall performance f of f the th PV solar l plant l t ABB scope:

Mezos PV Plant (France) Size: 4.2 MWp, fix roof top Customer: Unit ABB Scope: eBoP Year of commissioning EPC: 2011 Status: Connected to grid

Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, housing system optimization, optimization control control, SCADA Installation: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, system optimization, control, SCADA, etc

ABB Group May 10, 2012 | Slide 33

Lethabo PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Lethabo PV Plant (South Africa) Size: 578 kWp, 1 axis tracker Customer: ESKOM ABB Scope: EPC Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 34

Kendal PV Solar Plant


Customer need

First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers the complete EPC ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Supply: Panels, DC cabinets, AC cabinets, unit transformers, switchgears, equipment housing, system optimization, control and SCADA. Turn key installation, ground & civil works: Inverters, structures, PV modules, transformers and switchgears, cabinets, housing, system optimization, control, SCADA, security system, cabling, etc

Kendal PV Plant (South Africa) Size: 620 kWp, fix installation Customer: ESKOM ABB Scope: EPC Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 35

Solarmo PV Solar Plant


Customer need

First class electrical systems Maximize plant performance and reliability

ABB response

ABB Supplies all the MV electrical equipment and its engineering. ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope: Supply: inverters, DC & AC cabinets, transformers, switchgears, cabling, equipment housing.

Installation: inverters, DC & AC cabinets, transformers, switchgears, g, equipment q p housing. g cabling,

Solarmo PV Plant (Germany) Size: 1,2 MWp, fix installation Customer: HaWi Project GmbH ABB Scope: Supplier Year of commissioning EPC: 2011 Status: Connected to grid

ABB Group May 10, 2012 | Slide 36

Nangal PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Nangal PV Plant (Punjab, India) Size: 1 MWp, fix installation Customer: Soma ABB Scope: eBoP Year of commissioning EPC: 2011 Status: Connected to grid

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, system optimization, control, SCADA Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection, system optimization, control, SCADA

ABB Group May 10, 2012 | Slide 37

Tinwari PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Tinwari PV Plant (Rajasthan, India) Size: 5 MWp, fix installation Customer: Moserbaer Photo Voltaic Ltd ABB Scope: p eBoP Year of commissioning EPC: 2011 Status: Connected to grid
ABB Group May 10, 2012 | Slide 38

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, system optimization, control, SCADA Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection, system optimization, control, SCADA

Bhilwara PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Bhilwara PV Plant (Rajasthan, India) Size: 5 MWp, fix installation Customer: Moserbaer Engineering and Constructions ABB Scope: p eBoP Year of commissioning EPC: 2012 Status: Under Construction
ABB Group May 10, 2012 | Slide 39

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, system optimization, control, SCADA Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection, system optimization, control, SCADA

Bolangir PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Bolangir PV Plant (Rajasthan, India) Size: 5 MWp, fix installation Customer: Moserbaer Engineering and Constructions ABB Scope: p eBoP Year of commissioning EPC: 2012 Status: Under Construction
ABB Group May 10, 2012 | Slide 40

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, system optimization, control, SCADA Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection, system optimization, control, SCADA

Bap PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Bap PV Plant (Rajasthan, India) Size: 5 MWp, fix installation Customer: Punj Lloyd Delta Renewables Private Limited ABB Scope: p eBoP Year of commissioning EPC: 2012 Status: Under Construction
ABB Group May 10, 2012 | Slide 41

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, system optimization, control, SCADA Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, PV modules electrical connection, system optimization, control, SCADA

Sliven PV Solar Plant


Customer need

Single point of responsibility for all the electrical works and equipment Cost economic solution Reduced project lead time First class automation and electrical systems Maximize plant performance and reliability

ABB response

ABB delivers an eBoP solution to the customer ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Sliven PV Plant (Bulgaria) Size: 9 MWp, fix installation Customer: SDN Company Ltd Ltd. ABB Scope: MV Turnkey Year of commissioning EPC: 2012 Status: Under Commissioning

Supply: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment Installation: Inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line

ABB Group May 10, 2012 | Slide 42

SLP Parking PV Solar Plant


Customer need

First class automation and electrical systems from ABB High quality PV modules and carport structures Short construction schedule Expertise in electrical connection to CFE Local footprint

ABB response

ABB delivers a complete p solution ABB partners with reputable contractors and suppliers to ensure highest project quality ABB scope: p

SLP PV Plant (San Luis Potos, Mexico) Size: 1,1 MWp, p Carport installation ABB Scope: EPC Year of commissioning EPC: 2012 Status: Under Construction
ABB Group May 10, 2012 | Slide 43

Supply: carports, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, SCADA system, PV modules. Turn key structures, inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, SCADA, PV modules, grid connection

APEX PV Solar Plant


Customer need

First class automation and electrical systems from ABB Short construction schedule Expertise in substation and HV grid connection to NV Energy

ABB response

ABB delivers the complete solution ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant ABB scope:

Apex PV Plant (Nevada, USA) Size: 24,8 MWp, 1 axis traxkers Customer: SunEdison ABB Scope: eBoP Year of commissioning EPC: 2012 Status: Under Construction

Supply: transformation centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, line SCADA system system, substation substation, overhead line for grid connection Installation: trackers, transformation centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, protection equipment, MV connection line, SCADA, PV modules, substation, overhead line for grid connection

ABB Group May 10, 2012 | Slide 44

Projects Photovoltaics
Order year 2008 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2011 2011 2011 2011 2011 2011 Country Spain I l Italy Italy Italy Italy Italy Italy Italy Italy Italy Italy Italy y Italy Italy Italy Italy Spain Spain France France Italy Italy Italy Italy Location Murcia Si il Sicily Sicilia Sicilia Sicilia Sicilia Lazio Sicily Lazio Puglia Puglia Puglia Puglia g Puglia Sicily Sicily Leon Leon Corsica Atlantic Pyrinees Liguria Lazio Sardinia Sardinia Customer Bridge Investment Capital G Gestamp Solar S l Actelios Solar Actelios Solar Actelios Solar Actelios Solar Geosol Gestamp Solar Volteo Energia (Kinexia) Macchia Rotonda s.r.l. Macchia Rotonda s.r.l. Macchia Rotonda s.r.l. Macchia Rotonda s.r.l. Emmessenne Gestamp Solar Gestamp Solar Gestamp Solar Gestamp Solar Ralos Unite Solar Peter Phenix Renewables Sardegna Agrienergia 4 Sardegna Agrienergia 5 Project Name Totana S Sapeu Schinosa Cardonita Spinasanta Sugherotorto Borgomontello Ducotto Aprilia Inicorbaf Macchia Rotonda Armiento Iacovangelo g De Nittis 1,2,3 Monreale Francofonte Golf La Robla Prunu Mezzos Cairo Montenotte Canino SAE Furcas SAE Pinna Capacity (MW) 1,0 39 3,9 1,0 3,8 6,0 3,3 3,4 7,3 9,2 3,0 6,6 2,0 3,5 , 39,0 3,2 2,7 62 6,2 13,3 4,4 4,2 10 1,0 24,1 2,5 1,8 Technology Tracker Fi d Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Tracker Tracker Fixed Fishfarmer Roof plant Tracker Greenhouse Greenhouse

Projects Photovoltaics
Order year 2011 2011 2011 2012 2011 2011 2011 2011 2011 2011 2011 2011 2012 2012 2012 2012 2012 Country Italy I l Italy Italy Mexico Slovakia Southafrica Southafrica United Kingdom United Kingdom Germany India India Bulgaria USA India India I di India Location Puglia P li Puglia Sicily San Luis Potos Sirkovce Johanesbrug Johanesbrug Gloucestershire Wiltshire Bavaria Punjab Rajasthan Sliven Nevada Rajasthan Rajasthan R j th Rajasthan Customer Helios ITA3 (controllata Etrion) H li ITA3 ( Helios (controllata ll E Etrion) i ) Gestamp Solar ABB Mexico Enertec Eskom Eskom Soostoom Sunstroom HaWi Project GMBH Soma Moserbaer Photo Voltaic Ltd SDN Company Ltd. Ltd Sun Edison Moserbaer Engineering Moserbaer Engineering P j Lloyd Punj Ll d Delta D lt Renewables R bl Project Name Brindisi M Mesagne Enerti 5 plants SLP Sirkovce Lethabo Kendal Tentbury Malmesbury Solarmo Nangal Tinwari Sliven Apex Bhilwara Bolangir B Bap Capacity (MW) 5,0 5,0 0 21,0 1,1 1,0 0,6 0,6 1,0 5,2 1,2 1,0 5,0 9 24,8 5,0 5,0 50 5,0 252,9 Technology Tracker T k Tracker Fixed Parking Lot Fixed Tracker Fixed Fixed Fixed Fixed Fixed Fixed Fixed Tracker Fixed Fixed Fi d Fixed

Total installed capacity (MW)

Summary y of Solar ABB references


PV PLANTS
More than 40 PV plants (EPC, BOS ) More than 120 PV plants ( EBOP ) More than 250 MWp grid connected More than 81 Mwp under erection More than 3.100 Mwp under negotiation 10 Countries (Spain, Italy, UK, France, South Africa, USA, Mexico, India, Bulgaria, Germany) Starting activities in many others countries ( Australia, Israel, China, Chile. Peru, Namibia, Mauritania, Brazil, Japan, Indonesia, Malaysia, Korea, Vietnam Morocco, Algeria )