You are on page 1of 8

MONTH OF JUNE-13

Gradation for Aggregates


Sl.No

Date

8.06.2013

Sieve
Analysis

FI

AIV
1

Combind
1

Concrete Cube Testing

Sieve
Cement Steel
Analysis of
FA
1

7 Days in Sets
Date
8.06.2013

Grade

Cubes

28 Days in Sets
Grade

M35 RCC

18.06.2013 M15 PCC

18.06.2013 M35 RCC

M35 RCC

18.06.2013 M35 PILE

M25 RCC

18.06.2013 M35 PILE

18.06.2013

19.06.2013 M40 RCC

19.06.2013 M35 RCC

Cubes

Age

Date
7
03.06.2013

10.06.2013

12.06.2013

M35 PILE

22.06.2013

M40 RCC

M35 RCC

M35 RCC

19.06.2013 M35 RCC

M35 PILE

10

19.06.2013 M35 RCC

M15 PCC

11

19.06.2013 M25 RCC

12

21.06.2013

M35 RCC

21.06.2013

M35 RCC

14

22.06.2013 M35 RCC

M35 RCC

15

22.06.2013 M35 RCC

M35 PILE

16

24.06.2013 M35 RCC

17

24.06.2013 M35 PILE

18

25.06.2013 M35 PILE

19

25.06.2013 M35 RCC

20

26.06.2013 M35 PILE

21

21.06.2013

26.06.2013

13

26.06.2013 M35 RCC

22

27.06.2013 M35 PILE

23

28.06.2013 M35 PILE

24

28.06.2013 M35 PILE

TOTAL

TOTAL Witnessed by
IE

Total No of Test
Conducted by EPC

30

7 Days
2

M35 RCC

21

28 Days

37

21
7 Days

30

30

30

30

No of Test Fail
* Steel Was tested in third Party lab
**Sand pouring cylinder was calibrated on 29.06.2013.
*** PQC Production Batching Plant at 13+00 LHS was Calibrated on 22.06.2013
**** Concrte Batching Plant at 2+600 RHS was Calibrated on 4.06.2013.

Testing for Soils

PQC Beam Testing

MDD&
CBR
OMC
GSB

Date

GSA

FSI

24.06.2013

25.06.2013

FDD
E/W

28

37

307

16

18

28 Days
114

TH OF JUNE-13
Testing for Soils
FDD
DLC

4
4
5

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping, Road Transport and Highways, Government of India)
Name of Work: -

Project Client : Concessionaire : Independent Consultant : Contractor

:
:
:
:

Design, Built, Finance, Operate and Transfer of 4 Lane of Baleswar -Jaleswar Section of NH-60 From Km
0+000 to Km 45+000 in the State of Orissa
National Highways Authority of India
Baleshwar Kharagpur Expressway Limited
Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.
M/s. NAPC LTD

WEATHER REPORT MONTH OF JUNE-13


Baleshwar Kharagpur Expressway Limited NH-60
80

40

Rainfall (mm)

Tempreture in C

35

70
60

30

50

25

40
30

20

20
15

10
0

10

Date

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Max Temp C

31.9 33.9 35.9 35.7 35.7 35.9 36.1 35.8 35.6 32.1 33.0 33.0 30.1 27.9 30.0 32.9 33.9 34.9 33.8 33.9 34.9 32.9 33.1 33.9 31.9 34.9 34.2 32.9 30.0 31.9

Min Temp C

25.2 27.8 27.8 27.4 27.7 27.2 28.1 28.2 28.1 28.6 28.1 26.6 26.6 26.3 26.3 28.1 28.5 27.2 27.6 27.2 27.7 28.1 27.8 27.0 28.0 27.8 27.5 28.1 27.7 27.3

Rainfall (mm)

2.2

6.5

40.6 54.8 70.3 25.2

4.4

12.5 42.6 18.6

4.4 13.2 20.0 10.4

15.0

Max Humi %

99.0 99.0 97.0 98.0 99.0 92.0 94.0 94.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 92.0

Mini Humi %

82.0 72.0 68.0 70.0 67.0 73.0 67.0 69.0 70.0 83.0 77.0 77.0 87.0 92.4 92.0 77.0 73.0 72.0 70.0 71.0 76.0 80.0 79.0 77.0 83.0 66.0 76.0 67.0 81.0 83.0

Climate
Date of Month

Legend

Maximum

Minimum

10

11

12

13

Sunny

14

15

16

17

Cloudy

18

19

20

21

Rain Fall

22

23

24

25

26

27

28

29

30

Baleshwar Kharagpur Expressway Limited NH-60


100.0
95.0
90.0
85.0
80.0
75.0
70.0
65.0
60.0
55.0
50.0
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
1

Maximum Humidity

10

11

12

13

14

15

16

MiniMum Humidity

17

18

19

20

21

22

23

24

25

26

27

28

29

30

YS AUTHORITY OF INDIA

port and Highways, Government of India)

e and Transfer of 4 Lane of Baleswar -Jaleswar Section of NH-60 From Km


tate of Orissa
f India
way Limited

Rain Fall (in mm)

ORT MONTH OF JUNE-13

Days
M15
7
4
28
13
Mix Design

M25
5
41
7 Days-

M35
48
128

M35 Pile M40 RCCC


38
19
99
26
28 Days-

Cement
3Days
7Days
28Days